Boq Tennis Court & Rehabilitation of Gymnasium - 15155675531

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
313 views53 pages

Boq Tennis Court & Rehabilitation of Gymnasium - 15155675531

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 53

BILL OF QUANTITIES OF

TENNIS COURT & REHABILITATION OF GYMNASIUM


AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY
LARKANA

S.No ITEMS OF WORKS COST (Rs.)

TENDER
1 TENNIS COURT & REHABILITATION OF
GYMNASIUM

TOTAL AMOUNT

SEAL SEAL

Seal and Sign of Client Seal and Sign of Contractor


ENGINEER'S ESTIMATE OF
TENNIS COURT & REHABILITATION OF GYMNASIUM
AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
Description Cost
A Cost Summary Of Tennis Court
Civil Works
Schedule Items 3,523,024
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF CIVIL WORK
Plumbing
Schedule Items 187,708
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF PLUMBING WORK
Electrical
Schedule Items 888,163
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF ELECTRICAL WORK

SUB TOTAL A =
B Cost Summary Rehablitation of Gymnasium
Civil Works
Schedule Items 2,973,731
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF CIVIL WORK
Plumbing
Schedule Items 48,697
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF PLUMBING WORK
Electrical
10% of Civil Work
____ % Premium on Schedule Items
TOTAL OF ELECTRICAL WORK
SUB TOTAL B =
SUB (A+B) TOTAL
ENGINEER'S ESTIMATE OF
TENNIS COURT & FEMALE GYMNASIUM
AT SMBBMU LARKANA

2 (B) SCHEDULE OF ITEM (B), PLUMBING WORKS (Part A, Tennis Court)


Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
1 Providing & fixing 1/2" dia, lead connection complete
with a 1/2" dia brass stop cock, two brass nuts & lining
jointed to lead pipe with plumber wiped solder joints 1/2"
inches lead pipe to be of not less than 4lbs per lineal
yard (S.I. No. 22/P-6).
Each 6 689.70 4,138
2 Providing & fixing M.S clamps of the approved design to
4" i/c the cost of cutting and making good to wall or M.S
bolts and nuts, 4" into wall including pipe distance
pieces extra painting to match the colour of the building
(S.I. No. 2/P-9).
Each 8 72.16 577
3 Providing & fixing M.S clamps of the approved design to
3" i/c the cost of cutting and making good to wall or M.S
bolts and nuts,3" into wall including pipe distance pieces
extra painting to match the colour of the building (S.I.
No. 14/P-10).
Each 8 264.00 2,112
4 (b) S/Fixing concealed Tee stop cock of superior quality
with c.p head 1/2" dia (S.I.No. 14(A)/P-18). Each 10 1097.00 10,970
5 (b) S/Fixing long bib-cock of superior quality with c.p
head 1/2" dia (S.I. No. 13(a)/P-19). Each 10 1109.46 11,095
6 Supplying & fixing 6" x 4" earthen gully trap with 4"
outlet complete with 4" thick 1:2:4 C.C for bed & 1/2
thick cement plaster (1:3) to the karb C.I grating 6" x 6"
and C.I. cover and frame 12"x12" (inside) etc Complete
(b) earthen ware glazed gully trap(a) (i) 6'x6"x4" (i) With
C.I Cover and Frame(S.I. No. 1(i)/P-23.

Each 4 1220.67 4,883


7 Constructing manhole or inspection chamber for the
required diameter of circular sewer and 3’-6”(1067mm)
depth with walls of B.B in cement sand mortar 1:3
cement plastered 1:3,1/2” thick inside of walls and 1”
(25mm) thick over benching and channel i/c fixing C.I
manhole Cover with Frame of Clear opening 1-1/2’ x 1-
1/2’ (457x457 mm) of 1.75 cwt (88.9) embedded in plain
C.C 1:2:4 and fixing 1” (25mm) dia M.S Steps 6’ (150
mm) Wide Projecting 4” (102mm) from the face of wall at
12” (305 mm) C/C duly Painted Etc. Complete as per
standard Specification and Drawing. (a) 4" to 12" dia
2'x2'x3'-6" (S.I.No. 1/P-46) ).

Each 4 14748.00 58,992


8 Providing and fixing chrome plated brass towel rail
complete with brackets fixing on wooden cleats with 1"
long C.P brass Screws.(I) Towel rail 36" long (a) 3/4" dia
round or square (standard pattern) (S.I. No.1(i)(a)/P-7).
Each 4 1269.95 5,079.80
10 Supplying & fixing soap tray of made of plastic of
superior quality and design with fine finishing with c.p
screws etc complete (S.I. No.6/P-8). Each 4 169.40 677.60
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
11 Providing & fixing C.P muslim shower with double bib
cock & ring pipe (S.I. No.19(a)/P-19). Each 4 3432.00 13,728
12 Supplying & fixing ball valves (china ) (S.I. No.5/P-18)

i) 3/4" dia Each 4 271.92 1,087.68


ii) 1" dia Each 3 365.42 1,096.26
14 Supplying & fixing telephonic shower with ring pipe etc
complete (S.No 20 / P-19) Each 4 1122.00 4,488.00
17 Supplying & fixing wash basen mixture of superior
quality with c.p head 1/2" dia
(S.I. No.14 b /P-19) Each 4 3179.00 12,716.00
18 Providing and fixing orisa type white or color glazed
earthen ware w.c pan with cost of low level plastic flush
tank of 3 gallons capacity of approved quality i/c making
requiste numbers of holes in walls , plinth & floor and
making good in cement concrete 1:2:4
W.C pan orisa type 23" with plastic tank of low down 3
gallons C.I trap & C.I thumble (Superior Quality )
With 4" dia. earthen ware trap and plastic thumble (S.No
3 / P-2 )
Each 2 6166.60 12,333
19 Providing & fixing 24" x 18" lavatory basin in white
glazed earthen ware complete with and including the
cost of W.I or C.I cantilever brackets 6 inches built into
wall, painted white in to two coats after a primary coat of
red lead paint , a pair of 1/2" dia rubber plug & chrome
plate brass chain 1-1/4" dia malloable iron or c.p brass
traps malloable iron or brass unions and making
requiste number of holes in wall plinth & floor for pipe
connection and making good in cement concrete 1:2:4
(Standard pattern ) (S.No 8 / P-3 )
Each 4 4253.90 17,016
20 Providing & fixing European type white glazed earthen
ware wash down w.c pan complete with including the
cost of white / black plastic seat ( Best Qty ) and lid with
c.p brass hinges best quality and buffers 3 gallons
plastic flushing cistern with internal fitting with fitting
clamp 3/4" dia. and cutting and making requistic number
of holes in walls, plinth and floor for pipe connection and
making good in cement concrete 1:2:4 ( S.No 4 / P-2 )

Each 2 5339.40 10,679


21 Add extra for labour for providing and fixing of earthen
ware pedestal white or coloured glazed (S.No 9 / P-3 )
Each 4 938.47 3,754
22 Providing and fixing 15" x 12" bavelled edge mirror of
belgium glass complete with 1/8" thick hard board and
c.p screws fixed to wooden pleat
(b) Superior Quality (S.No 4(b) / P - 7 ) Each 6 2047.76 12,287
Total 187,708
4 (B) NON SCHEDULE OF ITEM (B), PLUMBING WORKS
1 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.

(a) Elbow / Bend 110 mm or 4" dia Each 4 3885 15,540


(b) Elbow / Bend With Door 110 mm or 4" dia Each 4 4500 18,000
(c) Tee 110 mm dia Each 3 8076 24,228
1

Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
(d) Socket 110 mm dia Each 4 799 3,196
(e) UPVC Tee With Door 110 mm dia Each 5 5517 27,585
2 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.

