0% found this document useful (0 votes)
107 views15 pages

Long Wall Short Wall

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views15 pages

Long Wall Short Wall

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

I ~

194 ESTIMATING AND COST ING

TWO-ROOM BUILDING WITH FRON T VERA NDAH

10 cm L.C. Terrac e
47cm 3 cm Insulation Layer

, , u n 1□□□ 1 lb □ QJ
cm R.C.C. Slab 5
C OW
1.00 m x 0.50 m
g
4 00 m 10 cm R.B. Lintel

10 c
2cm0
□□t- 2.5 cm C.C. Floor over
8cm L. C.
m
G.L.
20cm
10 cm ~:S==.-.
10 cm~~ -1;.::: ;;:i~-+cm
70 cm HALF SECNL ELEVATION ON ABCD
20cm
30 cm 90 cm
If-- 2.50 m
~r- ---- ---- --, r- _,_G_ - - - - - -- 7
45cm, l I

30cm

Window s 1.00 m x 1.50 m


Chauk hat8 x 10 cm 10
Shelves -1t~ff- 451...-
1.00m x 1.50 m cmr

Room 4.00 m x 3.50 m


4.00m
Room 4.00 m x 4.00 m ..,.
40cm ....
·n 1
2 50 f11
I
I
1__
E~ - - - 3 . W c m
0
Cf)
1

---~
Doors 1.20 m x 2.10 m
Chaukhat 8 cm x 12 cm
ll
10cm 20 cm
~
1
1 -- ·1
I I Verandah
I
I 12
I
' 2 50 Wide

I I I
I
'.1 ~ ~m _ _ _ _ -. _______ -1~m_o~ ~c.:.c.:.. ~of~I~I
I --- --- --- --- --- --- ---
~-
Lt- --- --- ---
45 cm Chuua Pro;ect1on
__ ...,. ____ ____ J

Steps - Tread 30 cm
Rise-15 cm
PLAN c ___ ____ All Windows 1.00 m x 1 ~

Fig. 3-5
TWO-ROOM BUILDING WITH FRONT VERANDAH 95

CROSS-SECTION OF TWO-ROOMED BUILDING

10 cm LC. Terrace
:l cm lns1,1Iation Layer
. . . . . . . . . . . .. .
10 cm L.C. Terrace - -
3 cm Insulation Layer
10 cm R.C.C. Slab 12 cm-8,.C.C. Sjab
C.S. Window 1.00 m x 0.50 m
4.00m

10 cm R.B. Lintel liel::=~ 5 cm

2.40 m

15 cm R.C.C.
Rccfa~
5 cmll

I
11·
J-
Col. 2.5 cm C.C. Floor'tt cm
over 8 cm L.C. •~ D.P.C.
rcm
i------
.L.
20 cm
10cm
0cm 10cm
10cm • 2o ·crn
20cm 30cm
30cm
90cm
10cm 90cm

SECNL ELEVATION ON CEFG

Fig. 3-6

Note - Founda6on of verandah is continuous of same section.

Centre to centre lengths -


Room long walls -- 3.50+ 4.00+.30+(2x·~O )- 8.I0 m combined total length.

