0% found this document useful (0 votes)
12 views

Construction Processes

Uploaded by

Kum Romanus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Construction Processes

Uploaded by

Kum Romanus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Site Investigation:

Site investigation refers to the process of assessing the geological, geotechnical, and environmental
conditions of a specific location or site. It involves conducting various studies, tests, and surveys to
gather information about the site's characteristics. The collected data is then used to evaluate the
suitability of the site for a particular project or to identify potential risks and hazards.

Stages of Site Investigation:

1. Desk Study: In this stage, existing information about the site, such as geological maps, previous
reports, and historical data, is reviewed to gain preliminary knowledge.

2. Site Reconnaissance: A visual inspection of the site is conducted to observe the surface conditions,
topography, existing structures, and any visible signs of geological or environmental issues.

3. Ground Investigation: This stage involves collecting additional data through various techniques,
including drilling boreholes, conducting geophysical surveys, extracting soil and rock samples, and
monitoring groundwater levels.

4. Laboratory Testing: The collected samples are analyzed in a laboratory to determine their physical,
mechanical, and chemical properties. This helps in understanding the engineering behavior of the soils
and rocks present at the site.

5. Reporting and Interpretation: The collected data and laboratory test results are compiled and
analyzed to generate a comprehensive report. The report provides recommendations and conclusions
regarding the site's suitability for the intended project.

Objectives of Site Investigation:

The main objectives of site investigation are as follows:


1. Site Suitability: To assess the suitability of the site for a specific project, considering factors such as
geology, hydrology, soil conditions, and environmental risks.

2. Risk Assessment: To identify potential hazards and risks associated with the site, such as slope
instability, groundwater contamination, or presence of hazardous materials.

3. Design Considerations: To provide essential data for the design of foundations, structures, and
infrastructure components, taking into account the site's geotechnical and geological characteristics.

4. Cost Estimation: To estimate the costs involved in construction and any necessary ground
improvement or remediation measures.

5. Compliance with Regulations: To ensure compliance with local regulations, codes, and standards
related to construction and environmental protection.

Purpose of Soil Investigation:

Soil investigation, which is a part of the overall site investigation, focuses specifically on studying the soil
conditions at a site. The purpose of soil investigation is to:

1. Characterize Soil Properties: Determine the physical, mechanical, and chemical properties of the soil,
such as grain size distribution, shear strength, permeability, compressibility, and bearing capacity.

2. Foundation Design: Provide data for designing appropriate foundations for structures based on the
soil's load-bearing capacity and settlement characteristics.
3. Ground Improvement: Identify the need for and recommend suitable ground improvement
techniques, such as soil stabilization or soil reinforcement, to enhance the engineering properties of the
soil.

4. Slope Stability Analysis: Assess the stability of slopes and embankments by evaluating soil shear
strength, groundwater conditions, and other relevant factors.

Phases of Soil Investigation:

Soil investigation typically involves the following phases:

1. Planning: Defining the objectives, scope, and methods of the investigation, considering the proposed
project and site conditions.

2. Field Investigation: Collecting soil samples through methods like drilling boreholes, conducting cone
penetration tests (CPT), and excavating test pits. This phase may also include in-situ testing, such as
standard penetration tests (SPT), vane shear tests, or plate load tests.

3. Laboratory Testing: Analyzing the collected soil samples in a laboratory to determine their properties,
including grain size distribution, Atterberg limits, compaction characteristics, shear strength, and
permeability.

4. Data Analysis and Interpretation: Analyzing the field and laboratory data to evaluate the engineering
properties of the soil and provide recommendations for design and construction.

Site Visit and Site Observations:

A site visit and site observations are crucial components of the site investigation process. During a site
visit, engineers, geologists, and other relevant professionals physically inspect the site to:
1. Evaluate Surface Conditions: Assess the topography, vegetation, drainage patterns, existing
structures, and any visible signs of geological or environmental issues.

2. Identify Potential Risks: Observe any indications of geological hazards, such as landslides, sinkholes, or
areas prone to flooding. Also, identify potential environmental risks, such as contamination sources or
protected habitats.

3. Gather Preliminary Information: Note any existing infrastructure, utilities, or geological features that
may affect the proposed project's design and construction.

4. Verify Existing Data: Compare the existing information about the site with the actual conditions
observed on-site to ensure accuracy and identify any discrepancies.

