Inspection Work Request (IWR) Form
Inspection Work Request (IWR) Form
Reference No.:
Project Name:
From: Position/Company:
Remarks:
Requested by (Contractor):
____________________________
Signature over Printed Name/Date
Approved by RLC:
____________________________
Signature over Printed Name/Date
Noted By (LGB ECBS INC.):
_____________________________
Signature over Printed Name/Date
Note:
All documents needed must be provided prior to inspection commencement.
Commissioning Testing Adjusting & Balancing Commissioning Management Equipment Performance MEPF Condition
MEPF (TAB)
AgentConstruction Management DALT (Duct Air Leakage Fire & Life Safety Testing IAQ (Indoor Air Quality Survey
Thermal
Test) Test) Imaging