· Rloom Short walls- 4.00+(2x·~O )=4.30 m


0
Verandah Front- ~Extreme outer length at plinth (2x·~ )
--{ 3.50+4.00+(3 X.30)+(2x.0S) } - .30.::8.20 m

Verandah Sides-2.50, -~ 0 , .~O c-2.75 m ,


96 ESTIM ATIN G AND COST ING

DETAILS OF MEASUREMENT AND CALCULATION OF QUAN


TITIES (E
Item Partic ulars of "· S)
Heigh t
No. items and details No. Lengt h Bread th or Quan tity Expla natory note
of works Depth
I. Earthwork in exca-
vation in
found ation -
Room s
Long walls ... 2 9.00m .90m .90m 14.58 L = 8.10 + .90 == 9.00 m
Short walls ... 3 3.40 m .90 m .90 m 8.26 L = 4.30 - .90 == 3.40 m
Veran dah front ... 1 8.90m .70m
i
.90 m 5.61 L = 8.20 + .70 = 8.90 m
Veran dah sides ...
2 1.95 m .70 m .90m 2.46 L = 2.75 - -~O _.JQ_
= 1.95 m 2
Step ... 1 2.90m 1.00 m .15 m 0.44 L=2.7 0 + (2 x .10) =2.90m
Total 31.35
cum
2. Earthwork in f"Illing
"
in plint h-
Room (i) ... 1 3.90 m 3.40 m .54m 7.16 L = 4.00 - .10 = 3.90 m
"
B = 3.50 - .10 = 3.40 m
Ht. = 60 + 2 - 8 = 54 cm
= .54m
Room (ii) ... l 3.90 m 3.90 m .54m 8.22 {L = 8.20 - .30 = 7.90 m
Veran dah ... 1 7.90m 2.40 m .54m 10.23 B=2. 75 - .io --~o = 2..1

Total 25.61
cum
3 Lime concrete in
found ation
Room s -
Long walls ... 2
I
9.00 m .90 m .30 m 4.86 May be taken 1/ 3 of
Short walls ... 3 excav ation.
3.40 rn .90 m .30 m 2.75
Veran dah front ... 1 8.90 m .70 m .JO m
Veran dah sides t.87
... 2 1.95 m .70 m .30 m 0.82
Step ... 1 2.90 Ill 1.00 m .15 m 0.44
' ··---
Total 10.74
- - - l - - -L--
- - cum
TWO-ROOMFD BUILDING WITH FRON f VERANDAH 97

-
(Ex. 5 Contd.)
Height
Item Particulars of No. Length Breadth or Quantity Explanatory note
No. items and details Depth
of works
4. I-class Brick-work
in Foundation and
Plinth in 1 : 6
cement mortar-

ROOMS-

Long walls -
1st footing ... 2 8.80 m .70 m .20m 2.46 L = 8.10 + .70 = 8.80 m

2nd footing ... 2 8.70 m .60m .10 m 1.04 L = 8.80 - .10 = 8.70 m

3rd footing ... 2 8.60 m .50 m .lOm 0.86 L = 8.70 - .10 = 8.60 m

Plinth wall ... 2 8.50 m .40m .80m 5.44 L = 8.60 - .10 = 8.50 m

Short walls -
1st footing ... 3 3.60 m .70m .20m . 1.51 L = 4.30 - .70 = 3.60 m

2nd footing ... 3 3.70 m .60m .lOm 0.67 L = 3.60 + .lO = 3.70 m

3rd footing ... 3 3.80 m .50 m .10 m 0.57 L = 3.70 + .10 = 3.80 m

Plinth wall ... 3 3.90 m .40m .80 m 3.74 L = 3.80 + .10 = 3.90 m

VERANDAH-

Front wall (long)-


1st footing ... 1 8.70 m .50 m .LO m 0.87 L = 8.20 + .50 = 8.70 m

2nd footing ... 1 8.60 m .40m .10 m 0.34 L = 8.70 - .10 = 8.60 m

1 8 50 m .30 m .90m 2.30 L = 8.60 .IO - 8.50 m


Plinth wall ...
Side wall (short) -
1st footing ... 2 2.15 m .50 m .20 Ill 0.43 L=2.75 - -~O - -~O =2.15m

2nd footing ... 0 0


2 2.25 m .40m .IO m 0.18 L=2.75 -~ - -~ =2.25m
L----
- - -
c.o. 20.41
----
/

--- ~ '- -~-


th Note. - Verandah wall foundation is continuous of same section for simplicity. In practice ,
bee f~undation of verandah pillars should be square and separate and in between pillars there will
P mth dwarf wall of small section.
98 ESTI MAT ING AND COSTij'TG

Item Partic ulars of Heigh t


No. items and detail s No. Lengt h Bread th or Quan tity Expla natory n
of work s Dept h Ote

