0% found this document useful (0 votes)
27 views

Practical

Copyright
© © All Rights Reserved
Available Formats
Download as ODT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Practical

Copyright
© © All Rights Reserved
Available Formats
Download as ODT, PDF, TXT or read online on Scribd
You are on page 1/ 9

Practical

Assignment
nAME:- Shreya Suman Prabhakar

CLASS:- IX

SECTIONS:- B

ROLL NUMBER:- 34

SUBJECT:- Information Technology

TEACHER IN-CHARGE:- Ms. Shalini


Mukherjee

TERM:- 2

ACADEMIC YEAR:- 2023-24


INDEX
SI NO. LIST OF PRACTICALS
Start Calc. Create your School Time Table.
• Insert 1 column after Period 4. Label it as Lunch break.
1 • Freeze top 2 rows.
• Name the range of whole time table as MyTimetable.
• Take the print of final Time table
Create the following worksheet and save the workbook as WAGES.ods.
• Find out the number of days each worker has worked, by subtracting date on
which worker was hired from today’s date.
2 • Calculate Gross wages for each worker. The gross wages can be calculate
Gross wagated by using the following formula:-
=No. Of Days Worked* Pay Rate
• take a screenshot of the final worksheet

Create the following worksheet


3 Sort the data on the alphabetical order of the employee’s name.Take the
screenshot .Then sort the Data on the alphabetical order ofDepartment.Name,
then in descending order of Salary. Take the screenshot.Create a Bar Chart of
the above table.Take the screenshot
4 Create a presentation titled “Which has greater environmental destructive potential,
Mankind or Nature?” based on the following guidelines.Provide at least one slide for the
following:
1. The Risks
2. Mega Tsunami
3. Earthquake
4. Hurricanes
5. Soil Degradation
6. Man-made Global Warming
7. Nuclear Bomb
8. Conclusion
Design the above using text, graphics, Transition and Animation effects. You can also set
some attractive slides as Master Slides.Take the printout of Outline ViewTake the
printout oof the slidesf Handouts .
practical-6
STEP 1:- Open, Open office

STEP 2:- Insert 1 column after Period 4. Label it as Lunch


break

STEP 3:- Freeze top 2 rows.


STEP 4:- Name the range of whole time table as
MyTimetable.

THE FINAL OUTCOME SHOULD LOOK LIKE THIS

PRACTICAL 7-
STEP1:- Create the following worksheet and save the
workbook as WAGES.ods.
STEP2:- Find out the number of days each worker has worked, by
subtracting date on which worker was hired from today’s
date.
STEP 3:-Calculate Gross wages for each worker. The gross wages
can be calculate Gross wagated by using the following
formula:-
=No. Of Days Worked* Pay Rate
practical-8
STEP1:- Create the following worksheet
STEP2:-Sort the data on the alphabetical order of the employee’s
name.
STEP3:-Then sort the Data on the alphabetical order
of Department.Name, then in descending order of Salary.
STEP4:-.Create a Bar Chart of the above table .
The final outcome should look something like this.

You might also like