20T -2 Nos.
PS1
F14
F11
GB6
GB6
PS1 PS1 PS1 PS1
PB8
PB8
PB8
PB1
PS1
20T -2 Nos.
20T -2 Nos.
C79 C80 PBC11
PB11 PB11 PB11 PB11
F14
F16 F16 F16 F12 230 x 400
16T -6 Nos., 8T-150C/C (ALT. DOUBLE RINGS)
PS1
GB6
GB7
SECTION AT X-X
E C50 C77 C51 C78
E PS1
20T -2 Nos.
20T -2 Nos.
F15 F14
GB6
GB6
20T -2 Nos.
D C48 C75 C49 C76
X X
D
20T -2 Nos.
F14 GB8 GBC6
F15
PS1
GB7
PB11
C C47 C
20T -2 Nos.
TYPICAL FOOTING DETAIL
C43 C44 C45 C46 C74 PS3
F16 F12
PS3 PB1
GB7
PB8
PS3
BOTTOM REINFORCEMENT
GRADE SLAB IN M:15
GB6 230 750 20T-3Nos. - - - - - - - - 20T-2Nos. 10T-100 C/C 8T-100 C/C B.O.C @ -150mm PS2 150 10T-200 C/C 10T-200 C/C
(T.O.C @ -450mm)
GRADE SLAB IN M:15
TOP REINFORCEMENT CANTILEVER PS3 100 10T-200 C/C 10T-200 C/C
GBC6 230 750 20T-3Nos. - - - - - - - - 20T-3Nos. 10T-100 C/C 10T-100 C/C B.O.C @ -150mm
(T.O.C @ -100mm)
GB7 230 750 20T-3Nos. 20T-2Nos. 20T-2Nos. 10T-100 C/C 8T-100 C/C B.O.C @ -150mm
BOTTOM REINFORCEMENT
GB8 230 750 20T-3Nos. 16T-2Nos. 20T-2Nos. 10T-100 C/C 8T-150 C/C B.O.C @ -150mm
NOTE:-
10. BEFORE REFILLING OF THE TRENCHES, ALL FOOTINGS AND UNPLASTERED COLUMN SHALL HAVE BE KEPT FOR EXAMINATION
BOTTOM REINFORCEMENT BY OUR OFFICE.
11. REFILLING OF SOIL IN TO THE TRENCHES SHALL HAVE TO BE CARRIED OUT USING NONEXPENSIVE SOIL IN LAYER OF 300MM.
1. USE M:25 GRADE CONCRETE UNLESS OTHERWISE WITH PROPER WATERING & COMPECTION OF EXISTING SOIL IS USED THEN IT SHOULD BE AS PER THE INSTRUCTION ISSUED
BY OUR OFFICE AT THE TIME OF EXECUTION.
SPECIFIED.
2. THE DRAWING SHALL NOT BE SCALED ONLY COLUMN REDUCTION NOTES :-
1. ALL STIRRUPS (RINGS) SHALL BE OF SIZE 80mm LESS THAN THE COLUMN SIZE.
WRITTEN DIMENSION SHALL BE FOLLOWED.
2. CLEAR COVERS IN ALL R.C.C. COLUMNS SHALL BE 40MM.
3. IN EVENT OF ANY AMBIGUITY INFORM US 3. THE CONCRETE GRADE SHALL BE M25, UNLESS SPECIFIED OTHERWISE.
4. OVERLAPING IN MAIN BARS SHALL BE STAGARED AND SHALL BE AS PER THE INDIAN STANDARD CODE OF PRACTICE.
BEFORE COMMENCING WORK.
5. UNLESS SPECIFIED OTHERWISE, ALL REINFORCEMENTS SHALL BE IN Fe500d GRADE (FROM STANDARD MILLS).
4. ALL DIMENSION ARE IN mm STANDARD TOR STEEL.
6. THE CONCRETE & STEEL GRADE SHALL HAVE TO BE CONFIRMED BY THE LABORATORY
5. REINFORCEMENT SHALL BE OF DEFORMED BARS (FE-500) TESTS AT CONTRACTORS COST AND SHALL BE SUBMITED BEFORE PROCEEDING TO THE
CONFORMING I.S.-1786 OR I.S.-1139 WITH A MINIMUM YIED STRENTH NEXT STAGE OF WORK. ARCHITECT & DESIGNER
Concept
7. ALL CIRCULAR COLUMNS SHALL BE CASTED AS SQUARE COLUMNS UPTO BOTTOM OF BASEMENT
OF 5000kg/cm2 BEAMS, RETAINING THE REINFORCEMENT AS CIRCULAR.
