Ds ES54 S2 01 Secondary Three Phase Services 120 208V and 347 600V Up To 1600A
Ds ES54 S2 01 Secondary Three Phase Services 120 208V and 347 600V Up To 1600A
Application
This standard describes requirements for installing secondary three-phase services up to 1600 A 120/208 V and
347/600 V supply on private property.
Revision Notes
Updated reference in note 2.8 from ES54 S0-04 to ES53 S1-01. Added dimensions to Figures 2 and 3. Added
kiosk parts, descriptions, and dimensions to Figure 4. Added dimensions and references to other figures to Figures
5 and 6. Updated dimensions and added details and references to other figures to Figure 7. Updated dimensions
and Table 2 in Figure 8. Added dimensions and references to other figures and removed note on perpendicular
bus bars from Figure 9. Added new Figures 10, 12, and 13. Added note and centre lines to Figures 11. Moved
underground parking level 2 pull box and updated references to other standards and figures in Figure 14.
Removed dimension and added note to Figure 16. Substantive changes are marked by green vertical revision lines
in the left margin. This revision released concurrently with Standards and Equipment Advisory Information Bulletin
2023-049 R1 Revised ES54 S2-01 Secondary Three-Phase Services 120/208 V and 347/600 V up to 1600 A
Private Property Installation.
References
BC Hydro Distribution Standards
ES53 S1-01 Secondary Services Single-Phase up to 600 A 120/240 V Wiring and Revenue
Metering Connections
ES53 S2-01 Secondary Services Three-Phase to 1600 A
ES53 U1-01 Cable and Conductor Data, New Construction
ES53 Z8-03 Cable Grips, Ties, and Tie Mount
ES54 section B Pull/Splice, Service, and Junction Boxes
ES54 section F Transformer Pads and Vaults
ES54 S0-02 Services General Notes
ES54 S0-04 General Notes Secondary Services
ES54 S0-05 Services General Notes Service Ducts and Trenches
ES54 S3-04 Primary Services Service Duct to Rear Yard Narrow Side Yard Installation
ES55 section D3 Conductor Data, Cable Pulling
Other BC Hydro Documents
DI S10-4 Electric Service Connections – Voltages
Secondary Metering Requirements for Secondary Voltage Revenue Metering (750 V and less)
External Documents
BCEC Canadian Electrical Code, Part I (CSA C22.1) adopted for BC and endorsed by
Technical Safety BC (TSBC)
Professional of Record
Designed:
M. Kelvin, P. Eng Secondary Three-Phase Services
Checked: 120/208 V and 347/600 V up to
M. Kelvin, P. Eng
1600 A Private Property Installation
Reviewed:
M. Stevens, P. Eng
Approved:
H. Giesbrecht, P. Eng
Issued: 2024-06-10
Effective: 2024-07-30
ES54 S2-01 R10
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 1 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Notes
Table 1 – Size of pull boxes and wireways installed in a building at service entrance equipment or mid-cable run
1. Materials
a. All materials from the stub-off on private property shall be supplied and installed by the customer.
b. Materials installed on private property, including meter socket, service panels, and switchgear, shall be
CSA certified. Material and electrical equipment up to the utility’s point of connection to customer-owned
equipment, including grounding and duct work, is exempt from the BC Electrical Safety Regulation. This
equipment is not within the jurisdiction of electrical inspection authorities and permits are not required for
this work.
2. Installation Requirements
2.1 General
a. Building parkade vehicle access shall be 2100 mm minimum.
b. A customer building elevator cannot be the only point of access for BC Hydro crews performing utility
work and carrying out their duty as the utility.
2.2 Service in Duct
See ES54 S0-05 for BC Hydro requirements for service in ducts on private property.
2.3 Wall Entry
The customer shall ensure a smooth transition to avoid service duct and cable damage caused by
differential settlement wherever service ducts enter a building foundation wall or where differential
settlements are expected to occur. See ES54 S0-05 for BC Hydro requirements for direct burial of supply
service ducts on private property.
