0% found this document useful (0 votes)
14 views

Tambuttegama New Fill

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Tambuttegama New Fill

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

UPGRADATION OF RAILWAY LINE FROM MAHO TO OMANTHAI UNDER INDIAN LINE OF CREDIT TRACK REHABILITATION AND ANCILLARY

WORKS

JOINT MEASUREMENT SHEET

Description: Clearing & Grubbing in Tambuttegama Yard Area Unit Sq.m

Location CH 196+100 - 196+760 Section: : ANP - MAHO (Section - I)

LHS RHS
Distance
Chainage Avg. Width Quantity Avg. Width Quantity Remarks
(m) Width (m) Width (m)
(m) (Sq.m) (m) (Sq.m)

196+100.00
196+120.00 20.00 0.00 - 8.385 4.19 83.86
196+140.00 20.00 0.00 - 6.612 7.50 149.98
196+160.00 20.00 0.00 - 4.132 5.37 107.44
196+180.00 20.00 0.00 - 3.112 3.62 72.44
196+200.00 20.00 0.00 - 2.552 2.83 56.64
196+220.00 20.00 0.00 - 1.28 25.52
196+240.00 20.00 0.00 - 7.432 3.72 74.32
196+250.00 10.00 0.00 - 9.522 8.48 84.77
196+260.00 10.00 0.00 - 4.76 47.61
196+280.00 20.00 0.00 - 0.00 -
196+300.00 20.00 0.00 - 0.00 -
196+320.00 20.00 0.00 - 0.00 -
196+340.00 20.00 0.00 -
196+360.00 20.00 0.00 -
196+367.50 7.50 0.00 - 0.00 -
196+380.00 12.50 0.00 - 0.00 -
196+400.00 20.00 0.00 - 0.00 -
196+420.00 20.00 0.00 - 4.980 2.49 49.80
196+440.00 20.00 0.00 - 5.100 5.04 100.80
196+460.00 20.00 0.00 - 5.610 5.36 107.10
196+480.00 20.00 0.00 - 8.972 7.29 145.82
196+500.00 20.00 0.00 - 12.731 10.85 217.04
196+520.00 20.00 3.581 1.79 35.82 6.37 127.32
196+540.00 20.00 5.300 4.44 88.82 10.753 5.38 107.54
196+560.00 20.00 5.800 5.55 111.00 16.372 13.56 271.26
196+580.00 20.00 7.600 6.70 134.00 24.796 20.58 411.68
196+600.00 20.00 8.100 7.85 157.00 22.984 23.89 477.80
196+620.00 20.00 7.900 8.00 160.00 22.577 22.78 455.62
196+640.00 20.00 8.700 8.30 166.00 19.720 21.15 422.98
196+660.00 20.00 8.100 8.40 168.00 15.425 17.57 351.46
196+680.00 20.00 4.05 81.00 10.999 13.21 264.24
196+700.00 20.00 0.00 - 7.624 9.31 186.24
196+720.00 20.00 0.00 - 5.206 6.42 128.30
196+740.00 20.00 0.00 - 2.538 3.87 77.44
196+760.00 20.00 0.00 - 1.27 25.38

Sub Total 1,101.64 Sub Total 4,630.40


Total Quantity in CuM. 5,732.04
Signature Signature

The Contractor The Engineer


IRCON INTERNATIONAL LTD CECB
UPGRADATION OF RAILWAY LINE FROM MAHO TO OMANTHAI UNDER INDIAN LINE OF CREDIT TRACK REHABILITATION AND ANCILLARY
WORKS

JOINT MEASUREMENT SHEET

Description: Formation Excavation in Tambuttegama Yard Area Unit Cu.m

Location CH 176+620 -177+360 Section: : ANP - MAHO (Section - I)

LHS RHS
Distance
Chainage Area Av. Area Quantity Area Av. Area Quantity Remarks
(m)
(Sq.m) (Sq.m) (Cu.m) (Sq.m) (Sq.m) (Cu.m)

