Sany 260T
Sany 260T
Crawler Crane
260 Tons Lifting Capacity
Quality Changes the World
www.sanyglobal.com V1.5
Main ▪ Product Specification
P03 Characteristics ▪ Safety Device
SCI2600A P09
Technical
Parameters
▪ Outline Dimension
▪ Transport Dimension
▪ Transport Plan
▪ H Configuration
Main Characteristics
▪▪ Page 04 Product Specification
▪▪ Page 07 Safety Device
> 03
04 SCI2600A Crawler Crane
260 Tons Lifting Capacity
_________________
Main Characteristics
Product Specification
Product Specification
Product Specification
Fixed Jib
▪▪ Lattice structure. The chord adopts high-strength structural tube
and each section is connected through pins;
▪▪ Basic jib: 5m jib base +3m insert +5m jib top;
▪▪ Jib insert: 6m×3;
▪▪ Fixed jib: 13m~31m;
▪▪ Longest boom + jib: 70m +31m.
Luffing jib
▪▪ Lattice structure. The chord adopts high-strength structural tube
and each section is connected through pins;
▪▪ Basic jib: 6.5m jib base +9m insert +6.5m jib top;
▪▪ Jib insert: 3mx1,6mx1,9mx3;
▪▪ Longest boom + jib: 55m+58m.
Extension Jib
▪▪ The welding structure is connected with main boom through
hinge pin, and used for aux. hook operation;
▪▪ Length of extension jib: 1.5m.
Hook Block
▪▪ 250t hook, 11 pulleys
▪▪ 150t hook, 7 pulleys;
▪▪ 80t hook, 3 pulleys;
▪▪ 35t hook, 1 pulley;
▪▪ 13.5t ball hook.
Safety Device
Hook Latch
▪▪ The hook is provided with a baffle to prevent wire rope from
falling off.
Safety Device
Swing Indicator Light Engine Power Limit Load Adjustment and Stalling
▪▪ The swing indicator light flashes during traveling or swing. Protection
▪▪ The controller monitors the engine power to prevent engine
getting stuck and stalling.
Illuminating Light
▪▪ The machine is equipped with the low beam light and high
beam light at the front of the cab, illumination light at cab, and Engine Status Monitoring
other night lights, boom lights to improve the visibility during ▪▪ The engine status will be presented, such as engine coolant
construction. temperature, fuel volume, total work hours, engine oil pressure,
engine speed, battery charging, voltage.
Technical Parameters
▪▪ Page 10 Major Performance Specifications
▪▪ Page 11 Outline Dimension
▪▪ Page 12 Transport Dimension
▪▪ Page 17 Transportation Plan
> 09
10 SCI2600A Crawler Crane
260 Tons Lifting Capacity
_________________
Technical Parameters
Transport Max. transport weight of basic machine (with boom base) t 47.3
parameter Maximum transport dimension of basic machine (L × W × H) mm 17100×3000×3250
Unit: mm
Outline Dimension
5466
3000
6
88
R6
m
~85
16m
4371
2252
1340
1452
1100 1550
455
6400 6600
7950
9103
Transportation Dimensions
Basic machine ×1
Length(L) 17.10m
H
Width(W) 3.00m
Height(H) 3.25m
L
Weight 47.3t
Basic machine 2 ×1
Length(L) 11.30m
H
Width(W) 3.00m
Height(H) 3.25m
L Weight 42.8t
Crawler ×2
Length(L) 9.10m
Width(W) 1.58m
H
L
Height(H) 1.34m
Weight 21.2t
Boom base ×1
Length(L) 8.21m
H
Width(W) 2.36m
Height(H) 2.51m
L
Weight 5.93t
Boom top ×1
Length(L) 8.78m
Width(W) 2.23m
H
Height(H) 2.92m
L
Weight 3.6t
3m boom insert ×1
Length(L) 3.18m
Width(W) 2.23m
H
Height(H) 2.39m
L Weight 0.82t
Transportation Dimensions
6m Boom insert ×3
Length(L) 6.18m
H
Width(W) 2.23m
Height(H) 2.39m
L
Weight 1.31t
Height(H) 2.39m
L Weight 2.43t
Extension jib ×1
Length(L) 1.96m
Width(W) 0.76m
H
Height(H) 1.03m
L Weight 0.24t
Height(H) 1.66m
L Weight 1.17t
Note: the weight of the strut is 0.45t, and the
tapered pendant strap is 0.15t)
Height(H) 1.06m
L Weight 0.59t
Height(H) 1.06m
L Weight 0.22t
Transportation Dimensions
Width(W) 1.17m
L Height(H) 1.06m
Weight 0.4t
Width(W) 2.19m
Height(H) 3.16m
L Weight 4.5t
Height(H) 1.85m
L
Weight 1.5t
Height(H) 1.54m
L
Weight 0.48t
Height(H) 1.54m
L
Weight 0.79t
Height(H) 1.54m
L Weight 1.08t
Transportation Dimensions
Carbody counterweight ×2
H
Length(L) 4.95m
L Width(W) 1.65m
Height(H) 0.85m
Weight 12.5t
Width(W) 0.88m
Height(H) 1.03m
L Weight 1.25t
Width(W) 2.33m
L
Height(H) 0.52m
Weight 14.0t
Height(H) 0.57m
H W
Weight 6.0t
3t counterweight block ×2
Length(L) 2.19m
L
Width(W) 2.33m
Height(H) 0.35m
H W
Weight 3.0t
250t hook ×1
Length(L) 1.42m
H
Width(W) 0.92m
Height(H) 2.67m
L Weight 4.48t
Transportation Dimensions
H W ×1
150t hook
Length(L) 2.45m
Width(W) 0.91m
L
Height(H) 1.03m
Weight 2.91t
80t hook ×1
W H Length(L) 2.21m
Width(W) 0.91m
Height(H) 0.62m
L
Weight 1.94t
35t hook ×1
H W Length(L) 1.88m
Width(W) 0.82m
Height(H) 0.46m
L
Weight 1.11t
Weight 0.45t
Remarks:
1.The transport dimensions for the parts are for reference that do not draw to the
scale. The dimensions listed above are deisnged values excluding packing.
2.Weight is design values. It maybe different due to manufacturing tolerances.
Transport Plan
17100
Transport cart 1 ▪▪ 50t low plate-13.5m,Width 3m
Components included ▪▪ Basic Machine (with four winches, carbody
assembly, A-frame, wire rope): 41.34t
4050
▪▪ Boom base (include jib hoist winch and jib
hoist wire rope): 5.93t
▪▪ Boom base outer pendant strap: 0.03t
Transport weight ▪▪ 47.3t
1040
800
Transport cart 2 ▪▪ 35t low plate-17.5m, Width 3m
Components included ▪▪ 12m boom: 2.43t
▪▪ Rear CW tray: 14t
▪▪ Rear CW *2: 12t 12135
▪▪ Luffing jib 9m: 1.08t
▪▪ Tapered pendant strap: 0.15t
▪▪
4276
Fixed jib top: 0.59t
▪▪ Fixed jib 3m: 0.22t
▪▪ 6m boom outer pendant strap: 0.19t
Transport weight ▪▪ 30.66t
1250
Transport cart 3 ▪▪ 35t low plate-17.5m, Width 3m
Components included ▪▪ 12m boom: 2.43t 18180
▪▪ 6m boom: 1.31t
▪▪ Rear CW *4: 24t
▪▪
4211
Luffing jib 9m: 1.08t
▪▪ Fixed jib 6m: 0.4t
▪▪ 12m boom outer pendant strap: 0.34t
Transport weight ▪▪ 29.56t
1250
Transport Plan
4209
Boom base outer pendant strap: 0.24t
▪▪ The packing cases: 1t
▪▪ CW block 3t*2: 6t
▪▪ 20.36t
1250
Transport weight
4250
▪▪ Fixed jib 6m: 0.4t
▪▪ 250t hook: 4.48t
▪▪ Extension jib: 0.26t
1250
Transport weight ▪▪ 28.35t
18190
Transport cart 7 ▪▪ 30t low plate-17.5m, Width 3m
Components included ▪▪ 12m boom: 2.43t
▪▪
4030
Luffing jib 6m: 0.79t
▪▪ Carbody CW*2: 25t
▪▪ 12m boom outer pendant strap: 0.34
1250
Transport weight ▪▪ 28.56t
Transport weight
Configurations
▪▪ Page 23 H Configuration
▪▪ Page 29 FJ Configuration
▪▪ Page 39 LJ Configuration
> 19
20 SCI2600A Crawler Crane
260 Tons Lifting Capacity
_________________
Boom/jib Combination
Boom Combination
Boom Combination
Boom Combination
H Configuration
16m B T
19m B 3m T
22m B 6m T
22m B 3m 3m T
25m B 3m 6m T
28m B 12m T
28m B 3m 3m 6m T
34m B 6m 12m T
34m B 3m 3m 6m 6m T
37m B 3m 6m 12m T
40m B 3m 3m 6m 12m T
43m B 3m 6m 6m 12m T
6m boom insert
B 8m Boom base
3m boom insert
T 8m Boom top
8m boom base
3m 3m Boom insert
6m 6m Boom insert
H Working Radius
Boom length
83°
85m 80°
82m 85
70m
67m 70
50°
64m
65
61m
58m
60
55m 40°
52m 55
49m
50
46m
43m
45
40m 30°
37m 40
34m
35
31m
28m
30
25m
22m 25
19m
20
16m
15
10
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
Radius (m)
Unit: t
H Load Chart
Note:
1.The rated load in the load chart is calculated complying with EN 13000;
2.The working radius is the horizontal distance from the load center to the swing center;
3.The actual lifting capacity must subtract the weight of hooks and other riggings from the rated capacity in the load chart.
4.The load value is calculated when the object is hung freely,without considering the influence of wind on the load, ground conditions and slope, operation speed and the influence
of any other negative factors over safe operation. Therefore, the operator bears the responsibility of making a judgement and decreasing the load and lowering speed.
5.All rated values are calculated when the machine is parking on firm and level ground with less than 1% gradient.
