0% found this document useful (0 votes)
5 views

Untitled - AAFS - Complete

Uploaded by

m24v6604
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Untitled - AAFS - Complete

Uploaded by

m24v6604
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 8

Project: Liverpool L Insurgentes ETAP Page: 1

Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020


Contract: RPU:970040401473 SN: ENERSAVE2
Engineer: Study Case: A_SC Revision: Base
Filename: INSURGENTES Config.: Normal

Electrical Transient Analyzer Program

Arc Flash Analysis

IEEE 1584-2018
ANSI Short-Circuit

Swing V-Control Load Total

Number of Buses: 1 0 15 16

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 4 0 0 9 0 2 15

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 4 5

System Frequency: 60.00

Unit System: Metric

Project Filename: INSURGENTES

Output Filename: C:\Users\Enersave\Documents\Proyectos en ETAP LA\Proyectos\Liverpool\LIVERPOOL INSURGENTES


L MT\Untitled.AAFS
Project: Liverpool
Liverpool
L Insurgentes
L Insurgentes ETAP ETAP Page: Page:
532 4
Location: INSURGENTES
INSURGENTES
SUR
SUR
1310
1310
DEL
DEL
VALLE
VALLE 19.5.0C 19.5.0C Date: Date:
16-07-202016-07-2020
Contract: RPU:970040401473
RPU:970040401473 SN: SN:
ENERSAVE2
ENERSAVE2
Engineer: Study Case: A_SC Revision: Revision:
Base Base
Study Case: A_SC
Filename: INSURGENTES
INSURGENTES Config.: Config.:
Normal Normal

Bus Input Data


Line/Cable/Busway
AdjustmentsInput Data
Bus / Enclosure Input Data
ohms or siemens/1000 m per Conductor
Apply(Cable) or per Phase (Line/Busway)
Individual
Bus Initial Voltage
Tolerance Adjustments Arc Flash Ratings Percent
/Global
Line/Cable/BuswayFaulted Bus
ID Type Length
Nom. kV Base kV Sub-sys %Mag. Ang.
ID
Transformer Impedance:
Library Size Adj. (m) % Tol.
Yes
#/Phase
Individual Conductor Enclosure Dimensions (mm)
Bus6 Load Equipment0.463
0.440 1 T (°C)
Electrode 100.00R 0.00 X Y Avail. Protection
Working
Enclosure ID Reactor Impedance: ID Nom. kV Type Yes
Configuration Individual
Type Gap (mm) Height Width Distance
cal/cm²
Depth(cm)
Cable primario TR01 Bus13 25NCUN1 Load
1/0 0.220
15.0 00.226 1 1 75 100.00
0.39960 0.00 0.16076 0.0000000
OverloadBus15
Cable primario TR02 Heater Resistance:
Bus15 25NCUN1 1/0
Load 24.000 15.0
Other
24.000 0
23.000
No
1 VCB 1 75 0.39960 0.00 0.16076
Copper
100.00 0.0000000 45.72
Transmission
Cable primario TR03 Bus16 Line25NCUN1
Bus16 Length: 1/0
Load 24.000 20.0
24.000
Other 0
23.000 1 NoVCB
1 75 0.39960 0.00
100.00
Copper 0.16076 0.0000000 45.72
Cable SE azotea Cable / Busway 25NCUN1 1/0 120.0 0 1 No 1 75 0.39960 0.16076 0.0000000
Bus17 Length:
Bus17 Load 24.000 24.000
Other 23.000 VCB 100.00
Copper 0.00 45.72
Cable SE PRINCIPAL 25NCUN1 1/0 153.0 0 1 75 0.39960 0.16076 0.0000000
Bus115
CCM1 Load 0.220
0.440 Switchboard 0.226 VCB1 100.00
Copper 0.00 32 508.00 508.00 508.00
60.96
Cable Secundario TR01 0.6MCUN1 500 15.0 0 6Apply 75 0.09514
Individual 0.15748 0.0000000
Bus135 Load 0.440 0.463 1 100.00 0.00
Seccionador SE 02 AZOTEACorrection 23.000 Switchgear
Temperature VCB
Adjustments Copper
/Global Degree C 91.44
Cable Secundario TR02 0.6MCUN1 500 15.0 0 8 75 0.09514 0.15748 0.0000000
CCM1 Load 0.440 0.463 1 100.00 0.00
Cable SecundarioTransmission
TR03 TABLERO GENERAL NORMAL 0.480 20.0
Switchboard 0 VCB Copper 32 508.00 508.00 508.00
60.96
Line0.6MCUN1
Resistance: 500 6 Yes 75 0.09514
Individual 0.15748 0.0000000
Punto Conexion baja TR-02 Load 0.220 0.226 1 100.00 0.00
Cable Transf TR-3 TGN-01 0.6MCUN1 500 0.220 40.0
Switchboard 0 8 VCB 75 0.09514
Copper 0.15748
32 0.0000000
508.00 508.00 508.00
60.96
Cable / Busway Resistance: Yes Individual
Punto conexion CFE SWNG 23.000 23.000 1 100.00 0.00
TGN -02 0.220 Switchboard VCB Copper 32 508.00 508.00 508.00
60.96
Line / Cable / Busway resistances are listed
SE PRINCIPAL SE 01at the specified temperatures.
Load 23.000 23.000 1 100.00 0.00