Site observations complement other data collection methods and provide valuable insights for
subsequent stages of the site investigation, helping to make informed decisions and recommendations.

Soil Exploration Program:

A soil exploration program refers to a systematic and organized approach to investigate and gather
information about the soil conditions at a particular site. The purpose of a soil exploration program is to
assess the physical and engineering properties of the soil, which are essential for various construction
and engineering projects. The program typically involves field investigations, laboratory testing, and data
analysis to characterize the soil and provide relevant information for design and construction purposes.

Soil Exploration Methods:

Several methods are commonly used in soil exploration to obtain information about the soil conditions.
These methods include:

1. Test Pits: Excavation of pits or trenches to visually inspect and sample the soil layers. Test pits allow
direct observation of the soil profile and collection of disturbed or undisturbed soil samples.
2. Boreholes: Drilling deep holes into the ground using drilling equipment. Boreholes provide access to
subsurface soil layers and allow for sampling and testing of the soil at various depths.

3. Cone Penetration Test (CPT): A method where a cone-shaped penetrometer is pushed into the
ground, measuring the resistance encountered. CPT provides information about soil stratigraphy, soil
strength, and other geotechnical properties.

4. Standard Penetration Test (SPT): A widely used method that involves driving a split-barrel sampler
into the ground using a hammer. The number of blows required to penetrate the sampler a certain
distance provides an indication of soil density and strength.

5. Seismic Refraction: A geophysical method that uses seismic waves to determine the subsurface soil
layers and their properties based on the wave velocities.

Soil Identification in the Field:

Soil identification in the field involves the visual examination and assessment of soil properties at a site.
Field identification provides preliminary information about the soil type, composition, and general
characteristics. Some common field identification methods include:

1. Visual Inspection: Observing the color, texture, structure, and moisture content of the soil to make
initial assessments about its properties.

2. Manual Testing: Conducting simple tests such as squeezing the soil to determine its consistency (e.g.,
sandy, clayey, or silty) and performing ribbon tests to assess its plasticity.

3. Odor and Taste: Although not commonly practiced, in some cases, soil identification may involve
smelling or tasting the soil to detect any peculiar odors or salty/sweet tastes that could indicate certain
soil properties.
Groundwater Conditions:

Assessing groundwater conditions is an essential aspect of soil exploration, especially for projects
involving foundations, excavations, or groundwater control. Understanding groundwater conditions
helps determine the presence, depth, and behavior of the water table. Several methods are used to
assess groundwater conditions:

1. Observation Wells: Wells are installed specifically for monitoring groundwater levels. Measurements
are taken periodically to determine the depth of the water table and any fluctuations over time.

2. Piezometers: These are instruments placed in boreholes or wells to measure groundwater pressure
and its variation with depth. Piezometers provide information on the hydraulic properties of the soil and
the water table's elevation.

3. Pumping Tests: By pumping water out of a well or borehole and monitoring the response of the water
table, pumping tests help determine the soil's permeability and the aquifer's characteristics.

4. Geophysical Methods: Techniques such as electrical resistivity surveys, ground-penetrating radar, or


electromagnetic surveys can be used to infer the presence and extent of groundwater based on changes
in subsurface electrical properties or reflections of electromagnetic waves.

It is important to note that soil exploration and groundwater assessment methods may vary depending
on the specific project requirements, site conditions, and local regulations or standards.

A construction site refers to an area or location where construction activities take place to build,
renovate, or repair structures such as buildings, roads, bridges, and other infrastructure. It is a
designated space where workers, equipment, materials, and machinery are gathered for the purpose of
constructing a project.

Factors affecting the choice of a construction site include:

1. Accessibility: The site's proximity to transportation networks, such as roads, highways, railways, and
ports, is important for efficient movement of construction materials and equipment.
2. Zoning and Regulatory Requirements: The site must comply with local zoning regulations and building
codes, which dictate the permitted land use, building height, setbacks, and other parameters.

3. Availability of Utilities: Access to essential utilities like water, electricity, gas, and sewage systems is
crucial for construction operations and the functioning of the completed building.

4. Environmental Considerations: The impact on the environment, such as potential hazards, ecological
sensitivity, and conservation areas, needs to be assessed and mitigated during site selection.

5. Topography and Geotechnical Conditions: The physical characteristics of the land, including slope, soil
type, and stability, influence construction methods, foundation design, and overall project feasibility.