6. The rated values in the table shall deduct the coverted weight of main hook.
7. The main hook must lift to the top and shall not attach load when using the auxiliary hook for lifting.
8. See Operation Manual for load charts of HCm configuration.
Load chart -H(Boom 16~85m, Rear counterweight 80t, Carbody counterweight 25t) 1/2
Boom Boom
length/ 16 19 22 25 28 31 34 37 40 43 46 49 length/
radius (m) radius (m)
5 260.0 220.0 5
6 230.0 216.0 201.0 188.0 6
7 192.0 192.0 191.0 185.0 177.3 164.8 7
8 165.1 164.9 162.9 158.8 154.6 150.6 142.0 130.0 117.0 112.5 8
9 139.3 139.3 139.4 138.7 135.4 132.0 129.0 126.1 117.0 111.0 103.0 92.0 9
10 118.0 118.0 118.0 118.0 117.9 116.5 114.2 111.8 109.5 107.3 101.5 92.0 10
12 90.1 90.1 90.0 89.9 89.9 89.8 89.7 89.6 88.4 86.7 85.3 83.8 12
14 72.6 72.5 72.5 72.4 72.3 72.2 72.1 72.0 71.9 71.7 71.4 70.2 14
16 60.5 60.5 60.3 60.3 60.1 60.1 59.9 59.8 59.6 59.5 59.4 16
18 51.8 51.7 51.6 51.5 51.3 51.3 51.1 51.0 50.8 50.7 50.5 18
20 45.1 44.9 44.8 44.6 44.6 44.4 44.3 44.1 44.0 43.8 20
22 39.7 39.6 39.4 39.3 39.1 39.0 38.8 38.7 38.5 22
24 35.3 35.1 35.1 34.9 34.7 34.5 34.4 34.2 24
26 31.8 31.6 31.6 31.4 31.2 31.0 30.9 30.7 26
28 28.7 28.6 28.4 28.3 28.1 28.0 27.8 28
30 26.1 25.9 25.8 25.6 25.5 25.3 30
32 23.8 23.6 23.4 23.3 23.1 32
34 21.9 21.7 21.5 21.4 21.2 34
36 20.1 19.9 19.8 19.6 36
38 18.4 18.3 18.1 38
40 17.0 16.8 40
44 14.6 44
48 48
52 52
56 56
60 60
64 64
68 68
72 72
Unit: t
H Load Chart
Load chart -H(Boom 16~85m, Rear counterweight 80t, Carbody counterweight 25t) 2/2
Boom Boom
length/ 52 55 58 61 64 67 70 73 76 79 82 85 length/
radius (m) radius (m)
5 5
6 6
7 7
8 8
9 87.9 9
10 87.2 79.0 72.5 10
12 82.3 78.7 71.8 65.3 59.3 53.9 49.3 45.2 41.5 12
14 69.1 67.9 66.9 64.9 58.9 53.7 49.1 44.7 40.9 37.1 33.7 30.6 14
16 59.2 58.3 57.5 56.6 55.7 53.1 48.5 43.8 39.6 35.9 32.6 29.5 16
18 50.4 50.2 50.1 49.4 48.6 47.8 47.1 42.5 38.4 34.8 31.4 28.4 18
20 43.6 43.5 43.3 43.1 43.0 42.3 41.7 41.0 37.2 33.6 30.3 27.4 20
22 38.3 38.1 38.0 37.8 37.7 37.5 37.1 36.5 35.9 32.5 29.3 26.3 22
24 34.1 33.9 33.7 33.5 33.4 33.2 33.0 32.8 32.2 31.4 28.2 25.4 24
26 30.5 30.3 30.2 30.0 29.8 29.6 29.5 29.3 29.0 28.6 27.2 24.4 26
28 27.6 27.4 27.3 27.0 26.9 26.7 26.5 26.3 26.1 25.9 25.4 23.5 28
30 25.1 24.9 24.7 24.5 24.3 24.1 24.0 23.8 23.5 23.4 23.1 22.6 30
32 22.9 22.7 22.6 22.4 22.2 22.0 21.8 21.6 21.4 21.2 21.0 20.6 32
34 21.0 20.8 20.7 20.5 20.3 20.1 19.9 19.7 19.5 19.3 19.1 18.8 34
36 19.4 19.2 19.0 18.8 18.6 18.4 18.3 18.0 17.8 17.6 17.4 17.2 36
38 17.9 17.7 17.6 17.3 17.2 16.9 16.8 16.6 16.3 16.1 16.0 15.7 38
40 16.6 16.4 16.3 16.0 15.8 15.6 15.5 15.3 15.0 14.8 14.6 14.4 40
44 14.4 14.2 14.0 13.8 13.6 13.4 13.2 13.0 12.8 12.6 12.4 12.2 44
48 12.3 12.2 12.0 11.8 11.5 11.4 11.2 10.9 10.7 10.5 10.3 48
52 10.6 10.4 10.2 10.0 9.9 9.6 9.4 9.2 9.0 8.8 52
56 8.9 8.7 8.5 8.3 8.1 7.9 7.7 7.4 56
60 7.6 7.4 7.2 6.9 6.7 6.5 6.2 60
64 6.2 5.9 5.8 5.5 5.2 64
68 4.9 4.6 4.2 68
72 3.8 3.4 72
Unit: t
Load chart -HCa(Boom 16~82m, Rear counterweight 80t, Carbody counterweight 25t) 1/2
Boom Boom
length/ 16 19 22 25 28 31 34 37 40 43 46 49 length/
radius (m) radius (m)
6 24.0 6
7 24.0 24.0 7
8 24.0 24.0 24.0 24.0 24.0 8
9 24.0 24.0 24.0 24.0 24.0 24.0 24.0 9
10 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 10
12 22.8 23.7 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 12
14 21.8 22.6 23.2 23.8 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 14
16 21.3 21.8 22.3 22.9 23.4 23.9 24.0 24.0 24.0 24.0 24.0 24.0 16
18 21.3 21.6 22.1 22.7 23.0 23.5 23.8 24.0 24.0 24.0 24.0 18
20 21.3 21.2 21.8 22.0 22.5 22.9 23.3 23.6 23.9 24.0 24.0 20
22 21.2 21.3 21.7 22.0 22.4 22.6 23.0 23.4 23.5 23.8 22
24 21.3 21.3 21.6 21.9 22.3 22.6 22.8 23.1 23.3 24
26 21.2 21.4 21.6 21.9 22.1 22.5 22.6 23.0 26
28 21.2 21.3 21.4 21.8 22.1 22.3 22.6 28
30 21.3 21.2 21.3 21.5 21.7 21.9 22.2 30
32 21.4 21.1 21.3 21.4 21.7 21.7 32
34 20.6 20.4 20.2 20.1 19.9 34
36 18.8 18.6 18.5 18.3 36
38 17.5 17.3 17.2 16.9 38
40 16.0 15.9 15.7 40
44 13.6 44
48 48
52 52
56 56
60 60
64 64
68 68
72 72
Unit: t
Load chart -HCa(Boom 16~82m, Rear counterweight 80t, Carbody counterweight 25t) 2/2
Boom Boom
length/ 52 55 58 61 64 67 70 73 76 79 82 length/
radius (m) radius (m)
6 6
7 7
8 8
9 9
10 10
12 24.0 24.0 12
14 24.0 24.0 24.0 24.0 24.0 24.0 24.0 14
16 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 16
18 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 18
20 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 20
22 23.9 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 22
24 23.5 23.7 23.8 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24
26 23.2 23.3 23.5 23.5 23.7 23.8 23.8 23.8 23.8 23.8 23.8 26
28 22.8 22.9 23.0 23.2 23.3 23.4 23.4 23.5 23.4 23.5 23.3 28
30 22.4 22.5 22.7 22.9 22.8 22.6 22.5 22.3 22.1 21.9 21.7 30
32 21.5 21.3 21.2 21.1 20.8 20.6 20.4 20.2 20.0 19.8 19.6 32
34 19.7 19.5 19.4 19.3 19.0 18.8 18.6 18.4 18.2 18.0 17.8 34
36 18.2 17.9 17.8 17.7 17.4 17.2 17.1 16.9 16.7 16.5 16.3 36
38 16.8 16.6 16.4 16.3 16.0 15.8 15.7 15.5 15.3 15.1 14.9 38
40 15.5 15.3 15.2 15.1 14.8 14.6 14.4 14.2 14.0 13.8 13.6 40
44 13.4 13.2 13.1 13.0 12.7 12.5 12.3 12.1 11.9 11.7 11.5 44
48 11.7 11.5 11.3 11.2 10.9 10.7 10.6 10.3 10.2 9.9 9.7 48
52 9.9 9.8 9.5 9.2 9.1 8.9 8.7 8.5 8.3 52
56 8.5 8.2 8.0 7.9 7.6 7.4 7.2 7.0 56
60 6.9 6.8 6.6 6.4 6.1 5.9 60
64 5.8 5.6 5.4 5.2 5.0 64
68 4.6 4.4 4.1 68
72 3.6 3.3 72
FJ Configuration
13m B 3m T
10°
19m B 3m 6m T
30°
25m B 3m 6m 6m T
31m B 3m 6m 6m 6m T
28m-70m
FJ Configuration
FJ Working Radius
110
70°
100
70m
+3 95
1m 60°
70m
+2 90
5m
70m 85
+1
9m 80°
70m 80
+1
3m
Boom 75
length
70m 70
67m
64m 40°
65
61m
60
58m 28m
+3
1m
55m 55
52m 28m
+2
5m
49m 50
28m
46m +1
9m 30° 15
43m
28m
40m +1
3m 40
37m
34m 35
31m
30
28m
25
20
15
10
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75
Radius (m)
Unit: t
FJ Load Chart
Note:
1.The rated load in the load chart is calculated complying with EN 13000;
2.The working radius is the horizontal distance from the load center to the swing center;
3.The actual lifting capacity must subtract the weight of hooks and other riggings from the rated capacity in the load chart.
4.The load value is calculated when the object is hung freely,without considering the influence of wind on the load, ground conditions and slope, operation speed and the influence of any
other negative factors over safe operation. Therefore, the operator bears the responsibility of making a judgement and decreasing the load and lowering speed.
5.All rated values are calculated when the machine is parking on firm and level ground with less than 1% gradient.
