Electrical Plan Group 2 Final
Electrical Plan Group 2 Final
PB1
60 AT, C.B.
3 POLE, 3Ø
60AT, 3P 30AT, 2P
PB 1 01 02 REF 1
30AT, 2P 30AT, 2P
REF 2 03 04 REF 3
30AT, 2P 30AT, 2P
REF 4 05 06 REF 5
30AT, 2P 30AT, 2P
REF 6 07 08 REF 7
30AT, 2P 30AT, 2P
REF 8 09 10 REF 9
30AT, 2P 30AT, 2P
REF 10 11 12 CHILLER 1
30AT, 2P 30AT, 2P
CHILLER 2 13 14 CHILLER W/ FREEZER
30AT, 2P 30AT, 2P
ICE MAKER 15 16 SECURITY CAMERA
30AT, 2P 30AT, 2P
SPARE 17 18 SPARE
GROUND BUS
PANEL BOARD 1 (PB1)
PB2
60 AT, C.B.
3 POLE, 3Ø
20AT, 2P 20AT, 2P
EMERGENCY LIGHT 1 01 02 EMERGENCY LIGHT 2
20AT, 2P 20AT, 2P
SURFACE M-DOWNLIGHT 03 04 PENDANT LIGHT 1
20AT, 2P 20AT, 2P
PENDANT LIGHT 2 05 06 PENDANT LIGHT 3
20AT, 2P 20AT, 2P
PIN LIGHT 07 08 PENDANT LIGHT 4
SURFACE
MOUNTED DOWNLIGHT
ELECTRIC WIRE
PB 2
CKT 7
PB 2
CKT 13
CDS
CKT 1
PB 1
PB 2
DS
CKT 11
Service Table
Trolley(Cooler)
Sink Work Table Table Ref. PB 1 1000*700
850*800 CKT 16
1200*700 700*700 1500*700
Drying Rack
1000*700 Sink
PB 2
PB 2 CKT 12 1200*700
PB 2
CKT 11 CKT 4 Spray Sink
500*700
PB 2
PB 2
CKT 10 CKT 3
Showcase
650*650
Oven
(10 layer) Table Ref.
Table Ref. Table Ref. Ice Maker
1200*700 DINING AREA
Gas stove
1500*750 1200*700 1200*700 650*700
PB 1 PB 1
PB 1
Trolley CKT 15 CKT 9
PB 1
CKT 7 CKT 8 480*630
EXIT
DISPATCHING
AREA POS
PB 1 PB 1 1200*700
Table Ref.
CKT 3
1200*700
Table Ref.
CKT 4
Upright Chiller
w/ 1/2 freezer
PB 1
CKT 14
PB 1
Sink
PB 1
600*700
PB 2
PB 2
Drying Rack
Upright Chiller
1000*700
PB 1
CKT 13
PB 2
DINING AREA
CKT 15
KITCHEN AREA
PB 2
Upright Chiller
PB 2 CKT 6
PB 1
CKT 9 CKT 12
Table Sink
Mop Sink 700*700 1200*700 Food trash table
PB 2
700*700 600*700
CKT 2 LOCKER CAB.
DS
INSTRUCTOR PROJECT / LOCATION: GROUP MEMBER PREPARED BY: No. REVISIONS DATE
CARL JUSTINE
*INSERT NAME*C. LALUNIO
SHEET CONTENT SHEET NO.
*INSERT
ERWIN GIANNAME*
M. BAYTAMO
*INSERT NAME*
CARL JUSTINE C. LALUNIO *INSERT
CRISJEN C. NAME*
FARRALES
ERWIN GIAN M. BAYTAMO
HERO L. FUNDADOR
AS SHOWN
GROUP NO: GROUP 2
METRO MANILA
HERO L. FUNDADOR