0% found this document useful (0 votes)
13 views

Untitled - Complete

Etap data report

Uploaded by

hieu.huynh2001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Untitled - Complete

Etap data report

Uploaded by

hieu.huynh2001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

Project:

ETAP Page: 1
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total


Number of Buses: 2 0 22 24

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 0 0 16 0 6 24

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 2 0 0 0 2

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: RELAY1

Output Filename: C:\ETAP 1260\RELAY3\Untitled.SI2


Project:
ETAP Page: 2
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global 0

Cable Resistance: Yes Global 0


Project:
ETAP Page: 3
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 Load 110.000 110.000 1 100.00 0.00

Bus2 Load 22.000 22.000 1 100.00 0.00

Bus3 Load 22.000 22.000 1 100.00 0.00

Bus4 Load 22.000 22.000 1 100.00 0.00

Bus5 Load 22.000 22.000 1 100.00 0.00

Bus6 Load 22.000 22.000 1 100.00 0.00

Bus7 Load 22.000 22.000 1 100.00 0.00

Bus8 Load 22.000 22.000 1 100.00 0.00

Bus9 Load 22.000 22.000 1 100.00 0.00

Bus37 Load 110.000 110.000 1 100.00 0.00

Bus38 Load 22.000 22.000 1 100.00 0.00

Bus39 Load 22.000 22.000 1 100.00 0.00

Bus40 Load 22.000 22.000 1 100.00 0.00

Bus41 Load 22.000 22.000 1 100.00 0.00

Bus42 Load 22.000 22.000 1 100.00 0.00

Bus43 Load 22.000 22.000 1 100.00 0.00

Bus44 Load 22.000 22.000 1 100.00 0.00

Bus45 Load 22.000 22.000 1 100.00 0.00

Bus47 Load 110.000 110.000 1 100.00 0.00

Bus48 Load 110.000 110.000 1 100.00 0.00

Bus49 Load 110.000 110.000 1 100.00 0.00

Bus50 Load 110.000 110.000 1 100.00 0.00

Bus51 SWNG 110.000 110.000 1 100.00 0.00

Bus52 SWNG 110.000 110.000 1 100.00 0.00

24 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project:
ETAP Page: 4
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


Line1 5000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line2 4000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line3 2000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line4 4000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line5 2000.0 0.0 1 0 0.425 0.094 1.7 0.376

Line6 5000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line7 3000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line29 5000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line30 2000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line31 4000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line32 4000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line33 2000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line34 5000.0 0.0 1 0 0.85 0.188 3.4 0.752

Line35 3000.0 0.0 1 0 0.132 0.156 0.528 0.624

Line38 1000.0 0.0 1 0 1 40 3 120

Line39 1000.0 0.0 1 0 0.8 32 2.4 96

Line / Cable resistances are listed at the specified temperatures.


Project:
ETAP Page: 5
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T2 40.000 110.000 22.000 10.00 45.00 0 0 0 0 0 10.0000 YNyn 0.000

T6 40.000 110.000 22.000 10.00 45.00 0 0 0 0 0 10.0000 YNyn 0.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T2 40.000 110.000 22.000 Y/Y Solid Solid

T6 40.000 110.000 22.000 Y/Y Solid Solid


Project:
ETAP Page: 6
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T2 2W XFMR Bus1 Bus2 0.55 24.64 24.65

T6 2W XFMR Bus37 Bus38 0.55 24.64 24.65

Line1 Line Bus3 Bus2 13.64 16.12 21.11

Line2 Line Bus3 Bus4 70.25 15.54 71.95

Line3 Line Bus4 Bus5 35.12 7.77 35.97

Line4 Line Bus6 Bus3 10.91 12.89 16.89

Line5 Line Bus7 Bus6 17.56 3.88 17.99

Line6 Line Bus6 Bus8 87.81 19.42 89.93

Line7 Line Bus9 Bus6 8.18 9.67 12.67

Line29 Line Bus41 Bus38 13.64 16.12 21.11

Line30 Line Bus40 Bus39 35.12 7.77 35.97

Line31 Line Bus41 Bus40 70.25 15.54 71.95

Line32 Line Bus44 Bus41 10.91 12.89 16.89

Line33 Line Bus42 Bus44 35.12 7.77 35.97

Line34 Line Bus44 Bus43 87.81 19.42 89.93

Line35 Line Bus45 Bus44 8.18 9.67 12.67

Line38 Line Bus50 Bus49 0.83 33.06 33.07

Line39 Line Bus48 Bus47 0.66 26.45 26.45

CB_ Tie Breakr Bus2 Bus38

CB_1 Tie Breakr Bus48 Bus1

CB_2 Tie Breakr Bus51 Bus47

CB_3 Tie Breakr Bus37 Bus50

CB_4 Tie Breakr Bus52 Bus49

CB_13 Tie Breakr Bus1 Bus37


Project:
ETAP Page: 7
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type
U1 Bus51 5200.000 110.000 0.07686 1.92154 0.04 Wye - Solid

