1. POWER SYSTEM
PROTECTION SUMMIT
OCTOBER 20–21, 2020 | ONLINE
Smart Testing for a Smart Grid
5
Incompetence
6
Reliability and Availability
Reliability: represents the probability of components, parts and systems to
perform their required functions for a desired period of time without failure
in specified environments with a desired confidence
Availability: the probability that the system is operating properly when it is
requested for use
Testing dependency
The functionality of the system
The hierarchy of the system
Its components
The purpose of the test
It is important to consider the requirements, methods, procedures and
tools at the very beginning of the engineering process and maintain this
link at every step of that process.
Requirements for Smart Testing
Know what you are testing
Know why you are testing
Know the tools that are available
Know the methods that are available
9
Requirements for Reliable Grid
Condition monitoring of primary and secondary equipment
Reduced number of outages
Reduced duration of outages
Increased availability of equipment
10
Smart Phone
11
Smart Phone for Testing
12
Task: Maintenance Testing
13
Task: Maintenance Testing
14
Condition Monitoring
15
Task: Cutting a branch
16
Wrong tool
17
Manual Tools
18
Power Tools
19
Double Circuit Line Protection
20
Double Circuit Line Testing
21
Double Circuit Line Protection Testing
22
Power swing testing
23
Busbar Protection Testing
6 test sets inject time-synchronized into 10 bay units
1 extension device to record binary signals from central unit
ABB REB500
Feldeinheiten
CMCs
PTP-Transparenter
Switch
ISIO200
CMGPS588
ABB REB500 PTP GMC
Zentraleinheit
Laptop mit
RelaySimTest Analoge- und binäre Signale
Ethernet-Verbindungen
24
WAMPACS Testing
Distribution Automation Testing
26
Wide Area Testing
27
Object-Oriented Engineering
Object-Oriented Testing
29
Digital Substations
30
Digital Substations
Manual Tools
32
Power Tools
33
Power Tools
34
GOOSE Configuration
35
Black-box Testing
Control
Reports Outputs
SFM
Test
System
Page 36
White-box Testing
Control
Reports Outputs
SFM
Test
System
Page 37
Flexible Optical CT
Testing of NCIT Based Systems
Testing of Merging Units
40
Testing of Merging Units
41
Testing of Merging Units
42
Remote Testing
Remote
Computer
Test
Computer
Ethernet
Switch
GOOSE GOOSE
Ethernet and SV
and SV
IEC 61850
Based IED
SAN
A2 SAN SAN
B1 B2
RB
DANP DANP DANP
SAN SAN
R1 R2
PiIED PiIED
PiIED PiIED
Substation
Substation
Substation
PiIED Computer
PCMR Unit
Computer PiIED
PiIED PiIED
PiIED PiIED
PiIED PiIED
Substation
Substation
Substation
PiIED Computer
PCMR Unit
Computer PiIED
PiIED PiIED