0% found this document useful (0 votes)
66 views

NVS - Intr Fitout CHK List - C&I

Uploaded by

Sunny Makwana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

NVS - Intr Fitout CHK List - C&I

Uploaded by

Sunny Makwana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 42

Client Logo

<Project Name>
Package Inspection Report No
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Partition Marking Signature
Wing Dwg Ref.No Rev
Inspection
Floor
Request No
Location Date
S. No Description Yes No Remarks
1 Is the drawing No. coorect? c c
2 Is the latest revision of drawing available? c c
3 Is the right angle of the partition checked? c c
4 Are the inner dimensions of the cabin as per dwg? c c
5 Is the marking of partition thickness as per dwg? c c
6 Is the reference from the column as per dwg? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :


Legend: NA - Not Applicable
Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-032/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 1 of 42


Client Logo

Checklist for Installation of Interior Works


<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Wall paneling Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the drawing No. coorect? c c
2 Is the latest revision of drawing available? c c
3 Is the reference from the column as per dwg? c c
4 Is the reference from the cabin as per dwg? c c
5 Is the marking of risers checked? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable

Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-033/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 2 of 42


Client Logo

Checklist for Installation of Interior Works


<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Raceways for floor Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the drawing No. coorect? c c
2 Is the latest revision of drawing available? c c
3 Are the risers marked as per dwg? c c
4 Is the thickness of raceways as per specifications? c c
5 Is the make of raceways as per specifications? c c
6 Is the routing as per drawing? c c
7 Have the gaps in the raceway been checked? c c
8 Have the junction bex been closed? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-034/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 3 of 42


Client Logo

Checklist for Installation of Interior Works


<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Screed Works Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the drawing No. correct? c c
2 Is the latest revision of drawing available? c c
3 Are the levels as per the drawing? c c
4 Is the mother slab clean as per requirement? c c
5 Have you checked for channel fixing? c c
6 Is the mix ratio as per specification? c c
7 Have the services works been completed as per requirement? c c
8 Were the levels checked after screeding? c c
9 Is the finishing as per requirement? c c
10 Was curing done as per specifications? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-035/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd 4 of 42


Client Logo

Checklist for Installation of Interior Works


<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Glazed partition Signature

Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the Approved Shop drawing available? c c
2 Are the dimensions as per dwg? c c
3 Is the wooden support on top available as per requirement? c c
4 Is the wooden thickness as per specification? c c
5 Is the wooden support of approved make? c c
6 Is the partition thickness as per specification? c c
7 Is the glass thickness as per specification? c c
8 Is the glass as per specification? (toughened / ordinary) c c
9 Is the thickness for aluminum /salwood section as per specifications? c c
10 Is the laminate / veneer fixing pattern as per specifications? c c
11 Is the thickness of laminate / Veneer as per specifications? c c
12 Is the groove size / thickness as per specifications? c c
13 Is the beading fixing as per specifications? c c
14 Is the beading thickness as per specifications? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-036/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 5 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Partition first side gyp closing Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the Approved Shop drawing available? c c
2 Is the aluminum / salwood boxing as per requirement? c c
3 Are the dimensions as per dwg? c c
4 Is aluminium/salwood boxing of approved make? c c
5 Is the thickness of aluminum / salwood as per specification? c c
6 Is the fixing of partition on the ceiling and flooring done as per dwg? c c
7 Is Gyp / MDF of approved make? c c
8 Is the thickness of Gyp / MDF as per specifications? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-038/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 6 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Partition 2nd/3rd/4th side gyp closing Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Are the conduit laying for light fixtures in place? c c
2 Are the conduit laying for Speakers in place? c c
3 Are the conduit laying for Volume Control in place? c c
4 Are the conduit laying for Thermostat in place? c c
5 Is the Glass wool fixing done? c c
6 Is the thickness of glass wool as per specifications? c c
7 Is glass wool of approved make? c c
8 Is there provision given for cable tray / conduit above false ceiling as per re c c
9 Is the electrical box fixing done? c c
10 Is the cable pulling done for data / voice? c c
11 Is groove size as per specification? c c
12 Is groove thickness as per specification? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-039/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 7 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Partition above false ceiling Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the partition fixing on top and bottom done as per requirement? c c
2 Are the Gyp/MDF packing done on both side? c c
3 Is the above false ceiling partition frame as per requirement? c c
4 Is the above false ceiling partition on both side gyp / MDF fixing in place? c c
5 Is the gap closed around the conduit? c c
6 Is the gap closed around the cable tray? c c
7 Is the gap closed around the duct? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-042/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 8 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work MDF/Ply fixing Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the Approved Shop drawing available? c c
2 Are the Aluminum / wood partitions as per requirement? c c
3 Are the dimensions as per dwg? c c
4 Have you checked the L clamp screwing? c c
5 Is the MDF/ply of approved make? c c
6 Is the thickness of MDF/ply as per specification? c c
7 Is the screw / nail size as per requirement? c c
8 Are the MDF/ply joints screwing in place? c c
9 Are the MDF/ply fixing done with proper screws? c c
10 Is the conduit laying for light fixtures in place? c c
11 Is the conduit laying for Speakers in place? c c
12 Is the conduit laying for volume control in place? c c
13 Is the conduit laying for Thermostat in place? c c
14 Is the Glass wool fixing done? c c
15 Is the thickness of glass wool as per specifications? c c
16 Is glass wool of approved make? c c
Is there provision given for cable tray / conduit above false ceiling as per
17 c c
requirement?
18 Is the electrical box fixing done? c c
19 Is the cable pulling done for data / voice? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-044/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 9 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Veneer/Partition fixing on the partition Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the Ply / MDF partition in right angle? c c
2 Is the Ply/ MDF partition nail/screw fixing done properly? c c
3 Is the veneer/laminate of approved make? c c
4 Have you checked the Code no? c c
5 Have you checked the grains? c c
6 Is the Approved Shop drawing available? c c
7 Are the grains matching? c c
8 Is the veneer/laminate polishing done? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-048/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 10 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name

