BOQ - Water Feature - WP

Uploaded by

Abdul Latheef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

BOQ - Water Feature - WP

Uploaded by

Abdul Latheef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CELEBRATION PLAZA - AL SHAMKHA

Bill of Quantities
Bill 3 - Mosque Plaza

Ref Description Qty Unit Rate Total

Bill 3, Pg.13 of 18

8 EXTERNAL WORKS (Continued)

8.5 External fixtures (Continued)

8.5.2 Ornamental features (Continued)

Water feature structure; complete as shown on Drawing no.


2020_018-01-BMA-LS-DT-09028; utility connections measured separately
A Foundation excavation for foundations; not exceeding 2m 168 m3 -
B Disposal of previously excavated off site to a suitable location in accordance with 168 m3 -
Engineer requirements
C Compaction of existing sub-grade 98% MDD 27 m2 -
D Anti-termite; to face of soil; horizontally 178 m2 -
E Anti-termite; to face of soil; vertically 42 m2 -
F Plain in-situ concrete; blinding - assumed 75 mm thick; concrete grade 13 m3 -
C15/20; to underside of slab on grade
G Cast in-situ reinforced concrete; slab on grade - 200mm thick; concrete 36 m3 -
grade C25/30
H Cast in-situ reinforced concrete; retaining wall - 200mm thick; concrete 6 m3 -
grade C35/45
J Formworks; edges of horizontal work; 200mm thick 49 m -
K Formworks; faces of walls; vertically 64 m2 -
L Reinforcement; high yield steel bars with varying size; including main bars and 5,400 kg -
links; to concrete slab; rebar allowance of 150kg/m3
M Reinforcement; high yield steel bars with varying size; including main bars and 900 kg -
links; to concrete walls; rebar allowance of 150kg/m3
N Surface finishes to in-situ concrete; waterproofing membrane; horizontally 178 m2 -
to underside of slab on grade; comprising of bituminous paint primer coat and
5mm SBS modified bitumonous membrane
P Surface finishes to in-situ concrete; waterproofing membrane; vertical sides 42 m2 -
to face of soil; comprising of bituminous paint primer coat and
5mm SBS modified bitumonous membrane
Q Surface finishes to in-situ concrete; 50mm thick protection screed; horizontally 178 m2 -
to underside of slab on grade
R Surface finishes to in-situ concrete; 6mm bituminous protection board; vertical 42 m2 -
sides to face of soil
S Surface finishes to in-situ concrete; 1 layer of 1000 gauge polythene sheet; 178 m2 -
horizontally to top surfaces of to underside of slab on grade
T Surface finishes to in-situ concrete; 1 layer of 150mm thick road base material 178 m2 -
of 80% CBR value to a strenght of 98%MDD
U Surface finishes to in-situ concrete; 50mm thick leveling screed; concrete 178 m2 -
grade C15/20; to top surfaces of slab on grade
V Surface finishes to in-situ concrete; waterproofing membrane; horizontally to 178 m2 -
top surfaces of slab on grade
W Surface finishes to in-situ concrete; waterproofing membrane; horizontally to 16 m2 -
internal side of walls to water feature
X Dry deck feature; 600x600x50mm thick granite on pedestals - type GP4 178 m2 -
(EXT-107); including setting bed/mortar
Y Steel grating; 250mm wide 48 m -

Total - UAE Dirhams


-