Seccionador SE 02 AZOTEA Load 23.000 23.000 1 100.00 0.00


Energy Levels
TAB INCO Load 0.440 0.463 1 100.00 0.00
NFPA 70E 2012 to 2018 / User-Defined
TABLERO GENERAL Load 0.480 0.480 1 100.00 0.00
NORMAL Level ID cal/cm²
TGN-01 Load 0.220
Level A 0.2262.00 1 100.00 0.00

TGN -02 Load 0.220


Level B 0.2264.00 1 100.00 0.00
Level C 8.00
16 Buses Total
Level D 25.00
Level kV.
All voltages reported by ETAP are in % of bus Nominal E 40.00
Base kV values of buses are calculated and used internally
Level F by ETAP. 100.00
Level G 120.00
Level H 0.00
The Gap is not utilized if the theoretically derived Lee method was usedLevel
to determine the incident energy and arc flash boundary.
I 0.00
The Lee method is used if the bus voltage and/or short-circuit parameters are outside the range covered by the IEEE 1584 empirical equations.
Level J 0.00
Project: Liverpool L Insurgentes ETAP Page: 6
Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020
Contract: RPU:970040401473 SN: ENERSAVE2
Engineer: Study Case: A_SC Revision: Base
Filename: INSURGENTES Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

TR 01 1.000 23.000 0.220 5.24 5.79 0 0 0 -2.500 0 5.2400

TR 02 1.000 23.000 0.220 5.01 5.79 0 0 0 -2.500 0 5.0100

TR 03 2.000 23.000 0.440 5.79 7.10 0 0 0 -5.000 0 5.7900

TR 04 0.500 23.000 0.480 3.62 3.09 0 0 0 0 0 3.6200


Project: Liverpool L Insurgentes ETAP Page: 7
Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020
Contract: RPU:970040401473 SN: ENERSAVE2
Engineer: Study Case: A_SC Revision: Base
Filename: INSURGENTES Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

TR 01 2W XFMR Bus15 Bus13 84.78 490.86 498.13

TR 02 2W XFMR Bus16 Punto Conexion baja TR-02 81.06 469.31 476.26

TR 03 2W XFMR Bus17 TAB INCO 36.45 258.72 261.27

TR 04 2W XFMR Seccionador SE 02 AZOTEA TABLERO GENERAL NORMAL 222.92 688.83 724.00