Laminate & Veneer Paneling (MDF or Ply) on Partition Inspected by


Description of Work Signature
/ Wall

Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the make of the veneer/laminate as per specfications? c c
2 Is the shade of the veneer/laminate as per specifications? c c
3 Is the grain design of the veneer as per specifications? c c
4 Is the thickness of the veneer/laminate as per specifications? c c
5 Is the quality of the frames used for the paneling as per specification? c c
6 Have you checked the gap between the frame work for the paneling? c c
7 Are the hardware(screws etc) used for the paneling as per requirement? c c
8 Is the workmanship of the frame work as per requirement? c c
9 Is the thickness of the MDF/ Ply used as per specification? c c
10 Is the quality of the MDF/ Ply used as per specification? c c
11 Are the fixing details of the MDF/ Ply used as per dwg? c c
12 Is the adhesive used for fixing the veneer/laminate as per specification? c c
13 Is the workmanship of the veneer/laminate fixing as per requirement? c c

14 Is the grain design after fixing of the veneer matching? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-050/Rev02/Feb 2021

CBRE South Asia Pvt. Ltd. Project Management, India 11 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Whiteboard on Walls & Partition Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the quality of the white board as per specification? c c
2 Is the shade of the white board as per specification? c c
3 Is the frame work of partition as per requirement? c c
4 Is the beading used for fixing of the white board as per requirement? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-054/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 12 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work POP on the walls Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Has the dryness of the wall surface been checked c c
2 Has the quality of the POP material used been checked c c

3 Has the thickness of the material applied on the wall surface been checked c c

4 Are the walls checked for any air gaps c c


5 Has the alignment of the wall checked after POP punning c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-060/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 13 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Putty for the partition Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Has the dryness of the wall surface been checked c c
2 Has the quality of the POP material used been checked c c

3 Has the thickness of the material applied on the wall surface been checked c c

4 Are the walls checked for any air gaps c c


5 Has the alignment of the wall checked after POP punning c c
6 Was the gap at the junction of wall & partition checked c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-061/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 14 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work 1st coat of primer Signature
Wing Dwg Ref.No Rev