(a) Elbow / Bend 75 mm or 3" dia Each 4 3118 12,472


(b) Tee 75 mm dia Each 2 3201 6,402
(c) Socket 75 mm dia Each 3 550 1,650
(d) UPVC Tee With Door 75 mm dia Each 4 4428 17,712
3 Providing & laying PPR PN-20 (Dadex or approved by
engineer incharge) pipe with all fittings i.e socket, bend
tee, elbow where required.(for cold water pipe )
(a) 20mm (3/4") dia PPR Rft 200 56 11,280
(b) 1 mm ( 1" ) Rft 150 73 10,922
4 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and
rubber ring all as specified including socket, bend, tee
all fittings 4" dia (110 mm) etc complete. Rft 270 247 66,741
5 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and
rubber ring all as specified including socket, bend, tee
all fittings 3" dia (75 mm) etc complete.
Rft 215 165 35,552
6 Supply & fix UPVC Dadex or approved by engineer
incharge vent cowel 110mm (4" dia) on top of vent pipe.
Each 35 311 10,885
7 Supply & fix UPVC Dadex or approved by engineer
incharge vent cowel 110mm (3" dia) on top of vent pipe.
Each 35 280 9,800
8 Providing & fixing UPVC floor trap(DADEX or approved
by engineer incharge) with 4" dia inlet and 4" dia outlet
of the approved self cleaning design with a UPVC
Grating with or without a vent arm i/c cost of making
requisite number of holes in walls plinth and floor for
pipe connectons and making good cement concrete
1:2:4.
Each 4 450 1,800
9 Providing UPVC pipe with collars class "B" and digging
the trenches to required depth and fixing imposition i/c
cutting, fitting & jointing with maxphalt composition &
cement mortar 1:1 and testing with water pressure to a
head of 4 feet above the top of the highest pipe and
refilling with excavated staff.
a.9" dia RCC Pipe Class B Rft 350 700.00 245,000
Total 518,765
MATERIAL CARTAGE STATEMENT TENNIS COURT SMBBMU LARKANA
(1) (Foundation)

Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Ton % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17

1 Cement Concrete( 1:4:8) #REF! 9.60% #REF! 48.0% #REF! 96.0% #REF! - - - -
3 Cement Concrete ( 1:2:4 ) #REF! 17.60% #REF! 44.0% #REF! 88.0% #REF! - -
4 Cement Concrete( 1:3:6) #REF! 13.0% #REF! 46.0% #REF! - - 92.0% #REF! - -
5 3" Thick Flooring #REF! 17.60% #REF! 44.0% #REF! 88.0% #REF! - -
6 Fabrication of steel #REF! - - - - - - - #REF! 1350% - 5% #REF!
Total Quantities :- #REF! #REF! #REF! #REF! #REF!

Rate as per R.A.A 168.33 4418.68 2139.48 2139.48


Amount :- #REF! #REF! #REF! #REF!

Total Amount :- #REF!


MATERIAL CARTAGE STATEMENT TENNIS COURT SMBBMU LARKANA
(2) (Ground Floor)

Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17

1 R.C.C 1:1.5:3 #REF! 21.91% #REF! 41.1% #REF! - - 82.00% #REF!


4 Cement plaster (1:6 )1/2" thick #REF! 1.16% #REF! 8.70% #REF! - - - - - - - -
2 Cement plaster (1:4 )1/2" thick #REF! 0.53% #REF! 4.00% #REF! - - - -
3 Cement plaster(1:4) 3/8" thick #REF! 0.57% #REF! 3.00% #REF! - - - -
6 Fabrication of steel #REF! - - - - - - - #REF! 5% #REF!
7 Brick Masonary (1:4) #REF! 4.80% #REF! 24.0% #REF! 1350% #REF!
Total Quantities :- #REF! #REF! 0 #REF! #REF! #REF!

Rate as per R.A.A 168.33 4418.68 2139.48 2139.48 721.74 3253.63


Amount :- #REF! #REF! 0 #REF! #REF! #REF!

Total Amount :- #REF!


CONSTRUCTION OF
TENNIS COURT
BILL OF QUANTITIES OF
TENNIS COURT AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
PART-I: SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
(Foundation)
1 SCH/C18/ Turfing lawns
ITEM no.43/ Turfing lawns
P-103 %Sft 272.25 5850.00 15,927
2 SCH/C18/ Supply manure
ITEM no.44/ Supply manure
P-104 Cart Load 298.12 71.50 21,316
3 EXCAVATION:
Excavation in foundation of building bridges
SCH/C1/ item and other structures including dagbelling
no.18b/ dressing refilling around structure with
P-4 excavated earth watering and ramming lead
up to 5ft (S.I. No. 18 (b)/P-4) (for foundation)
(C) in hard soil or soft murum %oCft 3554.38 11,186 39,760
4 LEAN CONCRETE (1:4:8):
SCH/C4/ item Cement concrete brick or stone blast 1
no.5-i/
P-16 1/2" to 2" gauge.
C)Ratio 1:4:8 (S.No. 4 / P-14) %Cft 9416.28 1,470 138,419

REINFORCED CEMENT CONCRETE:


R.C.C work in
roof slab, beams columns rafts,lintels and
other structural members laid in situ or
SCH/C4/ item precast laid in position complete in all
5 no.6-a(i)/ respects.
P-16
(I)Column using ratio (1:2:4) or more 90
Lbs cement 2 Cft sand 4 Cft. Shingle 1/8" to
1/4" guage.must have cylinder strength
>3750psi (S.I. No.6(a)(ii)/P-16).
P.Cft 337.00 2,079 700,623
7 C.C (1:3:6):
Cement concrete plain including placing
SCH/C4/ item compacting, finishing and curing, complete
no.5-a(h)/
P-15 (including screening and washing of stone
aggregate without shuttering).
Ratio ( 1: 3:6) S.I. No. 5(h) P-15).
%Cft 12595.00 103.5 13035.83
8 FORMWORK:
SCH/C4/ item Erection and removal of centering for
no.19(b)/ R.C.C or plain concrete works of Partal
P-17 wood
vertical ( S.No 19 b (ii) / P-17) %Sft 3127.41 180.0 5629.34
9 EARTH FILL FROM OUTSIDE:
(FOR FLOORING)
SCH/C1/ item Filling, watering and ramming earth
no.21/
P-4 in floor with surplus earth from foundation
lead upto the one chain and lift upto 5 ft.
(S.I. No. 21/P-4) (for plinth) %oCft 1512.50 3728.7 5639.71
10 LEAD FOR EXCAVATED EARTH FROM
OUTSIDE: Filling,
SCH/C1/ item
watering and ramming earth in floor with
no.22/
P-4 new earth from excavated from outside lead
upto the one chain and lift upto 5 ft.(S.I. No.
21/P-4) (for plinth) %oCft 3630.00 2,319 8418.93
11 C.C (1:5:10):
SCH/C5/ item Cement concrete brick or stone blast 1
no.4c/
P-15 1/2" to 2" gauge.
C)Ratio 1:5:10 (S.No. 4 / P-14) %Cft 8694.95 94.5 8216.73
polythene sheet:
Providing and laying single layer of
SCH/C7/ item polythene sheet 0.13mm thick for water
12 no.38/
P-38 proofing as per specification and
instructions of Engineer incharge. (S.I. No.
38/P-37). P.Sft 10.70 1872 20030.40
13 ANTI TERMITE:
Providing anti-termite treatment by
spraying/ sprinkling / spreading Neptachlar
0.5% or equivalent. Emulsion as an over
SCH/C18/ item all Pre Construction treatment in slab type
no.92/
P-109 construction along external foundation
trenches of the building over complete
parimeter of the foundation trench etc. as
per directions of engineer incharge.
(S.I.No.92/P-108) P.Sft 9.74 1872.0 20030.4
(GROUND FLOOR)

REINFORCED CEMENT CONCRETE:


R.C.C work in
1 roof slab, beams columns rafts,lintels and
other structural members laid in situ or
SCH/C4/ item precast laid in position complete in all
no.6-a(ii)/ P- respects.
16 (I)Column using ratio (1:1-1/2:3) or more 90
Lbs cement 2 Cft sand 4 Cft. Shingle 1/8" to
1/4" guage.must have cylinder strength
>3750psi (S.I. No.6(a)(ii)/P-16).
P.Cft 349.00 1,097.4 383,006
BRICK MASONRY:
SCH/C5/ ITEM Pacca brick Work in ground floor in cement
3 no.5-1(c)/ sand mortar 1:4 ( S.No 5 (1e) / P-20)
P-21
%Cft 13227.41 863.1 114,170
4 Deodar wood Door:
First class deodar wood wrought joinery
work in door and windows etc fixed in
SCH/C10/ position including chowkats hold fasts
ITEM no.7(b)/
P-57 hingers, iron tower bolts chocks cleats
handles and cords with hooks etc. Deodar
panelled or panelled and glazed or fully
glazed (1273.76-370.83=902.93 )
a) 1 3/4" thick (S.No 7 b / P-57) P.Sft 902.93 274.0 247,403
5 CEMENT PLASTER : Cement plaster 1: 6
SCH/C9/ item
up to 12' height (S.I. No. 13 /P-51).
no.13/
P-51 b. In walls 1/2 inches thick (1:6)
%Sft 2206.60 5,097.5 112,481
6 CEMENT PLASTER: Cement
plaster 1: 4 up to 12' height (S.I. No. 11 /P-
SCH/C9/ item 51).
no.11/ b. In walls 3/8 inches thick (1:4)
P-51 %Sft 2197.52 5,097.5 112,019
b. In slab 1/2 inches thick (1:4)
%Sft 2197.52 724.5 15,921
7 MATT FINISH:
Preparing the surface and painting with matt
finish i/c rubbing the surface with bathy
SCH/C9/ item (Silicon carbide rubbing brick) filling the
no.36a/ voids with zink/chalk/plaster of paris
P-55 mixture, applying first coat premix making
the surface smooth and then painting 3
coats with matt finish of approved make etc:
complete ( 3 coats ) %Sft 3444.38 3450 118,814
8 WEATHER COAT: Preparing the surface
and painting with weather coat including
SCH/C9/ item rubbing the surface with rubbing brick / sand
no.38b/ paper filling the voids with chalk / plaster of
P-55 paris and then painting with weather coat of
approved make.
3 coats (S.I No. (B) 38/P-55). %Sft 2567.95 1648 42,320
9 PRIMARY COAT CHALK DISTEMPER
SCH/C9/ item
no.23/ (CEILING):Primary coat of Chalk under
P-53
distemper (for ceiling)(S.I. No. 23/P-53). %Sft 442.75 725 3,208
10 Distempering (c) three coats
SCH/C9/ item Distempering (c) three coats.(for ceiling) (S.I
no.24/
P-53 No. 24/P-53).
%Sft 1079.65 725 7,822
11 SCH/C11/ item FRENCH POLISHING:
no.7a/ French polishing complete (a) on new Work.
P-71 (S.N 7a P/71) %Sft 3841.75 548.0 21,053
12 SCH/C10/ item MORTICE LOCK
no.21/ Providing and fixing approved
P-59 quality mortice lock (SNo21 / P-59) No. 1786.13 4 7,145
13 C.C TOPPING:
SCH/C8/ item Providing and laying 1" thick topping
no.16c/ cement concrete (1:2:4) including surface
P-41 finishing and dividing into panels:
C) 2" thick (S.I No. 16c/ P-41) %Cft 3275.50 500 16,378
14 GLAZED TILE:
Providing and laying tiles glazed 6"x6"x1/4"
on floor or wall facing in required colour and
pattern of stile specification jointed in white
SCH/C8/ item cement and pigment over a base of 1:2
no.60/ grey cement mortar 3/4" thick including
P-47 washing and filling of joints with slurry of
white cement and pigment in desired shape
with finishing, clearing and cost of wax
polish etc. complete including cutting. (S.No
60 / P-46) %Sft 30509.77 500.0 152,549
15 STEEL FOUNDATION: Providing and
fabrication of tor steel reinforcement for
SCH/C4/ ITEM cement concrete including cutting, bending,
no.8b/ laying in position, making joints and
P-17 fastenings including cost of binding wire
(also including removal of rust from bars).
S.I. No. 8(b) P-16). P.Cwt 5001.70 166 831,883
16 STEEL GROUND FLOOR Providing and
fabrication of tor steel reinforcement for
SCH/C4/ ITEM cement concrete including cutting, bending,
no.8b/ laying in position, making joints and
P-17 fastenings including cost of binding wire
(also including removal of rust from bars).
S.I. No. 8(b) P-16). P.Cwt 5001.70 67.9 339,809
SCHEDULE ITEMS TOTAL = 3,523,024
PART-II: NON-SCHEDULE ITEMS
(FOUNDATION)
DACCA GRASS: Supply live (Dacca) grass
1 OR-1 in slabs with earth intact including all lead SFT 5850.00
and lifts.
COMPACTION: Rolling the surface dry with
light power roller (upto 6 tons or 6.09 m. ton)
2 OR-2 as directed by the Engineer-in-charge. SFT 2808.00

STONE SOILING: Providing and laying


soling stones 6 inches to 9 inches (152 mm
3 OR-3 to 229 mm) size under floors including CFT 2106.00
packing with spawls and chips and
consolidating etc. complete

C.C BLENDING1:9 Providing and laying in


CC Blending 1:9 (1 cement 9 all in
aggregate) cement concrete using screened
graded bajri 3/4 inch (19 mm) and down
gauge for filling voids in foundation,
4 OR-4 basement and plinth including compacting, CFT 702.00
curing etc. complete, foundation and
basement up to 5 feet (1.52 m) depth and
plinth up to 4 feet (1.2 m) height from
ground level.

CEMENT CONCRETE: Providing and laying


4" (102 mm) thick not leaner than 1:1.5:3
cement concrete (minimum works cube
crushing strength of 5000 Lbs. PSI (at 28
days) in tennis court etc. compacting with
5 OR-5 vibrators (immersion or screen or both) (with SFT 2808.00
admixture) of required thickness power float
finished for perfect floor level etc complete
and as per direction of engineer in charge.
(GROUND FLOOR)
PROCELAIN TILES: Providing & laying
light/colour unglazed vitrified porcelain tiles
(polished) not exceeding 21" x 21" each on
wall & floors foreign make (Italian or
1 OR-1 equivalent except china make) in any floor
laid with dry bond (site bond) over existing
floor including jointing the tiles with joint
floor of approved quality as per direction of
engineer incharge. P.Sft 538
PROCELAIN TILE SKIRTING: Providing &
laying light/colour unglazed vitrified
porcelain tiles skirting (polished) not
exceeding 1600 sq.cm each on wall & floors
2 OR-2 foreign make (Italian or equivalent except
china make) in any floor laid with dry bond
(site bond) over existing floor including
jointing the tiles with joint floor of approved
quality as per direction of engineer incharge. P.Sft 64
VERONA MARBLE: Providing and fixing
3/8" thick Verona marble tiles of approved
quality and colour shade size on stairs as
specified in drawings in steps and risers
skirting and facing removal / tucking of
3 OR-3 existing plaster surface etc over 1/2" thick
base of cement mortar 1:3 setting mortar
base including fillings the joints and washing
the tiles with white cement , slurry current ,
finishing cleaning and polishing etc
complete . (a) for new work P.Sft 2664
S.S PIPE RAILING: Providing and fixing
S.S. pipe railing of 2" (50 mm) diameter,
comprising, vertical posts and horizontal
bracing of S.S. pipe of the same dia as
per design including cost of specials,
4 OR-4 bends, threading, cutting and making RFT 104.00
good the floor or wall of any kind in
cement concrete 1:2:4 etc. 'complete in
any floor