0.130
0.00 0.07 - 0.00 -
0.00 0.560 0.28 - 0.057 0.03 -
0.00 1.218 0.89 - 0.126 0.09 -
0.00 1.144 1.18 - 5.165 2.65 -
0.00 0.595 0.87 - 6.757 5.96 -
0.00 0.30 - 6.662 6.71 -
0.00 0.205 0.10 - 4.925 5.79 -
0.00 1.298 0.75 - 3.601 4.26 -
0.00 0.228 0.76 - 1.661 2.63 -
0.00 0.11 - 0.105 0.88 -
0.00 0.00 - 0.05 -
0.00 0.043 0.02 - 0.00 -
0.00 0.081 0.06 - 0.00 -
0.00 0.042 0.06 - 0.00 -
0.00 0.143 0.09 - 0.00 -
0.00 0.245 0.19 - 0.00 -
0.00 0.082 0.16 - 0.00 -
0.00 0.139 0.11 - 0.00 -
0.00 0.315 0.23 - 0.00 -
0.00 0.172 0.24 - 0.00 -
0.00 0.534 0.35 - 0.00 -
0.00 0.532 0.53 - 0.00 -
0.00 0.683 0.61 - 0.00 -
0.00 0.428 0.56 - 0.00 -
0.00 0.164 0.30 - 0.00 -
0.00 0.237 0.20 - 0.00 -
0.00 0.250 0.24 - 0.00 -
0.00 0.465 0.36 - 0.00 -
0.00 0.584 0.53 - 0.00 -
0.00 0.903 0.74 - 0.495 0.25 -
0.00 0.823 0.86 - 0.495 0.50 -
0.00 0.564 0.69 - 0.364 0.43 -
0.00 0.168 0.37 - 0.18 -
0.00 0.08 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.00 - 0.00 -
0.00 0.006 0.00 - 0.209 0.11 -
0.00 0.030 0.02 - 0.348 0.28 -
0.00 0.027 0.03 - 0.251 0.30 -
0.00 0.068 0.05 - 0.557 0.40 -
Sub Total - Sub Total -
Total Quantity in CuM. -
Signature Signature

The Contractor The Engineer


IRCON INTERNATIONAL LTD CECB
UPGRADATION OF RAILWAY LINE FROM MAHO TO OMANTHAI UNDER INDIAN LINE OF CREDIT TRACK REHABILITATION AND ANCILLARY
WORKS

JOINT MEASUREMENT SHEET

Description: Embankment Filling in Tambuttegama Yard Area Unit Cu.m

Location CH 176+026.8 - 176+094.5 Section: : ANP - MAHO (Section - I)

LHS RHS
Distance
Chainage Area Av. Area Quantity Area Av. Area Quantity Remarks
(m)
(Sq.m) (Sq.m) (Cu.m) (Sq.m) (Sq.m) (Cu.m)

177+026.80 1.325
177+030.00 3.20 1.410 1.37 4.38 0.00 -
177+030.00 0.00 1.421 1.42 - 0.00 -
177+040.00 10.00 1.604 1.51 15.13 0.00 -
177+040.00 0.00 1.654 1.63 - 0.00 -
177+045.00 5.00 1.845 1.75 8.75 0.00 -
177+050.00 5.00 1.500 1.67 8.37 0.00 -
177+050.00 0.00 1.488 1.49 - 0.00 -
177+055.00 5.00 1.936 1.71 8.56 0.00 -
177+060.00 5.00 3.964 2.95 14.75 0.00 -
177+060.00 0.00 3.964 3.96 - 0.00 -
177+070.00 10.00 2.037 3.00 30.01 0.00 -
177+080.00 10.00 1.489 1.76 17.63 0.00 -
177+090.00 10.00 1.534 1.51 15.12 0.00 -
177+094.50 4.50 1.465 1.50 6.75 0.00 -