Floor Inspection
Request No
Location Date
S. No Description Yes No Remarks
1 Was the surface level checked c c
2 Has the surface been checked for proper smoothness c c
3 Has the quality of the primer been checked c c
4 Is the material applied uniformly c c
5 Was the surface checked for proper drying of Primer c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-062/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 15 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Surface preparation Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the sand paper used for leveling c c
2 Has the alignment of the surface been checked c c
3 Are the holes/gaps filled properly c c
4 Was proper leveling of the surface done using sand paper c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-063/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 16 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work 2nd/3rd coat paint Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the surface levelling done? c c
2 Is proper smoothness of the surface achieved? c c
3 Is the quality of paint as per specification? c c
4 Is the material uniformly applied? c c
5 Is proper painting done using a roller? c c
6 Check for proper drying of the paint c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-064/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 17 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work 1st Coat paint clean on the texture Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the plastering checked for smooth finish c c
2 Was the application of primer checked c c
Was the sand paper used for sanding, to smoothen lumps or hard surfaces
3 c c
on walls?
4 Is the POP finish proper c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-066/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 18 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work POP bullmarking on the column Signature

Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the ceiling to flooring wall undulation checked with plumb c c
2 Is the column marked at mid height from floor level c c
3 Were instructions give for plastering, if an undulation is more than 2cm c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-067/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 19 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Skirting fixing Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the skirting material as per specification? c c
2 Does the material match with the approved sample? c c
3 Is the finish as per requirement? c c
4 Is fixing detail as per approval? c c
5 Is design of skirting as per dwg? c c
6 Have you checked for any moulding? (Half round, PVC corner trim, etc) c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-070/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 20 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Tile fixing on the grid frame work Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
Has the L angle been properly fastened on the true ceiling with specified
1 c c
anchor fasteners
2 Are all the Frame work materials used as per specs c c
Were the intermediate support been given to the both sides of Slotted
3 c c
angle grill

4 Are the vertical ends properly supported with intermediate and L angle c c

5 Has the surface been finished as per the required ceiling level c c
6 Is the frame at right angle with wall ( every 2m) c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-075/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 21 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Door Frame Signature
Wing BOQ Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No NA Remarks
Was the quality of wood checked and found to be same as
1 c c c
approved
2 was the section of door frame checked c c c
3 Was the size of door frame checked c c c
4 Was the holdfasts fixed properly c c c
5 Has the direction of door opening been checked c c c
6 Was the frame finishing and polishing checked c c c
7 Was the groove between door frame and partition checked c c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-076/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 22 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Door Hardware Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Hinges
1.1 Was the make of hinges checked c c
1.2 Was the Model number checked c c
1.3 Were the hinges checked for diemension c c
1.4 Was the positioning of hinges checked and found as per drawing c c
1.5 Were the screws used for fixing the hinges checked c c
1.6 Was the working condition of hinges checked c c
2 Handles
2.1 Was the make of handles checked c c
2.2 Was the Model number checked c c
2.3 Were the handles checked for diemension c c
2.4 Was the positioning of handles checked and found as per drawing c c
2.5 Were the screws used for fixing the handles checked c c
2.6 Was the working condition of handles checked c c
3 Lock
3.1 Was the make of Locks checked c c
3.2 Was the Model number checked c c
3.3 Were the Locks checked for diemension c c
3.4 Was the positioning of Locks checked and found as per drawing c c
3.5 Were the screws used for fixing the Locks checked c c
3.6 Was the working condition of Locks checked c c
3.7 Were the number of keys checked c c
4 Door Closer
4.1 Was the make of Door closer checked c c
4.2 Was the Model number checked c c
4.3 Were the Door closer checked for diemension c c
4.4 Was the positioning of Door closer checked and found as per drawing c c
4.5 Were the screws used for fixing the Door closer checked c c
4.6 Was the Closing speed of the Door closer checked c c
4.7 Was the Latching action of Door closer checked c c
4.8 Was the Backcheck of Door Closer checked c c
4.9 Has the door been checked for delayed action c c
5 Door Stopper
5.1 Was the make of Door Stopper checked c c
5.2 Was the Model number checked c c
5.3 Were the Door Stoppers checked for diemension c c