B.F. 20.41
Plinth wall 10 cm
above footin g
... 2 2.35 m .30 m 0.10 m 0.14 L=2. 75 - .50 .30
Plinth wall remai n- 2 --r-===2.35tn
ing portio n ... 2 2.40 m .30 m .80m 1.15 L=2.75 .40 .30
2 -y===2.4orn
Steps -
1st step ... 1 2.70m .90m .15 m 0.36
2nd step ... l 2. 10 m .60m .15 m 0.19
3rd step ... 1 1.50 m .30 m .15 m 0.07
Total 22.32
cum
5. 2 cm Damp proof
course
Roo ms-
Long walls ... 2 8.50m .40m - 6.80 Leng th, breadth same as
for plinth wall.
Short walls ... 3 3.90 m .40m - 4.68
Total 11.48
Dedu ct door sills ... 2 1.20 m .40m - 0.96
Net Total 10.52
sq m
6 I-class Brick-work
in superstructure in
lime morta r -
Room s -
Long walls ... 2 8.40 m .30 m 4.00 m 20. 16 Leng th - Out to out.
Short walls ... 3 4.00 m .30 m 4.00 m 14.40 Leng th - In to in.
Ver. above lintels
(over pillars) --
Front (Jong) ... I 8.40 m .20 m .30 m 050
Sides (shor t) ... 2 2.50 m 20 m 30 m 0.30
Parap et
Over Room s
Long wall!. ... 2 8.40 m .20 m .60 m 2.02 Ht. = 47 + IO + 3 == 60 cnl
'
= .60 m
Short walls .. 2 4.20 m .20m .60 m 1.01 L=4.0 0 + (2 x .30) -
I
(2 X .20) == 4.20 [Jl
I
I C.O. -
.L 38.39
--· ....__

TWO-ROOMED BUILDING WITH FRONT VERANDAH 99

-
(Ex. 5 Contd.)
Height
Item Particulars of No. Length Breadth or Quantity Explanatory notes
No, items and details Depth
of works
B.F. 38.39
Verandah -
Front (lonID ... l 8.40m .20m .40m 0.67 Ht. = 27 + 10 + 3 = 40 cm
= 40cm
Side (short) ... 2 2.50m .20m .40m 0.40
Total 39.46
cum

Deduct-
Door openings ... 2 1.20 m .30m 2.10 m 1.51
Window openings 10 1.00m .30m 1.50 m 4.50
C.S. Window ,, ... 12 1.00m .30m 0.50m 1.80
Shelves,, ... 2 1.00m .20m 1.50 m 0.60 Back of:-shelf 10 cm

R.B. lintels over-


Doors ... 2 1.40 m .30m .10 m 0.084 10 cm bearing.
(a)
Windows ... 10 1.20 m .30m .lOm 0.360
(a)

... 12 1.20 m · .30m .lOm 0.432 Total of (a) s = 0.948 cu m


C.S:Wfodows
(a) .
Shelves ... 2 1.20 m .30m .lOm 0.072
(a)
Total 9.36

Net Total 30.10


cum
7. R. B. work in lintels
excluding steel and
its bending but
including centering
and shuttering and I,
'
binding steel-
Over doors,
windows and
shelves ... Same as for items marked
(a) in item no. 6 = 0.948
Over ver. pillars~
Front ..... 1 8.40 .2.0 .30 0.504 Out to out .
Sides ... 2 2.80 .20 .30 0.336 Inside bearing 30 cm
Total 1.788
I
. cum
- -
I
100 ESTIMATING AND COSTING

