METHOD STATEMENT Doc No: B&V/EI/CP-01

Rev: 00
FLOW METER CALIBRATION Page: 1 of 2

1. OBJECTIVE
The objective of this method statement is to provide general guidelines for calibration, testing,
identification and storage of instrument at project sites.

2. SCOPE
Scope of this method statement covers the following activities.
• Procedure
• Precautions
• Inspection

3. REFERENCE
3.1. PROJECT RECORDS
• System Flow Sheets for Flow Meters
• Flow Meter Calibration Standards, specifications
• Others

3.2. QUALITY PLAN (QP)


• Quality plan for Flow Meter calibration

3.3. CODES AND STANDARDS


• Related latest Standard Codes and Specifications

4. ABBREVIATIONS/DEFINITIONS
I/C Incharge
ITP Inspection and Test Plan
E/I Electrical & Instrumentation
NEC National Electrical Code
BS British Standard
DIN Din Standard
MS Method Statement
PPE Personal Protection Equipment
HSE PLAN Health Safety & Environment Plan

5. RESPONSIBILITIES
• It is overall responsibility of I/C to organize resources to perform construction activities as per
project specification, in compliance with quality, schedule & HSE requirements

6. PROCEDURES
The procedure consists of the following
• Test equipment control and traceability
• Calibration plan
• Calibration procedure

Do not Duplicate, Controlled Copy If Stamped In Red


Bolt & Volt Private Limited
METHOD STATEMENT Doc No: B&V/EI/CP-01
Rev: 00
FLOW METER CALIBRATION Page: 2 of 2

6.1. HANDLING AND CONTROL OF MATERIAL


• Flow Meters shall be calibrated at the site as per their relative calibration procedure.
• The calibration data shall be recorded on their respective formats. Install a sticker
mentioning the details i.e. date, type, rate, location and the particular tag number.
• The flow meter nonconformed with the calibration shall be informed to client with a sticker
and the corrective action request (CAR).
• The open ports and tube ends of the instruments shall be safe guarded by means of relevant
size of stop plugs or tape.

6.2. TEST EQUIPMENT CONTROL AND TRACEABILITY


All the equipment being used for the calibration shall be itself calibrated and certified by a third
party. The calibration record shall be maintained on a format called control sheet calibration
equipment.

6.3. CALIBRATION PROCEDURES


For calibration of instruments and equipment procedure are as listed below:

6.4. DIFFERENTIAL PRESSURE TRANSMITTER


Place the differential pressure transmitter at the test table. Read the information given on the
instrument tag and specifications supplied along with by the vendor.
1) Inspect the differential pressure transmitter for the following
2) Make a visual inspection for any missing or damage.
3) Connect the transmitter's process connections to the pneumatic calibrator.
4) Connect an AVO meter at the out put terminals of the transmitter.
5) Supply regulated air pressure (instrument air) or electric power supply to the transmitter.
6) Apply pressure approximately to the full range of the transmitter to check leakage in the
system, use soapy water for detection.
7) De--pressurize the system.
8) Check and record the readings at "zero percent" pressure.
9) Now increase the pressure step wise and record the readings for "25%,50%,75% and 100%.
10) Decrease the pressure in descending order from 100% to 0% in stages of 75%,50%,25% and
at last at 0% and record the readings. These shall verify the previous readings taken.
11) In case percentage error is greater than the specification requirements, adjust the "zero and
span" again and repeat the step # 8, # 9, # 10.
12) After completing the process issue the test report for site use and record.

7. HSE INSTRUCTIONS
• All efforts shall be made to keep the environment clean
• No smoking is permitted in restricted areas
• During the calibration always follow the instruction manual and the special instructions given by
the manufacturer. All the calibration shall be according to the client's specification. Only trained
engineers, inspectors and technicians shall perform the calibration work

Do not Duplicate, Controlled Copy If Stamped In Red