Sub Total 129.45 Sub Total -


Total Quantity in CuM. 129.45
Signature Signature

The Contractor The Engineer


IRCON INTERNATIONAL LTD CECB
UPGRADATION OF RAILWAY LINE FROM MAHO TO OMANTHAI UNDER INDIAN LINE OF CREDIT TRACK REHABILITATION AND ANCILLARY
WORKS

JOINT MEASUREMENT SHEET

Description: Subbase Filling in Tambuttegama Yard Area Unit Cu.m

Location CH 176+026.8 - 176+094.5 Section: : ANP - MAHO (Section - I)

LHS RHS
Distance
Chainage Area Av. Area Quantity Area Av. Area Quantity Remarks
(m)
(Sq.m) (Sq.m) (Cu.m) (Sq.m) (Sq.m) (Cu.m)

177+026.80 0.541
177+030.00 3.20 0.499 0.52 1.66 0.00 -
177+030.00 0.00 0.541 0.52 - 0.00 -
177+040.00 10.00 0.540 0.54 5.41 0.00 -
177+040.00 0.00 0.540 0.54 - 0.00 -
177+045.00 5.00 0.539 0.54 2.70 0.00 -
177+050.00 5.00 0.539 0.54 2.70 0.00 -
177+050.00 0.00 0.539 0.54 - 0.00 -
177+055.00 5.00 0.538 0.54 2.70 0.00 -
177+060.00 5.00 0.540 0.54 2.70 0.00 -
177+060.00 0.00 0.529 0.54 - 0.00 -
177+070.00 10.00 0.540 0.54 5.35 0.00 -
177+080.00 10.00 0.539 0.54 5.40 0.00 -
177+090.00 10.00 0.548 0.54 5.44 0.00 -
177+094.50 4.50 0.540 0.54 2.45 0.00 -

Sub Total 36.51 Sub Total -


Total Quantity in CuM. 36.51
Signature Signature

The Contractor The Engineer


IRCON INTERNATIONAL LTD CECB
UPGRADATION OF RAILWAY LINE FROM MAHO TO OMANTHAI UNDER INDIAN LINE OF CREDIT TRACK REHABILITATION AND ANCILLARY
WORKS

JOINT MEASUREMENT SHEET

Description: Aggregate Base Course (ABC) in Tambuttegama Yard Area Unit Cu.m

Location CH 176+620 -177+360 Section: : ANP - MAHO (Section - I)

LHS RHS
Distance
Chainage Area Av. Area Quantity Area Av. Area Quantity Remarks
(m)
(Sq.m) (Sq.m) (Cu.m) (Sq.m) (Sq.m) (Cu.m)

177+026.80 0.800
177+030.00 3.20 0.793 0.80 2.55 0.00 -
177+030.00 0.00 0.832 0.81 - 0.00 -
177+040.00 10.00 0.844 0.84 8.38 0.00 -
177+040.00 0.00 0.855 0.85 - 0.00 -
177+045.00 5.00 0.840 0.85 4.24 0.00 -
177+050.00 5.00 0.846 0.84 4.22 0.00 -
177+050.00 0.00 0.837 0.84 - 0.00 -
177+055.00 5.00 0.840 0.84 4.20 0.00 -
177+060.00 5.00 0.840 0.84 4.20 0.00 -
177+060.00 0.00 0.840 0.84 - 0.00 -
177+070.00 10.00 0.840 0.84 8.40 0.00 -
177+080.00 10.00 0.839 0.84 8.40 0.00 -
177+090.00 10.00 0.823 0.83 8.31 0.00 -
177+094.50 4.50 0.185 0.50 2.27 0.00 -

Sub Total 55.17 Sub Total -


Total Quantity in CuM. 55.17
Signature Signature

The Contractor The Engineer


IRCON INTERNATIONAL LTD CECB