TOTAL OF GROUND FLOOR =


MEASURMENT SHEET OF TENNIS COURT
AT CMC LARKANA
S.No. Description No. Length Width Height Total Unit
SCHEDULE ITEM
QUANTITIES OF FOUNDATION
(I)Schedule Items: (except Steel fabrication,Steel Work,Steel grils,Marbel works,Glazed
tile Work,Aluminum Door& Window,G.I Door Frames
ITEM # 1
Trufing
2 26.00 66.00 - 3432.00 Sft
2 15.50 78.00 - 2418.00 "
TOTAL= 5850.00 Sft
ITEM # 2
Supply Manure
2 26.00 66.00 0.50 1716.00 Cft
2 15.50 78.00 0.50 1209.00 "
TOTAL= 1716.00 Cft
1 Cft = 24 Cart Load (Total Quantity / 24) 71.50 Cart Load
ITEM # 3
Excavation
SHORT WALL 4 30.67 6.67 5.00 4091.38 CFT
LONG WALL 2 40.67 6.67 5.00 2712.69 "
F1(RECTANGLE) 2 7.67 6.67 5.00 511.59 "
Court Area 1 78.00 36.00 1.33 3743.06 "
External P.B
EXTERNAL PLINTH BEAM 2 36.00 1.50 1.50 162.00
TOTAL= 11220.72 CFT
Deduction:
F1(RECTANGLE) 2 7.67 1.50 1.50 34.52 "
34.52 "
T= 11186.21 CFT
ITEM # 4
Lean Concrete 1:4:8
SHORT WALL 4 30.00 6.00 0.50 360.00 "
LONG WALL 2 40.00 6.00 0.50 240.00 "
F1(RECTANGLE) 2 7.00 6.00 0.50 42.00 "
total 642.00 Cft
Sitting area
tread 6 36.00 4.00 0.50 432.00
Riser 6 36.00 1.50 0.50 162.00
Riser 2 36.00 3.00 0.50 108.00
tread 2 36.00 2.00 0.50 72.00
total 774.00 Cft
External PB
EXTERNAL PLINTH BEAM 2 36.00 1.50 0.50 54.00 "
total 54.00 "
SUM OF ALL CONCRETE = 1470 CFT
ITEM # 5
RCC 1:2:4
Foundation Paid
SHORT WALL 4 30.00 6.00 1.25 900.00 CFT
LONG WALL 2 40.00 6.00 1.25 600.00 "
F1(RECTANGLE) 2 7.00 6.00 1.25 105.00 "
C1(RECTANGLE) 2 1.50 0.75 3.25 7.31 "
T= 1612.31 CFT
R.C.C WALLS OF SITTING
LONG WALL 2 34.50 0.75 3.25 168.19 CFT
SHORT WALL 2 40.00 0.75 3.25 195.00 "
T= 363.19 CFT
PLINTH BEAM
External PB
EXTERNAL PLINTH BEAM 2 36.00 0.75 2.00 108.00 CFT
Deduction:
C1(RECTANGLE) -2 1.50 0.75 2.00 -4.50
T= 103.50 CFT
SUM OF ALL CONCRETE = 2079 CFT
ITEM # 7
1:3:6 PLAIN CONC
EXTERNAL PLINTH BEAM 2 36.00 0.75 2.00 108.00 "
TOTAL= 108.00 CFT
Deduction:
C1(RECTANGLE) 2 1.50 0.75 2.00 4.50 "
TOTAL= 4.50 CFT
T= 103.50 CFT
ITEM # 8
Erection and Removal of Shuttering
External Plinth beam
EXTERNAL PLINTH BEAM 2 36.00 - 2.50 180.00 Sft
TOTAL= 180.00 Sft
ITEM # 9
Surplus(1/3 of Excavation) 1 3728.74 T= 3728.74 "
TOTAL= 3728.74 CFT
ITEM # 10
Earthfill From Outside
GROUND AREA 1 1008.00 6.00 6048.00 "
Deduction of Surplus Earth -3728.74 "
T= 2319.26 CFT
ITEM # 11
C.C Plain 1:5:10
Retiring Lounge 2 10.50 18.00 0.25 94.50 cft
T= 94.50 cft
ITEM # 12
Polythene Sheet singles layer(flooring)
Retiring Lounge and Sitting Area 1 1872.00 1872.00 Sft
ITEM # 13
Anti - Termite Treatment
GROUND AREA 1 1872.00 1872.00 SFT
T= 1872.00 SFT
QUANTITIES OF THE GROUND FLOOR
ITEM # 1
Concrete Ratio 1 : 1.5 : 3
Column
C1(RECTANGLE) 2 1.50 0.75 12.00 27.00 CFT
T= 27.00 CFT
Roof Beam
EXTERNAL BEAM 2 36.00 0.75 2.00 108.00 CFT
ROOM 2 12.75 0.75 2.00 38.25 "
A= 146.25 CFT
Ceiling slabs
sitting area
tread 12 36.00 4.00 0.25 432.00
Riser 12 36.00 1.50 0.50 324.00
Riser 2 36.00 3.00 0.50 108.00
Riser 2 36.00 2.00 0.25 36.00
B= 900.00 CFT
lintel
MAIN DOOR 2 5.00 0.75 0.75 5.63 "
DOOR 2 6 3.50 0.75 0.75 11.81 "
V1 2 6.00 0.75 0.75 6.75 "
C= 24.19 CFT
Sum A+B+C= 1097.44 CFT
ITEM # 2
Pucca Brick Works
External
EXTERNAL WALL 2 36.00 0.75 12.00 648.00 CFT
INTERNAL "
HARIZINTAL "
BATH 4 5.00 0.75 12.00 180.00 "
CHAN + LOCKERS 2 6.41 0.75 12.00 115.38 "
VERTICAL
BATH 1 5.00 0.75 12.00 45.00
CHAN + LOCKERS 1 5.00 0.75 12.00 45.00 "
T= 1033.38 CFT
DEDUCTION
MAIN DOOR 2 5.00 0.75 7.00 52.50 CFT
D2 6 2.50 0.75 7.00 78.75 "
V1 4 2.00 0.75 2.00 12.00 "
C1(RECTANGLE) 2 1.50 0.75 12.00 27.00 "
T= 170.25 CFT
T= 863.13 CFT
ITEM # 3
Plaster 1:6 & 1/2" thick
q INSIDE.
BATH 4 20 - 12.00 960.00 SFT
CHAN ROOM 2 21 - 12.00 504.00 "
ROOM 2 55.5 - 12.00 1332.00 "
ROOM 1 WALL 2 34.5 7.50 517.50
LOCKERS 2 13 - 12.00 312.00 "
DEDUCTION
MAIN DOOR -2 4.00 - 7.00 -56.00 "
D2 -6 2.50 7.00 -105.00 "
V1 -2 5.00 1.50 -15.00 "
T= 3449.50 SFT
B Plaster 1:4 & 1/2" thick (EXT.)
sitting area X - SECTION 4 210.00 840 SFT
WALL 2 36.00 12.00 864.00
DEDUCTION
MAIN DOOR -2 4.00 7.00 -56.00 "
T= 1648.00 SFT

Total (A+B) 5097.50 SFT


ITEM # 4
Plaster 1:4 & 1/2" thick (EXT.)
Same Quantity Item No 3 5097.5 SFT
ITEM # 5
Plaster 1:4 & 1/2" thick (CEILING)
ROOM 2 362.25 - 724.50 "
T= 724.50 SFT
ITEM # 6
Matt finish
Same Quantity of Item # 3 = 3450 sft
ITEM # 7
Weather Coat
same qty of item # 4 = 1648.00 sft
Total = 1648.00 sft
ITEM # 8
Primary Coat Chalk distemper
Same Quantity of Item # 5= 725 sft
ITEM # 9
2 coats distemper
Same Quantity of Item # 8 = 725 sft
ITEM # 10
First Class Deodar
MAIN DOOR 2 3.50 - 7.00 49.00 SFT
D2 12 2.50 - 7.00 210.00 "
V1 2 5.00 1.50 15.00 "
T= 274.00 SFT
ITEM # 11
French polishing
Twice of area of doors windows and vents 548.00 548 "
T= 548 SFT
ITEM # 12
MORTCE LOCK
Total= 4.00 Each
ITEM # 13
C.C FLOORING 1:2:4 (1.5" thick)
T= 500 SFT
ITEM # 14
False Ceiling
Retiring Lounge 2 12.75 29.00 - 740 Sft

