0% found this document useful (0 votes)
31 views3 pages

Pengujian IR CB20 KV AK09

Pengujian IR CB20

Uploaded by

rifki wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views3 pages

Pengujian IR CB20 KV AK09

Pengujian IR CB20

Uploaded by

rifki wahyudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PT.

Krakatau Chandra Energi


Work Order Form Jl. Amerika No. 1, Samangraya
Citangkil - Cilegon - Banten - Indonesia
Work Order : 311000040136

MWO Description : Pengujian IR CB20 kV AK09 Krenceng Functional : KDL-J-4810-AKO-090 AK09 Krenceng (TD)
Notification : Equipment : 210000004741 Circuit Breaker 20 kV AK09 Krenceng
Notif. Description : Technical Object : KES00227 Cb 20 Kv
Reported by : Object Part :
Notification Date : Damage :
Maintenance Plan : 10010576 Cause :
Superior Order : Location : KDL-J-4810 20 kV Krenceng Substation Area
Order Type : 21PM Preventive Maintenance Plant Section : S04 Dinas T&DS
Order Status : RELEASE Planner Group : 214 Dinas T&DS
Priority : 3 High Main Work Center : TC1-N01 Work Center TC
Release Date : 19.08.2024 Cost Center : 213220 Dinas-Dinas Transmission & Distribution
Start Date : 26.08.2024 Operation Status :
Finish Date : 26.08.2024 Revision :

OPERATION Ext. Service PR Number:


Op No Sub Work-Center C-Key Operation Short Text Num Dur Work Unit Start-Date Start-Time End-Date End-Time
0010 TC1-N01 PM01 Insulation Resistan Test 2 2,0 4,0 MHR 26.08.2024
Breaker
Insulation Resistan Test Breaker
Pastikan 5 langkah keselamatan kerja,,
Posisi On,,
ukur IR Contact fasa terhadap ground,,
Posisi Off,,
Ukur IR contact fasa Atas dengan bawah,,

COMPONENT Reservation Number: 0000424309


Item Material Description Qty UoM Op No S. Loc PR No Recipient Status

TOOLS/SAFETY
No PRT No Description Qty UoM

PENGAMANAN (Perhatikan 5 langkah Keselamatan Kerja dan Gunakan Peralatan Keselamatan Kerja)
Elektrik Mekanik Safety
Langkah Pengamanan : Langkah Pengamanan : Note :

SPV/SPT : TTD SPV: SPV/SPT : TTD SPV: SPV/SPT/K3 Rep : TTD SPV:
Tanggal : Tanggal : Tanggal :
Aman Dikerjakan [_]Y [_]N TTD SPT: Aman Dikerjakan [_]Y [_]N TTD SPT: JSA [_]Y [_]N TTD SPT:
Aman Dioperasikan [_]Y [_]N Aman Dioperasikan [_]Y [_]N LOTO [_]Y [_]N

DILAKSANAKAN OLEH : DISETUJUI OLEH :


Nama Durasi Nama Tanda Tangan Postponed / Cancellation of Order
Operation By (Name) :
SPV TC:Rifki Wahyudi Reason Type:
Tanggal :09.10.2024 [_] Waiting for Material [_] Waiting for Service
Sptd TDS : Day Priatna [_] Object Running [_] Duplicate WO
Tanggal: 09.10.2024 [_] Object Breakdown [_] No Fault Found
SPV PG-Eng : [_] Bad Weather [_] Others
Tanggal :
.
Comment:
Pelaksanaan Pekerjaan NO.DOK. : F. PWT 01 19 02
Work Order No. : 311000040136
Tgl. Mulai di Kerjakan : Rabu, 9 Oktober 2024 REVISI : 01
Tgl. Selesai di kerjakan : Rabu, 9 Oktober 2024
Lokasi : Substation Krenceng
INSULATION RESISTANCE TEST
DATA TEKNIK Vn : 20 kV
ID : AK09 Year : 1975
Merk : Siemens S/N : 31011907
Type : 3AC-20N/630-500/20 HN Origin : Germany
STANDAR PENGUKURAN (Acceptance Criteria )
Tegangan Inject = 5000 VDC
Standar PUIL 2011 : 1 Volt : 1,000 Ohm/1menit
( SNI 0225:2011 ) : 20 kV : 20,000,000 Ohm = 20 M Ohm
Alat yang digunakan : Megger MIT 515
Posisi OFF
No. Measurement Value SI Remark Recommendation
1 R-R 1263000 M Ohm GOOD
2 S-S 1988000 M Ohm GOOD
3 T-T 1392000 M Ohm GOOD
Posisi ON
No. Measurement Value SI Remark Recommendation
1 R - Ground 3440000 M Ohm GOOD
2 S - Ground 3880000 M Ohm GOOD
3 T - Ground 3840000 M Ohm GOOD
5 R-S 4510000 M Ohm GOOD
6 R-T 6680000 M Ohm GOOD
7 S-T 5620000 M Ohm GOOD

Petugas pelaksana : 1. M. Reza Alhabsyi 3.


2. Jetar 4.

Keterangan : IR Test CB 20kV AK09 Sub. Krenceng


Hasil baik & CB laik Dioperasikan

Cilegon, 9 Oktober 2024


Mengetahui : Mengetahui :
T&D Solution Testing & Commissioning

( Day Priatna ) ( Rifky Wahyudi )