Item Particulars of
No. items and details
of works
m m
Height
No. Length B readth or
Depth
m
Quantity Explanatory n
Otes
----
8. R. C. C. work in .._
ver. columns
excluding steel and
its bending, but
including form
work and binding
steel complete fair 1r (.15)2
finished 4 X 2.70 = 0 19 30 cm insertion int f
4 cum r h ut~
p mt wall belo\\ noor
9. R.C.C. work exclud-
ing steel and its
bending, but includ-
ing centering and
shuttering and
binding steel, fair
finished-
Roof slab rooms ... I 8.64 4.84 .12 5.018 12 cm projections.
Roof slab ver. ... 1 8.40 2.80 .IO 2.352 IO cm inner bearing.
excluding chujja.
Chujja projections -
Ver. front ... I 9.30 .45 .06 0.251 Average thickness.
Ver. sides ... 2 2.70 .45 .06 0.146
Sun-shed and
breakers in
windows-
' Top ... 4 2.50 .45 .05 0.225
Bottom ... 4 2.50 .15 .05 0.0]5 5 cm insertion into 11
Sides ... 4X2 1.50 .50 + 15
.05 0. 195 5 cm insertion and J
2 breadth.
Shelf slab ... 2 x3 I.to .20 .05 0.066 5 cm bearing.
Total 8.328
cum
10. Mild steel bars incl-
uding bending in re- l
inforcement@ 1%
of R.B. and R.C.C.
10.31 I (te!Tl
works ... X ~ 78.5 ==
I% of total o i
8.lOq
100 and 9.
..
Note. - Chu.l}as, sun sheds, etc. may be taken under a separate J(t:111•
101
(Ex. 5 Contd.)
.
-Item
Particulars of Height
No. items and details No. Length Breadth or Quantity Explanatory notes
of works Depth
m m rrt
-11. 10 cm Lime
concrete in roof
terracing complete
with surface
finishing-
Rooms ... I 8.00 4.20 - 33.60 Clear roof area in between
parapet.
Verandah ... I 8.00 2.50 - 20.00 ,, "
\
"
Total 53.60
' I sq m
12. 3 cm thick
insulation layer of
sand and clay-
Rooms ... I 8.00 4.20 - 33.60 Clear roof area.
Verandah ... I 8.00 . 2.50 - 20.00 ,, ,,
Total 53.60
sqm
13. Sal wood work in
chowkhat wr9ught
framed and fixed-
Doors (3 cm inser-
tion into
floor) ... 2· 5.46 .n .08 0.105 {2 Vert.-2.13 m each.
I Hor.-1.20 m each.
,
{2 Vert.-1.50 m each
Windows ... 10 . 5.00 .IO .08 0.400 2 Hor.-1.00 m each .
{2 Vert.-0.50 m each.
C.S. Windows ... 12 3.00 .08 .08 0.230 2 Hor.-1.00 m each.
Total 0.735
cum
14. 4 cm thick Indian
teak wood panelled
door and wmdow
shutters inchiding
fittings-
Doors ... 2 1.07 - 2.035 4.355 Rebate 1.5 cm.

Windows ... 10 0.87 - 1.37 11.919


Total 16.274
15. 4 cm thick Indian sq m .
teak wood glazed
shutters including
fittings -
C.S. Windows ... 12 0,87 0.37 3.863
sq m
-
Note- Lime concrete terracing(item 11) has been taken on area basis, ifrequired the volume
can be found by-multiplymg the thickness.
Door and window fittings may be taken under a separate item.
i:. ·,r rl 11: ft .,, ... ~ • 1 1 , ;-

Tl l~

102 t df C ESTIMATING AND CO..STING .


Item Particulars of Height
No. items and details No. Length Breadth or Quantity
of works Depth
m m m
16. Iron work (mild
steel) in hold fasts
and window grat-
ines-
Hold.fasts in doors,, 2x6 12 nos. 6 nos. per door.
Hold fasts m
windows 10X4 40 nos. 4 nos. per window.
Hold fast~ in
C.S. windows ... 12x2 24 nos. 2 nos. per C.S. window
l----t-------1
Total 76 nos.
@ 1 kg
each
= 76kg
Window bars.16
mm dia. @ 1.58
kg/m-
Windows 10X8 I.SO 120 Ver. bars at 10 cm centre1
approx.
C.S. windows ... 12X2 1.00 24 Two horizontal bars.
144m
17. 12 mm tlllct plaster- @ 1.58 kg
Int In ..... 1 : 1 : 6 = 227. 52 kg
cement, land, lime
mortar -
Total
·INSIDE-. =
Rooms-
(i) 2 3.50
2 . 4.00
4.00 28.00 } May be taken as inner ~
(ii) 4.00 32.00 meter x ht. = 15.00 x '·
4 4.00 4.00 64.00
Verandah inner wall 1 8.40
Ver. Front above 3.00 25.20 Length out to out.
cols. inner facc 1 8.00
Ver. Sides above .68 4.80
cols. inner face ••• 2 2.50
Jambs sills and .60 3.00
soffits of shelves 2 5.00 -30~
.20 2.00 L=2 x 1.0 + 2 x I.5- .
Soffits of ver.
lintel -
Front 1 oJ. en
Sides .20 1.68 No deduction for c
2
.20 1.00
Total 161.68
TWO=ROOMED BUILD ING WITH FRON T VERA NDAH 103