Cable primario TR01 Cable SE PRINCIPAL SE 01 Bus15 0.11 0.05 0.12

Cable primario TR02 Cable SE PRINCIPAL SE 01 Bus16 0.11 0.05 0.12

Cable primario TR03 Cable SE PRINCIPAL SE 01 Bus17 0.15 0.06 0.16

Cable SE azotea Cable SE PRINCIPAL SE 01 Seccionador SE 02 AZOTEA 0.91 0.36 0.98

Cable SE PRINCIPAL Cable Punto conexion CFE SE PRINCIPAL SE 01 1.16 0.46 1.25

Cable Secundario TR01 Cable Bus13 TGN -02 46.72 77.33 90.34

Cable Secundario TR02 Cable Bus115 TGN-01 35.04 58.00 67.76

Cable Secundario TR03 Cable Bus135 CCM1 14.78 24.47 28.59

Cable Transf TR-3 Cable TAB INCO Bus6 22.18 36.71 42.89

TRANSFER TR-02 Tie Switch Bus115 Punto Conexion baja TR-02

TRANSFER TR3 Tie Switch Bus135 Bus6


Project: Liverpool
Liverpool
L Insurgentes
L Insurgentes ETAP ETAP Page: Page:
98 10
Location: INSURGENTES
INSURGENTES
SUR
SUR
1310
1310
DEL
DEL
VALLE
VALLE 19.5.0C 19.5.0C Date: Date:
16-07-202016-07-2020

Contract: RPU:970040401473
RPU:970040401473 SN: SN:
ENERSAVE2
ENERSAVE2
Engineer: Study Case: A_SC Revision: Revision:
Base Base
Study Case: A_SC
Filename: INSURGENTES
INSURGENTES Config.: Config.:
Normal Normal

Lumped
PowerLoad
GridInput
InputData
Data
Arc Flash Analysis
Lumped Load Motor Loads Static Loads
½ Cycle Calculation Method % Impedance
Power Grid Connected Bus Rating 100 MVA% Impedance
Base
Lumped Load Connected Rating % Load Loading X/R Ratio (Machine Base) Loading
ID Bus ID MVASC kV X/R R X
ID ID kVA kV MTR STAT kW kvar X"/R X'/R Correction
R X" X' kW kvar
Acometida CFE Punto conexion CFE 188.990 23.000 3.18 15.87293 50.47593
Carga_TR-01 TGN -02
Arc Fault Location
447.2 0.220 80 20 354.2 50.5 2.38 2.38
Factors
8.403
Incident
20.00
Energy
50.00 88.54 12.62
Total Connected Power Grids (= 1 ): 188.990 MVA
Carga_TR-02 TGN-01 154.8 0.220 80 20 122.6 17.5 2.38 2.38 8.403 20.00 50.00 30.66 4.37
Enclosure
Electrode Prefault Iarc Encl. Source PD FCTAFBIE
Carga_TR-03 CCM1 713.1 0.440 80 20 519.1 236.5 2.38 2.38 8.403 20.00 50.00 129.78 59.13
Element ID Connected Bus ID ID Type Config. kV Var. (%) CF (pu) Ibf" (kA) Ia" (kA) Ia" (kA)
Source PD
(Cycles)
ID
(cal/cm²)
(m)
Carga_TR-04 TABLERO GENERAL 258.7 0.480 80 20 188.3 85.8 2.38 2.38 8.403 20.00 50.00 47.08 21.45
Bus15 NORMAL
Bus15 Bus Arc Fault VCB 0 5.019 5.019 4.977
FuseTR01 0.6 2.952

Total Connected Lumped Loads ( = 4 ): 1573.8 kVA FCT = (+) 0.6


Total
0.72
2.952
=

Bus16 Bus16 Bus Arc Fault VCB 0 5.018 5.018 5.003


FuseTR02 0.6 2.952

FCT = (+) 0.6


Total
0.72
2.952
=

Bus17 Bus17 Bus Arc Fault VCB 0 5.016 5.016 4.947


FuseTR03 0.6 2.951

FCT = (+) 0.6


Total
0.72
2.951
=

CCM1 CCM1 Bus Arc Fault VCB 0.440 13 1.000 34.499 20.011Int principal
18.032 TRANSF3.8
TR-3
2.102

