PALPALA
PALPALA
U/S
5. TERRAIN TYPE - PLAIN
Bank BHUASUNI SIDE (LHS) = 258.84 M
6. PAVEMENT TYPE - FLEXIBLE
EXISTING BRIDGE BALIDIHA SIDE (RHS) = 275.00 M
7. CARRIAGE WAY WIDTH - INTERMEDIATE LANE (5.5M)
(11.00 M X 7 NO'S SPAN ) TOTAL = 533.84 M
SHED SHED
6. NO DIVERSION ROAD IS REQUIRED AS THE EXISTING BRIDGE USED FOR
SHED TRAFFIC DURING THE CONSTRUCTION PERIOD.
TS:1017.675
ST:819.728
CS:769.728
LEGEND Right side EXISTING STRUCTURE DETAILS
SC:75
SC:
G
DIN IL
BU
108
1.205
2. TYPE OF STRUCTURE = MINOR BRIDGE
TS : 7
ED
SH
7.67
2 TREE 25.50 M
TOW LAGE
3. TYPE OF FOUNDATION = OPEN
VIL
C
01.2
5
3 ELECTRIC POL 10.250 M
ARD
4. CARRIAGEWAY WIDTH = 6.0 M
05
CS
4 STONE
S
5. EXISTING FORMATION LEVEL = 94.00 M
:1
12
6. VENT ADEQUACY = IN ADEQUATE
7.
SB
5 SIGN BOARD PROPOSED BOX CELL
02
B
7
SHED
D/S
6 CULVERT 23.0m CULVERT = 1X2X2
8. SUBMERGENCE DETAILS = GET SUBMERGED EVERY YEAR DURING RAINY
SHED
810.000
815.000
840.000
865.000
890.000
915.000
940.000
965.000
990.000
1015.000
1020.000
1025.000
1030.000
805.000
1035.000
800.000
795.000
1040.000
1045.000
790.000
Straight
1050.000
785.000
780.000
1055.000
775.000
1060.0000
770.000
1065.0 0
765.000
1070.0
760.000
10750.000
755.00
BUILDING
SHED
750.00 0
108 5.000
SHED
7
745.0 0
108 0.0000
TEMPLE
SEASON WITH 1.5 M DEPTH WATER OVER BRIDGE TOP LEVEL. & 3.0 M
740.0 0
10995.0000
735.0 00
10 00.0 00
730.0 00
SHED
725.0 00
SH
11 05.0.0000
BU
ED IL
720. 00
DI
NG
11 10 .00 0
715. 00
.000
8 KILOMETRE STONE DEPTH OF WATER FLOW OVER BRIDGE DURING HIGH FLOOD.
BU SHED
710. 00
11 115 .00 00
ILDI
0
NG
15.0 m
0
705.
1 120 5.0
SH
0
ED
1 12
0
690.
152.16 m 9. NEAR BY BRIDGE DETAILS ON RIVER / NALLAH STREAM :-
0
HU
1
T
0
Straight 1
0
9 HOT 1 13
665.
i. BRIDGE ON U/S SIDE - Baldiaha Dam @ 700m towards U/S
000
11 135 0.0
PROPOSED H.L. BRIDGE
SHED
SHED
11 40 .0 00
Curve No: 1
640.
10 BUILDING ii. BRIDGE ON D/S SIDE - 2 no's check dam @ 3000 m towards D/S
0
11 45 .0 00
(25.36 M X 6 NO'S SPAN )
SH BUILDI
ED NG
SHED
00
11 50. .00 00
Curve No: 2
SH
BU
615.
ILD
HIP=X=9402.587 Y=8249.350 11 55. 00 0
ED
000
ING
TOW LAGE
NALLAH
ST
11 11 60.0 000 0
BUILDING
SHED
SH
:1
HIP=X=9117.423 Y=8459.878
BU
IL
VIL
DI
590.
19
ED
NG
000
A 11 65.0 00 7.0
HYDRAULIC DATA
ARD
PALP
11 70.0 00 27
565.