T= 740 Sft
(II)Schedule Items Marbel works,Glazed tile Work,As per notification 2017 At Par
ITEM # 1
Glazing tiles 6"x6"x1/4" on floor
BATH 4 5.00 5.00 - 100 Sft
Dado
BATH 4 20.00 - 5.00 400 "
T= 500 Sft
(III)Schedule Items: Fabrication of steel work Steel Grill steel Grated Foor & other Steel Works.
ITEM # 6
Steel
Total sum of R.c .c concrete = 2079 cft
2079 Cft

We take 8% of RCC conrete = 166 Cwt


ITEM # 1
Steel
Qty % of steel CWT
A Column 27 6% 2
C Lintel 24 2% 0.5
D Roof Beams 146 10% 15
E Slab 900 5.69% 51
T= 68 CWT
NON SCHEDULE ITEM
QUANTITIES OF FOUNDATION
ITEM # 1
Dacca Grass
2 26.00 66.00 - 3432.00 Sft
2 15.50 78.00 - 2418.00 "
TOTAL= 5850.00 Sft
ITEM # 2
Compaction
Court Area 1 78 36 2808 Sft
T= 2808.00 Sft
ITEM # 3
Stone Soling
Court Area 1 78 36 0.75 2106 Cft
T= 2106.00 Cft

ITEM # 4
Lean 1:9
Court Area 1 78 36 0.25 702 Cft
T= 702.00 Cft
ITEM # 5
C.C Plain 1:1.5:3
Court Area 1 78 36 2808 SFT
T= 2808.00 SFT
QUANTITIES OF THE GROUND FLOOR
ITEM # 1
Porcelain Tiles
ROOM 2 268.79 - 537.58 "
T= 537.58 SFT

ITEM # 2
Porcelain Tiles skirting
CHAN 2 18 - 0.33 11.99 SFT
Room 2 86.25 - 0.33 57.44 "
DEDUCTION "
MAIN DOOR -2 4.00 - 0.33 -2.66 "
D2 -3 2.50 - 0.33 -2.50 "
T= 64.27 SFT
ITEM # 3
Verona Marble
Sitting Area 12 36.00 4.00 - 1728 SFT
Sitting Area 2 36.00 2.00 - 144
Riser 2 36.00 2.00 - 144
Riser 12 36.00 1.50 - 648
T= 2664.00 SFT
ITEM # 4

Supplying & installation of plexipave 10.3


system plexipave tournament from M/S
plexipave USA official surface provider of
the Australian open tennis the system
consists of 10 layers giving it total
thickness of approx 4 mm
Tennis Court 1 130.00 66.00 8580 Sft

8580 Sft
ITEM # 5
Steel stair railing
Railing
4 26.00 - - 104 Rft

104 Rft
ITEM # 6
Chairs T= 71 No
BILL OF QUANTITIES OF
TENNIS COURT AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
2 (B) SCHEDULE OF ITEM (B), PLUMBING WORKS
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
1 Providing & fixing 1/2" dia, lead connection complete with a
1/2" dia brass stop cock, two brass nuts & lining jointed to lead
pipe with plumber wiped solder joints 1/2" inches lead pipe to
be of not less than 4lbs per lineal yard (S.I. No. 22/P-6).
Each 6 689.70 4,138
2 Providing & fixing M.S clamps of the approved design to 4" i/c
the cost of cutting and making good to wall or M.S bolts and
nuts, 4" into wall including pipe distance pieces extra painting
to match the colour of the building (S.I. No. 2/P-9). Each 8 72.16 577
3 Providing & fixing M.S clamps of the approved design to 3" i/c
the cost of cutting and making good to wall or M.S bolts and
nuts,3" into wall including pipe distance pieces extra painting to
match the colour of the building (S.I. No. 14/P-10).
Each 8 264.00 2,112
4 (b) S/Fixing concealed Tee stop cock of superior quality with
c.p head 1/2" dia (S.I.No. 14(A)/P-18). Each 10 1097.00 10,970
5 (b) S/Fixing long bib-cock of superior quality with c.p head 1/2"
dia (S.I. No. 13(a)/P-19). Each 10 1109.46 11,095
6 Supplying & fixing 6" x 4" earthen gully trap with 4" outlet
complete with 4" thick 1:2:4 C.C for bed & 1/2 thick cement
plaster (1:3) to the karb C.I grating 6" x 6" and C.I. cover and
frame 12"x12" (inside) etc Complete (b) earthen ware glazed Each 4 1220.67 4,883
7 Constructing manhole or inspection chamber for the required
diameter of circular sewer and 3’-6”(1067mm) depth with walls
Each 4 14748.00 58,992
of B.B in cement sand mortar 1:3 cement plastered 1:3,1/2”
8 Providing and fixing chrome plated brass towel rail complete
with brackets fixing on wooden cleats with 1" long C.P brass
Screws.(I) Towel rail 36" long (a) 3/4" dia round or square
(standard pattern) (S.I. No.1(i)(a)/P-7). Each 4 1269.95 5,079.80
10 Supplying & fixing soap tray of made of plastic of superior
quality and design with fine finishing with c.p screws etc
complete (S.I. No.6/P-8). Each 4 169.40 677.60
11 Providing & fixing C.P muslim shower with double bib cock &
ring pipe (S.I. No.19(a)/P-19). Each 4 3432.00 13,728
12 Supplying & fixing ball valves (china ) (S.I. No.5/P-18)
i) 3/4" dia Each 4 271.92 1,087.68
ii) 1" dia Each 3 365.42 1,096.26
14 Supplying & fixing telephonic shower with ring pipe etc
complete (S.No 20 / P-19) Each 4 1122.00 4,488.00
17 Supplying & fixing wash basen mixture of superior quality with
c.p head 1/2" dia
(S.I. No.14 b /P-19) Each 4 3179.00 12,716.00
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
18 Providing and fixing orisa type white or color glazed earthen
ware w.c pan with cost of low level plastic flush tank of 3
gallons capacity of approved quality i/c making requiste
numbers of holes in walls , plinth & floor and making good in
cement concrete 1:2:4
W.C pan orisa type 23" with plastic tank of low down 3 gallons
C.I trap & C.I thumble (Superior Quality )
With 4" dia. earthen ware trap and plastic thumble (S.No 3 / P-
2)
Each 2 6166.60 12,333
19 Providing & fixing 24" x 18" lavatory basin in white glazed
earthen ware complete with and including the cost of W.I or C.I
cantilever brackets 6 inches built into wall, painted white in to
two coats after a primary coat of red lead paint , a pair of 1/2"
dia rubber plug & chrome plate brass chain 1-1/4" dia
malloable iron or c.p brass traps malloable iron or brass unions
and making requiste number of holes in wall plinth & floor for
pipe connection and making good in cement concrete 1:2:4
(Standard pattern ) (S.No 8 / P-3 )
Each 4 4253.90 17,016
20 Providing & fixing European type white glazed earthen ware
wash down w.c pan complete with including the cost of white /
black plastic seat ( Best Qty ) and lid with c.p brass hinges best
quality and buffers 3 gallons plastic flushing cistern with
internal fitting with fitting clamp 3/4" dia. and cutting and
making requistic number of holes in walls, plinth and floor for
pipe connection and making good in cement concrete 1:2:4
( S.No 4 / P-2 )
Each 2 5339.40 10,679
21 Add extra for labour for providing and fixing of earthen ware
pedestal white or coloured glazed (S.No 9 / P-3 ) Each 4 938.47 3,754
22 Providing and fixing 15" x 12" bavelled edge mirror of belgium
glass complete with 1/8" thick hard board and c.p screws fixed
to wooden pleat
(b) Superior Quality (S.No 4(b) / P - 7 ) Each 6 2047.76 12,287
Total Of Schedule Items = 187,708
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
4 (B) NON SCHEDULE OF ITEM (B), PLUMBING WORKS
1 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.
(a) Elbow / Bend 110 mm or 4" dia Each 4
(b) Elbow / Bend With Door 110 mm or 4" dia Each 4
(c) Tee 110 mm dia Each 3
(d) Socket 110 mm dia Each 4
(e) UPVC Tee With Door 110 mm dia Each 5
2 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.
(a) Elbow / Bend 75 mm or 3" dia Each 4
(b) Tee 75 mm dia Each 2
(c) Socket 75 mm dia Each 3
(d) UPVC Tee With Door 75 mm dia Each 4
3 Providing & laying PPR PN-20 (Dadex or approved by engineer
incharge) pipe with all fittings i.e socket, bend tee, elbow where
required.(for cold water pipe )
(a) 20mm (3/4") dia PPR Rft 200
(b) 1 mm ( 1" ) Rft 150
4 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and rubber ring
all as specified including socket, bend, tee all fittings 4" dia
(110 mm) etc complete. Rft 270
5 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and rubber ring
all as specified including socket, bend, tee all fittings 3" dia (75
mm) etc complete.
Rft 215
6 Supply & fix UPVC Dadex or approved by engineer incharge
vent cowel 110mm (4" dia) on top of vent pipe.
Each 35
7 Supply & fix UPVC Dadex or approved by engineer incharge
vent cowel 110mm (3" dia) on top of vent pipe. Each 35
8 Providing & fixing UPVC floor trap(DADEX or approved by
engineer incharge) with 4" dia inlet and 4" dia outlet of the
approved self cleaning design with a UPVC Grating with or
without a vent arm i/c cost of making requisite number of holes
in walls plinth and floor for pipe connectons and making good
cement concrete 1:2:4.