U5 Bus52 6000.000 110.000 0.06661 1.66534 0.04 Wye - Solid

Total Connected Power Grids ( = 2 ): 11200.000 MVA


Project:
ETAP Page: 8
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus1


Nominal kV = 110.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus1 Total 0.00 3.675 0.00 128.75 128.84 2.009 2.009 4.08E-001 1.57E+001 1.53E+000 5.48E+001

Bus2 Bus1 0.00 0.000 0.00 128.75 128.84 0.000 0.000

Bus38 Bus37 0.00 0.000 0.00 128.75 128.84 0.000 0.000

Bus49 Bus50 94.75 1.654 88.17 104.67 104.86 0.915 0.937 9.00E-001 3.49E+001 3.21E+000 1.17E+002

Bus47 Bus48 92.60 2.021 82.89 107.00 107.26 1.094 1.073 7.46E-001 2.86E+001 2.91E+000 1.03E+002

Bus3 Bus2 0.00 0.000 0.00 128.75 128.84 0.000 0.000

Bus41 Bus38 0.00 0.000 0.00 128.75 128.84 0.000 0.000

U5 Bus52 100.00 1.654 100.00 100.00 100.00 0.915 0.937 7.33E-002 1.83E+000 7.33E-001 1.83E+001

U1 Bus51 100.00 2.021 100.00 100.00 100.00 1.094 1.073 8.45E-002 2.11E+000 9.30E-001 2.33E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 3.675 2.009 3.183 3.258
Peak Current (kA), Method C : 10.013 5.474 8.672 8.877
Breaking Current (kA, rms, symm) : 2.009 3.183 3.258
Steady State Current (kA, rms) : 3.675 2.009 3.183 3.258

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 9
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus2


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total 0.00 10.298 0.00 119.01 119.14 7.031 7.031 6.82E-001 2.80E+001 1.80E+000 6.71E+001

Bus3 Bus2 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus1 Bus2 43.96 5.149 30.01 119.01 119.14 3.515 3.515 1.36E+000 5.60E+001 3.60E+000 1.34E+002

Bus41 Bus38 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus37 Bus38 43.96 5.149 30.01 119.01 119.14 3.515 3.515 1.36E+000 5.60E+001 3.60E+000 1.34E+002

Bus4 Bus3 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus6 Bus3 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus47 Bus48 95.85 1.132 88.03 104.77 104.97 0.766 0.751 7.46E-001 2.86E+001 2.91E+000 1.03E+002

Bus40 Bus41 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus44 Bus41 0.00 0.000 0.00 119.01 119.14 0.000 0.000

Bus49 Bus50 97.06 0.927 91.72 103.20 103.35 0.640 0.655 9.00E-001 3.49E+001 3.21E+000 1.17E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.298 7.031 8.918 9.314
Peak Current (kA), Method C : 28.122 19.200 24.354 25.436
Breaking Current (kA, rms, symm) : 7.031 8.918 9.314
Steady State Current (kA, rms) : 10.298 7.031 8.918 9.314

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 10
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus3


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total 0.00 6.221 0.00 123.41 127.91 3.674 3.674 1.43E+001 4.41E+001 5.63E+001 1.32E+002

Bus2 Bus3 45.49 6.221 53.74 113.12 104.31 3.674 3.674 1.43E+001 4.41E+001 5.63E+001 1.32E+002

Bus4 Bus3 0.00 0.000 0.00 123.41 127.91 0.000 0.000

Bus6 Bus3 0.00 0.000 0.00 123.41 127.91 0.000 0.000

Bus1 Bus2 68.22 3.110 66.67 113.12 104.31 1.837 1.837 1.36E+000 5.60E+001 3.60E+000 1.34E+002

Bus41 Bus38 45.49 0.000 53.74 113.12 104.31 0.000 0.000

Bus37 Bus38 68.22 3.110 66.67 113.12 104.31 1.837 1.837 1.36E+000 5.60E+001 3.60E+000 1.34E+002

Bus5 Bus4 0.00 0.000 0.00 123.41 127.91 0.000 0.000

Bus7 Bus6 0.00 0.000 0.00 123.41 127.91 0.000 0.000

Bus8 Bus6 0.00 0.000 0.00 123.41 127.91 0.000 0.000

Bus9 Bus6 0.00 0.000 0.00 123.41 127.91 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 6.221 3.674 5.387 5.641
Peak Current (kA), Method C : 12.232 7.225 10.593 11.091
Breaking Current (kA, rms, symm) : 3.674 5.387 5.641
Steady State Current (kA, rms) : 6.221 3.674 5.387 5.641

