Republic of the Philippines
Province of Surigao del Norte
Municipality of Sison Barangay Mabuhay
Construction of Perimeter Fence in Barangay GAMMACON BUILDERS,
PROJECT TITLE: CONTRACTOR: Mabuhay Barangay Hall INC PROJECT COST: P199,444.62 PROJECT STARTED: September 10, 2024 INSPECTION DATE: September 25, 2024 PROJECT COMPLETION: October 05, 2024
PUNCH LIST/FINAL INSPECTION FORM
ITEM NO. DESCRIPTION LOCATION STATUS B.5 PROJECT BILLBOARD Barangay Hall Completed 800 (2) CLEARING AND GRUBBING Barangay Hall Completed 801 (1) REMOVAL OF STRUCTURES AND OBSTRUCTION Barangay Hall Completed 803 (1) a STRUCTURE EXCAVATION (Common Soil) Barangay Hall Completed 804 (1) b EMBANKMENT (FROM BORROW) Barangay Hall Completed 900 (1) c1 STRUCTURAL CONCRETE (Class A, 28 Days) Barangay Hall Completed 902 (1)a REINFORCING STEEL Barangay Hall Completed 903 (2) FORMWORKS AND FALSEWORKS Barangay Hall Completed 1046 (1)a1 MASONRY WORKS Barangay Hall Completed 1047 METAL STRUCTURES Barangay Hall Completed
Other Findings and Recommendation:
1. On-going Painting Works but not included in the Contract 2. Project is Completed