Work Breakdown Structure - Villa Construction
Work Breakdown Structure - Villa Construction
Budget: $ 190,325
Work: 10%
2.0
CONSTRUCTION
Work: 65%
Budget: $ 140,637
Work: 5%
Work: 45%
Work: 6%
Work: 6%
Work: 1%
Work: 5%
Work: 1%
INSPECTION
Budget: $ 3,500 Budget: $ 7,500 Budget: $ 7,500 Budget: $ 1,540
Budget: $137,137 Budget: $ 3,500 Budget: $ 1,540 Work: 5%
3.1
FINISHES 3.2 LANDSCAPE 3.3 CLEANING CLOSURE
3.4 & HANDO VER Budget: $ 3,500
Prepare scop v
En ironmental
List of material and
Budget: $ 17,000 Budget: $ 15,000 Budget: $5,000 Budget: $5,000
equipment
Assessment of project assessment and
2.2.1 Pipe work Installation of wire
Finalization of vendors STRUCTURAL 4.4.1
Heating & Cooling 4.4.2
Drainage
needs regulations Installation of Placing electrical
1.4 Material shipping
Feasibility report an 1.2
PLANNING
Site permissions and DESIGN FRAIMMING x
fi ture back boards
Work: 1%
Work: 1.5%
Reception of material
study Work: 3.0%
Lawn plantatio
Documentatio
hardwar Conducting
Work: 11%
Work: 1.0%
Work: 1.0%
Work: 1.0%
2.1.2.1 2.1.2.2
Work: 4.0%
Work: 4.0%
Work: 4.0%
Work: 4.0%
wood cladding Budget: $ 17,815 Budget: $ 17,815
authorities x v
E ca ating Installing Concrete beams Concrete panels Reinforce Beams hingles
roof s Plasterin y
Underla ment
arranging resource
Tiles or panels