6. See Operation Manual for load charts of FJm and FJa configurations.
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 1/8
Boom to jib angle 10°, Jib 13m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
12 36.3 36.3 12
14 34.9 35.1 35.5 35.4 35.4 35.4 14
16 33.3 33.7 34.0 34.4 34.5 34.2 33.9 33.6 33.2 32.9 16
18 32.0 32.5 32.7 33.2 33.2 32.9 32.4 32.1 31.8 31.4 31.0 30.5 30.0 29.4 18
20 30.6 31.2 31.5 31.8 31.9 31.5 31.1 30.7 30.3 29.9 29.4 28.8 28.2 27.7 27.1 20
22 29.4 30.1 30.5 30.8 30.5 30.1 29.7 29.3 28.8 28.4 28.0 27.3 26.7 26.2 25.5 22
24 29.0 28.9 29.6 29.4 28.9 28.5 28.1 27.7 27.3 27.0 26.5 25.9 25.2 24.6 24.0 24
26 27.7 28.4 28.1 27.8 27.3 27.0 26.6 26.3 26.0 25.5 24.7 24.2 23.5 23.0 22.4 26
28 26.1 26.7 26.4 26.1 25.8 25.3 24.9 24.6 24.3 23.6 23.1 22.6 21.9 21.4 20.8 28
30 24.6 25.1 24.8 24.5 24.1 23.6 23.3 23.0 22.6 21.8 21.5 21.2 20.7 20.1 19.4 30
32 23.3 23.7 23.4 23.1 22.7 22.4 22.0 21.7 21.4 20.4 20.0 19.7 19.3 18.8 18.2 32
34 22.2 22.0 21.9 21.6 21.3 21.0 20.7 20.4 20.0 19.3 18.9 18.3 17.9 17.4 16.9 34
36 20.7 20.4 20.3 20.0 19.8 19.6 19.4 19.1 18.9 18.3 18.0 17.2 16.6 16.1 15.7 36
38 19.3 19.0 18.9 18.6 18.4 18.1 18.0 17.7 17.5 17.2 16.7 16.4 15.7 15.2 14.6 38
40 17.7 17.6 17.3 17.1 16.9 16.7 16.5 16.2 16.0 15.8 15.6 14.9 14.5 13.9 40
44 15.2 14.9 14.7 14.5 14.3 14.1 13.8 13.7 13.4 13.2 13.0 12.6 44
48 13.1 12.9 12.7 12.5 12.3 12.0 11.9 11.6 11.4 11.2 11.0 48
52 11.2 11.0 10.8 10.5 10.4 10.1 9.9 9.7 9.5 52
56 9.7 9.5 9.3 9.1 8.8 8.6 8.3 8.1 56
60 8.1 7.9 7.6 7.4 7.1 6.9 60
64 6.9 6.6 6.4 6.1 5.9 64
68 5.5 5.2 5.0 68
72 4.4 4.2 72
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 2/8
Boom to jib angle 10°, Jib 19m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
14 27.9 28.0 14
16 26.8 27.0 27.2 27.2 27.5 27.3 16
18 25.7 26.0 26.2 26.4 26.4 26.6 26.5 26.6 26.6 26.4 18
20 24.6 25.0 25.3 25.5 25.6 25.8 25.8 25.8 25.8 25.8 25.7 25.5 25.3 25.1 20
22 23.5 24.0 24.4 24.6 24.8 25.1 25.1 25.2 25.1 25.2 25.0 24.9 24.9 24.7 24.3 22
24 22.6 23.0 23.4 23.5 23.6 23.7 23.9 24.0 24.1 24.2 24.3 24.4 24.3 24.3 23.9 24
26 21.4 21.5 21.8 21.9 22.0 22.2 22.3 22.4 22.5 22.6 22.7 22.8 22.9 23.0 23.1 26
28 19.8 19.9 20.2 20.4 20.5 20.6 20.7 20.8 20.9 21.0 21.1 21.2 21.3 21.4 21.4 28
30 18.3 18.4 18.9 19.0 19.1 19.2 19.3 19.4 19.5 19.6 19.7 19.8 19.9 20.0 19.7 30
32 17.4 17.5 17.7 17.8 17.9 18.0 18.1 18.2 18.3 18.4 18.6 18.7 18.8 18.7 18.2 32
34 16.5 16.6 16.9 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 17.8 17.7 17.3 16.9 34
36 15.8 15.9 16.1 16.2 16.3 16.4 16.5 16.6 16.7 16.9 17.0 17.0 16.5 16.1 15.7 36
38 14.9 15.1 15.3 15.4 15.5 15.6 15.7 15.8 15.9 16.0 16.1 15.9 15.5 14.9 14.6 38
40 14.4 14.5 14.6 14.7 14.8 14.9 15.1 15.2 15.3 15.4 15.5 15.6 14.4 14.0 13.7 40
44 12.9 13.0 13.3 13.4 13.5 13.6 13.7 13.8 13.9 14.0 14.0 13.7 12.9 12.3 11.9 44
48 12.2 12.3 12.4 12.5 12.6 12.7 12.6 12.3 12.2 11.9 11.7 11.1 10.6 48
52 11.2 11.3 11.4 11.5 11.3 11.1 10.8 10.7 10.4 10.2 10.0 9.8 52
56 10.4 10.2 10.0 9.8 9.6 9.4 9.1 8.9 8.7 8.5 56
60 8.9 8.7 8.4 8.3 8.0 7.7 7.5 7.3 60
64 7.7 7.4 7.2 7.0 6.7 6.4 6.2 64
68 6.3 6.0 5.8 5.5 5.3 68
72 5.2 5.0 4.7 4.5 72
76 4.0 3.8 76
80 3.1 80
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 3/8
Boom to jib angle 10°, Jib 25m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
16 20.0 20.1 16
18 19.1 19.3 19.4 19.5 19.6 19.6 18
20 18.3 18.6 18.7 18.9 18.9 19.1 19.0 19.1 19.1 19.0 20
22 17.7 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.5 18.5 18.6 18.5 18.3 18.2 22
24 17.1 17.2 17.5 17.6 17.8 17.9 18.0 18.0 18.1 18.1 18.1 18.1 18.0 17.8 17.3 24
26 16.4 16.6 16.9 17.1 17.3 17.4 17.5 17.6 17.6 17.7 17.7 17.6 17.6 17.5 17.0 26
28 15.8 16.1 16.3 16.5 16.8 16.9 17.1 17.1 17.2 17.3 17.2 17.3 17.2 17.2 16.7 28
30 15.3 15.6 15.8 16.0 16.1 16.2 16.3 16.7 16.8 16.9 16.8 16.8 16.9 16.8 16.4 30
32 14.5 14.6 14.7 14.8 14.9 15.1 15.2 16.3 16.4 16.5 16.5 16.5 16.5 16.5 16.1 32
34 13.6 13.7 13.8 13.9 14.0 14.1 14.2 15.4 16.0 16.1 16.1 16.1 16.2 16.2 15.9 34
36 12.8 12.9 13.0 13.1 13.3 13.4 13.5 14.5 15.5 15.8 15.8 15.8 15.9 15.9 15.6 36
38 12.2 12.3 12.4 12.5 12.6 12.7 12.8 13.9 14.9 15.4 15.4 15.5 15.4 14.8 14.5 38
40 11.6 11.7 11.8 11.9 12.0 12.1 12.2 13.3 14.3 15.1 15.1 14.7 14.3 13.9 13.6 40
44 10.6 10.7 10.8 10.9 11.0 11.1 11.2 12.4 13.5 14.3 13.9 13.3 12.7 12.2 11.9 44
48 9.8 9.9 10.0 10.1 10.2 10.3 10.4 11.6 12.6 12.6 12.4 12.2 11.8 11.4 10.7 48
52 9.3 9.4 9.5 9.6 9.8 9.9 10.8 11.3 11.1 10.9 10.7 10.5 10.2 10.1 52
56 9.1 9.2 9.3 9.4 10.2 10.0 9.8 9.6 9.4 9.2 9.0 8.8 56
60 8.8 8.9 9.0 9.1 8.9 8.7 8.5 8.3 8.0 7.8 7.6 60
64 8.4 8.1 7.9 7.7 7.5 7.2 7.0 6.7 6.5 64
68 7.3 7.0 6.8 6.6 6.3 6.1 5.8 5.6 68
72 6.0 5.8 5.5 5.3 5.0 4.8 72
76 4.8 4.5 4.3 4.1 76
80 3.9 3.6 3.4 80
84 2.8 84
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 4/8
Boom to jib angle 10°, Jib 31m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
18 13.6 13.6 18
20 13.1 13.1 13.2 13.2 13.2 13.2 20
22 12.6 12.7 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.7 22
24 12.2 12.3 12.3 12.4 12.4 12.4 12.5 12.5 12.5 12.4 12.4 12.3 12.2 12.0 24
26 11.8 11.9 11.9 12.0 12.1 12.1 12.2 12.2 12.2 12.1 12.1 12.0 11.9 11.8 11.6 26
28 11.4 11.5 11.6 11.7 11.7 11.8 11.8 11.8 11.8 11.8 11.8 11.7 11.7 11.6 11.4 28
30 11.1 11.1 11.3 11.3 11.4 11.4 11.5 11.5 11.6 11.5 11.5 11.5 11.4 11.3 11.2 30
32 10.6 10.8 10.9 11.0 11.1 11.1 11.2 11.2 11.3 11.3 11.3 11.2 11.2 11.1 11.0 32
34 10.1 10.4 10.6 10.7 10.8 10.8 10.9 10.9 11.0 11.0 11.0 11.0 10.9 10.9 10.8 34
36 9.5 9.9 10.3 10.4 10.5 10.5 10.6 10.7 10.7 10.7 10.8 10.7 10.7 10.6 10.6 36
38 9.0 9.3 9.8 10.1 10.2 10.3 10.4 10.4 10.5 10.5 10.5 10.5 10.5 10.4 10.4 38
40 8.6 8.9 9.2 9.6 10.0 10.0 10.1 10.2 10.2 10.3 10.3 10.3 10.3 10.2 10.2 40
44 7.7 8.1 8.5 8.8 9.1 9.4 9.7 9.7 9.8 9.8 9.9 9.9 9.9 9.8 9.8 44
48 7.1 7.5 7.7 8.1 8.4 8.7 9.0 9.3 9.4 9.4 9.5 9.5 9.5 9.5 9.4 48
52 6.6 6.9 7.2 7.5 7.7 8.1 8.4 8.7 9.0 9.0 9.1 9.1 9.1 9.1 9.1 52
56 6.5 6.7 6.9 7.2 7.5 7.7 8.1 8.4 8.6 8.8 8.8 8.8 8.8 8.8 56
60 6.3 6.5 6.8 7.0 7.2 7.4 7.6 7.8 8.5 8.5 8.2 8.0 7.8 60
64 6.4 6.6 6.8 7.0 7.2 7.4 7.7 7.4 7.2 7.0 6.8 64
68 6.3 6.5 6.7 6.9 7.0 6.8 6.5 6.3 6.0 5.8 68
72 6.1 6.4 6.2 6.0 5.7 5.5 5.2 5.0 72
76 5.7 5.4 5.2 5.0 4.7 4.5 4.3 76
80 4.6 4.3 4.1 3.8 3.6 80