Each 4
9 Providing UPVC pipe with collars class "B" and digging the

trenches to required depth and fixing imposition i/c cutting,

fitting & jointing with maxphalt composition & cement mortar

1:1 and testing with water pressure to a head of 4 feet above

the top of the highest pipe and refilling with excavated staff.
a.9" dia RCC Pipe Class B Rft 350
Total
BILL OF QUANTITIES OF
TENNIS COURT AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
SCHEDULE ITEM ELECTRICAL WORKS

S.NO DESCRIPTION OF WORK UNIT RATE QTY AMOUNT

1 Wiring for light or fan point with (3/.029) PVC


insulated wire in 20mm (3/4") PVC conduite
recessed in the wall or column including ECC Wire Point 1130 178 201140
(1mm)² (S.no.124,Pg-15)

2 wiring for plug point (3/.029) PVC insulated wire in


20mm (3/4") PVC conduite recessed in the wall or
column as/ required including 1mm² PVC insulated Point 985 44 43340
wire ECC as required (S.no.126,Pg-15)

3 P/Laying (Main or Sub Main) Pvc insulated with 2


core copper conductor 300/500 volts size (6mm²) in
25mm (1") PVC conduite under ground Mtr 500 60 30000
(S.no.100,Pg-12) From Main D.B to LGF DB-1,2

4 P/Laying (Main or Sub Main) Pvc insulated with 4


core copper conductor 300/500 volts size (6mm²) in Mtr 500 50 25000
25mm (1") PVC conduite under ground
5 (S.no.100,Pg-12) From Supply Point to Main D.B
Providing and fixing one way SP 5 amp switch flush
type on metal board & covered with plastic sheet No. 54 178 9612
(S.no.219, Pg-33)
6 Providing and fixing two pin 5 amp plug & socket
switch flush type on metal board & covered with No. 83 12 996
plastic sheet (S.no.225, Pg-33)
7 Providing and fixing three pin 5 amp plug & socket
switch flush type on metal board & covered with No. 151 32 4832
8 plastic sheet
Providing and(S.no.226, Pg-33)
fixing bakelite / Plastic ceiling rose
with two terminals(S.no.228, Pg-33) No. 72 2 144
9 Providing & Fixing B.C Brass / Pvc batten holder (S.
No 2, Pg-14) No. 54.79 150 8218.5
10 Providing & Fixing on given Pole Flood Light 400 w
(HPIT) having IP65 classification with 400 w lamp, No. 16980 24 407520
choke, capacitor, igniteretc & internal wiring
11 complete in all respect at the height up to 40 ft with
Providing & Fixing energy saver superior quality 25w
& fixing on existing holder etc complete (S. No 6, No. 497 150 74550
Pg-33)
12 Providing and fixing ceiling fan 56" good quality
No. 3185 26 82810
(S.no.235, Pg-34)
Sub-TOTAL AMOUNT OF SCHEDULE ITEMS 888162.5
NON SCHEDULE ITEM ELECTRICAL WORKS
1 Providing and fixing 4 1/2" x 4 1/2" ms di casted
powder coated recessed type fan clamp box with
3/8" dia ms bar fan clamp fixed on roof at casting No. 26
time as required
2 Providing and fixing 6 A piano fan dimmer fixed on
plastic or fiber top cover sheet on 14 swg metal
board recessed in the wall or collumn including No. 26
connection

3 Providing and fixing 30 cm (12") sweep metalic body


exhaust fan complete with blades, motor, shutter etc
including making hole in the wall & connection with
14.0076 flexible wire complete as required Millat / No. 2
Pak /Asia / Climas / Younas / Royal.

4 Providing & Fixing Ms Tubilor Pole 10 Mtr Heigh


complete with base plate & 1" dia wholes (4 nos),
Ms (suitable for holding 6 nos flood light dully
painted with 2 coats of aluminium paints after
No. 4
applying anti currosive paint including making cc
foundation and 4 nos 3/4" dia foundation boalts &
nuts

5 Providing and fixing Earthing set with 2'x2'x1/8"


copper plate buried in the ground at a depth of 12
feet or less if water comes out from the ground level
(salt & charcoal, or earthing chemical powder) etc.
making the pit 12 feet deep by excavation of all type
of soil (except soft or hard rock) including fixing of Job 1
2x8 SWG copper wire in 1/2" dia GI conduit
complete in as respect as required.

DISTRIBUTION BOARD

15 A SP mcb (pp & pump) 02 NO


6 Incoming:- 2
40 A DP MCB 02 No (Terasaki)
Indicating lamp 03 No
Out going:-
10 A SP MCB 28 No (Terasaki)
7 MAIN DB (14 KW)
Providing & Fixing, testing,commissioning cubical
type metal sheet distribution board flush type with
locking arrangement duly powder quoted paint
including all fastening material including wiring with
suitable gauge PVC wire complete in all respect
(Pel, Libra, Rco, Karimi, Industrial Power Tech,
Global Tech).
Incoming:- NO 1
30 ampTp mccb 01 no
Volt meter with selector 01 no
Ampere meter with selector 01 no
Indicating lamp 03 nos
TOTAL AMOUNT
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
1.DACCA GRASS
Supply live (Dacca) grass in slabs with earth intact
including all lead and lifts.

DETAIL OF COST FOR 1.00 SQFT OR 1 SQM.


UNIT SQFT.

LABOUR

1962 Grass Dacca. 1.00 Sq.ft. 19.50 Day 19.50


Cartage of material. Lump sum 1.30
Rs. 20.80
Total Rs. 20.80
Add 10 % Contractor profit. Rs. 2.08
Total Rs. 22.88
Add 7.5% Income Tax Rs. 1.72
Cost of 1.00 Sqft. Rs. 24.60
F P S Cost in Final Cost Units. Rs. 24.60 Per 1 Sqft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
2.COMPACTION
Rolling the surface dry with light power roller (upto
6 tons or 6.09 m. ton) as directed by the Engineer-
in-charge.

DETAIL OF COST FOR 100 SQFT. OR 9.29


Sq.m. UNIT 100 SQFT.

