0% found this document useful (0 votes)
16 views7 pages

Table List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views7 pages

Table List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Table 2.

1. Inflow
Load Data
and in
Discharge
North Sulawesi
of Eachand
Hydroelectric
Gorontalo. Power
Plant.
Period Load (MW) Period Load (MW)
1
Power 316.45 r (m3/h)
Plant 13 d390.86
(m3/h) e (m3/h)
2 307.93 14 394.23
Tonsealama
3 301.5 25,20015 10,462
391.21 3,491
4
Tanggari 296.89
1 - 16 387.83
- 3,150
5 301.65 17 383.44
Tanggari
6 2
305.97 - 18 1,584
429.12 3,024
7 313.39 19 433.15
8 326.71 20 418.54
9 352.21 21 402.04
10 365.62 22 375.6
11 382.3 23 350.3
12 386.79 24 330.89
Total 8644.62

Table 3. Volume Limit of Each Hydroelectric Power Plant.

Minimum Maximum Starting


Power Plant Volume Volume Volume
(m3) (m3) (m3)

Tonsealama 1,092,433 1,137,629 1,098,459


Tanggari 1 1,101,593 1,148,569 1,107,855
Tanggari 2 1,262,070 1,349,820 1,273,770

Table 4. Discharge Limit of Each Hydroelectric Power Plant.

Maximum Minimum
Power Plant Discharge Discharge
(m3/h) (m3/h)

Tonsealama 52,349 21,283


Tanggari 1 56,700 11,970
Tanggari 2 59,040 17,914
Table 5. Maleo Gas-Fired Power System TOP Data.

Generating TOP Contract


LNG Cost Heat Rate Value
Units Cost (MMBTU
($/MMBTU) (MMBTU/MWh)
($/MWh) /24 h)

1 52.2 10 5.22
2 52.1 10 5.21
4800
3 52.3 10 5.23
4 52.3 10 5.23

Table 6. Lahendong Geothermal Power System TOP Data.

Maximum Total in Capacity


Total TOP
Units Output 24 H Factor
(MW) (MW)
(MW) (MW) (%)
1 18.5
2 19.1
3 18.4
114.9 2757.6 2300 83
4 18.9
5 20
6 20

Table. 7. Simulation Cases.

Total
Gas-Fired Geothermal
Coal-Fired
Power Power
Case Power System
System System
Generator Units
TOP TOP
Operated
Base Case 60 % No Yes
Case 1 40 % Yes Yes
Case 2 100 % No Yes
Case 3 80 % Yes Yes

Appendix A. Generating and Start Up Costs of North


Sulawesi and Gorontalo Power System Generator Units.

Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Sulut 3 Unit 1 Coal 44.05 5,000
Sulut 3 Unit 2 Coal 44.17 5,000
Sulbagut Unit 1 Coal 40.05 5,000
Sulbagut Unit 2 Coal 40.17 5,000
Amurang Unit 1 Coal 52.72 3,125
Amurang Unit 2 Coal 52.84 3,125
Amurang Unit 3 Coal 44.87 3,750
Amurang Unit 4 Coal 44.45 3,750
Anggrek Unit 1 Coal 63.12 3,000
Appendix B. Generating and Start Up Costs of North Sulawesi
and Gorontalo Power System Generator Units.

Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Anggrek Unit 2 Coal 63.24 3,000
Marisa Diesel 132.97 132.97
Bitung Unit 1 Diesel 190.30 190.30
Bitung Unit 2 Diesel 190.36 190.36
Bitung Unit 3 Diesel 190.42 190.42
Bitung Unit 4 Diesel 190.48 190.48
Bitung Unit 5 Diesel 190.54 190.54
Bitung Unit 6 Diesel 190.60 190.60
Bitung Unit 7 Diesel 190.66 419.46
Bitung Unit 8 Diesel 190.73 476.81
Bitung Unit 9 Diesel 190.79 524.66
Lopana Unit 1 Diesel 178.51 178.51
Lopana Unit 2 Diesel 178.63 178.63
Telaga Unit 1 Diesel 153.00 153.00
Telaga Unit 2 Diesel 153.06 153.06
Telaga Unit 3 Diesel 153.13 153.13
Telaga Unit 4 Diesel 153.19 153.19
Telaga Unit 5 Diesel 153.25 153.25
Telaga Unit 6 Diesel 153.31 153.31
Telaga Unit 7 Diesel 153.37 153.37
Telaga Unit 8 Diesel 153.43 153.43
Telaga Unit 9 Diesel 153.49 153.49
Telaga Unit 10 Diesel 153.55 89.06
Kotamobagu Unit 1 Diesel 219.56 65.87
Mini
Poigar Unit 1 0 0
Hydro
Mini
Poigar Unit 2 0 0
Hydro
Mini
Lobong Unit 1 0 0
Hydro
Mini
Lobong Unit 2 0 0
Hydro
Mini
Mongango Unit 1 0 0
Hydro
Mini
Mongango Unit 2 0 0
Hydro
Mini
Mobuya Unit 1 0 0
Hydro
Mini
Mobuya Unit 2 0 0
Hydro
Mini
Mobuya Unit 3 0 0
Hydro
Mini
Taludaa Unit 1 0 0
Hydro
Mini
Taludaa Unit 2 0 0
Hydro
Maleo Unit 1 Gas 52.21 1,350
Maleo Unit 2 Gas 52.09 1,350
Maleo Unit 3 Gas 52.27 1,350
Maleo Unit 4 Gas 52.33 1,350
Geo
Lahendong Unit 1 59.19 0
Thermal
Geo
Lahendong Unit 2 61.89 0
thermal
Geo
Lahendong Unit 3 61.95 0
thermal
Geo
Lahendong Unit 4 63.42 0
thermal
Geo
Lahendong Unit 5 63.48 0
thermal
Geo
Lahendong Unit 6 63.54 0
thermal
Appendix C. Generating and Start Up Costs of North
Sulawesi and Gorontalo Power System Generator Units.

Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Sumalata Solar 0 0
Isimu Solar 0 0
Likupang Solar 0 0
Tonsealama Hydro 1.22 15.50
Tanggari 1 Hydro 1.34 19.00
Tanggari 2 Hydro 1.28 27.00
Appendix D. Specifications of North Sulawesi and
Gorontalo Power System Generator Units.

P P Ramp Ramp Up Down


Power Plant Type Max Min Up Down time time
(MW) (MW) (MW/h) (MW/h) (h) (h)
Sulut 3 Unit 1 Coal 50 20 7.5 7.5 5 4
Sulut 3 Unit 2 Coal 50 20 7.5 7.5 5 4
Sulbagut Unit
Coal 50 20 7.5 7.5 5 4
1
Sulbagut Unit
Coal 50 20 7.5 7.5 5 4
2
Amurang Unit
Coal 21.75 12.5 7.5 7.5 5 4
1
Amurang Unit
Coal 21.75 12.5 7.5 7.5 5 4
2
Amurang Unit
Coal 27 15 7.5 7.5 5 4
3
Amurang Unit
Coal 27 15 7.5 7.5 5 4
4
Anggrek Unit
Coal 22.5 12 7.5 7.5 5 4
1
Anggrek Unit
Coal 22.5 12 7.5 7.5 5 4
2
Marisa Diesel 1 1 0.43 0.43 1 1
Bitung Unit 1 Diesel 2.5 1 3.42 3.42 5 3
Bitung Unit 2 Diesel 2.5 1 3.42 3.42 5 3
Bitung Unit 3 Diesel 3 1 3.42 3.42 5 3
Bitung Unit 4 Diesel 3.5 1 3.42 3.42 5 3
Bitung Unit 5 Diesel 2 1 3.42 3.42 5 3
Bitung Unit 6 Diesel 2 1 3.42 3.42 5 3
Bitung Unit 7 Diesel 6 1 3.42 3.42 5 3
Bitung Unit 8 Diesel 6 1 3.42 3.42 5 3
Bitung Unit 9 Diesel 4 1 3.42 3.42 5 3
Lopana Unit 1 Diesel 4.5 1 3.42 3.42 5 3
Lopana Unit 2 Diesel 4.5 1 3.42 3.42 5 3
Telaga Unit 1 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 2 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 3 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 4 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 5 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 6 Diesel 1.8 1 3.42 3.42 5 3
Telaga Unit 7 Diesel 2 1 3.42 3.42 5 3
Appendix E. Specifications of North Sulawesi and Gorontalo Power System Generator Units.

P P Ramp Ramp Up Down


Power Plant Type Max Min Up Down time time
(MW) (MW) (MW/h) (MW/h) (h) (h)
Telaga Unit 8 Diesel 1.8 1 3.42 3.42 5 3
Kotamobagu
Diesel 4.56 0.3 3.42 3.42 5 3
Unit 1
Mini
Poigar Unit 1 1.2 1 0.43 0.43 1 1
Hydro
Mini
Poigar Unit 2 1.2 1 0.43 0.43 1 1
Hydro
Mini
Lobong Unit 1 0.7 0.7 0.43 0.43 1 1
Hydro
Mini
Lobong Unit 2 0.7 0.7 0.43 0.43 1 1
Hydro
Mongango Mini
0.525 0.45 0.43 0.43 1 1
Unit 1 Hydro
Mongango Mini
0.525 0.5 0.43 0.43 1 1
Unit 2 Hydro
Mobuya Unit Mini
1.2 1 3.42 3.42 5 3
1 Hydro
Mobuya Unit Mini
1 0.67 0.43 0.43 1 1
2 Hydro
Mobuya Unit Mini
1 0.67 0.43 0.43 1 1
3 Hydro
Taludaa Unit Mini
3 1 0.43 0.43 1 1
1 Hydro
Taludaa Unit Mini
2 0.5 0.43 0.43 1 1
2 Hydro
Maleo Unit 1 Gas 23.5 9 12.7 12.7 4 2
Maleo Unit 2 Gas 23.5 9 12.7 12.7 4 2
Maleo Unit 3 Gas 23.5 9 12.7 12.7 4 2
Maleo Unit 4 Gas 23.5 9 12.7 12.7 4 2
Lahendong Geo
18.4 14.72 22.2 22.2 5 4
Unit 1 thermal
Lahendong Geo
19.2 15.9 22.92 22.92 5 4
Unit 2 thermal
Lahendong Geo
14.2 14 22.08 22.08 5 4
Unit 3 thermal
Lahendong Geo
19.1 17.9 22.68 22.68 5 4
Unit 4 thermal
Lahendong Geo
20 16 24 24 5 4
Unit 5 thermal
Lahendong Geo
20 16 24 24 5 4
Unit 6 thermal
Sumalata Solar 1.6 0.01 - - - -
Isimu Solar 10 0.01 - - - -
Likupang Solar 15 0.01 - - - -
Tonsealama Hydro 12 3.1 15.9 15.9 1 1
Tanggari 1 Hydro 18 3.8 10.6 10.6 1 1
Tanggari 2 Hydro 19 5.4 10.6 10.6 1 1

You might also like