(Ex. 5 Contd.)
-1te01
Particulars of Height
No. items and details No. Length Breadt h or Quanti ty Explan atory notes
of works Depth
m m m
Deduct openin gs in
wall in between ver.
and room -
Door openings ... 2 1.20 - 2.10 5.04 One surface of each.
Window openings ... 2 1.00 - 1.50 3.00 One surface of each.
Total 8.04 Other doors and windows
I deduct ea from outside .
. Net Total 153.64 Total of i11$ide plastering.
sqm
OUTS IDE-
Rooms -
Back plinth includ ing
TO,cm below G,1L.•,. l 8(50 - .75 6.38 } Ht.= .60 + .05 +. .I0=.75 m
Back super- These can be combi ned as-
structure ... 1 8.40 - 4.00 33.60 1 X 8.40 X 4.75 = 39.90
Sides plinth -
including 10 cm
below G.L. ... 2 4.70 - .75 7.05 '
,}These can be Combined as--
Sides super- 2 X 4.6() X 4.75 = 43.70
structure ••• 2 4.60 - 4.00 36.80
Verandah -
Above cols. front
outer face ... 1 8.40 - .60 5.04
Above cols. sides
outer face ... 2 2.70 - .60 3.24
Plinth front
including l O cm
below G.L. ... I 8.50 - .70 5.95 Ht. =·.60 + .10 = .70 m
Plinth sides ... 2 2.75 - .70 3.85
Wall above ver. roof 1 8.40 - .77 6.47 Ht.= 4.00 - 3.23 = .77 m
Parape t -
Room s-
Long wall outer face 2 8.40 - .60 10.08 .- These can be taken approX.
Long wall inner in pne operat ion as -
face ... 2, 8.00 - .47 7.52 = \ totat ce~tre length +
inner ht. + top width x
I .outer ht.)
Long wall top face ,,.r 2 8.40· .20 - 3.36 ~
Short walls
outer face ... 2 4.60 - .60 5.52
Short walls = (2 X8.40 + 2 X 4.20)
inner face ... 2 4.20 - .47 3.95
\
1((.47 + .20 + (.47 + .10
t .03)
Short walls
top face ••• 2 4.20 .20 -
c.o.
1.68
140.49
- = 25.20 x l .27=32.00 sq m.