LABOUR

9130 Road roller 6 Ton capacity, hire charges. 0.01 No. 4,550.00 Day 45.50
9003 Beldar 0.02 No. 455.00 Day 9.10
9027 Coolie (boy or girl). 0.02 No. 455.00 Day 9.10
Sundries/Labour. Lump sum. 32.50
Total Rs. 96.20
Total Rs. 96.20
Add 0.50 % Water Charges. Rs. 0.48
Add 10 % Contractor profit. Rs. 9.62
Total Rs. 106.30
Add 7.5% Income Tax Rs. 7.97
Cost of 100 Sqft. Rs. 114.27
F P S Cost in Final Cost Units. Rs. 114.27 Per 100 Sq.ft.
F P S Cost in Final Cost Units. Rs. 1.14 Per Sq.ft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
3.STONE SOLING
Providing and laying soling stones 6 inches to 9
inches (152 mm to 229 mm) size under floors
including packing with spawls and chips and
consolidating etc. complete.

DETAIL OF COST FOR 100 CFT OR 2.83 CUM.


UNIT 100 CFT.

MATERIAL
Soling stone 6" to 9" (152 mm to 229 mm) size. =
100 Cft. Add extra for voids 16.67 %. 1.17 %Cft 2,250.00 %Cft 2,632.50
Total (A) Rs. 2,632.50
LABOUR
Beldar. 2.00 Nos. 437.50 Day 875.00
Bhishti with mashak. 0.25 No. 500.00 Day 125.00
Sundries / Labour. Lump sum 12.50
Total (B) Rs. 1,012.50
Total A +B Rs. 3,645.00
Add 1.50 % Water Charges. (1% for constructional
and 0.5% drinking purpose) Rs. 54.68
Add 10% Contractor profit. Rs. 364.50
Total (C) Rs. 4,064.18
Add 7.5% Income Tax Rs. 304.81
Cost of 100 Cft. Rs. 4,368.99
F P S Cost Per 100 Cft Rs. 4,370.00 Per 100 Cft.
F P S Cost Per Cft Rs. 43.70 Per Cft
Say Rs. 44.00 Per Cft
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
4.C.C 1:9
Providing and laying 1:9 (1 cement 9 screened
bajri) cement concrete using 3/4 inch (19 mm) and
down gauge screened bajri in foundation including
levelling, compacting and curing etc. complete .

DETAIL OF COST FOR 100 CFT. OR 2.83 Cu.m.


UNIT 100 CFT.

MATERIAL

2390 Grey cement Portland 11.67 Cft. 9.73 Cwt. 537.50 Cwt. 5,229.88
0017 Screened graded bajri 3/4" 19 mm & down gauge.
1.05 % Cft 2,835.00 % Cft 2,976.75
cartages L.S 30.00
Total (A) Rs. 8,236.63
LABOUR

For concreting work by using concrete mixer.


9053 Mason (second class for block, brick and concrete
work). 0.25 No. 687.50 Day 171.88
9026 Concrete lifter. 0.50 No. 500.00 Day 250.00
9102 Concrete filler. 0.25 No. 500.00 Day 125.00
9027 Coolie (boy or girl) 3.00 Nos. 437.50 Day 1,312.50
9005 Bhishti with mashak. 0.75 No. 500.00 Day 375.00
9057 Mate. 0.06 No. 500.00 Day 30.00
9156 Concrete mixer (MECH), hire charges. 0.05 No. 10,000.00 Day 500.00
Total (B) Rs. 2,764.38

Sundries/Labour. Lump Sum 80.00


Total (C) Rs. 80.00

Total A + B + C Rs. 11,081.00


Add 1.50 % Water Charges. Rs. 166.22
Add 10% Contractor's Profit Rs. 1,108.10
Total (D) Rs. 12,355.32
Add 7.5% Income Tax Rs. 926.65
Cost of 100 Cft. Rs. 13,281.96
F P S Cost Per 100 Cft Rs. 13,281.96 Per 100 Cft.
F P S Cost Per Cft Rs. 132.82 Per Cft
Say Rs. 133.00 Per Cft
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
5.C.C 1:1.5:3 (SPECIAL FLOOR)
Providing and laying 4" (102 mm) thick not leaner
than 1:1.5:3 cement concrete (minimum works
cube crushing strength of 5000 Lbs. PSI (158 Kg.
per Sq.cm. at 28 days) in courts, gymnasium
floors, squash court etc. using crushed graded
boulders 3/4" and down guage and approved
admixture @ 0.5 litres per bag or recommended
by the manufacturer including cost of necessary
form work and its removal, compacting with
vibrators (immersion or screen or both) and proper
levelling the surface with power float, and curing
etc. complete and as per direction of engineer
incharge

DETAIL OF COST FOR 100 SQFT OR 9.29


SQM. UNIT 100 SQFT.

Cubical content of 4" concrete slab 100 x 1/3 =


33.34 Cft. Say 33 Cft. Quantity Same as item No.
5 of this S.H "Cement concrete cost in situ in
foundation and planth"

MATERIAL

2390 Grey cement portland. 7.19 Cwt. 590.00 Cwt. 4,242.10


Admixture 3.60 litres 100.00 P.litre 359.50
0009 Sand local. 0.14 %Sft. 1,333.33 %Sft. 181.33
0017 Crushed graded boulders 3/4" = 19 mm and down *
gauge (malir). 0.27 %Sft. 1,733.33 %Sft. 473.20
1273 Wood partal (phares). 10.07 Sft. 300.00 Sft. 3,021.00
1901 Sawing chrages for partal wood. 10.07 Sft. 18.00 Sft. 181.26
* Timber can be used 20 times. Hence cost per
operation, necessitated to divided by 20.
Carriage : timber upto 350 Km lead machnical. 0.09 %Sft. 54.35 %Sft. 4.89
Sundries / Miscellenious Lump sum 20.00
Sundries / labour. Lump sum 60.00
Total (A) Rs. 8,543.28
LABOUR

9053 Mason (second class for block, brick am concrete


work). 0.08 No. 1,200.00 Day 96.00
9026 Concrete lifter. 0.17 No. 800.00 Day 133.36
9102 Concrete filler. 0.08 No. 800.00 Day 66.40
9027 Coolie (boy or girl). 1.00 No. 700.00 Day 700.00
9005 Bhishti with mashak. 0.25 No. 800.00 Day 200.00
9057 Mate. 0.02 No. 800.00 Day 16.00
9156 Concrete mixer (mech.), hire charges 0.02 No. 15,000.00 Day 250.05
9020 Carpenter (centering) 0.33 No. 1,200.00 Day 399.60
9003 Beldar. 0.58 No. 800.00 Day 466.40
9109 Screen vibrator. 0.01 No. 800.00 Day 5.36
9154 Vibraotor (immersion), hire charges. 0.01 No. 5,000.00 Day 33.50
9096 Hire charges, power float. 0.01 No. 5,000.00 Day 33.50
9003 Beldar. 0.17 No. 800.00 Day 133.36
9027 Coolie (boy or girl). 0.17 No. 700.00 Day 116.69
9053 Mason (second class for block, brick am concrete
work). 0.01 No. 1,200.00 Day 8.04
Total (B) Rs. 2,658.26
Total A + B Rs. 11,201.54
Add 1.50 % Water Charges. Rs. 168.02
Add 10 % Contractor profit. Rs. 1,120.15
Total Rs. 12,489.72
Add 7.5% Income tax Rs. 936.73
Cost of 100 Sqft. Rs. 13,426.45
F P S Cost in Final Cost Units. Rs. 13,426.45 Per 100 Sqft.
S I Cost in Final Cost Units. Rs. 134.26 Per Sqft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
6.PORCELAIN TILES
Providing and laying Procelain tiles laid in cement
mortar or lime mortar 1:2 as per approved quality
& design complete. size 16" x 16"

DETAIL OF COST FOR 100 SQFT. OR 9.28


SQM. UNIT 100 SQFT.

