Table List
Table List
1. Inflow
Load Data
and in
Discharge
North Sulawesi
of Eachand
Hydroelectric
Gorontalo. Power
Plant.
Period Load (MW) Period Load (MW)
1
Power 316.45 r (m3/h)
Plant 13 d390.86
(m3/h) e (m3/h)
2 307.93 14 394.23
Tonsealama
3 301.5 25,20015 10,462
391.21 3,491
4
Tanggari 296.89
1 - 16 387.83
- 3,150
5 301.65 17 383.44
Tanggari
6 2
305.97 - 18 1,584
429.12 3,024
7 313.39 19 433.15
8 326.71 20 418.54
9 352.21 21 402.04
10 365.62 22 375.6
11 382.3 23 350.3
12 386.79 24 330.89
Total 8644.62
Maximum Minimum
Power Plant Discharge Discharge
(m3/h) (m3/h)
1 52.2 10 5.22
2 52.1 10 5.21
4800
3 52.3 10 5.23
4 52.3 10 5.23
Total
Gas-Fired Geothermal
Coal-Fired
Power Power
Case Power System
System System
Generator Units
TOP TOP
Operated
Base Case 60 % No Yes
Case 1 40 % Yes Yes
Case 2 100 % No Yes
Case 3 80 % Yes Yes
Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Sulut 3 Unit 1 Coal 44.05 5,000
Sulut 3 Unit 2 Coal 44.17 5,000
Sulbagut Unit 1 Coal 40.05 5,000
Sulbagut Unit 2 Coal 40.17 5,000
Amurang Unit 1 Coal 52.72 3,125
Amurang Unit 2 Coal 52.84 3,125
Amurang Unit 3 Coal 44.87 3,750
Amurang Unit 4 Coal 44.45 3,750
Anggrek Unit 1 Coal 63.12 3,000
Appendix B. Generating and Start Up Costs of North Sulawesi
and Gorontalo Power System Generator Units.
Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Anggrek Unit 2 Coal 63.24 3,000
Marisa Diesel 132.97 132.97
Bitung Unit 1 Diesel 190.30 190.30
Bitung Unit 2 Diesel 190.36 190.36
Bitung Unit 3 Diesel 190.42 190.42
Bitung Unit 4 Diesel 190.48 190.48
Bitung Unit 5 Diesel 190.54 190.54
Bitung Unit 6 Diesel 190.60 190.60
Bitung Unit 7 Diesel 190.66 419.46
Bitung Unit 8 Diesel 190.73 476.81
Bitung Unit 9 Diesel 190.79 524.66
Lopana Unit 1 Diesel 178.51 178.51
Lopana Unit 2 Diesel 178.63 178.63
Telaga Unit 1 Diesel 153.00 153.00
Telaga Unit 2 Diesel 153.06 153.06
Telaga Unit 3 Diesel 153.13 153.13
Telaga Unit 4 Diesel 153.19 153.19
Telaga Unit 5 Diesel 153.25 153.25
Telaga Unit 6 Diesel 153.31 153.31
Telaga Unit 7 Diesel 153.37 153.37
Telaga Unit 8 Diesel 153.43 153.43
Telaga Unit 9 Diesel 153.49 153.49
Telaga Unit 10 Diesel 153.55 89.06
Kotamobagu Unit 1 Diesel 219.56 65.87
Mini
Poigar Unit 1 0 0
Hydro
Mini
Poigar Unit 2 0 0
Hydro
Mini
Lobong Unit 1 0 0
Hydro
Mini
Lobong Unit 2 0 0
Hydro
Mini
Mongango Unit 1 0 0
Hydro
Mini
Mongango Unit 2 0 0
Hydro
Mini
Mobuya Unit 1 0 0
Hydro
Mini
Mobuya Unit 2 0 0
Hydro
Mini
Mobuya Unit 3 0 0
Hydro
Mini
Taludaa Unit 1 0 0
Hydro
Mini
Taludaa Unit 2 0 0
Hydro
Maleo Unit 1 Gas 52.21 1,350
Maleo Unit 2 Gas 52.09 1,350
Maleo Unit 3 Gas 52.27 1,350
Maleo Unit 4 Gas 52.33 1,350
Geo
Lahendong Unit 1 59.19 0
Thermal
Geo
Lahendong Unit 2 61.89 0
thermal
Geo
Lahendong Unit 3 61.95 0
thermal
Geo
Lahendong Unit 4 63.42 0
thermal
Geo
Lahendong Unit 5 63.48 0
thermal
Geo
Lahendong Unit 6 63.54 0
thermal
Appendix C. Generating and Start Up Costs of North
Sulawesi and Gorontalo Power System Generator Units.
Generating
Start Up Cost
Units Type Cost
($)
($/MWh)
Sumalata Solar 0 0
Isimu Solar 0 0
Likupang Solar 0 0
Tonsealama Hydro 1.22 15.50
Tanggari 1 Hydro 1.34 19.00
Tanggari 2 Hydro 1.28 27.00
Appendix D. Specifications of North Sulawesi and
Gorontalo Power System Generator Units.