0% found this document useful (0 votes)
29 views

Assignment 6 Final

Uploaded by

KarLok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Assignment 6 Final

Uploaded by

KarLok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Faculty of Civil Engineering & Technology

Universiti Malaysia Perlis (UniMAP)

AMJ20403
Engineering Drawing

ASSIGNMENT 6

Name Tang Kar Lok

Matric no. 221202011

Submission date 1/1/2024


TAKING OFF LIST FORM
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS
PROJECT TITLE : SEKOLAH AGAMA
PREPARED BY : TANG KAR LOK

ITEM DESCRIPTION UNIT


A Clearing site of undergrowth m2

B Lifting turf m2

C Excavate top soil average 100mm depth m2

D Excavate pit for pad footing n.e. 1.5m depth m3

E Piling works 200mm x 200mm with concrete grade 45 Nos

F Piling works 200mm x 200mm m

G Lean conc. 50mm thick under pile cap m3

H Concrete for stump


m3
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Site Clearance 1


T/DM/18/07/01

HEADING:

Clearing undergrowth

DESCRIPTION: UNIT:

Clearing site of undergrouth, bushes, scrub and the like and grubbing up their m2
roots
QTY:

660

24.00
27.50
660.00
660.00
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Site Clearance 2


T/DM/18/07/01

HEADING:

Lifting turf

DESCRIPTION: UNIT:

Lifting turf, set aside and preserve by stacking under shade, for reuse m2

QTY:

120

15.00
8.00
120.00
120.00
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Site Clearance 3


T/DM/18/07/01

HEADING:

Excavation top soil

DESCRIPTION: UNIT:

Excavation top soil average 100mm depth m2

QTY:

711

GL A-E/1-6 Length/Width

GL A-E 24.00
Add fdn.
(1/2)(2)P2 1.10
Total Length 25.10

GL 1-6 27.50
Add fdn.
(1/2)P1 0.30
(1/2)P3 0.525
25.10 Total Length 28.33
28.33
711.08
711.08
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Excavation 4
T/DM/18/07/01

HEADING:

Excavate commencing to reduce levle, get out the part return, filling and ramming, mat. From site
and consolidated within the site

DESCRIPTION: UNIT:

Pit far Pad footing not exceeding 1.5m depth m3

QTY:

P1 Depth

0.60
Add
Lean concrete 0.05
2/ Stump 0.10
0.60 Total Depth 0.75
0.60
0.75
0.54
P2 Depth

0.90
Add
Lean concrete 0.05
13/ Stump 0.10
0.60 Total Depth 1.05
1.10
1.05
9.01
9.55
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Excavation 5
T/DM/18/07/01

HEADING:

Excavate commencing to reduce level, get out part return, filling and ramming, mat. From site
and consolidated within the site.

DESCRIPTION: UNIT:

Pit for pad footing not exceeding 1.5m depth m3

QTY:

30

9.55
P3 Depth

1.00
Add
Lean concrete 0.05
13/ Stump 0.10
1.10 Total Depth 1.15
1.05
1.15
17.27
P4 Depth

1.00
Add
Lean concrete 0.05
2/ Stump 0.10
1.10 Total Depth 1.15
1.10
1.15

2.78
29.60
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Piling Works 6


T/DM/18/07/01

HEADING:

Total number of piles

DESCRIPTION: UNIT:

200mm x 200mm precast r.c pile with concrete grade 45 Nos

QTY:

75

2/ P1
1.00
2.00
P2
13/
2.00
26.00
P3
13/
3.00
39.00
P4
2/
4.00
8.00
75.00
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Piling works 7


T/DM/18/07/01

HEADING:

RC pile design

DESCRIPTION: UNIT:

200mm x 200mm Rc pile type to be pre-stressed concrete pile 30m under the m
ground
QTY:

2250

2/ P1
1/
30.00
60.00

13/ P2
2/
30.00
780.00

13/ P3
3/
30.00
1170.00

2/ P4
4/
30.00
240.00
2250.00
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Concrete 8
T/DM/18/07/01

HEADING:

Lean concrete

DESCRIPTION: UNIT:

50mm thick under pile cap m3

QTY:

2/ P1
0.60
0.60
0.05
0.04
P2
13/
1.10
0.60
0.05
0.43
P3 Base Area
13/ 1.1 x 1.05 1.155
1.02 Ddt.
0.05 0.45 x 0.3 0.14
0.66 m2 1.02

2/ P4
1.10
1.10
0.05
0.12
1.25
SLIP SORT
SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

DRAWING NO: ELEMENT: SLIP NO:

JPW/P006/SEMAI/ Concrete 9
T/DM/18/07/01

HEADING:

Concrete for stump

DESCRIPTION: UNIT:

100 mm depth as stated in piling notes m3

QTY:

24/ C2
0.30
0.30
0.10
0.22

6/ C3
0.30
0.30
0.10
0.05
0.27

BILL OF QUANTITY FORM


SEM 1 SA 2023/2024
AMJ20403 – ENGINEERING DRAWING
FACULTY OF CIVIL ENGINEERING & TECHNOLOGY
UNIVERSITI MALAYSIA PERLIS

PROJECT TITLE : SEKOLAH AGAMA


PREPARED BY : TANG KAR LOK

ITEM DESCRIPTION UNIT QUANTITY RATE (RM) AMOUNT (RM)

A Clearing site of undergrowth m2 660 502.12 331399.20

B Lifting turf m2 120 3.63 435.60

C Excavate top soil average 100mm m2 711 3.60 2559.60


depth

D Excavate pit for pad footing n.e. m3 30 14.08 422.40


1.5m depth

E Piling works 200mm x 200mm with Nos 75 81.90 6142.50


concrete grade 45

F Piling works 200mm x 200mm m 2250 81.90 184275.00

G Lean conc. 50mm thick under pile m3 2 230.00 460.00


cap

H Concrete for stump m3 1 285.60 285.60


Total 525979.90