CBRE South Asia Pvt. Ltd. Project Management, India 23 of 42


Client Logo
5.4 Was the positioning of Door Stopper checked and found as per drawing c c
5.5 Were the screws used for fixing the Door Stoppers checked c c
5.6 Was the working condition of Door Stopper checked c c
6 Tower Bolts
6.1 Was the make of Tower Bolts checked c c
6.2 Was the Model number checked c c
6.3 Were the Tower Bolts checked for diemension c c
6.4 Was the positioning of Tower Bolts checked and found as per drawing c c
6.5 Were the screws used for fixing the Tower Bolts checked c c
6.6 Was the working condition of Tower Bolts checked c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-078/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 24 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Door Shutter Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Doors
1.1 Were the Door shutters checked and found to be same as approved c c
1.2 Was the Door Shutters checked for approved quality of plywood c c
1.3 Was the moisture content checked c c
1.4 Are the Door Shutters free from insects c c
1.5 Was the height of shutter checked c c
1.6 Was the width of shutter checked c c
1.7 Was the thickness of shutter checked c c
1.8 Is the right angle of the shutter checked c c
Was the shutter checked and found to be free from twist or warp in its
1.9 c c
plane
1.10 Were the edges checked for both smooth and even textures c c
2 Door Finish
2.1 Was the adhesives used for fixing laminate or veneer checked c c
2.2 Was the thickness of laminate checked c c
2.3 Was the type of laminate checked c c
2.4 Were the position of grains for laminate checked c c
2.5 Was the thickness of veneer checked c c
2.6 Was the type of veneer checked c c
2.7 Were the position of grains for veneer checked c c
2.8 Is the vision panel checked c c
2.9 Was the beading for fixing the vision panel checked c c
2.10 Was the wooden surface checked for the polishing(paint) c c
2.11 Are the louvers checked c c
3 Door Fixing
3.1 Was the opening direction of the shutters checked c c
3.2 Were the number of hinges checked c c
3.3 Were the screws used for fixing the hinges checked c c
3.4 Was the tolerance of gaps checked c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-077/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 25 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Glass Doors Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Specifications c c
1.1 Was the make of glass checked and found to be same as approved ? c c
1.2 Was the quality of glass checked and found to be same as approved ? c c
1.3 Was the height of the glass checked c c
1.4 Was the width of the glass checked c c
1.5 Was the thickness of the glass checked c c
1.6 Was the right angle of the glass checked c c
2 Finish Quality c c
2.1 Was the glass checked for scratches c c
2.2 Was the glass doors checked for any breakages in the corner and sides c c
2.3 Was the glass door checked and found free of twist or warp in its plane c c
2.4 Were the edges checked for both smooth and even textures c c
2.5 Was the opening direction of door checked c c
Was the door checked for tolerance of gaps between the glass door and
2.6 c c
adjacent partition
2.7 Is the glass door surface plane c c
2.8 Was the functioning of patch fittings checked c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-079/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. 26 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Floor Marking Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Is the approved drawing with latest revision available? c c
2 Are the reference points checked? c c
3 Is the thickness checked? c c
4 Is the right angle of the partition checked? c c
5 Is the diagonal of room checked? c c
6 Is the size of modular storage checked? c c
7 Is the size of workstation checked? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-085/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 27 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Carpet Laying Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Were the carpet samples approved ? c c
2 Was the make of carpet checked and found same as approved ? c c
3 Was the make of adhesives checked and found to be same as approved ? c c
4 Was the marble checked for uniformity of color and shade c c
5 Was the eveness of floor checked and found satisfactory ? c c
6 Were the tile size found in accordance to the drawing ? c c
7 Was the surface preperation checked before laying of carpet ? c c
8 Was the flooring pattern checked ? c c
9 Were the joints checked ? c c
Was the cleanliness and finishing near floor junction box checked and found
10 c c
satisfactory ?
11 Was the carpet protected by polythene sheet ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-088/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 28 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Modular Furniture Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Modular Frame Work
1.1 Are the markings as per drawing? c c
1.2 Are the frames fixed as required? c c
1.3 Is the initial alignment of frames as per dwg? c c
1.4 Is the level of frames as per dwg? c c
2 Modular Partition Services sign off
2.1 Are the raw power cables as per dwg? c c
2.2 Are the UPS power cables as per dwg? c c
2.3 Are the DATA/Voice cables as per dwg? c c
2.4 Are the frames aligned after pulling of cables? c c
3 Modular Panel Fixing
3.1 Is the modular panel fixing checked? c c
3.2 Is the pattern as per drawing? c c
4 Service open in modular
4.1 Are the services openings as per the drawing? c c
4.2 Is the fixing of electrical face plates, switches & sockets as per dwg? c c
4.3 Are the DATA/Voice IO's as per requirement? c c
5 Table top fixing
5.1 Is the table top properly fixed? c c
5.2 Is the level of Table top as per requirement? c c
5.3 Are the wire managers, gromats in place? c c
5.4 Are the flip ups in place? c c
5.5 Are the screws placed correctly? c c
5.6 Is edge lipping in place? c c
6 Alignment of modular furniture
6.1 Are the angles at 90 degree? c c
6.2 Is the passage width as per dwg? c c
6.3 Is the level as per dwg? c c
7 Modular Soft board & writing board fixing
7.1 Is the soft board in place and as per dwg? c c
7.2 Is the white board in place and as per requirement? c c

