0% found this document useful (0 votes)
29 views

Pole

Uploaded by

Fida
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Pole

Uploaded by

Fida
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

DOC. REF.

:
PROJECT TITLE

OPERATION
REQUEST FOR INSPECTION (RFI)
Subcontractor : Date :

Location : Time :

Reference Reference
Drawing Documents

Work Item

Activity

Originator Acknowledged by
Participant Main Contractor Main Contractor Consultant's Engineer *Owner's Rep / Engineer
(Operation) (QA/QC) Representative *(if applicable)

Signature

Name
Date
To be attended by

Inspection Results :

Inspection passed. The Contractor is allowed to proceed with the works

Remedial works listed below to be completed and inspection is required after remedial works

Remedial works listed below to be completed but no further inspection required

Rejected

Remarks/Comments :

Inspected by
Main Contractor Main Contractor Consultant's Engineer *Owner's Rep / Engineer
Participant (Operation) (QA/QC) Representative *(if applicable)

Signature

Name
Date
To be attended by
DOC. REF. :
PROJECT TITLE

Electrical Services
Street Lighting Installation Inspection Checklist
Location :
Identity :

Checking
Item Descriptions Yes No Date Remarks
Method

Check installation locations are as per shop


1 drawing.
Visual

Poles, lanterns and accessories are damage free


2 prior to installation.
Visual

Internal wirings are not injured or pinned after being


3 pulled.
Visual

All pole section and electrical connections/joints are


4 correct and secure prior to lifting and planting of Physical
pole.

Cable hole is plugged with rubber grommet prior to


5 lifting and planting of pole.
Visual

6 Check vertical straightness of pole during planting. Physical

Lighting pole's base plate bolts and nuts are


7 securely tightened.
Physical

8 Lantern should face the correct direction. Visual

Terminations at cable terminal block are correct and


9 secure.
Visual

10 Inside of pole should be free of rubbish and debris


prior to closing/locking of service door.
Visual

11 Pole's base plate cover installed. Visual

Signed by Sub Contractor : Designation Date :

Signed by Main Contractor : Designation Date :

Sign by Consultant : Designation Date :

* Delete where not applicable