-
104 ESTIMATING AND COSTING

Item Particulars of He ight


No. ite ms and details No. Lengt h Bre adth or Qu antity .E xplanatory notes
of works D epth
m m m
B.F. 140.49
Verandah parapet-
Front wall outer '
face
Front wall
inner face
...
...
I
I
8.40 .40 3.36 ll ! hese can be ~aken approi
8.00 .27 2.16 m one operation as "' ·
Front wall (Total centre length) x
top face I 8.40 .20 (inner ht. +top width x
1.68
Side wall outer face router ht.)
2 2.70 .40 2. 16
= (8.65 + 2 X 2.50) X
Side wall inner face. 2 2.50 [.27+.20+(.27+.IQ + .03)]
.27 1.35
= 13.65 x .87 = I 1.88 s4 m
Side wall top face, ·· 2. 2.50 20 1.00
Deduct- ·T otal 152.20
Window openings
(in outer walls) ... 8 1.00 1.50
C.S. window 12.00 One surface of each.
openings ... 12 1.00 0.50 6.00
Step from plinth I One surface of each.
wall 2.70 0.70
... 1.89 Including IO cm below
Ends of ver. side G .L.
wall and lintet
above col. level _.. 2
Ends of ver. parapet .20 .60
wall, from wall 0.24 Th is may be neglected.
above ver. roof level 2
t"20 .27 0. 11 T h is may be neglected .
r=----t-....__--+----+------i
Total o· deduc ions 20. 24
Net
Total131 .96 Total of outside plast ering
----- sq m
Grand T otal oJ inside and
outside plastering = 285 .60
l 8. 20 mm thick cement sq m
plaster I : 3 in step
finished cement
rendered -

~~~·!~r;~i :;r :::


3rd step riser ... J
l t 50
2·t0
. 15 }
--
. 15 - ~
Front and sides.
Front and sides.
--
- -.Note-No - - · O - -15 1.49 Front and sides . • · {/nish'J
plastering iii ceili~h~ b~~~-:::--~---1.-=----L-=-:_=-:-=----:=~-:--
•mhout any extra payment. If spJ;r;!d th? taken mto account, R. C. c. work will be fair .Jed and
t;,t,:n under a separat~ item. n cement coarse sand plaster I : 3 may be pro vi
TWO-ROOMED BUILDING WITH FRONT VERANDAH 105

( Ex. 5 Contd.)

..- Particular'> of Height


ltCill · No. Lengt h Breadth or Quantity Explanato ry notes
item~ and de ta1b
No. Dept h
of worb
m m· m

- I st step tread
2nd step tread
.. .
.. .
I

I
3.9(/)

2.70
.30
.30
} 2.43
Front and sides .

Front and sides .

Jrd step tread ... I 1.50 .30 Front and sides .

Plinth wall
above
I st step .. . 2 . .30 .45 0.27 Sides.
2nd step .. . 2 .30 -.30 0. 18 Sides.
3rd step ... I 1.50 . 15 0.22 Sides .

I Tot a l 4.59
- sq m

19. 2.5 cm thick c.c.


I : 2 : 4 over and
including 8 cm lime -
-
concrete floor -
Room (i) ... I 4.00 3.50 14.00 '

Room (ii) ... I 4.00 4.00 16.QO

Verandah . .. I 8.00 2.50 20.00 Si lls of verandah opening


have been taken under
Total 50.00 item 20.
I
sq m

20. 2.5 cm thick c~c~


l : 2 : 4 floor in
sills
Door sills ... 2 1. 20 .30 0.72

Sills of ver. opening


front ... I 8.50 .25 2. 12 Including .05 m plinth
outer offset. No. deduc-
tion for cols.

Sills of vcr. openi ng


sides .. • 2 2.50 .25 1.25

To ta l 4.09

Deduct pill ars , .. 4 fT\( (.15)· 0.07 This deduction may be


neglected.
4
Total 4.02

--
Net
sq m

!l
l06 ESTIMA TING AND COSTIN G

Item Particula rs o'f Height


No. items and details No. Length Breadth or Quantity Explana tory notes
of works Depth
m m m
21. White washing
three coats inside -
Walls am as for inside wall
plasterin g in item (17) = 153.64.
Ceiling of room 4.00 3.50 14.00
Ceiling of room 4.00 4.00 16.00
Ceiling of ver. 8.00 2.50 20.00
Total 203.64
sq m
22. Colour washing two
coats over one coat
of white washing
outside -
Walls am as for outside wall
plas tering in item (17) = 131.96