84 3.7 3.5 3.2 3.0 84
88 2.7 2.5 88
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 5/8
Boom to jib angle 30°, Jib 13m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
16 17.3 17.5 16
18 16.6 16.8 17.0 17.1 17.2 17.4 18
20 16.0 16.2 16.4 16.6 16.7 16.8 17.0 17.1 17.1 17.1 20
22 15.5 15.7 15.9 16.1 16.3 16.4 16.5 16.6 16.8 16.8 16.8 16.8 16.8 17.0 22
24 15.0 15.3 15.5 15.7 15.9 16.0 16.1 16.2 16.3 16.4 16.6 16.6 16.6 16.6 16.6 24
26 14.6 14.9 15.0 15.2 15.4 15.6 15.7 15.8 15.9 16.1 16.2 16.2 16.2 16.3 16.3 26
28 14.2 14.5 14.7 14.9 15.1 15.3 15.4 15.6 15.7 15.7 15.8 15.9 15.9 16.0 16.1 28
30 13.9 14.2 14.4 14.5 14.7 15.0 15.1 15.3 15.3 15.4 15.5 15.7 15.7 15.8 15.8 30
32 13.7 13.9 14.1 14.4 14.7 14.9 15.1 15.3 15.5 15.2 15.3 15.4 15.5 15.5 15.6 32
34 13.5 13.8 14.2 14.4 14.6 14.8 15.0 15.3 15.4 15.6 15.0 15.1 15.2 15.3 15.3 34
36 13.2 13.5 13.8 14.2 14.4 14.6 14.8 15.0 15.2 15.4 15.0 14.9 15.0 15.0 15.1 36
38 13.1 13.3 13.6 13.8 14.1 14.3 14.5 14.7 14.9 15.1 15.3 14.6 14.7 14.8 14.9 38
40 13.1 13.3 13.6 13.8 14.0 14.2 14.4 14.6 14.8 15.1 15.3 14.5 14.3 14.0 40
44 12.7 12.9 13.1 13.4 13.6 13.8 14.0 14.1 14.1 13.9 13.7 13.5 12.6 44
48 12.6 12.8 12.9 12.7 12.6 12.3 12.2 12.0 11.8 11.6 11.5 48
52 11.5 11.4 11.2 11.0 10.8 10.6 10.4 10.3 10.0 9.9 52
56 9.8 9.6 9.4 9.3 9.1 8.9 8.6 8.5 56
60 8.5 8.2 8.1 7.9 7.7 7.4 7.2 60
64 7.0 6.8 6.6 6.3 6.2 64
68 5.8 5.6 5.4 5.2 68
72 4.5 4.3 72
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 6/8
Boom to jib angle 30°, Jib 19m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
20 11.6 11.8 20
22 11.2 11.3 11.5 11.5 11.7 11.7 22
24 10.8 10.9 11.1 11.1 11.3 11.3 11.5 11.5 11.6 11.6 24
26 10.4 10.5 10.7 10.8 11.0 11.0 11.2 11.2 11.3 11.3 11.4 11.5 11.5 11.6 26
28 10.0 10.3 10.4 10.5 10.7 10.7 10.9 10.9 11.0 11.1 11.2 11.2 11.2 11.3 11.3 28
30 9.7 9.9 10.1 10.2 10.4 10.5 10.6 10.7 10.8 10.8 10.9 10.9 11.0 11.0 11.1 30
32 9.4 9.7 9.8 9.9 10.1 10.2 10.3 10.4 10.5 10.6 10.6 10.7 10.9 10.9 10.9 32
34 9.2 9.4 9.6 9.7 9.8 10.0 10.1 10.2 10.3 10.4 10.4 10.6 10.6 10.7 10.7 34
36 9.0 9.2 9.4 9.5 9.6 9.8 9.9 10.0 10.1 10.1 10.3 10.4 10.4 10.4 10.5 36
38 8.8 9.0 9.2 9.3 9.4 9.6 9.7 9.8 9.9 10.0 10.1 10.1 10.2 10.3 10.4 38
40 8.7 8.9 8.9 9.1 9.2 9.3 9.5 9.6 9.7 9.8 9.9 10.0 10.0 10.1 10.2 40
44 8.6 8.6 8.7 8.8 9.0 9.1 9.1 9.2 9.4 9.4 9.6 9.6 9.8 9.8 9.8 44
48 8.6 8.6 8.7 8.7 8.8 8.9 9.0 9.1 9.2 9.3 9.4 9.5 9.5 9.6 48
52 8.8 8.7 8.7 8.7 8.8 9.0 9.1 9.2 9.4 9.5 9.6 9.6 52
56 9.0 9.0 9.1 9.2 9.3 9.4 9.5 9.4 9.2 9.0 56
60 9.0 9.1 8.9 8.7 8.6 8.4 8.2 7.9 7.8 60
64 7.8 7.6 7.5 7.3 7.1 6.8 6.7 64
68 6.6 6.5 6.3 6.1 5.9 5.7 68
72 5.4 5.2 5.0 4.8 72
76 4.4 4.2 4.0 76
80 3.3 80
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 7/8
Boom to jib angle 30°, Jib 25m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
24 8.2 8.2 24
26 7.8 7.9 8.0 8.1 8.2 8.3 26
28 7.5 7.6 7.7 7.8 7.9 8.0 8.0 8.2 8.2 8.2 28
30 7.3 7.4 7.6 7.6 7.7 7.8 7.8 7.9 8.0 8.0 8.1 8.1 8.1 8.1 30
32 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.7 7.8 7.8 7.9 7.9 7.9 8.0 8.0 32
34 6.8 7.0 7.1 7.2 7.3 7.4 7.5 7.5 7.6 7.6 7.7 7.7 7.8 7.8 7.8 34
36 6.6 6.8 6.9 7.0 7.1 7.2 7.3 7.3 7.4 7.5 7.5 7.6 7.6 7.6 7.7 36
38 6.4 6.6 6.7 6.8 6.9 7.0 7.1 7.2 7.2 7.3 7.4 7.4 7.5 7.5 7.6 38
40 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7.0 7.1 7.1 7.2 7.3 7.3 7.3 7.4 40
44 6.0 6.1 6.2 6.3 6.5 6.6 6.6 6.7 6.8 6.8 6.9 7.0 7.0 7.1 7.2 44
48 5.8 5.9 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.6 6.7 6.7 6.8 6.8 6.9 48
52 5.8 5.9 5.9 6.0 6.1 6.1 6.2 6.3 6.4 6.5 6.5 6.6 6.7 6.7 52
56 5.8 5.8 5.9 5.9 6.0 6.1 6.1 6.2 6.3 6.3 6.4 6.4 6.5 56
60 5.8 5.8 5.9 5.9 6.0 6.0 6.1 6.1 6.2 6.3 6.3 60
64 5.8 5.8 5.8 5.9 5.9 5.9 6.0 6.1 6.1 6.2 64
68 5.8 5.8 5.8 5.9 5.9 5.9 6.0 6.0 68
72 6.2 6.0 6.0 5.8 5.6 5.4 5.2 72
76 5.2 5.0 4.8 4.6 4.4 76
80 4.2 4.1 3.9 3.7 80
84 3.2 3.0 84
Unit: t
FJ Load Chart
Load chart -FJ(Boom 28~70m, Rear counterweight 80t, Carbody counterweight 25t) 8/8
Boom to jib angle 30°, Jib 31m
Radius (m) 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 Radius (m)
28 6.0 6.0 28
30 5.7 5.8 5.8 5.9 5.9 6.0 30
32 5.5 5.6 5.6 5.7 5.8 5.8 5.8 5.9 5.9 5.9 32
34 5.3 5.3 5.4 5.5 5.5 5.6 5.7 5.7 5.8 5.8 5.8 5.9 5.9 5.9 34
36 5.1 5.2 5.3 5.3 5.4 5.5 5.5 5.6 5.6 5.7 5.7 5.7 5.8 5.8 5.8 36
38 4.9 5.0 5.1 5.2 5.3 5.3 5.4 5.4 5.5 5.5 5.6 5.6 5.6 5.6 5.7 38
40 4.7 4.9 4.9 5.0 5.1 5.2 5.2 5.3 5.4 5.4 5.4 5.5 5.5 5.5 5.6 40
44 4.5 4.6 4.7 4.7 4.8 4.9 5.0 5.0 5.1 5.1 5.2 5.2 5.2 5.3 5.3 44
48 4.3 4.3 4.4 4.5 4.6 4.7 4.7 4.8 4.8 4.9 5.0 5.0 5.1 5.1 5.1 48
52 4.1 4.2 4.2 4.3 4.4 4.5 4.5 4.6 4.7 4.7 4.8 4.8 4.9 4.9 5.0 52
56 4.0 4.0 4.1 4.2 4.2 4.3 4.3 4.4 4.5 4.5 4.6 4.6 4.7 4.7 4.8 56
60 4.0 4.0 4.0 4.1 4.1 4.2 4.3 4.3 4.4 4.4 4.5 4.5 4.6 4.6 60
64 4.0 4.0 4.0 4.1 4.1 4.2 4.3 4.3 4.4 4.4 4.4 4.5 64
68 4.0 4.0 4.1 4.1 4.1 4.2 4.2 4.3 4.3 4.4 68
72 4.0 4.0 4.0 4.1 4.1 4.1 4.2 4.2 4.3 72
76 4.0 4.0 4.0 4.1 4.1 4.1 4.1 76
80 4.0 4.0 4.0 4.0 4.1 4.1 80
84 3.9 3.8 3.5 3.4 84
88 3.1 2.9 2.8 88
LJ Configuration
22m B 9m T
25m B 3m 9m T
28m B 6m 9m T
28m B 3m 6m 6m T
31m B 3m 6m 9m T
34m B 3m 9m 9m T
34m B 3m 3m 6m 9m T
37m B 6m 9m 9m T
37m B 3m 6m 6m 9m T
40m B 3m 6m 9m 9m T
43m B 3m 9m 9m 9m T
43m B 3m 3m 6m 9m 9m T
46m B 6m 9m 9m 9m T
46m B 3m 6m 6m 9m 9m T
49m B 3m 6m 9m 9m 9m T
52m B 3m 3m 6m 9m 9m 9m T
55m B 6m 9m 9m 9m 9m T
55m B 3m 6m 6m 9m 9m 9m T
58m B 3m 6m 9m 9m 9m 9m T
LJ Configuration
LJ Working Radius
120
55
m+
55 58 110
m+ m
55 55
m+ m
105
55 52
m+ m
55 49
m+ m 100
55 46
m+ m
55 43
m+ m 95
55 40
m+ m
55 37m 90
m+
55 34
m+ m
55 31
m+ m 85
55 28
m+ m
55 2 5m 80
m+
22
m
75
70
65
Boom
length 60
84°
55m
75°
65° 55
52m
25m
25m
25m
49m
+58
50
25m
+55
25m
+52
m
25m
46m
+49
m
25m
+46
m
25m
45
+43
43m
m
25m
+40
m
25m
+37
m
25m
40m
+34
m
25m
40
+31
m
25m
+28
37m
m
+25
m
+22
34m 35
m
m
31m
30
28m
25m 25
22m
20
19m
16m 15
10
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80
Radius (m)
Unit: t
LJ Load Chart
Note:
1.The rated load in the load chart is calculated complying with EN 13000;
2.The working radius is the horizontal distance from the load center to the swing center;
3.The actual lifting capacity must subtract the weight of hooks and other riggings from the rated capacity in the load chart.