6. LAPS & COVER FOR REINFORCEMENT WHEREVER NOT CURING :-
SHOWNSHALL BE AS PER I.S.-456 1. ALL R.C.C. MEMBERS SHALL HAVE TO BE SUBJECTED TO RIGOROUS
Designers & Engineering Consultants
CURING USING EITHER CURING COMPOUNDS OR GUNNY BAG CURING 412-Skylon, Silvassa Road,
7. CLEAR COVER TO REINFORCEMENT-: FOOTING : BOTTOM : 50mm FOR A MINIMUM PERIOD OF 10 DAYS. THE EXPOSED SURFACE SHALL G.I.D.C. Char Rasta, Vapi - 396 195.
SIDE : 50mm REMAIN COMPLETELY WET. CURING SHALL BE ENTIRELY THE RESPONSI - Phone :(0260) 2425744,
BILITY OF THE CONTRACTOR. Fax; 2434944
COLUMN : SIDE : 40mm e-mail : [email protected]
LAPPAGE FOR BOTTOM BARS :-
BEAM : TOP & BOT : 25mm 1. BARS SHALL BE WELDED WITH STANDARD WELD LENGTH WHEN EVER CLIENT
SIDE : 25mm LAPPAGE IS TOBE DONE WITHIN THE SPAN OF THE BEAM.
SLAB : BOTTOM : 15mm 2. LAPPAGE SHALL BE STAGGERED ON TO EITHER SIDE OF THE BEAM.
3. OVERLAPING IN MAIN BARS SHALL BE STAGARED AND (50d) SHALL BE AS PER THE INDIAN STANDARD CODE OF PRACTICE.
M/s.: ALLIENCE RECPET
8. DON'T LEAVE EXPOSED BARS, BINDING WIRE ENDS OPEN IN THE SOIL. (d = Ø OF BARS.) AT:- MOTABORASARA, KIM(SURAT).
CUT AND TREATE ALL SUCH EXPOSED SURFACES TO AVOID GROUND BEAM NOTES :-
CORROSSION. ALSO TREAT ALL HONEYCOMBS AND RUFF SURFACES 1. ALL STIRRUPS (RINGS) SHALL BE OF SIZE 50mm LESS THAN THE BEAM DEPTH SPECIFIED.
PROPERLY BEFORE REFILLING WITH SOIL. 2. BOTTOM COVER SHALL BE 25MM AND TOP COVER SHALL BE 25MM. PROJECT :
9. BEFORE REFILLING OF THE TRENCHES, ALL FOOTINGS AND
3. UNLESS SPECIFIED THE CONCRETE SHALL BE IN M25 GRADE.
4. THE SUBGRADE SHALL BE WELL COMPACTED AND FINISHED WITH GRAVEL OR BRICK BAT
PLANT BUILDING.
UNPLASTERED COLUMN SHALL HAVE BE KEPT FOR EXAMINATION BAT CONCRETE OF 75MM THICKNESS IN NOMINAL MIX OF 1:4:8.
DRG. TITLE :
5. COLUMN HEADS SHOULD BE HAMMERED AND CLEANED THROUGHLY FOR LOOSE MATERIAL
BY OUR OFFICE.
MATERIAL IT SHALL BE COMPLETILY CLEAN AT THE TIME OF CONCRETING THE BASEMENT BEAMS.
10. REFILLING OF SOIL IN TO THE TRENCHES SHALL HAVE TO BE CARRIED 6. COLUMN RINGS SHALL CONTINUE AT THE SPACING SPECIFIED, EVEN IN THE BEAM JUNCTION CENTER LINE PLAN.
WITHOUT BREAKING. BEAM RINGS SHALL BE STARTED FROM THE FACE OF THE COLUMN.
OUT USING NONEXPENSIVE SOIL IN LAYER OF 300MM. WITH PROPER
7. DON'T LEAVE EXPOSED BARS, BINDING WIRE ENDS OPEN IN THE SOIL. CUT AND TREATE ALL SUCH EXPOSED SURFACES PROJECT NO. 961/B1/2024 DRAWNING NO. REV.
WATERING & COMPECTION OF EXISTING SOIL IS USED THEN IT SHOULD TO AVOID CORROSSION. ALSO TREAT ALL HONEYCOMBS AND RUFF SURFACES PROPERLY BEFORE REFILLING WITH SOIL.
BE AS PER THE INSTRUCTION ISSUED BY OUR OFFICE AT THE TIME PURPOSE
OF EXECUTION. 10. BEFORE REFILLING OF THE TRENCHES, ALL FOOTINGS AND UNPLASTERED COLUMN SHALL HAVE BE KEPT FOR EXAMINATION