FCT = 3.8
Total
0.87
2.102
=

Int principal TR03 CCM1 Source PD Line Side VCB 0.440 13 1.000 34.499 20.011Int principal
18.032TRANSF3.8
TR-3
2.102

FCT = 3.8
Total
0.87
2.102
=
Project: Liverpool L Insurgentes ETAP Page: 11
12
Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020

Contract: RPU:970040401473 SN: ENERSAVE2


Engineer: Revision: Base
Study Case: A_SC
Filename: INSURGENTES Config.: Normal

Correction
Arc Fault Location Factors Incident Energy

Enclosure
Electrode Prefault Iarc Encl. Source PD FCT IE AFB
Element ID Connected Bus ID ID Type Config. kV Var. (%) CF (pu) Ibf" (kA) Ia" (kA) Ia" (kA) (Cycles) Source PD ID (cal/cm²) (m)

Seccionador SE 02 AZOTEA
TGN-01 Seccionador SE 02 AZOTEA
TGN-01 Bus Arc Fault VCB 0.220 0 1.000 43.618
4.759 15.829
4.759 4.736
0.000 0.6
6.0 Fuse SE 02 AZOTEA 0.671
2.755

FCT = 0.6
6.0 (+) Total = 0.671
2.755 0.68
1.03

SE principal
Int 02-A TR-04
TR02 Seccionador SE 02 AZOTEA
TGN-01 Source
Load PD
PDLine
LineSide
Side VCB 0.220 140 1.000 43.618
4.759 13.648
4.759 4.736
0.129 5147.1
0.6 Fuse SE
FuseTR02
02 AZOTEA 2051.137
0.671

FCT = 5147.1
0.6 (+) Total = 2051.137
0.671 64.25
0.68

FuseTR04 Seccionador SE 02 AZOTEA Load PD Line Side VCB 0 4.759 4.759 4.736 0.6 Fuse SE 02 AZOTEA 0.671
TGN -02 TGN -02 Bus Arc Fault VCB 0.220 0 1.000 43.527 15.814 0.000 6.0 2.752
FCT = 0.6 (+) Total = 0.671 0.68
FCT = 6.0 Total = 2.752 1.02

SE 02 AZOTEA-B Seccionador SE 02 AZOTEA Source PD Line Side VCB 0 4.759 4.759 4.736 0.6 Fuse SE 02 AZOTEA 0.671
Int. Principal TR01 TGN -02 Source PD Line Side VCB 0.220 14 1.000 43.527 13.636 0.121 9207.7 FuseTR01 3665.233
FCT = 0.6 (+) Total = 0.671 0.68
FCT = 9207.7 Total = 3665.233 92.39

#TABLERO
The FCTGENERAL
(fault clearing time)TABLERO
has been limited to the maximum value allowed in the study case. The
GENERAL incident
Bus energy is calculated
Arc Fault VCB using 0.480
this value. 13 1.000 16.624 10.929 0.212 6.1 FuseTR04 1.764
+NORMAL
The theoretically derived LeeNORMAL
method was used to determine the incident energy and flash protection boundary for this location since the bolted fault current or nominal voltage or gap values are outside the
empirical IEEE 1584-2018 method range. FCT = 6.1 Total = 1.764 0.78

0 The incident energy has been automatically assigned at this location (i.e. 2000 A/ 240 Volt limit guideline) based on actual study case settings.
Int TABLERO GENERAL TABLERO GENERAL Source PD Line Side VCB 0.480 13 1.000 16.624 10.929 0.212 6.1 FuseTR04 1.764
1NORMA
The user-defined fault clearingNORMAL
PD, as specified in the bus/enclosure editor, is outside the region for calculating short-circuit contributions.
2 The user-defined Relay, as specified in the bus/enclosure editor, is not connected to an energized phase CT or has no interlock PDs. FCT = 6.1 Total = 1.764 0.78