000
12 PROPOSED ROAD 11 75.00 00
SH
Rc=240.000 1. HYDRAULIC ANALYSIS HAS BEEN CARRIED OUT AS PER IRC:SP:13-2022 AND
ED
D/S
8
11 0.00 0
000
Lc=18.523 Rc=100.000 8
11 5.00 0 IRC:SP:54-2018, 3 NOS. OF RIVER CROSS SECTION HAS BEEN TAKEN FOR
EXISTING ROAD
ALA
13 90 0
Lc=39.352 11 .
95 000 HYDRAULIC ANALYSIS AS PER CLAUSE NO.3.3 OF IRC:SP:13-2022 -
BU
ILD
ING
Speed=65 Km/h .00
14 TOE LINE PROPOSED
RIVE
0
e=0.070 Speed=50 Km/h i. AT 500 M ON UPSTREAM SIDE.
15 PROPOSED H.L. BRIDGE e=0.070 ii. AT BRIDGE SIDE
Widening=0.600 Both side
12
R
15
SH
.00
iii. AT 500 M ON DOWNSTREAM SIDE.
ED
12
40 SL. 500 M BRIDGE 500 M
.00
PARAMETERS REFERENCE
SIDE D/S
0
NO. U/S
CO UNDE
D
NS
12
TR
UC
R
PLAN
51
TIO
N
.14
2 1 CATCHMENT AREA(SQ. KM) 133 SQKM TOPO SHEET
BU
RUGOSITY CO-EFFICIENT(n)
IN
ILD
G
ING
PALPALA RIVER
DISCHARGE in Cumec CLAUSE NO 5.5,
8 2583.68 2586.87 2820.72
D/S
(MANNING'S FORMULA) IRC:SP:13-2022
DISCHARGE in Cumec CL. NO 4.2,
SCAN FOR KML
(DICKEN'S FORMULA)
96 O.F.L = RL 95.50
95 HIGH FLOOD LEVEL (HFL) IN M 97.00
Existing Bridge Top = RL 94.00
94 AFFLUX IN M 0.150
101.655
101.297
100.938
100.580
100.245
100.004
100.070
100.136
100.202
100.268
100.334
100.400
100.466
100.530
100.590
100.647
100.698
100.746
100.790
100.829
100.865
100.896
100.924
100.946
100.965
100.980
100.991
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.000
101.002
101.021
101.040
101.065
101.095
101.132
101.175
101.224
101.279
101.340
101.407
101.480
101.559
101.644
101.735
101.830
101.927
102.023
102.119
102.215
102.312
102.408
102.504
102.600
102.696
102.789
102.875
102.955
103.030
103.097
103.159
103.215
103.264
103.307
103.344
103.375
103.400
103.418
103.437
103.434
103.429
103.425
103.420
103.419
99.969
99.756
99.604
99.514
99.484
99.515
99.609
99.740
99.872
99.938
DESIGN LEVELS
On PCL
Benchmark Details (In Mtr.)
102.014
101.399
100.882
100.267
100.004
100.061
100.149
100.264
100.646
100.636
100.600
100.521
100.401
100.446
101.362
101.405
101.487
101.589
101.694
101.738
101.651
102.071
101.910
102.483
102.102
102.441
102.919
103.082
103.202
103.306
103.310
103.440
103.374
103.378
103.380
103.381
103.025
103.297
103.255
103.030
103.400
103.419
99.945
99.619
99.349
99.069
98.855
98.744
98.183
97.671
97.860
97.730
97.512
97.525
97.143
96.842
96.795
96.790
96.782
96.770
96.752
96.852
96.956
96.998
96.921
96.845
96.771
96.601
96.411
96.146
95.857
95.569
95.348
95.168
94.965
94.736
94.184
92.797
91.986
91.621
90.389
90.283
90.379
90.565
90.484
90.609
90.679
93.093
93.450
93.421
94.386
95.811
97.102
98.820
99.132
99.991
99.978
99.969
99.966
99.975
ORIGINAL GROUND
LEVEL NAME EASTING NORTHING ELEVATION LOCATION
102.062
102.120
100.513
100.032
100.177
100.418
100.658
100.840
100.761
100.458
100.055
100.700
101.999
102.541
102.520
102.611
103.077
102.982
103.021
103.072
102.807
102.753
102.568
102.762
102.869
102.994
103.122
103.236
103.403
103.273
103.230
103.192
103.162
103.119
103.384
103.384
102.939
102.063
102.036
Existing Levels
99.719
99.396
99.037
98.701
98.193
97.551
96.963
96.473
96.553
96.703
96.848
96.913
96.960
96.963
96.937
96.910
97.009
97.000
96.991
96.982
96.976
96.976
96.980
96.703
96.616
96.582
96.288
96.475
96.100
95.732
95.553
95.404
95.270