4.The load value is calculated when the object is hung freely,without considering the influence of wind on the load, ground conditions and slope, operation speed and the influence of any
other negative factors over safe operation. Therefore, the operator bears the responsibility of making a judgement and decreasing the load and lowering speed.
5.All rated values are calculated when the machine is parking on firm and level ground with less than 1% gradient.
6. See Operation Manual for load charts of LJm and LJa configurations.
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 1/11
Boom 25m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
12 66.8 61.5 12
14 52.7 53.0 54.3 49.9 14
16 43.1 43.4 44.5 44.4 44.2 38.6 33.6 16
18 36.4 36.6 37.6 37.4 37.3 37.2 33.3 29.1 25.5 18
20 31.4 31.6 32.5 32.3 32.2 32.1 31.9 28.7 25.1 22.1 19.5 20
22 27.6 27.7 28.5 28.4 28.3 28.1 27.9 27.8 24.8 21.7 19.1 16.8 14.8 22
24 24.5 24.7 25.4 25.2 25.1 25.0 24.8 24.7 24.4 21.3 18.7 16.5 14.5 24
26 22.2 22.8 22.7 22.6 22.4 22.3 22.1 22.0 21.0 18.4 16.1 14.1 26
28 18.5 20.7 20.6 20.5 20.3 20.2 20.0 19.9 19.7 18.0 15.7 13.8 28
30 18.1 18.8 18.7 18.5 18.4 18.2 18.1 18.0 17.6 15.4 13.4 30
32 17.2 17.1 17.0 16.8 16.7 16.6 16.4 16.3 15.0 13.1 32
34 13.4 15.8 15.7 15.5 15.4 15.3 15.1 15.0 14.7 12.8 34
36 13.2 14.5 14.4 14.3 14.1 14.0 13.8 13.7 12.5 36
38 12.8 13.4 13.3 13.1 13.0 12.8 12.7 12.1 38
40 10.1 12.3 12.4 12.2 12.1 11.9 11.8 11.6 40
44 9.7 10.7 10.5 10.4 10.3 10.1 44
48 7.6 8.9 9.2 9.0 8.7 48
52 5.8 7.1 7.8 7.4 52
56 5.5 6.1 56
60 4.2 60
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 2/11
Boom 28m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
12 66.3 12
14 54.6 54.9 55.3 49.8 14
16 44.4 44.6 46.0 46.0 43.1 37.4 16
18 37.3 37.5 38.6 38.6 38.6 37.2 32.4 28.4 24.9 18
20 32.1 32.3 33.2 33.2 33.2 33.1 32.1 28.1 24.6 21.7 19.1 20
22 28.1 28.3 29.1 29.0 29.0 28.9 28.8 27.7 24.3 21.3 18.8 16.6 14.6 22
24 25.0 25.1 25.8 25.7 25.7 25.6 25.5 25.4 23.9 21.0 18.4 16.2 14.3 24
26 20.6 22.5 23.2 23.1 23.1 23.0 22.8 22.7 22.6 20.6 18.1 15.9 14.0 26
28 20.4 21.0 20.9 20.9 20.8 20.7 20.5 20.4 20.2 17.7 15.5 13.6 28
30 19.1 19.1 19.0 18.9 18.8 18.7 18.5 18.4 17.4 15.2 13.3 30
32 14.7 17.5 17.4 17.3 17.2 17.1 17.0 16.8 16.7 14.9 13.0 32
34 14.8 16.1 16.0 15.9 15.8 15.6 15.5 15.3 14.5 12.7 34
36 14.5 14.8 14.7 14.6 14.4 14.3 14.2 14.0 12.4 36
38 13.7 13.6 13.5 13.4 13.2 13.1 13.0 12.1 38
40 11.1 12.7 12.6 12.5 12.3 12.2 12.1 11.8 40
44 10.7 10.9 10.8 10.6 10.5 10.3 44
48 8.4 9.5 9.4 9.2 9.1 48
52 6.5 7.9 8.2 7.7 52
56 6.2 6.4 56
60 4.8 60
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 3/11
Boom 31m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
12 64.0 12
14 56.6 55.4 54.0 14
16 45.7 46.0 47.4 47.4 41.4 36.1 16
18 38.3 38.5 39.6 39.6 39.6 35.9 31.4 27.6 18
20 32.8 33.0 34.0 33.9 33.9 33.9 31.2 27.3 24.0 21.2 18.8 20
22 28.7 28.8 29.7 29.6 29.6 29.5 29.4 27.0 23.7 20.9 18.4 16.3 14.4 22
24 25.4 25.5 26.3 26.2 26.2 26.1 26.0 25.9 23.4 20.6 18.1 16.0 14.1 24
26 22.8 22.9 23.6 23.5 23.4 23.4 23.2 23.2 23.1 20.2 17.8 15.6 13.7 26
28 20.7 21.3 21.2 21.2 21.1 21.0 20.9 20.8 19.9 17.5 15.3 13.4 28
30 19.4 19.3 19.3 19.2 19.1 19.0 18.9 18.7 17.1 15.0 13.2 30
32 16.3 17.7 17.7 17.6 17.4 17.4 17.3 17.1 16.8 14.7 12.9 32
34 16.1 16.3 16.2 16.1 16.0 15.9 15.7 15.6 14.4 12.5 34
36 15.1 15.0 14.8 14.7 14.6 14.5 14.4 14.1 12.2 36
38 12.1 13.9 13.8 13.7 13.6 13.4 13.3 13.2 12.0 38
40 12.2 12.8 12.7 12.6 12.5 12.4 12.3 11.7 40
44 11.1 11.0 10.9 10.8 10.7 10.5 44
48 9.1 9.6 9.5 9.4 9.2 48
52 7.1 8.4 8.3 7.8 52
56 6.8 6.6 56
60 5.3 60
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 4/11
Boom 34m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
12 61.3 12
14 54.6 53.4 51.8 14
16 47.1 47.4 47.0 45.3 39.7 34.8 16
18 39.3 39.5 40.7 40.6 39.5 34.6 30.4 26.8 18
20 33.6 33.8 34.7 34.7 34.7 34.4 30.1 26.5 23.4 20.7 20
22 29.3 29.4 30.3 30.2 30.2 30.1 29.9 26.2 23.1 20.4 18.0 15.9 14.1 22
24 25.9 26.0 26.8 26.7 26.7 26.6 26.5 25.9 22.8 20.1 17.7 15.6 13.8 24
26 23.2 23.3 23.9 23.9 23.8 23.8 23.6 23.6 22.5 19.8 17.4 15.4 13.5 26
28 21.0 21.6 21.5 21.5 21.4 21.3 21.2 21.1 19.5 17.1 15.1 13.3 28
30 19.7 19.6 19.5 19.5 19.3 19.3 19.2 19.0 16.8 14.8 13.0 30
32 17.5 17.9 17.9 17.8 17.7 17.6 17.5 17.4 16.5 14.5 12.7 32
34 16.5 16.5 16.4 16.3 16.2 16.1 15.9 15.8 14.2 12.4 34
36 15.2 15.1 15.0 14.9 14.8 14.7 14.6 13.9 12.1 36
38 13.1 14.1 13.9 13.8 13.7 13.6 13.5 13.4 11.8 38
40 13.0 13.0 12.9 12.8 12.6 12.5 12.4 11.6 40
44 10.0 11.3 11.1 11.0 10.9 10.8 10.6 44
48 9.8 9.7 9.6 9.4 9.3 48
52 7.7 8.5 8.4 8.0 52
56 7.1 6.7 56
60 5.6 60
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 5/11
Boom 37m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 53.1 51.8 49.1 14
16 47.6 46.7 45.9 42.9 37.8 16
18 40.3 40.6 41.7 40.8 37.6 33.2 29.2 25.9 18
20 34.4 34.5 35.6 35.5 35.5 32.9 29.0 25.7 22.7 20.1 20
22 29.9 30.0 30.9 30.8 30.8 30.8 28.8 25.4 22.5 19.8 17.6 15.6 22
24 26.4 26.5 27.3 27.2 27.2 27.1 27.0 25.2 22.2 19.6 17.3 15.3 13.5 24
26 23.6 23.7 24.3 24.3 24.2 24.2 24.0 24.0 21.9 19.3 17.0 15.0 13.3 26
28 21.4 22.0 21.9 21.8 21.8 21.6 21.6 21.5 19.0 16.8 14.8 13.0 28
30 18.8 20.0 19.9 19.8 19.7 19.6 19.5 19.4 18.7 16.5 14.5 12.7 30
32 18.3 18.2 18.1 18.1 17.9 17.8 17.7 17.6 16.2 14.2 12.5 32
34 16.7 16.7 16.6 16.5 16.4 16.3 16.1 15.9 13.9 12.2 34
36 15.4 15.3 15.2 15.1 15.0 14.9 14.8 13.7 11.9 36
38 14.0 14.2 14.1 14.0 13.9 13.8 13.6 13.4 11.7 38
40 13.2 13.1 13.0 12.9 12.8 12.7 12.5 11.4 40
44 10.8 11.4 11.3 11.1 11.0 10.9 10.7 44
48 9.9 9.8 9.7 9.5 9.4 48
52 8.2 8.6 8.4 8.2 52
56 6.4 7.4 6.9 56
60 5.7 60
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 6/11
Boom 40m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 51.1 49.8 14
16 46.2 45.3 44.1 40.6 36.0 16
18 41.5 41.0 40.3 39.4 35.8 31.7 28.1 18
20 35.2 35.4 36.4 36.1 35.4 31.4 27.9 24.7 22.0 19.5 20
22 30.5 30.7 31.6 31.5 31.5 31.1 27.7 24.5 21.7 19.3 17.1 15.2 22
24 26.9 27.0 27.8 27.7 27.7 27.6 27.4 24.3 21.5 19.0 16.8 14.9 13.2 24
26 24.0 24.1 24.8 24.7 24.7 24.6 24.5 24.0 21.2 18.8 16.6 14.7 13.0 26
28 21.7 22.3 22.2 22.2 22.1 22.0 21.9 21.0 18.5 16.3 14.4 12.7 28
30 19.7 20.3 20.2 20.1 20.0 19.9 19.8 19.7 18.2 16.1 14.2 12.5 30
