Foundation
Foundation
C G NOTE:-
A B D E F H NOTES:-
1. SAFE BEARING CAPACITY OF THE SOIL 300 TONNES/SQ.M
Submit soil report for the 1. THIS STRUCTURE IS USED IN ACCORDANCE WITH B.S CODE 8110 -1985
15.80 same plots.
2. DESIGNED FOR G+11 FLOORS R.C.C FRAMED STRUCTURE.
3. DEPTH OF FOUNDATION IS 4.00 m. FROM LOWEST NATURAL LEVEL.
2. ALL DIMENSIONS ARE IN CM.UNLESS OTHERWISE STATED
1.70
2
VIBRATED & SHALL HAVE A MINIMUM CRUSHING STRENGTH OF 40 KN/CM
8.SULPHATE RESISTING CEMENT SHALL BE USED IN CONCRETE WORKS 3
UPTO PLINTH LEVEL AND A MINIMUM CEMENT CONTENT 380 KG/M OF CONCRETE UNLESS
OTHERWISE STATED, THE CONTRACTOR WILL BE FULLY RESPONSIBLE
9 . PROVIDE 1000 G. POLYTHEEN SHEETS UNDER THE P.C.C OF
FOR QUALITY OF CONCRETE. IF THE CLIENT& CONSULTANT ASK TO THE
FOUNDATION & FLOOR P.C.C.
CONTRACTOR FOR THE CUBE/CORE TEST THE CONTRACTOR WILL
3 Y20@15 C/C T&B Y20@15 C/C T&B Y20@15 C/C T&B Y20@15 C/C T&B 10 . APPLY TWO COATS BITUMEN ON THE UNDER GROUND CONCRETE
PRODUCE TEST WITHOUT CLAIM ANY EXTRA AMOUNT.
SURFACE AND BLOCK WORK INCLUDING BUILDING, TANK, INSPECTION
CHAMBER. 6. PLAIN CONCRETE SHALL HAVE A MINIMUM 28 DAYS CURE CRUSHING
2
11. CONCRETE OF 28 DAYS CURE CRUSHING STRENGTH OF 40 N / MM2 STRENGTH OF 30 KN./CM
12. USE CONCRETE OF GRADE M40(READY MIX) & STEEL Fe460. 7. REINFORCEMENT DENOTED BY THE SYMBOL Y SHALL HIGH STRENGTH
13. "Y"DENOTES HIGH YIELD STRENGTH STEEL OF 460 N/MM2 YIELD STRESS. DEFORMED BARS WITH A MINIMUM YIELD STRENGTH OF 425 KN/CM2
2.50
14. ALL MATERIALS SHOULD BE APPROVED BY CONSULTANT. 8. REINFORCEMENT DENOTED BY THE SYMBOL R SHALL BE MILD STEEL
Y25@15 C/C T&B 15. REFER GENERAL SHEETS FOR MORE DETAILS, NOTES.
16. HATCHED PORTIONS TO BE SUNK BY 20cm. UNLESS OTHERWISE
BARS WITH A MINIMUM YIELD STRENGTH OF 240 KN./CM2
9 . MINIMUM LAPPING LENGTH AND ANCHORAGE LENGTH OF REINFORCING
0.80 0.60
ANY ADDITIONAL TREATMENT OR CHANGES SUCH AS (RETAINING WALL,
SHORING, DEPTH OF FOUNDATION ETC.) DURING OR BEFORE EXCAVATION. 11 . APPLY TWO COATS BITUMEN ON THE UNDER GROUND CONCRETE
4 21. CLEAR COVER TO STEEL REINFORCEMENT TO BE SURFACE AND BLOCK WORK INCLUDING BUILDING, TANK, INSPECTION
FOOTING - 75 MM CHAMBER.
COLUMNS - 25 MM 12.IN BEAMS MORE THAN 70CM DEPTH 2Y12 FACE BARS MUST BE PROVIDED.
1.70
AT EACH SIDE.
23 . NO LAPPING TO BE PROVIDED CENTER OF THE BOTTOM BAR AND
17.WASHED SAND & CRUSHER AGGREGATES TO BE USED FOR ALL
SUPPORT OF THE TOP BAR, FROM BOTTOM BAR LAPPING TO BE
Y25@15 C/C T&B SUPPORT AND CENTER TO BE TOP BAR.
CONCRETE WORKS
18.WEATHER PROOF SHUTTERING SHALL BE USED FOR ALL R.C.C WORKS.
24. IN COASTAL AREA EPOXY COATED STEEL SHOULD BE PROVIDED UPTO
Y25@15 C/C T&B
19.PROPER CURING SHALL BE CARRIED OUT OF ALL CONCRETE AND OTHER
0.30
0.30
5 PLINTH LEVEL & RUBBLE PACKING TO BE PROVIDED BELOW FOUNDATION CEMENT WORKS.
5*
C4 C4 20. IF THE CLIENT & CONSULTANT ASK TO THE CONTRACTOR FOR THE
CUBE/CORE TEST THE CONTRACTOR WILL PRODUCE TEST WITHOUT
0.60
0.60
CLAIM ANY EXTRA AMOUNT.
Y20@20 C/C EXTRA TOP
6 WATER TANK
X X
1.60
1.60
Y25@15 C/C T&B
Y25@15 C/C T&B
7
1.05
1.05
9
C4 C4 12 NOS 25mm DIA. EACH SIDE
Y25@15 C/C T&B
0.95
0.95
Y12@12mm
S.W-1
Y25@15 C/C T&B
10 S.W-1
Y10@12mm
0.80
0.80
24.80
24.80
Y25@15 C/C T&B Y Y25@15 C/C T&B
11 Y18@15mmC/C &
2.50
1.20
12 HOLDING TANK
0.30
1.60
1.60
Y 0.60 1.30 0.60
14
2.50
1.40
1.40
Y25@15 C/C T&B Y25@15 C/C T&B
By Eng. Abdullah Al Balushi at 8:36 am, Oct 03, 2024
Y25@15 C/C T&B
15
DETAILS S.W - 1
2.00
2.00
C3 C3
SCALE :1 : 25
17
2.40
Y20@15 C/C T&B
SCHEDULE OF COLUMNS
19
FROM FOUNDATION TO 3RD. FLOOR ROOF SLAB TO 7TH. FLOOR ROOF SLAB TO
1.05
1.05
RAFT FOOTING 3RD. FLOOR ROOF SLAB LVL 7TH FLOOR ROOF SLAB LVL 12TH FLOOR ROOF SLAB LVL MR. QAHTAN HAMED NASSER AL HINAI
TYPE LINKS
21 DEPTH - 130 cm. SIZE REINF. SIZE REINF. SIZE REINF. Use PLOT NO. Location
Y20@15 C/C T&B Y20@15 C/C T&B Y20@15 C/C T&B COMMERCIAL 3202 AL SEEB
C1 22Y20 22Y18 22Y16 AS DET.
Y20@15 C/C T&B Y20@15 C/C T&B 35 X 90 35 X 90 35 X 90 BUILDING PHASE NO: 7 AL MABELAH SOUTH
2.55
2.55
Y20@15 C/C T&B
FOUNDATION , COLUMN AXIS PLAN Project No. DRAWING TYPE SHEET NO.
ST - 01