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 11
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus4


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus4 Total 0.00 2.789 0.00 128.66 132.87 1.454 1.454 8.46E+001 5.97E+001 3.37E+002 1.94E+002

Bus3 Bus4 69.51 2.789 72.50 114.71 100.59 1.454 1.454 8.46E+001 5.97E+001 3.37E+002 1.94E+002

Bus5 Bus4 0.00 0.000 0.00 128.66 132.87 0.000 0.000

Bus2 Bus3 86.62 2.789 90.35 106.55 97.23 1.454 1.454 1.43E+001 4.41E+001 5.63E+001 1.32E+002

Bus6 Bus3 69.51 0.000 72.50 114.71 100.59 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 2.789 1.454 2.415 2.504
Peak Current (kA), Method C : 4.078 2.127 3.532 3.662
Breaking Current (kA, rms, symm) : 1.454 2.415 2.504
Steady State Current (kA, rms) : 2.789 1.454 2.415 2.504

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 12
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus5


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus5 Total 0.00 2.101 0.00 129.68 132.95 1.079 1.079 1.20E+002 6.74E+001 4.78E+002 2.25E+002

Bus4 Bus5 26.18 2.101 26.90 122.38 121.23 1.079 1.079 1.20E+002 6.74E+001 4.78E+002 2.25E+002

Bus3 Bus4 78.55 2.101 80.70 111.28 99.11 1.079 1.079 8.46E+001 5.97E+001 3.37E+002 1.94E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 2.101 1.079 1.820 1.879
Peak Current (kA), Method C : 3.045 1.564 2.637 2.722
Breaking Current (kA, rms, symm) : 1.079 1.820 1.879
Steady State Current (kA, rms) : 2.101 1.079 1.820 1.879

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 13
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus6


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus6 Total 0.00 4.629 0.00 125.78 129.75 2.600 2.600 2.52E+001 5.70E+001 1.00E+002 1.83E+002

Bus3 Bus6 27.08 4.629 30.42 117.74 116.86 2.600 2.600 2.52E+001 5.70E+001 1.00E+002 1.83E+002

Bus7 Bus6 0.00 0.000 0.00 125.78 129.75 0.000 0.000

Bus8 Bus6 0.00 0.000 0.00 125.78 129.75 0.000 0.000

Bus9 Bus6 0.00 0.000 0.00 125.78 129.75 0.000 0.000

Bus2 Bus3 60.93 4.629 68.45 109.84 101.66 2.600 2.600 1.43E+001 4.41E+001 5.63E+001 1.32E+002

Bus4 Bus3 27.08 0.000 30.42 117.74 116.86 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 4.629 2.600 4.009 4.173
Peak Current (kA), Method C : 8.379 4.706 7.257 7.553
Breaking Current (kA, rms, symm) : 2.600 4.009 4.173
Steady State Current (kA, rms) : 4.629 2.600 4.009 4.173

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 14
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus7


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus7 Total 0.00 3.878 0.00 126.81 131.29 2.112 2.112 4.28E+001 6.09E+001 1.70E+002 1.99E+002

Bus6 Bus7 24.16 3.878 26.32 125.19 118.17 2.112 2.112 4.28E+001 6.09E+001 1.70E+002 1.99E+002

Bus3 Bus6 44.39 3.878 48.35 117.39 109.31 2.112 2.112 2.52E+001 5.70E+001 1.00E+002 1.83E+002

Bus8 Bus6 24.16 0.000 26.32 125.19 118.17 0.000 0.000

Bus9 Bus6 24.16 0.000 26.32 125.19 118.17 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 3.878 2.112 3.358 3.495
Peak Current (kA), Method C : 6.247 3.402 5.410 5.630
Breaking Current (kA, rms, symm) : 2.112 3.358 3.495
Steady State Current (kA, rms) : 3.878 2.112 3.358 3.495

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 15
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus8


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus8 Total 0.00 2.115 0.00 129.57 132.73 1.091 1.091 1.13E+002 7.65E+001 4.51E+002 2.61E+002

Bus6 Bus8 65.90 2.115 67.99 116.06 102.35 1.091 1.091 1.13E+002 7.65E+001 4.51E+002 2.61E+002

Bus3 Bus6 76.12 2.115 78.53 111.02 100.13 1.091 1.091 2.52E+001 5.70E+001 1.00E+002 1.83E+002