The purpose of a building can vary depending on its intended use, and it often determines the design,
layout, and functionality of the structure. Buildings can serve various purposes, such as residential
(houses, apartments), commercial (offices, shops), institutional (schools, hospitals), industrial (factories,
warehouses), or recreational (stadiums, parks).

Excavation refers to the process of removing soil, rock, or other materials from a site in order to create a
cavity, trench, or hole. It is commonly performed in construction, mining, and archaeological activities.
Excavation is typically carried out using heavy machinery such as excavators, bulldozers, or backhoes.

There are various types of excavation, depending on the purpose and nature of the project. Some
common types include:

1. Trench Excavation: This involves the creation of narrow and deep excavations, usually used for utilities
installation, drainage systems, or foundation construction.

2. Basement Excavation: It involves the removal of soil or rock to create a below-ground level space for
constructing basements in buildings.
3. Cut and Fill Excavation: This type involves both cutting (removal of soil or rock) and filling (placing soil
or rock) to create level surfaces or slopes for construction projects.

4. Channel Excavation: It is the excavation of channels or ditches for the purpose of drainage, irrigation,
or water management.

5. Road Excavation: This involves the removal of soil, rock, or other materials to create roadways,
highways, or railway tracks.

6. Dredging: It refers to the excavation of underwater areas, such as rivers, lakes, or harbors, to deepen
the waterways or extract sediments.

Regarding timbering for trenches, it is a method used to provide temporary support to trench walls to
prevent collapse during excavation. Timbering involves using wooden planks, braces, and shoring
materials to reinforce the sides of the trench. This technique is commonly employed when the soil is
unstable or prone to cave-ins. However, it's important to note that timbering is an older method, and
modern construction practices often employ more advanced methods such as shoring systems, sheet
pile walls, or trench boxes for trench support.

Unfortunately, as an AI text-based model, I don't have access to specific lecture notes. However, you
may find relevant lecture notes on timbering for trenches through academic databases, engineering
textbooks, or online educational platforms that offer courses on construction or civil engineering.

The shape and size of a construction site are determined by several factors, including the available land,
project requirements, and local regulations. Some construction sites may be relatively small and
compact, such as for a single-family home, while others can be vast and complex, such as for large-scale
infrastructure projects.

Terrain conditions play a significant role in site selection and construction planning. Factors like soil
stability, slope, drainage, and presence of rock formations can affect excavation, foundation design, and
overall construction methodology.
Available facilities at a construction site refer to the existing infrastructure and amenities that support
construction operations. These may include temporary structures like site offices, storage areas, and
worker facilities (restrooms, break areas). Adequate access roads, parking areas, and utilities are also
essential facilities for a construction site to function efficiently.

It seems like you're referring to "timbering" and "trenches." Timbering refers to the process of using
timber or wooden supports to shore up the walls of an excavation or trench. Trenches, on the other
hand, are narrow excavations made in the ground, typically for construction, military purposes, or
drainage.

Timbering is often employed in trench construction to prevent the collapse of the trench walls, ensuring
the safety of workers inside. The timber supports are installed vertically along the trench walls, creating
a framework that holds the soil in place. This practice is especially important when the soil is loose or
unstable.

There are different methods of timbering that can be used depending on the specific requirements and
conditions of the trench. Some common timbering techniques include:

1. Vertical sheeting and waling: This method involves placing vertical sheets or planks against the trench
walls, which are then supported by horizontal members called walings. The walings provide additional
stability to the sheeting.

2. Horizontal sheeting and bracing: In this technique, horizontal sheets are placed one above the other
as the trench is excavated. The sheets are braced against each other using cross braces or struts to
prevent inward movement of the soil.

3. Soldier pile and lagging: Soldier piles, which are vertical steel or wooden beams, are first installed
along the trench edges at regular intervals. Then, horizontal lagging boards are placed between the
soldier piles to create a continuous support system.

4. Hydraulic shoring: This method involves using hydraulic jacks and specialized support systems to
provide temporary support to the trench walls. Hydraulic shoring is particularly useful when working in
confined spaces or areas with limited access.
It's important to note that trenching and timbering are potentially hazardous activities, and appropriate
safety measures should always be followed. This may include proper training, regular inspections, and
compliance with relevant safety regulations.

If you have any specific questions or need further information about timbering or trench construction,
feel free to ask

You might also like