CBRE South Asia Pvt. Ltd. Project Management, India 29 of 42


Client Logo
8 Pedestal fixing
8.1 Are the pedestals in place? c c
8.2 Are the pedestals free of denting? c c
8.3 Are keys in place for all pedestals? c c
8.4 Are the accessories in place? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-090/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 30 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Ramp / Step Signature
Wing Dwg Ref.No Rev

Inspection Available on
Floor
Request No ICL App
Location Date
S. No Description Yes No Remarks
1 Ramp
1.1 Was the slope of drawing checked and found as per drawing ? c c
1.2 Was the length of ramp checked ? c c
1.3 Was the width of ramp checked ? c c
1.4 Was the positioning of ramp cheked as per the drawing ? c c
1.5 Was the stability of ramp checked ? c c
1.6 Was the thickness of finishing materials checked and found satisfactory ? c c
1.7 Was the flooring pattern checked ? c c
1.8 Was the skirting checked and found appopriate ? c c
1.9 Were the grooves checked in order to avoid skidding ? c c

2 Step
2.1 Was the size of landing area checked and found adequate ? c c
2.2 Were the dimensions of treads checked and found appropiate ? c c
2.3 Were the dimensions of risers checked and found at par ? c c
2.4 Was the thickness of finishing materials checked and found satisfactory ? c c
2.5 Was the flooring pattern checked ? c c
Was the quality of bull nosings for treads checked and found as per
2.6 c c
drawing?
2.7 Was the hand rail checked and found as per approved drawing ? c c
2.8 Was the quality of hand rail checked and found as per approved drawing ? c c
2.9 Was the skirting checked and found appopriate ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-089/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 31 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Chairs Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of Chairs checked and found at par ? c c
2 Was the Model number checked and found same as the approved ones ? c c
3 Were the chairs checked for roller coasters ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-091/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 32 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Dadoing Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Were the dadoing samples checked and found to be same as approved ? c c
2 Were the tiles checked for uniformity of color/shade c c
3 Was the thickness of tiles checked and found suitable ? c c
4 Was the eveness of tiles checked and found proper ? c c
5 Was the tile size checked and found as per the drawing ? c c
6 Was the surface preperation checked before laying of dadoing ? c c
7 Was the thickness of bedding material checked and found suitable ? c c
8 Were the patterns of dadoing checked and found appropriate ? c c
9 Were the dadoing joints checked ? c c
10 Were the dadoing checked for cracks ? c c
11 Were the dadoing checked for cleanliness and pointing ? c c
12 Was the quality of polish checked and found suitable ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-092/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 33 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Grouting Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of grouting checked and found same as approved ? c c
2 Was the grouting checked for color ? c c
3 Was grouting checked for eveness ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-093/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 34 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Transition Profile Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Check for make c c
2 Check for guage c c
3 Check for type c c
4 Check for fixing as per the drawing c c
5 Check for eveness of fixing c c
6 Check for smoothness of edges c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-095/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 35 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Urinals Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of urinals checked and found same as the approved ones? c c
2 Was the model number of urinals checked and found same as the approved o c c
3 Was the color of approved urinals checked and found correct ? c c
4 Was the positioning of EWC on chair bracket checked ? c c
5 Was the waste pipe checked ? c c
6 Were the wall flange checked ? c c
7 Was the flow rate checked ? c c
8 Were the sensors checked? c c
9 Was the working of sensors checked ? c c
10 Was the grating checekd ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-097/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 36 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Pantry Sanitory Works Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of sink checked ? c c
2 Was the Model number checked and found same as the approved ones ? c c
3 Was the positioning of sink on the counter checked ? c c
4 Were the MS clamp used for fixing of sinks checked ? c c
5 Were the filing of joints chceked ? c c
6 Was the pillar cock checked ? c c
7 Was the water flow rate checked ? c c
8 Was the waste coupling checked ? c c
9 Were the connecting pipes checked ? c c
10 Were the angle valves checked ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-096/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 37 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Water Closet Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of water closet checked and found same as the approved ones c c
2 Was the model number of water closet checked ? c c
3 Was the color of water closet checked ? c c
4 Was the positioning of EWC on chair bracket checked ? c c
5 Was the flush valve checked ? c c
6 Was the flow rate of water checked ? c c
7 Was the health faucet checked ? c c
8 Was the coat hook checked ? c c
9 Was the paper holder checked ? c c
10 Was the bip cock checked ? c c
11 Was the grating checekd ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-098/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 38 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Toilet Accessories Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Wash Basin
1.1 Was the make of wash basin checked ? c c
1.2 Was the model number checked ? c c
1.3 Was the color of wash basin checked ? c c
1.4 Was the positioning of sink on the counter checked ? c c
1.5 Were the MS clamp used for fixing of sinks checked ? c c
1.6 Were the filing of joints chceked ? c c
1.7 Was the pillar cock checked ? c c
1.8 Was the water flow rate checked ? c c
1.9 Was the waste coupling checked ? c c
1.10 Was the bottle trap checked ? c c
1.11 Were the connecting pipes checked ? c c
1.12 Were the angle valves checked ? c c
1.13 Was the soap dispenser checked ? c c
1.14 Was the hand dryer checked ? c c
1.15 Was the paper towel checked ? c c
2 EWC
2.1 Was the make of EWC checked and found same as the approved ones? c c
2.2 Was the model number checked ? c c
2.3 Was the color of EWC checked ? c c
2.4 Was the positioning of EWC on chair bracket checked ? c c
2.5 Was the flush valve checked ? c c
2.6 Was the flow rate of water checked ? c c
2.7 Was the health faucet checked ? c c
2.8 Was the coat hook checked ? c c
2.9 Was the paper holder checked ? c c
2.10 Was the bip cock checked ? c c
3 Urinals
3.1 Was the make of urinals checked and found same as the approved ones? c c
Was the model number of urinals checked and found same as the approved
3.2 c c
ones ?
3.3 Was the color of approved urinals checked and found correct ? c c