32 18.5 18.4 18.4 18.3 18.2 18.1 18.0 17.9 15.8 13.9 12.2 32
34 17.0 16.9 16.8 16.7 16.6 16.5 16.4 15.6 13.7 12.0 34
36 15.0 15.6 15.5 15.4 15.3 15.2 15.1 14.9 13.4 11.7 36
38 14.5 14.4 14.3 14.2 14.1 13.9 13.8 13.2 11.5 38
40 13.4 13.3 13.2 13.1 12.9 12.8 12.7 11.2 40
44 11.5 11.5 11.4 11.2 11.1 11.0 10.8 44
48 10.0 9.9 9.8 9.6 9.5 48
52 8.7 8.6 8.5 8.3 52
56 6.8 7.6 7.0 56
60 5.8 60
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 7/11
Boom 43m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 49.7 48.5 14
16 45.0 43.9 42.9 38.2 16
18 40.6 40.0 39.2 37.8 33.9 30.2 26.9 18
20 36.0 36.2 35.9 35.3 33.6 30.0 26.7 23.8 21.1 20
22 31.2 31.3 32.2 32.2 31.9 29.7 26.4 23.5 20.9 18.6 16.5 14.7 22
24 27.4 27.5 28.3 28.3 28.2 28.2 26.1 23.3 20.7 18.4 16.3 14.5 12.9 24
26 24.4 24.5 25.2 25.1 25.1 25.0 24.9 23.0 20.5 18.1 16.1 14.3 12.6 26
28 22.0 22.7 22.6 22.5 22.5 22.3 22.3 20.2 17.9 15.9 14.1 12.4 28
30 20.0 20.6 20.5 20.4 20.3 20.2 20.1 19.9 17.7 15.6 13.8 12.2 30
32 18.8 18.7 18.6 18.6 18.4 18.3 18.2 17.4 15.4 13.6 11.9 32
34 17.2 17.1 17.0 16.9 16.8 16.7 16.6 15.1 13.4 11.7 34
36 15.8 15.8 15.7 15.6 15.5 15.4 15.2 14.9 13.1 11.5 36
38 14.6 14.6 14.4 14.3 14.2 14.1 14.0 12.9 11.2 38
40 13.5 13.4 13.3 13.2 13.1 13.0 12.6 11.0 40
44 11.7 11.6 11.5 11.4 11.2 11.1 10.6 44
48 9.4 10.1 10.0 9.9 9.7 9.6 48
52 8.8 8.7 8.6 8.4 52
56 7.3 7.6 7.1 56
60 5.9 60
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 8/11
Boom 46m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 47.7 45.2 14
16 43.3 42.3 40.2 36.0 16
18 39.2 38.7 38.0 35.6 32.0 28.7 18
20 35.8 35.4 34.8 34.1 31.6 28.4 25.4 22.7 20.3 20
22 31.8 32.0 32.0 31.5 30.9 28.1 25.2 22.5 20.1 17.9 16.0 22
24 27.9 28.1 28.9 28.8 28.6 27.4 24.9 22.3 19.9 17.7 15.8 14.1 12.5 24
26 24.8 24.9 25.6 25.6 25.5 25.5 24.4 22.0 19.6 17.5 15.5 13.8 12.3 26
28 22.3 22.4 23.0 23.0 22.9 22.8 22.7 21.7 19.4 17.3 15.3 13.6 12.1 28
30 20.3 20.9 20.8 20.7 20.7 20.5 20.4 19.1 17.0 15.1 13.4 11.8 30
32 19.0 19.0 18.9 18.8 18.7 18.6 18.5 16.8 14.9 13.2 11.6 32
34 17.4 17.3 17.3 17.1 17.0 16.9 16.5 14.7 13.0 11.4 34
36 16.1 16.0 15.9 15.8 15.7 15.6 15.4 14.5 12.8 11.2 36
38 14.8 14.7 14.6 14.5 14.4 14.3 14.2 12.5 11.0 38
40 13.7 13.6 13.5 13.4 13.2 13.1 12.3 10.8 40
44 11.8 11.7 11.6 11.5 11.4 11.2 10.3 44
48 9.9 10.2 10.1 10.0 9.8 9.7 48
52 8.9 8.8 8.7 8.5 52
56 7.7 7.7 7.2 56
60 5.9 6.1 60
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 9/11
Boom 49m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 46.3 14
16 42.1 41.2 37.4 33.7 16
18 38.2 37.7 36.7 33.3 30.1 27.1 18
20 35.0 34.3 33.9 32.7 29.7 26.8 24.1 21.6 20
22 32.0 31.8 31.1 30.7 29.2 26.5 23.8 21.4 19.2 17.1 15.4 22
24 28.5 28.6 28.9 28.4 27.5 26.0 23.5 21.2 19.0 17.0 15.2 13.6 12.0 24
26 25.3 25.4 26.1 26.0 25.6 24.6 23.2 20.9 18.8 16.7 15.0 13.4 11.9 26
28 22.7 22.8 23.4 23.3 23.3 23.0 21.9 20.6 18.5 16.6 14.8 13.2 11.7 28
30 20.6 21.2 21.1 21.0 21.0 20.5 19.7 18.2 16.3 14.6 13.0 11.5 30
32 19.3 19.2 19.2 19.1 19.0 18.5 17.7 16.1 14.4 12.8 11.3 32
34 17.7 17.6 17.6 17.5 17.4 17.3 16.6 15.9 14.1 12.5 11.1 34
36 16.2 16.2 16.1 16.0 15.9 15.7 15.0 13.9 12.3 10.9 36
38 15.0 14.9 14.8 14.7 14.6 14.1 13.6 12.1 10.7 38
40 13.4 13.8 13.7 13.6 13.5 13.3 12.8 11.9 10.5 40
44 11.7 11.8 11.7 11.5 11.3 10.9 10.0 44
48 10.0 10.1 9.9 9.9 9.7 9.4 48
52 8.6 8.5 8.4 8.3 52
56 7.3 7.3 7.2 56
60 6.2 6.1 60
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 10/11
Boom 52m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
14 42.7 14
16 40.4 38.2 34.8 16
18 37.0 36.3 34.1 31.0 28.2 25.5 18
20 33.9 33.3 32.7 30.4 27.8 25.2 22.7 20.5 20
22 31.1 30.7 30.2 29.4 27.3 24.8 22.5 20.3 18.3 16.4 22
24 28.8 28.4 28.0 27.4 26.2 24.4 22.1 20.0 18.1 16.2 14.5 13.0 11.6 24
26 25.7 25.8 26.0 25.5 24.6 23.4 21.8 19.8 17.9 16.0 14.4 12.8 11.4 26
28 23.0 23.1 23.8 23.5 22.9 21.9 21.0 19.4 17.6 15.8 14.2 12.6 11.2 28
30 20.9 21.5 21.4 21.1 20.5 19.7 18.8 17.3 15.6 14.0 12.4 11.0 30
32 19.6 19.5 19.4 19.0 18.4 17.8 17.0 15.3 13.8 12.3 10.9 32
34 17.9 17.9 17.8 17.6 17.1 16.7 16.0 15.1 13.5 12.1 10.7 34
36 16.4 16.3 16.2 15.9 15.5 15.1 14.4 13.3 11.9 10.5 36
38 15.0 14.9 14.6 14.5 14.1 13.6 13.1 11.7 10.3 38
40 13.7 13.7 13.6 13.5 13.2 12.8 12.4 11.4 10.1 40
44 11.5 11.5 11.4 11.2 11.0 10.6 9.7 44
48 9.8 9.8 9.7 9.6 9.4 9.1 48
52 8.4 8.3 8.2 8.1 52
56 7.2 7.1 7.1 56
60 6.2 6.2 60
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 84°, Rear counterweight 80t, Carbody counterweight 25t) 11/11
Boom 55m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
16 38.2 35.2 32.2 16
18 36.0 34.2 31.5 28.8 26.3 18
20 33.1 32.5 30.7 28.2 25.9 23.6 21.4 19.4 20
22 30.4 29.9 29.2 27.5 25.3 23.2 21.1 19.2 17.3 15.6 22
24 28.1 27.8 27.1 26.1 24.7 22.7 20.8 18.9 17.1 15.4 13.8 12.4 11.1 24
26 26.0 25.7 25.0 24.2 23.2 22.3 20.4 18.6 16.9 15.2 13.7 12.2 10.9 26
28 23.4 23.4 22.9 22.3 21.6 20.9 19.9 18.3 16.6 15.0 13.5 12.1 10.8 28
30 21.2 20.9 20.5 20.2 19.5 18.8 17.9 16.3 14.7 13.3 11.9 10.6 30
32 19.1 18.8 18.5 18.1 17.6 16.9 16.0 14.5 13.1 11.7 10.4 32
34 17.5 17.2 17.0 16.8 16.4 15.8 15.3 14.2 12.9 11.5 10.2 34
36 15.8 15.6 15.5 15.2 14.8 14.4 13.8 12.6 11.3 10.1 36
38 14.4 14.3 14.1 13.8 13.5 13.0 12.4 11.1 9.9 38
40 13.2 13.1 13.0 12.8 12.6 12.2 11.8 10.9 9.7 40
44 11.1 11.0 10.9 10.7 10.5 10.1 9.3 44
48 9.4 9.3 9.3 9.1 8.9 8.7 48
52 8.0 8.0 7.9 7.8 7.7 52
56 6.9 6.8 6.7 56
60 5.9 5.9 60
Unit: t
LJ Load Chart
Note:
1.The rated load in the load chart is calculated complying with EN 13000;
2.The working radius is the horizontal distance from the load center to the swing center;
3.The actual lifting capacity must subtract the weight of hooks and other riggings from the rated capacity in the load chart.
4.The load value is calculated when the object is hung freely,without considering the influence of wind on the load, ground conditions and slope, operation speed and the influence of any
other negative factors over safe operation. Therefore, the operator bears the responsibility of making a judgement and decreasing the load and lowering speed.
5.All rated values are calculated when the machine is parking on firm and level ground with less than 1% gradient.
