HIRARC For INSTRUMENT AND CABLE INSTALLATION (UNITEN)
HIRARC For INSTRUMENT AND CABLE INSTALLATION (UNITEN)
2. Fix the Flow meter Excessive Potential to 1. Full supervision 1. To organize work Authorised Person
manual sustain body from supervisor. rotation. Engineer
handling injury and 2. Conduct Tool Box 2. To apply buddy system Supervisor
Musculoskeletal Talk on during work
4 2 8
Disorder manual,Puncturin 3. Work must be carried out
Syndrome (MSDs g hazard and by trained personnel.
control. 4. To wearing safety hand
3. To apply safety glove.
Exposed to Finger injury helmet, safety 1. To cordon off the working Authorised Person
sharp objects shoes/boots and area. Engineer
or materials. Bodily injury safety vest. 2. Work must be carried out Supervisor
4 2 8
by trained personnel.
3. To wearing safety hand
glove
3. Pressure Transmitter Exposed to Potential to 1. Full supervision 1. To make sure all panel live Authorised Person
Installation contact with cause by supervisor. supply been terminated Engineer
live electricity electrocuted 2. Conduct Tool Box 2. To practice Lock Out and Supervisor
supply Talk on electric Tag Out system (LOTO).
safety. 3. Work must be carried out
Incorrect 3. Wearing of safety by authorized and trained
2 5 10
wiring or helmet, safety personnel.
grounding shoes/boots and 4. To provide fire
safety vest extinguisher.
5. To follow the
manufacturer installation
instruction.
4. Delivering cable 1. Full supervision 1. To prepared safe Authorised Person
by supervisor. designated access and Engineer
2. Conduct daily egress road for Supervisor
Tool Box Talk construction machineries
relate to mobilization.
Machinery
Poor access transportation 2. To engage traffic
accident and 3 4 12
and egress safety. controller.
overturned
3. Wearing of safety
helmet, safety
shoes/boots and
safety vest
5. Instrument cable Spark produce Potential to 1. To ensure portable fire Authorised Person
installation due to cutting cause fire, burn extinguisher is valid Engineer
work. and property BOMBA certificate. Supervisor
Cutting trunking damage 2. To ensure no flammable
materials exist within the
hot work working zone.
3 3 9 3. Display Hot Work signage.
1. Full supervision
4. To provide fire watcher.
from supervisor.
5. Conduct Tool Box Talk on
2. Conduct daily
fire hazard and control
Tool Box Talk.
prior to hot work.
3. Wearing of safety
6. Wearing Faceshield
helmet, safety
during cutting work.
shoes/boots and
Rotation part Major Cut 1. Power tools must be Authorised Person
safety vest
inspected before use. Engineer
4. To implement
2. To ensure the guarding is Supervisor
Hot Work Permit
3 3 9 fix during cutting work
(HWP) system.
3. Providing training for
5. Cordon off Hot
operators on safe grinding
Work working
practices
area.
Noise Hearing Loss 1. Using personal Authorised Person
6. Conduct Tool Box
protective equipment Engineer
Talk.
(PPE) ear protection Supervisor
such as earplug or
3 3 9 earmuff.
2. To limit the work duration
to minimize duration of
exposure.
3. To organize work rotation
Dust & flying Eye Irriation 1. Full supervision 1. Ensuring proper Authorised Person
particles Sore Throat from ventilation to reduce Engineer
supervisor. dust and fume Supervisor
2. Conduct daily 3 3 9 exposure.
Tool Box Talk. 2. To apply PPE: N95 Dust
3. Wearing of safety Mask & Eye Protection:
helmet, safety Goggle.
Equipment Property Damage shoes/boots and 1. Regular maintenance of Authorised Person
2 3 6
malfunctions safety vest grinding equipment to Engineer
7. Cable Pulling Excessive Potential to 1. Full supervision 1. To organize work rotation. Authorised Person
manual sustain body from supervisor. 2. Work must be carried out Engineer
handling injury and 2. Conduct daily by trained personnel. Supervisor
Musculoskeletal Tool Box Talk. 3. Never lift heavy load
4 2 8
Disorder 3. Wearing of safety alone, seek assistance
Syndrome helmet, safety from other, buddy system.
(MSDs) shoes/boots and 4. To wearing safety hand
safety vest. glove
Exposed to Potential to 1. To demarcate electric Authorised Person
1. Full supervision
contact with cause cable routing clearly. Engineer
by supervisor
live electricity electrocuted 2. To make sure all panel live Supervisor
2. Conduct daily
supply supply been terminated.
Tool Box Talk
3. To practice Lock Out and
relate to
2 5 10 Tag Out system (LOTO)
electrical safety.
4. Never touch any electrical
3. Wearing of safety
components with wet
helmet, safety
hands.
shoes/boots and
5. Work must be carried out
safety vest
by trained personnel.
Unsafe Working platform 1. Full supervision 1. Only approved materials Authorised Person
working collapse from supervisor. MS 1462 series of Engineer
platform (Scaffolding) 2. Scaffolding must Malaysia standard must Supervisor
(scaffolding) be inspected by be used for the
competent scaffolding.
scaffolder every 7 2. No scaffold should be
days once. erect and dismantled
3. Conduct daily except under the direct
Tool Box Talk supervision of a
4 3 12
relate to WAH. designated person.
4. Wearing of safety 3. Do not used defective
helmet, safety scaffolds components.
shoes/boots and 4. Wearing full body safety
safety vest harness with double
lanyard for working at
height above 2 meters.
8. Turn On power supply & Exposed to Potential to 1. Full supervision 2 5 10 1. To demarcate electric Authorised Person
Instrumentation contact with cause from supervisor. cable routing clearly. Engineer
simulation test live electricity electrocuted 2. Conduct Tool Box 2. Power supply activation Supervisor
supply Talk on electric only can be performed by
safety. in-charge competent
3. Wearing of safety person.
helmet, safety 3. To practice Lock Out and
shoes/boots and Tag Out system (LOTO)
safety vest 4. Never touch any electrical
components with wet
hands.
5. Work must be carried out
by trained personnel.
9. Housekeeping work Obstruction Slip, trip & fall 1. Full supervision 1. Working area must be Authorised Person
unused from supervisor. kept tidy and properly Engineer
materials or 2. Conduct Tool Box arranged on daily basis. Supervisor
equipment. Talk. 2. All scrap materials shall
3. Wearing of be removed from site on
safety helmet, weekly basis.
2 1 2
safety 3. Ensure road and access
shoes/boots and way are not blocked by
safety vest work material.
4. Secure all equipment
after the work is
complete.