95.033
94.491
92.674
90.761
90.902
90.740
90.382
90.379
90.568
90.489
90.706
90.952
93.012
93.600
93.511
93.433
97.838
98.806
98.804
98.811
99.130
99.130
99.131
99.830
99.800
99.795
99.848
99.976
TBM-3 9247.116 8315.429 94.0114 On top of Existing Bridge
On LHS @ 10M
94.95 On top of Existing Bridge
TBM-4 9213.466 8330.001
102.113
101.651
100.093
100.179
100.060
100.052
100.052
100.057
100.068
100.089
100.121
100.166
100.585
100.580
100.569
100.548
100.517
100.444
101.428
101.435
101.452
101.481
101.521
101.567
101.606
101.530
101.484
101.411
101.312
101.206
101.093
100.971
100.852
100.774
101.204
101.751
102.245
102.612
103.169
103.169
102.972
102.977
102.991
103.013
102.810
102.977
102.830
102.815
Existing Levels R.WALL
99.999
99.047
99.089
98.385
98.396
98.232
98.027
97.753
97.828
97.611
97.394
97.333
97.123
96.738
96.401
96.674
96.889
96.921
96.929
96.936
96.939
96.182
96.216
96.249
96.267
96.245
96.158
96.013
95.832
95.630
95.427
94.809
94.806
94.560
93.959
93.069
91.829
91.474
90.432
90.283
90.373
90.471
90.440
90.634
90.838
93.296
93.299
93.298
93.168
93.289
98.826
99.133
On RHS @ 10M
-3. -0.
Prop. Ver. Diagram 59% VCL=80.00 1.32
% VCL=80.00 0.00% VCL=80.00
1.9
3% VCL=80.00 05
%
on PCL
00 Ls= 0 Ls=7
Hor. Curve Details 50. R=240.00 50. 0.0 R=100.00 0.00
Ls= 0 0 Ls=7
on PCL
Super Elevation 7.00% 7.00% NAME OF THE PROJECT :
Diagram CONSTRUCTION OF HL. BRIDGE OVER RIVER PALPALA
Extra Widening AT 1ST KM OF BALIDIHA BHUASUNI ROAD (O.D.R) IN THE
Diagram DISTRICT OF MAYURBHANJ ODISHA FOR THE YEAR 2023-24.
1000.000
1006.852
1010.000
1017.675
1020.000
1025.000
1030.000
1035.000
1040.000
1042.675
1045.000
1046.852
1050.000
1055.000
1060.000
1065.000
1070.000
1075.000
1080.000
1085.000
1086.852
1087.675
1090.000
1095.000
1100.000
1105.000
1110.000
1115.000
1120.000
1125.000
1127.027
1130.000
1134.509
1135.000
1140.000
1145.000
1150.000
1155.000
1160.000
1165.000
1170.000
1172.027
1174.509
1175.000
1180.000
1185.000
1190.000
1195.000
1197.027
1200.000
1210.000
1214.509
1220.000
1222.027
1230.000
1240.000
1250.000
1251.142
565.000
575.000
585.000
595.000
605.000
606.319
615.000
625.000
635.000
645.000
646.319
655.000
665.000
675.000
683.348
685.000
686.319
695.000
701.205
705.000
710.000
715.000
719.062
720.000
725.000
730.000
735.000
740.000
745.000
750.000
750.485
751.205
755.000
760.000
765.000
769.728
770.000
775.000
780.000
785.000
790.000
790.485
795.000
800.000
801.871
805.000
810.000
815.000
819.728
820.000
830.000
830.485
837.585
840.000
850.000
860.000
870.000
880.000
890.000
900.000
910.000
920.000
930.000
940.000
950.000
960.000
970.000
980.000
990.000
992.675
CLIENT :
Chainage
EXECUTIVE ENGINEER,
MAYURBHANJ (R&B) DIVISION, BARIPADA
H.F.L = RL 99.00 Long-section
99 Drawing Title :
Scale = H : 1000 , V:100 PROPOSED ALIGNMENT PLAN
98 O.F.L = RL 97.50
100
97 H.F.L = RL 99.00 Drg. by : Designed. by : Checked. by :
99 Er. R. Tripathy Er. R. Tripathy Er. R. Mohanty
96
98 O.F.L = RL 97.50 Scale : Date : Drawing. No :
95 H.F.L = RL 97.00
97 1mm = 1.33 m 09/01/2024 RLBC/MB/BR/AL/104/24
94
96 O.F.L = RL 95.50 PROPOSED ALIGNMENT SHOWN AS A-B-C-D IS RECOMMENDED
93 L.W.L = RL 92.85
Datum: 91.8 H.F.L = RL 94.250 95 U/S FOR KIND APPROVAL.