3 The user-defined fault clearing PD, as specified in the bus/enclosure editor, is not energized.
Project: Liverpool L Insurgentes ETAP Page: 13
Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020
Contract: RPU:970040401473 SN: ENERSAVE2
Engineer: Study Case: A_SC Revision: Base
Filename: INSURGENTES Config.: Normal

Bus Incident Energy Summary

Total Fault Arc-Flash Analysis Results


Bus Current (kA)
FCT Incident E AFB Energy
ID Nom. kV Type Bolted Arcing (cycles) (cal/cm²) (m) Level

# Bus15 24.000 Other 5.019 5.019 0.600 2.952 0.72 Level B

# Bus16 24.000 Other 5.018 5.018 0.600 2.952 0.72 Level B

# Bus17 24.000 Other 5.016 5.016 0.600 2.951 0.72 Level B

CCM1 0.440 Switchboard 34.499 20.011 3.753 2.102 0.87 Level B

# Seccionador SE 02 AZOTEA 23.000 Switchgear 4.759 4.759 0.600 0.671 0.68 Level A

TABLERO GENERAL NORMAL 0.480 Switchboard 16.624 10.929 6.075 1.764 0.78 Level A

TGN-01 0.220 Switchboard 43.618 15.829 6.000 2.755 1.03 Level B

TGN -02 0.220 Switchboard 43.527 15.814 6.000 2.752 1.02 Level B

# The theoretically-derived Lee method was used to determine the incident energy and arc-flash boundary for this location since some of the input parameters may be
outside the range of the IEEE 1584 methods.
Project: Liverpool L Insurgentes ETAP Page: 14
Location: INSURGENTES SUR 1310 DEL VALLE 19.5.0C Date: 16-07-2020
Contract: RPU:970040401473 SN: ENERSAVE2
Engineer: Study Case: A_SC Revision: Base
Filename: INSURGENTES Config.: Normal

Bus Arc Flash Hazard Analysis Summary

Faulted Bus Fault Current Trip Device


Arc Flash Incident Working
Equipment Gap
Bolted Fault (kA)
PD Arc Trip Open FCT Boundary Energy Distance Energy
ID Nom. kV Type (mm) Bus PD Fault (kA) Source Trip Device ID (cycle) (cycle) (cycle) (m) (cal/cm²) (cm) Level

# Bus15 24.000 Other 5.019 4.977 4.977 FuseTR01 0.60 0.00 0.60 0.7 3.0 46 Level B

# Bus16 24.000 Other 5.018 5.003 5.003 FuseTR02 0.60 0.00 0.60 0.7 3.0 46 Level B

# Bus17 24.000 Other 5.016 4.947 4.947 FuseTR03 0.60 0.00 0.60 0.7 3.0 46 Level B

CCM1 0.440 Switchboard 32 34.499 31.087 18.032 Int principal TRANSF 3.75 0.00 3.75 0.9 2.1 61 Level B
TR-3
# Seccionador SE 02 23.000 Switchgear 4.759 4.736 4.736 Fuse SE 02 AZOTEA 0.60 0.00 0.60 0.7 0.7 91 Level A
AZOTEA
TABLERO GENERAL 0.480 Switchboard 32 16.624 0.323 0.212 FuseTR04 6.07 0.00 6.07 0.8 1.8 61 Level A
NORMAL
TGN-01 0.220 Switchboard 32 43.618 6.00 1.0 2.8 61 Level B

TGN -02 0.220 Switchboard 32 43.527 6.00 1.0 2.8 61 Level B

# The theoretically-derived Lee method was used to determine the incident energy and arc-flash boundary for this location since some of the input parameters may be outside the range of the IEEE 1584