Chujja ver. front 9.30 .95 Up per and Iower faces ar.:
8. 84
edges.
Chujja ver. sides 2 2.70 .95 5.13 Upper and lower faces 3n:
edges.
Sunshade and sun-
breakers in
windows - Top 4 2.50 .95 9.~o Upper and lower f ace·~ J~
edges.
Bottom 4 2.50 .25 2.50 ,, ,, ,, , ,,
Sides 8 x 2 1.50 .45 + . I 6.60 Inner and outer faces.
Edges of sides 8 1.50 .05 0.60 This may be negJected. ,
Outer projectio n of of roo,
roof slab L=Outer perimet:r rn
26.00 36
.36 9 36 1
t---+.--. :.....:·~- B = .12 + .12+.1 2- ·
Total 174.49
Deduct portion s1~~
below G.L. L=O4ter perimete;70
29.10 .10 2.91 = 2(8.50 + 7.40) - .
t----+---l--._--J = 29. IO m
Net Total 171 58
___.__ ___ . . - .. _....,___ s ~ bC-, ~
Note-L ower sides of chu]Jas and sunshades and isner faces of sun breakers rnaY
washed instead of colour washing.
TWO-ROOMED BUILDING WITH FRONT VERANDAH 107

I .
(Ex. 5 C ontd)
Item Particulars of Height
No. Length Breadth or Quantity Explanatory notes
No. items and details
of works Depth -
J
m m m
-
\
23. Painting doors and
windows two coats
over one coat of
-
priming-
Doors panelled ... 2x
2¼ 1.20 - 2.10 11.34 2¼ times one surface for
both sides.
Windows panelled JO X

2¼ 1.00 - 1.50 33.75


" "· " "

C.S. windows
glazed ... I2x l 1.00, - 0.50 6.00 One surface for both sides.

Window bars ... IO 0.84 1.34 - 11.25 } Excluding chowkhat, one


-
flat area for over all.
C.S. window bars 12 0.84 0.34 - 3.43
'
Total 65.77
sqm

- ·- - --
24. Solipum paintin1
two coats in back of
chaukhat+- \
Doors ... 2 5.46 .12 - / 1.31
Windows ... .IO 5.00 .IO - 5.00 } Lengths same for
.c howkhat in item (13)
C.S. windows ... 12 3.00 o:os 1 - 2.88· j

Total 9.19
sq m

.
25. C.I, Pipe 10 cm dia.
(rain water spout)
complete with

-- painting ... 4 1.00 - ~


4.00
108 ESTIMA r!NG AND COSTING

ABSTRACT OF ESTIMATED COST (Ex. 5)


Item Rate
No. Particulars of items Quantity Unit Per
Rs. P.
- -+- -~ - - - -- - -- -- -,----=--:----=-:-,-r-:-:::--:::::-r~--.--- P.
I. Earthwork in excavation in foundation 31.35 cum 350.00 % cum , _
2. Earthwork in filling in plinth
09 72
25.61 cu m 275.00 % cu m 7O.4J
3. Lime concrete in foundation 10.74 cum 220.00 per cum 2362.80
4. I-class brickwork in foundation and plinth in
I : 6 cement sand mortar 22.32 cu m 320.00 per cum 7142.40
5. 2cmdampproofcourse(D. P.C.) I: 2cement
mortar with water proofing compound 10.52 sq m 18.00 per sq m 189.36
6. I-class brickwork in superstructure in _lime
mortar
30.10 cu m 320.00 per cu m 9632.00
7. R.B. Work in lintels with I : 3 cement mortar
excluding steel and its bending, but including
centering and shuttering and binding steel . 1.788 cum 520.00 per cum 929.76
8. R.C.C. work I : I½ : 3 in verandah columns
excluding steel and its bending, but including
form work and binding steel complete fair
finished
0.19 cum 590.00 per cum 112.10
9. R.C.C. work I : 2 : 4 in slab excluding steel
and its bending, but including centering and
shuttering and binding steel, complete fair
finished
8.328 cu m 775.00 per cu m 6454.20
IO. \1ild steel including bending in reinforcement
bars
8.10 q 515.00 perq 41 71.5°
11. 10 cm Lime concrete in roof terracing
complete with surface finishing 64J2ll
53.60 sq m 12.00 per sq m
12. 3 cm thick insulation layer of sand and clay 80.40
53.60 sq m 1.50 per sq m
13. Sal wood work in chaukhat wrought framed.
and fixed. 3454.~~
0.735 cu m 4700.00 per cu m
c.o. 35352.3_!

You might also like