CBRE South Asia Pvt. Ltd. Project Management, India 39 of 42


Client Logo
3.4 Was the positioning of EWC on chair bracket checked ? c c
3.5 Was the waste pipe checked ? c c
3.6 Were the wall flange checked ? c c
3.7 Was the flow rate checked ? c c
3.8 Were the sensors checked ? c c
3.9 Was the working of sensors checked ? c c
4 Shower area
4.1 Was the make of shower area checked ? c c
4.2 Was the model number checked ? c c
4.3 Was the height of the nozzle checked ? c c
4.4 Was the positioning of shower area checked ? c c
4.5 Was for diverter checked ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-099/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 40 of 42


Client Logo
Checklist for Installation of Interior Works
<Project Name>
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Frosted Film Signature
Wing Dwg Ref.No Rev

Inspection
Floor
Request No

Location Date
S. No Description Yes No Remarks
1 Was the make of frosted film checked ? c c
2 Was the thickness of film checked ? c c
3 Was the color of frosted film checked ? c c
4 Was the frosted film pattern checked ? c c
5 Were the dimension of the film checked ? c c
6 Was the height from floor checked ? c c
7 Was the film checked for scratches and found suitable ? c c
8 Was the film checked for shrinkages ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-100/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 41 of 42


Client Logo
<Project Name>
Package Inspection Report No
Vendor Date/Time
P.O Number Name
Inspected by
Description of Work Wall paneling Signature
Wing Dwg Ref.No Rev
Inspection
Floor
Request No
Location Date
S. No Description Yes No Remarks
1 Was the wall panelling checked for markings ? c c
2 Were the frameworks checked and found to be as per specifications ? c c
3 Was the wall paneling checked with respect to right angles / plumb / water le c c
4 Was the conduiting of services checked ? c c
5 Was the glasswool checked ? c c
6 Was the thickness of plywood checked ? c c
7 Was the gypsum layer checked ? c c
8 Were the staggered joints for gypsum board checked ? c c
9 Were the grooves checked ? c c

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CBRE Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Legend: NA - Not Applicable


Cc : CBRE QS Department
Cc : Contractor/Vendor
Format No. F028-QC-Ch-101/Rev02/Feb2021

CBRE South Asia Pvt. Ltd. Project Management, India 42 of 42