6. See Operation Manual for load charts of LJm and LJa configurations.
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 1/11
Boom 25m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
20 42.8 42.8 20
22 36.2 36.4 37.3 37.1 22
24 31.3 31.4 32.2 32.1 31.9 24
26 27.5 27.6 28.3 28.2 28.0 27.9 27.7 26
28 24.5 24.6 25.2 25.1 24.9 24.8 24.6 24.5 28
30 22.1 22.7 22.5 22.4 22.3 22.1 22.0 21.9 19.2 30
32 20.0 20.6 20.4 20.3 20.2 20.0 19.9 19.8 18.9 16.5 32
34 18.8 18.7 18.6 18.4 18.3 18.1 18.0 17.8 16.3 14.2 12.4 34
36 17.2 17.1 16.9 16.8 16.6 16.5 16.3 16.0 13.9 12.1 36
38 15.8 15.7 15.6 15.4 15.3 15.2 15.0 14.9 13.7 11.9 38
40 14.6 14.5 14.3 14.2 14.0 13.9 13.8 13.4 11.6 40
44 12.1 12.4 12.3 12.2 12.0 11.9 11.7 11.2 44
48 10.8 10.6 10.5 10.4 10.2 10.1 48
52 9.3 9.3 9.1 9.0 8.8 52
56 8.1 8.0 7.8 56
60 7.1 6.6 60
64 5.4 64
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 2/11
Boom 28m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
20 42.5 20
22 37.8 37.7 37.5 22
24 33.0 33.2 33.7 33.4 33.3 24
26 28.8 29.0 29.8 29.8 29.7 29.6 26
28 25.5 25.7 26.4 26.3 26.3 26.2 26.0 25.0 28
30 22.9 23.0 23.7 23.6 23.5 23.4 23.3 23.1 21.7 30
32 20.8 21.4 21.3 21.3 21.2 21.0 20.9 20.7 18.7 16.3 32
34 19.5 19.4 19.3 19.3 19.1 19.0 18.8 18.5 16.1 14.0 34
36 17.9 17.8 17.7 17.6 17.5 17.4 17.2 17.1 15.9 13.8 12.0 36
38 16.4 16.3 16.2 16.1 16.0 15.8 15.7 15.5 13.6 11.8 38
40 15.1 15.0 14.9 14.8 14.6 14.5 14.3 13.3 11.6 40
44 13.0 12.9 12.7 12.6 12.5 12.3 12.2 11.1 44
48 10.9 11.2 11.0 10.9 10.7 10.6 10.5 48
52 9.7 9.6 9.5 9.3 9.2 52
56 8.5 8.4 8.2 8.1 56
60 7.3 6.9 60
64 5.8 64
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 3/11
Boom 31m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
20 42.0 20
22 37.4 37.2 22
24 33.6 33.5 33.3 33.0 24
26 30.3 30.4 30.2 29.9 29.8 29.6 26
28 26.7 26.9 27.6 27.3 27.2 27.0 26.8 28
30 23.9 24.0 24.7 24.6 24.5 24.5 24.4 24.3 21.3 30
32 21.6 22.2 22.1 22.1 22.0 21.9 21.8 21.1 18.4 32
34 19.6 20.2 20.1 20.1 20.0 19.8 19.8 19.7 18.2 15.9 13.9 34
36 18.5 18.4 18.3 18.2 18.1 18.0 17.9 17.8 15.7 13.7 11.9 36
38 16.9 16.8 16.8 16.6 16.5 16.4 16.3 15.5 13.4 11.7 38
40 15.6 15.6 15.5 15.3 15.3 15.1 15.0 14.9 13.2 11.5 40
44 13.4 13.2 13.1 13.0 12.9 12.8 12.6 11.1 44
48 11.5 11.5 11.3 11.2 11.1 11.0 10.7 48
52 10.0 9.8 9.7 9.6 9.5 52
56 8.7 8.6 8.5 8.3 56
60 7.7 7.5 7.3 60
64 6.1 64
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 4/11
Boom 34m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
22 37.0 36.8 22
24 33.2 33.1 32.9 24
26 30.2 30.0 29.8 29.6 29.4 26
28 27.6 27.4 27.2 27.0 26.8 26.7 28
30 24.9 25.0 25.0 24.8 24.7 24.5 24.2 23.8 30
32 22.4 22.5 23.1 22.9 22.8 22.6 22.4 22.2 20.7 18.1 32
34 20.4 20.9 20.9 20.8 20.7 20.6 20.5 20.4 17.9 15.7 34
36 19.1 19.0 19.0 18.9 18.8 18.7 18.6 17.7 15.5 13.5 11.8 36
38 17.4 17.4 17.3 17.2 17.1 17.0 16.8 15.3 13.3 11.6 38
40 16.1 16.0 15.9 15.8 15.7 15.6 15.5 15.1 13.1 11.4 40
44 13.7 13.6 13.5 13.4 13.3 13.1 12.7 11.0 44
48 11.8 11.8 11.6 11.5 11.4 11.3 10.6 48
52 10.3 10.2 10.1 10.0 9.9 9.7 52
56 8.9 8.8 8.7 8.6 56
60 7.8 7.7 7.6 60
64 6.9 6.4 64
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 5/11
Boom 37m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
22 36.5 22
24 32.8 32.7 32.4 24
26 29.8 29.6 29.4 29.2 26
28 27.2 27.1 26.9 26.6 26.5 26.3 28
30 25.0 24.9 24.7 24.5 24.3 24.1 23.9 30
32 23.1 23.0 22.8 22.6 22.4 22.3 22.0 21.9 20.2 32
34 21.1 21.2 21.0 20.8 20.6 20.4 20.2 20.1 17.6 15.4 34
36 19.7 19.5 19.4 19.2 19.0 18.8 18.6 17.4 15.2 13.3 36
38 18.1 18.0 18.0 17.9 17.7 17.6 17.4 17.2 15.0 13.1 11.5 38
40 16.6 16.5 16.4 16.3 16.2 16.1 16.0 14.9 13.0 11.3 40
44 14.2 14.1 14.0 13.9 13.8 13.6 13.5 12.6 10.9 44
48 12.2 12.1 11.9 11.8 11.7 11.6 10.5 48
52 10.6 10.5 10.3 10.2 10.1 10.0 52
56 9.3 9.1 9.0 8.9 8.8 56
60 8.0 7.9 7.8 60
64 7.0 6.6 64
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 6/11
Boom 40m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
22 36.0 22
24 32.4 32.2 24
26 29.4 29.2 29.0 28.7 26
28 26.8 26.7 26.5 26.2 26.1 28
30 24.7 24.5 24.3 24.1 23.9 23.8 23.5 30
32 22.8 22.7 22.5 22.3 22.1 21.9 21.7 21.5 32
34 21.0 20.9 20.6 20.5 20.3 20.1 19.9 19.6 17.2 34
36 19.6 19.4 19.2 19.1 18.9 18.7 18.5 18.3 17.0 14.9 13.1 36
38 18.2 18.0 17.8 17.7 17.4 17.3 17.1 16.9 14.7 12.9 11.3 38
40 16.8 16.7 16.5 16.3 16.2 16.0 15.8 14.6 12.7 11.1 40
44 14.6 14.5 14.4 14.3 14.1 13.9 13.7 12.4 10.7 44
48 12.6 12.5 12.4 12.3 12.1 12.0 11.9 10.4 48
52 10.9 10.7 10.6 10.5 10.4 10.1 52
56 9.5 9.4 9.2 9.1 9.0 56
60 8.2 8.1 7.9 60
64 7.2 7.0 64
68 5.8 68
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 7/11
Boom 43m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
24 31.9 31.7 24
26 28.9 28.8 28.6 26
28 26.4 26.3 26.1 25.8 25.6 28
30 24.3 24.2 24.0 23.7 23.6 23.4 30
32 22.5 22.3 22.1 21.9 21.7 21.6 21.3 21.1 32
34 20.8 20.7 20.5 20.3 20.2 20.0 19.7 19.6 19.0 34
36 19.3 19.1 18.9 18.8 18.6 18.4 18.2 18.0 16.5 14.6 36
38 17.9 17.7 17.5 17.4 17.1 17.0 16.8 16.4 14.4 12.7 11.1 38
40 16.8 16.6 16.4 16.3 16.0 15.9 15.7 15.5 14.3 12.5 10.9 40
44 14.5 14.4 14.2 14.0 13.8 13.6 13.5 12.2 10.6 44
48 12.8 12.6 12.5 12.3 12.1 11.9 11.8 10.3 48
52 11.1 11.0 10.8 10.6 10.5 10.0 52
56 9.7 9.6 9.5 9.3 9.2 56
60 8.5 8.4 8.3 8.1 60
64 7.4 7.2 64
68 6.0 68
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 8/11
Boom 46m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
24 31.4 24
26 28.5 28.4 26
28 26.1 25.9 25.7 25.4 28
30 24.0 23.8 23.6 23.3 23.2 23.0 30
32 22.1 22.0 21.8 21.6 21.4 21.2 20.9 32
34 20.5 20.4 20.2 20.0 19.8 19.7 19.4 19.2 18.3 34
36 19.0 18.9 18.6 18.5 18.3 18.0 17.9 17.7 16.0 36
38 17.8 17.6 17.4 17.2 17.1 16.8 16.7 16.5 15.9 14.0 12.4 38
40 16.5 16.3 16.2 16.0 15.8 15.6 15.4 15.2 13.9 12.2 10.7 40
44 14.3 14.1 13.9 13.8 13.6 13.3 13.2 11.9 10.4 44
48 12.6 12.4 12.2 12.1 11.8 11.7 11.5 10.1 48
52 11.1 11.0 10.8 10.6 10.4 10.3 9.8 52
56 9.7 9.5 9.4 9.2 9.0 56
60 8.6 8.4 8.3 8.0 60
64 7.6 7.4 7.2 64
68 6.2 68
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 9/11
Boom 49m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
26 28.1 27.8 26
28 25.6 25.5 25.3 28
30 23.6 23.4 23.2 22.9 22.7 30
32 21.8 21.6 21.4 21.2 21.0 20.8 20.4 32
34 20.2 20.1 19.9 19.6 19.5 19.3 19.0 18.8 34
36 18.8 18.7 18.5 18.3 18.1 17.9 17.7 17.5 17.3 15.5 36
38 17.5 17.3 17.1 16.9 16.8 16.5 16.3 16.2 15.4 13.6 38
40 16.2 16.0 15.9 15.7 15.4 15.3 15.1 14.9 13.5 11.9 10.4 40
44 14.1 14.0 13.9 13.6 13.5 13.3 13.1 12.9 11.6 10.1 44
48 12.3 12.1 12.0 11.8 11.6 11.4 11.2 9.9 48
52 10.9 10.7 10.6 10.3 10.2 10.0 9.6 52
56 9.6 9.5 9.3 9.1 9.0 8.7 56
60 8.4 8.2 8.0 7.8 60
64 7.4 7.3 7.0 64
68 6.3 68
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 10/11
Boom 52m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
26 27.4 26
28 25.2 25.0 24.6 28
30 23.2 23.0 22.8 22.4 30
32 21.4 21.3 21.0 20.8 20.6 20.2 32
34 19.9 19.7 19.5 19.3 19.1 18.9 18.5 18.2 34
36 18.5 18.4 18.2 17.9 17.8 17.6 17.3 17.1 16.7 36
38 17.2 17.0 16.8 16.6 16.4 16.2 16.0 15.8 14.7 13.1 38
40 15.9 15.7 15.6 15.4 15.1 15.0 14.8 14.5 13.0 11.5 40
44 13.9 13.7 13.6 13.3 13.2 13.0 12.8 12.6 11.2 9.8 44
48 12.2 12.1 11.9 11.7 11.5 11.3 11.1 11.0 9.6 48
52 10.6 10.5 10.3 10.1 9.9 9.8 9.4 52
56 9.4 9.3 9.0 8.9 8.7 8.5 56
60 8.3 8.1 8.0 7.8 7.6 60
64 7.2 7.1 6.8 64
68 6.4 6.2 68
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 75°, Rear counterweight 80t, Carbody counterweight 25t) 11/11
Boom 55m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
26 26.6 26
28 24.6 24.3 28
30 22.7 22.6 22.2 21.7 30
32 21.0 20.8 20.6 20.3 19.9 32
34 19.5 19.3 19.1 18.9 18.7 18.3 17.9 34
36 18.1 18.0 17.8 17.6 17.4 17.2 16.8 16.5 15.8 36
38 16.8 16.7 16.4 16.3 16.1 15.8 15.5 15.2 14.0 38
40 15.8 15.6 15.4 15.2 15.0 14.8 14.6 14.3 13.9 12.4 11.0 40
44 13.6 13.4 13.3 13.0 12.9 12.7 12.4 12.2 10.8 9.5 44
48 12.0 11.8 11.6 11.4 11.3 11.0 10.9 10.6 9.3 48
52 10.6 10.4 10.2 10.1 9.8 9.7 9.5 9.1 52
56 9.2 9.0 8.8 8.7 8.5 8.3 56
60 8.1 7.9 7.8 7.6 7.4 60
64 7.0 6.8 6.6 64
68 6.2 6.0 68
72 5.3 72
Unit: t
LJ Load Chart
Note:
1.The rated load in the load chart is calculated complying with EN 13000;
2.The working radius is the horizontal distance from the load center to the swing center;
3.The actual lifting capacity must subtract the weight of hooks and other riggings from the rated capacity in the load chart.