Bus7 Bus6 65.90 0.000 67.99 116.06 102.35 0.000 0.000

Bus9 Bus6 65.90 0.000 67.99 116.06 102.35 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 2.115 1.091 1.832 1.891
Peak Current (kA), Method C : 3.086 1.592 2.673 2.759
Breaking Current (kA, rms, symm) : 1.091 1.832 1.891
Steady State Current (kA, rms) : 2.115 1.091 1.832 1.891

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 16
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Fault at bus: Bus9


Nominal kV = 22.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus9 Total 0.00 3.870 0.00 126.90 130.41 2.126 2.126 3.34E+001 6.67E+001 1.33E+002 2.22E+002

Bus6 Bus9 16.98 3.870 18.65 121.43 122.63 2.126 2.126 3.34E+001 6.67E+001 1.33E+002 2.22E+002

Bus3 Bus6 39.62 3.870 43.53 114.91 112.61 2.126 2.126 2.52E+001 5.70E+001 1.00E+002 1.83E+002

Bus7 Bus6 16.98 0.000 18.65 121.43 122.63 0.000 0.000

Bus8 Bus6 16.98 0.000 18.65 121.43 122.63 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 3.870 2.126 3.351 3.477
Peak Current (kA), Method C : 6.775 3.722 5.868 6.087
Breaking Current (kA, rms, symm) : 2.126 3.351 3.477
Steady State Current (kA, rms) : 3.870 2.126 3.351 3.477

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 17
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground

ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus1 110.000 3.675 10.013 3.675 2.009 5.474 2.009 2.009 3.183 8.672 3.183 3.183 3.258 8.877 3.258 3.258
Bus2 22.000 10.298 28.122 10.298 7.031 19.200 7.031 7.031 8.918 24.354 8.918 8.918 9.314 25.436 9.314 9.314
Bus3 22.000 6.221 12.232 6.221 3.674 7.225 3.674 3.674 5.387 10.593 5.387 5.387 5.641 11.091 5.641 5.641
Bus4 22.000 2.789 4.078 2.789 1.454 2.127 1.454 1.454 2.415 3.532 2.415 2.415 2.504 3.662 2.504 2.504
Bus5 22.000 2.101 3.045 2.101 1.079 1.564 1.079 1.079 1.820 2.637 1.820 1.820 1.879 2.722 1.879 1.879
Bus6 22.000 4.629 8.379 4.629 2.600 4.706 2.600 2.600 4.009 7.257 4.009 4.009 4.173 7.553 4.173 4.173
Bus7 22.000 3.878 6.247 3.878 2.112 3.402 2.112 2.112 3.358 5.410 3.358 3.358 3.495 5.630 3.495 3.495
Bus8 22.000 2.115 3.086 2.115 1.091 1.592 1.091 1.091 1.832 2.673 1.832 1.832 1.891 2.759 1.891 1.891
Bus9 22.000 3.870 6.775 3.870 2.126 3.722 2.126 2.126 3.351 5.868 3.351 3.351 3.477 6.087 3.477 3.477

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project:
ETAP Page: 18
12.6.0H
Location: Date: 24-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: RELAY1 Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus1 110.000 0.49340 19.00252 19.00892 0.49340 19.00252 19.00892 1.84925 66.26948 66.29527 0.00000 0.00000 0.00000

Bus2 22.000 0.03299 1.35640 1.35680 0.03299 1.35640 1.35680 0.08722 3.24708 3.24825 0.00000 0.00000 0.00000

Bus3 22.000 0.69299 2.13640 2.24598 0.69299 2.13640 2.24598 2.72722 6.36708 6.92657 0.00000 0.00000 0.00000

Bus4 22.000 4.09299 2.88840 5.00953 4.09299 2.88840 5.00953 16.32722 9.37508 18.82738 0.00000 0.00000 0.00000

Bus5 22.000 5.79299 3.26440 6.64944 5.79299 3.26440 6.64944 23.12722 10.87908 25.55822 0.00000 0.00000 0.00000

Bus6 22.000 1.22099 2.76040 3.01838 1.22099 2.76040 3.01838 4.83922 8.86308 10.09813 0.00000 0.00000 0.00000

Bus7 22.000 2.07099 2.94840 3.60306 2.07099 2.94840 3.60306 8.23922 9.61508 12.66233 0.00000 0.00000 0.00000

Bus8 22.000 5.47099 3.70040 6.60490 5.47099 3.70040 6.60490 21.83922 12.62308 25.22486 0.00000 0.00000 0.00000

Bus9 22.000 1.61699 3.22840 3.61071 1.61699 3.22840 3.61071 6.42322 10.73508 12.50998 0.00000 0.00000 0.00000