92 H.F.L = RL 94.250
94 94
-145.000 99.000
98.236
98.123
98.023
97.785
-110.000 97.500
-100.000 96.562
-90.000 96.251
-80.000 95.630
-70.000 94.620
-60.000 94.586
-50.000 94.256
-40.000 94.453
-35.000 92.850
-30.000 92.147
-20.000 92.230
-15.000 92.296
-10.000 92.282
92.087
92.170
92.205
92.396
92.265
92.850
95.620
96.265
97.436
97.010
97.200
97.489
97.500
97.520
97.540
98.053
98.289
98.525
115.000 99.000
ORIGINAL GROUND
93 93 L.W.L = RL 92.85
B/S O.F.L = RL 92.50
LEVEL O.F.L = RL 92.50
-135.000
-130.000
-125.000
-120.000
100.000
105.000
10.000
15.000
20.000
25.000
30.000
35.000
40.000
55.000
70.000
75.000
80.000
85.000
90.000
95.000
0.000
5.000
Offset 92 92
91 91 L.W.L = RL 90.800 D/S
Asst. Engineer Asst. Executive Engineer Executive Engineer
Cross-section @ -500 m U/S (Section -Y-Y ) 90 90 Roads (R&B) Section -III Roads (R&B) Sub-division Mayurbhanj (R&B) Division
Scale = H : 1000 , V:100 L.W.L = RL 88.90 Baripada Baripada Baripada
89 L.W.L = RL 88.90 89
Consultants: Datum: 88.0 Datum: 88.0
R.LB.CONSULTANTS
-290.000 94.250
-280.000 93.651
-270.000 93.452
-260.000 93.421
-250.000 93.552
-240.000 92.756
-230.000 92.963
-220.000 92.500
-210.000 92.356
-200.000 92.152
-190.000 92.052
-180.000 91.895
-170.000 91.752
-160.000 91.352
-150.000 91.564
-140.000 91.254
-130.000 92.306
-120.000 92.238
-110.000 92.237
-100.000 90.856
-90.000 90.237
-80.000 90.263
-70.000 88.960
-60.000 89.789
-50.000 89.560
-40.000 88.900
-30.000 88.826
-20.000 88.685
-10.000 88.359
88.350
88.726
88.895
91.526
92.500
93.456
93.859
94.250
-500.000 92.087
-400.000 91.856
-300.000 91.560
-200.000 91.123
-100.000 90.752
90.283
100.000 90.020
200.000 89.652
300.000 89.260
400.000 88.785
500.000 88.350
ORIGINAL GROUND ORIGINAL GROUND
AN ISO 9001 - 2015 COMPANY LEVEL LEVEL
10.000
20.000
30.000
40.000
50.000
60.000
70.000
0.000
0.000
NABL Accrediated Lab. & Approved by Govt. of Odisha
Offset Offset
Regd. office - At Malikaspur , Balasore , Corp. office : Patia square , Bhubaneswar
Ar
Ph. 7008943799 , 7205023299 Chief Construction Engineer Chief Engineer (DPI Roads )
Er
Web : rlbcindia.com , Email - [email protected] Cross-section @ +500 m D/S (Section -Z-Z ) Longitudinal Section of Nallah
We Create beyond imagination Eastern Circle (R&B) Bhubaneswar
BALASORE , BHUBANESWAR Scale = H : 1000 , V:100 Scale = H : 5,000 , V:100 Balasore