4.The load value is calculated when the object is hung freely,without considering the influence of wind on the load, ground conditions and slope, operation speed and the influence of any
other negative factors over safe operation. Therefore, the operator bears the responsibility of making a judgement and decreasing the load and lowering speed.
5.All rated values are calculated when the machine is parking on firm and level ground with less than 1% gradient.
6. See Operation Manual for load charts of LJm and LJa configurations.
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 1/11
Boom 25m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
26 28.4 26
28 26.2 26.0 28
30 24.1 24.0 23.7 30
32 22.3 22.2 21.9 21.7 32
34 20.7 20.7 20.5 20.1 20.0 34
36 19.2 19.1 18.8 18.7 18.4 18.1 36
38 17.8 17.6 17.4 17.3 17.0 16.7 38
40 16.4 16.3 16.1 15.9 15.7 15.5 40
44 14.4 14.3 14.0 13.9 13.7 13.4 13.3 44
48 12.6 12.4 12.3 12.1 11.9 11.7 11.4 10.1 48
52 10.8 10.7 10.5 10.4 10.2 9.8 52
56 9.4 9.3 9.1 9.0 8.8 56
60 8.2 8.1 8.0 7.8 60
64 7.1 7.0 64
68 6.0 68
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 2/11
Boom 28m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
28 25.9 28
30 23.9 23.6 30
32 22.0 21.9 21.6 21.4 32
34 20.5 20.4 20.1 19.8 19.7 34
36 19.0 18.8 18.6 18.3 18.1 36
38 17.7 17.6 17.3 17.2 17.0 16.6 38
40 16.4 16.2 16.1 15.9 15.6 15.4 40
44 14.2 14.0 13.8 13.6 13.4 13.1 44
48 12.5 12.2 12.1 11.9 11.7 11.4 11.2 10.0 48
52 10.9 10.8 10.6 10.4 10.2 10.0 9.7 52
56 9.5 9.2 9.1 8.9 8.6 56
60 8.3 8.2 8.0 7.7 60
64 7.3 7.1 6.9 64
68 6.1 68
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 3/11
Boom 31m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
30 23.3 23.2 30
32 21.6 21.5 21.2 32
34 20.1 19.9 19.7 19.4 34
36 18.8 18.7 18.4 18.1 17.9 36
38 17.4 17.2 17.0 16.7 16.5 38
40 16.1 15.9 15.7 15.5 15.3 40
44 14.0 13.9 13.7 13.5 13.3 13.0 12.7 44
48 12.3 12.2 12.0 11.8 11.6 11.3 11.1 10.9 48
52 10.7 10.5 10.3 10.1 9.9 9.6 9.4 52
56 9.4 9.2 9.0 8.8 8.6 8.4 56
60 8.1 7.8 7.7 7.4 60
64 7.1 6.9 6.7 64
68 6.1 5.9 68
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 4/11
Boom 34m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
30 23.0 30
32 21.3 21.1 32
34 19.8 19.6 19.4 34
36 18.4 18.3 18.1 17.8 36
38 17.1 17.0 16.6 16.4 16.2 38
40 16.0 15.9 15.6 15.4 15.2 14.9 40
44 13.8 13.6 13.5 13.1 12.9 12.7 44
48 12.1 12.0 11.7 11.4 11.2 11.0 10.8 48
52 10.6 10.4 10.3 10.1 9.8 9.6 9.4 9.1 52
56 9.2 9.0 8.7 8.6 8.4 8.1 56
60 8.1 7.8 7.6 7.4 7.2 60
64 6.9 6.7 6.5 64
68 5.9 5.7 68
72 5.1 72
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 5/11
Boom 37m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
32 20.8 32
34 19.3 19.2 34
36 18.0 17.8 17.6 17.3 36
38 16.9 16.7 16.4 16.2 16.0 38
40 15.7 15.5 15.2 14.9 14.7 40
44 13.7 13.4 13.3 13.0 12.7 12.5 44
48 11.8 11.6 11.3 11.1 10.9 10.6 10.4 48
52 10.4 10.1 10.0 9.8 9.4 9.2 9.0 8.7 52
56 9.0 8.9 8.7 8.4 8.3 8.1 7.7 56
60 7.7 7.5 7.3 7.1 6.9 60
64 6.8 6.6 6.4 6.1 64
68 5.8 5.7 5.4 68
72 4.9 72
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 6/11
Boom 40m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
32 20.2 32
34 18.9 18.7 34
36 17.6 17.4 17.2 36
38 16.4 16.2 16.0 15.7 38
40 15.4 15.3 15.1 14.7 14.5 40
44 13.3 13.0 12.8 12.6 12.3 12.1 44
48 11.6 11.4 11.2 10.9 10.7 10.5 10.2 48
52 10.0 9.8 9.5 9.3 9.1 8.9 8.7 52
56 8.7 8.6 8.4 8.1 7.8 7.6 7.4 56
60 7.6 7.5 7.2 7.0 6.8 6.6 60
64 6.5 6.3 6.0 5.8 64
68 5.6 5.4 5.2 68
72 4.8 4.6 72
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 7/11
Boom 43m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
34 18.2 34
36 17.1 16.9 36
38 15.9 15.8 15.5 38
40 14.9 14.7 14.5 14.2 40
44 13.0 12.8 12.5 12.4 12.2 11.9 44
48 11.1 11.0 10.8 10.5 10.3 10.1 48
52 9.9 9.6 9.3 9.1 8.9 8.7 8.5 52
56 8.6 8.4 8.2 8.0 7.7 7.5 7.3 7.0 56
60 7.3 7.1 6.9 6.7 6.5 6.1 60
64 6.4 6.1 5.9 5.7 5.5 64
68 5.3 5.1 4.9 68
72 4.6 4.2 72
76 3.7 76
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 8/11
Boom 46m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
36 16.5 36
38 15.5 15.3 15.1 38
40 14.5 14.3 14.1 13.8 40
44 12.7 12.5 12.2 12.0 11.8 44
48 11.0 10.8 10.6 10.4 10.1 9.9 48
52 9.4 9.3 9.0 8.8 8.6 8.3 8.1 52
56 8.3 8.1 7.8 7.6 7.3 7.1 6.9 6.7 56
60 7.2 7.0 6.8 6.6 6.4 6.1 5.8 60
64 6.1 5.8 5.6 5.4 5.2 64
68 5.2 5.0 4.8 4.6 68
72 4.2 4.0 72
76 3.5 76
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 9/11
Boom 49m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
36 16.0 36
38 14.9 14.7 38
40 14.0 13.8 13.6 40
44 12.3 12.2 12.0 11.7 11.4 44
48 10.6 10.4 10.2 10.0 9.6 9.4 48
52 9.2 9.1 8.9 8.6 8.4 8.2 7.8 52
56 8.0 7.6 7.4 7.2 6.9 6.7 6.5 56
60 6.8 6.7 6.5 6.1 5.9 5.7 5.4 60
64 5.9 5.7 5.5 5.3 5.1 4.8 64
68 4.9 4.7 4.5 4.2 68
72 4.1 3.9 3.7 72
76 3.4 3.2 76
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 10/11
Boom 52m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
38 14.4 38
40 13.5 13.3 40
44 11.9 11.8 11.4 11.1 10.9 44
48 10.4 10.2 9.9 9.8 9.4 9.1 48
52 8.8 8.7 8.5 8.2 8.0 7.7 52
56 7.7 7.5 7.2 7.0 6.8 6.5 6.3 6.0 56
60 6.5 6.3 6.0 5.7 5.5 5.3 5.0 60
64 5.6 5.4 5.1 4.9 4.7 4.5 64
68 4.8 4.6 4.3 4.1 3.8 68
72 3.8 3.6 3.3 72
76 3.2 2.9 76
80 2.4 80
Unit: t
LJ Load Chart
Load chart -LJ(Jib 22~58m, Boom angle 65°, Rear counterweight 80t, Carbody counterweight 25t) 11/11
Boom 55m
Radius (m) 22 25 28 31 34 37 40 43 46 49 52 55 58 Radius (m)
40 12.8 12.6 40
44 11.3 11.1 10.9 10.6 44
48 10.0 9.8 9.4 9.2 8.9 48
52 8.6 8.4 8.2 8.0 7.6 7.4 7.2 52
56 7.3 7.1 6.8 6.6 6.4 6.0 5.8 56
60 6.4 6.0 5.8 5.6 5.3 5.1 4.9 4.6 60
64 5.4 5.2 5.0 4.7 4.5 4.2 4.0 64
68 4.5 4.1 3.9 3.7 3.4 68
72 3.6 3.5 3.3 3.0 72
76 2.8 2.5 76
80 2.1 80
Reminder:
Any change in the technical parameters and configuration due to product modification or upgrade may occur without prior notice.
The machine in the picture may include additional equipment. This brochure is for reference only, and goods in kind shall prevail.
Copyright at SANY. No part of this brochure may be copied or used for any purpose without written approval from SANY.
SANY CRANE
www.sanyglobal.com