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 2 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 3 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
295
MIN
5
13 IN
M
( )
* Main service meter socket
(hot style 7 jaw)
N
Lug size:
#2 - 3/0, Cu
MIN
480
#2 - 250 kcmil, Al
Customer
Customer service service panel
duct as per BCEC 120/208 V
Ø75 to Ø100
PVC coupling
BC Hydro supply
200 A
Figure 1 – Single 200 A three-phase service for 120/208 V, fault level <10 kA
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 4 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
B
C
N
1500-1800
G
BC Hydro supply
WW service ducts
utility wireway
Grade/ Floor
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 5 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
WW Service Customer
Utility wireway main load feeders
S1
A 200 A
B
C A V S2
BC Hydro N 200 A
utility supply Service
main
2350 MAX
cables
S3
N 600 A
BC Hydro
Cable channel revenue
(see note 2.8) metering
S4
Bonding 800 A
jumper
MIN
300
Grade/Floor
Bonding bus
BC Hydro supply service
Customer service
ducts Ø100 MIN
grounding conductors
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 6 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
WW Customer
Service
utility wireway access door Hinge
main
5A Revenue
BC Hydro meter
supply 600 N
cables Tipping
force
(**) ( )
*
A B C N RM RM ℄
S
C
2350 MAX
Ø121"
elbow
Ø3/4" duct
1400 MIN
CT/PT
2000
Cable channels
1500 ~ 1800
compartment B
(see note 2.8)
750 MAX
600 MIN
N A B C C
MIN
300
Bonding
50 bus
MIN
MIN
50
50
MIN
200
MIN Customer
Utility Concrete
service ducts Helical
supply To customer pad
Ø4" ducts service anchor
Gravel
ground Sono tube
pit
Frost Line
MIN
150
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 7 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Certified
splitter box (see Iigure 13)
A
B Customer service
C conductors
N
450 MIN
300
MIN Customer
service main
Edge grommets
by customer
2350 MAX
1400 MIN
Cable channel
H
D
3
( ) 2/ D
*
50
75
WW
utility wireway
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 8 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
W
utility pullbox
50
D
3
D 2/ Top entry 75
Certified
splitter box
(see Iigure 13)
A
Rear entry B Customer
(*) C service
N conductors
450 MIN
0 300
10 X
A MIN
M
(*)
Customer
service main
50
2350 MAX
Edge grommet
by customer
(see note 2.5)
H
Side entry
BC Hydro utility
supply cables
Cable channel
(see note 2.8)
300
750 MAX
600 MIN
MIN
D
3 0
2/ 45 IN
M
Floor slab
Pulling iron
WW
(see note 2.7)
utility wireway
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 9 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Mainswitch WW
Customer (customer) utility wireway
switchgear
N
( )
*
BC Hydro utility
supply cables
2350 MAX
Cable channel
(see ES53 S1-01 for cable
1400 MIN
clamp sizes supplied and
installed by BC Hydro)
600 MIN
50
D
2/3
75
See Getail 2
for alternate acceptable Floor slab
duct configuration
50 50
± 2" (50mm)
± 2" (50mm)
2/3 D
50
℄ ℄
D
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 10 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Customer Mainswitch WW W
switchgear (customer) utility wireway utility pullbox
Top entry
D D
2/3
(
**) Rear entry
200 MIN
A
50
200 MIN
B MIN
100
MIN
50
C MIN
Side entry
N
(see note 2.5)
( )
*
0
10
X
MA
2350 MAX
BC Hydro
utility supply
50 MIN
Cable channel cables
(see note 2.8)
3.8)
(Table 2)
H MIN
1400 MIN
N
MI
(Table 2)
(Table 2)
0
45
V MIN
H MIN
Access for
600 MIN
conductors 300
MIN
D
2/3
Pulling iron
(see note 2.7)
Edge grommets
by customer
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 11 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
A Cable channel
B (see note 2.8)
C
N
1200
MAX
Main
2350 MAX
switch
1400 MIN
CT/PT Complete bend to vertical position.
MIN
300
compartment Concrete pedestal will be required
for ducts buried less than 910 mm.
MAX
Do not cut 90° bends.
600
MIN
300
Floor
MIN
300
Bell ends
MIN
900
10
R9 1050
R
or
Figure 10 – Acceptable vertically spaced buses with cable lugs mounted on bus flags
(see ES54 S1-03 Figure 10 for vertically mounted splitter)
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 12 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
N C B A
A
NC B A
B
CSA
C
Front
Front
spacing
N
(*)100 TYP
MIN ℄ ℄ ℄ ℄
(*) 100 TYP
MIN ℄ ℄ ℄ ℄
Front View Side View Front View Side View
Figure 12 – Acceptable cable bus option for splitter, 100 mm (4") on centre for bus spacing (cable bus from service
main breaker terminating into double-sided terminal block inside BC Hydro wireway is unacceptable)
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 13 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
℄ ℄ ℄
100 100 100
A
_ 40
(*) (*) (*)
L1
L2
L3
N
35
B
_
Plan View Section A
1 - 600 kcm or
2 - 250 kcm lugs
Section B
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 14 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
BC Hydro service
run inside ceiling
PMT *
Pulling iron
* (if required)
Pulling iron
See Getail 1 (if required)
Customer pull box
900Wx1800Hx800D Customer
(sealable or lockable) secondary
service
See ES54 S0-05
*
Protection posts
1500 *
Pulling iron
MIN
(if required)
* U/G Sarking 1
Pulling iron
Concrete protection pedestal
(if required)
75 U/G Sarking 2
Concrete
BC Hydro
Ø100 ducts Mid-run 632 or 832 pull box
(see Figure 16)
50
Customer
foundation 6HH)LJXUHDQG(66QRWHIRUFDEOHSXOOLQJLURQUHTXLUHPHQWV
wall
Detail 1
Service Duct Inside Wall
(Vee ES54 S3-04)
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 15 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
12
152
Ø2
22x 2
33
Slo 33
t
128 Removable pulling iron
(Pat. Qo: 420-0918
33
3000
P P D
2
BC Hydro 3 D
pulling tripod 18 kN Cable
(TYP) guide
sheave
Bell
1500 ends
MIN
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 16 of 17
Secondary Three-Phase Services 120/208 V and 347/600 V
up to 1600 A Private Property Installation ES54 S2-01
Finished grade
BC Hydro
service
duct
Use only for doing work with or for BC Hydro. See legal disclaimer in ES54 A1-01. 2024-06-10, rev.10
Page 17 of 17