MATERIAL

Procelain tile 16" x 16" = upto 3/8'' thick. i/c 3%


0111a wastage. 103.00 Sq.ft 110.00 Sq.ft 11,330.00
2413 Mortar / cement , sand 1:2. 9.00 Cft. 255.83 Cft. 2,302.47
2391 White cement (Anwarzeb). 0.13 Cwt. 1,029.04 Cwt. 133.77
2356 Pigment of any colour. 1.40 Lbs. 225.00 Lbs. 315.00
2390 Cement Portland (grey cement). 1.75 Cwt 537.50 Cwt 940.63
Cartage of tiles. Lump sum. 25.00
Total (A) Rs. 15,046.87
LABOUR

Tile layer 3.00 No. 1,000.00 Day 3,000.00


Coolie (boy or girl). 2.00 No. 437.50 Day 875.00
Bhishti with mashak. 0.06 No. 500.00 Day 30.00
Total (B) Rs. 3,905.00
MISCELLANEOUS

Sundries/ Miscellaneous. Lump sum. 50.00


Total (C) Rs. 50.00
Total A + B + C Rs. 19,001.87
Add 1.50 % Water Charges.(for constructional and
drinking purpose) Rs. 285.03
Add 10% Contractor's Profit Rs. 1,900.19
Total (D) Rs. 21,187.08
Add 7.5% Income Tax Rs. 1,589.03
Cost of 100 Sqft. Rs. 22,776.12
F P S Cost in Final Cost Units. Rs. 22,776.12 Per 100 Sqft.
Per Sft Rate Rs. 227.76 Per Sqft.
Say Rs. 228.00 Per Sqft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
7.PORCELAIN TILES SKIRTING
Providing and fixing Procilain tileupto 3/8'' thick of
8"x 10" (203mm x 254mm) size in dado and
skirting in over 1/2" (13mm) thick base of cement
mortar 1:3 setting of tiles in slurry of grey cement
over mortar base including filling the joint with
white cement and washing the tile, curing and
cleaning etc. complete

DETAIL OF COST FOR 100 SQFT. OR 9.29


SQM. UNIT 100 SQFT.

MATERIAL

Porcelain tiles white 8"x10" = 203 x 254 mm, up


to 3/8'' thick. i/c wastage. 103.00 Sft. 140.00 Sft. 14,420.00
2415 Mortar / cement , sand 1:3. 5.61 Cft. 197.81 Cft. 466.52
2391 White cement (Anwarzeb). 0.14 Cwt. 1,029.04 Cwt. 115.25
2390 Cement Portland (grey cement). 1.00 Cwt 537.50 Cwt 430.00
Cartage of tiles. Lump sum. 200.00
Total (A) Rs. 15,631.77
LABOUR

9087 Tile layer (floor, walls & marble work). 3.50 No. 875.00 Day 2,450.00
9027 Coolie (boy or girl). 1.75 No. 437.50 Day 612.50
9005 Bhishti with mashak. 0.06 No. 500.00 Day 24.00
Total (B) Rs. 3,086.50
MISCELLANEOUS

Sundries/ Miscellaneous. Lump sum. 50.00


Total (C) Rs. 50.00
Total A + B + C Rs. 18,768.27
Add 1.50 % Water Charges. Rs. 281.52
Add 10 % Contractor's Profit. Rs. 1,876.83
Total (D) Rs. 20,926.62
Add 7.5% Income Tax Rs. 1,569.50
Cost of 100 Sqft. Rs. 22,496.12
F P S Cost in Final Cost Units. Rs. 22,496.12 Per 100 Sqft.
Per Sft. Rs. 224.96 Per Sq.m.
Say Rs. 225.00 Per Sqft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
8.VERONA MARBLE
Providing and fixing 3/8" thick Verona marble tiles
of approved quality and colour shade size on
stairs as specified in drawings in steps and risers
skirting and facing removal / tucking of existing
plaster surface etc over 1/2" thick base of cement
mortar 1:2 setting mortar base including fillings the
joints and washing the tiles with white cement ,
slurry current , finishing cleaning and polishing etc
complete . (a) (12" x 12") for new work

DETAIL OF COST FOR 100 SQFT. OR 9.28


SQM. UNIT 100 SQFT.

MATERIAL

1133 Marble stone Verona. 102.00 Sq.ft 60.00 Sq.ft 6,120.00


2393 Mortar /Cement sand 1:2. 9.00 Cft. 113.38 Cft. 1,020.38
2391 White cement (Anwarzeb). 0.13 Cwt. 1,029.04 Cwt. 133.77
2390 Cement Portland (grey cement). 1.75 Cwt 537.50 Cwt 940.63
Bailgari / gum/gum resin. Lump sum. 30.00
Total (A) Rs. 8,244.77
LABOUR

9049 Marble chiseller. 0.50 No. 875.00 Day 437.50


9123 Floor grinder with machine, hire enrages. 0.16 No. 1,000.00 Day 160.00
9112 Tile layer 2.00 No. 1,000.00 Day 2,000.00
9003 Beldar. 2.00 No. 437.50 Day 875.00
9028 Coolie (female) 2.00 No. 437.50 Day 875.00
9035 Floor grinder. 1.00 No. 750.00 Day 750.00
9059 Mistry. 0.25 No. 625.00 Day 156.25
9005 Bhishti with mashak. 0.25 No. 500.00 Day 125.00
Total (B) Rs. 5,378.75
MISCELLANEOUS

Sundries/ Miscellaneous. Lump sum. 100.00


Total (C) Rs. 100.00
Total A + B + C Rs. 13,723.52
Add 1.50 % Water Charges. Rs. 205.85
Add 10 % Contractor's Profit. Rs. 1,372.35
Total (D) Rs. 15,301.73
Add 7.5% Income Tax Rs. 1,147.63
Cost of 100 Sqft. Rs. 16,449.36
F P S Cost in Final Cost Units. Rs. 16,449.36 Per 100 Sqft.
Per Sft. Rs. 164.49 Per Sq.ft
Say = 164.50 Per Sq.ft
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
9.S.S RAILING
Providing and fixing S.S. pipe railing of 2" (50 mm)
diameter, comprising, vertical posts and horizontal
bracing of S.S. pipe of the same dia as per design
including cost of specials, bends, threading,
cutting and making good the floor or wall of any
kind in cement concrete 1:2:4 etc. 'complete in
any floor.

DETAIL OF COST FOR 46.70 RFT. OR 14.23


RUM. UNIT RFT.

Considering a railing 10' long and 2'-6" high

MATERIAL

S.S Pipes dia 2" = 51 mm (10 S.W.G) (2.54 mm


thick).
Vretical post 5 x 2'-10" = 14.20 Rft.
Horiz: brasses: 3 x 4' x 2'-3-1/2" = 27.50 Rft.
Arm 2 x 2 x 1'-3" = 5.00 Rft.
= 46.70 Rft.
Add 5% wastage = 2.30 Rft.
= 49.00 Rft.
S.S. Pipes dia 2" = 51 mm (10 S.W.G) (2.54 mm
thick). 49.00 Rft. 330.00 Rft. 16,170.00
S.S. tee dia 2" = 52 mm. 7.00 Nos. 293.75 Each 2,056.25
Mortar / Cement, sand 1:4 0.50 Cft. 165.07 Cft. 82.53
S.S. cross dia 2" = 52 mm. 8.00 Nos. 641.25 Each 5,130.00
White lead and hessian Lump sum. 25.00
Total (A) Rs. 23,463.78
LABOUR

Plumber (second class). 1.50 No. 500.00 Day 750.00


Mason (1st class for block brick and concrete
work). 0.25 No. 812.50 Day 203.13
Beldar 2.00 No. 437.50 Day 875.00
Total (B) Rs. 1,828.13
MISCELLANEOUS

Hire charges of die / tools / cement gun etc. Lump sum. 150.00
Cartage of S.SPipes & special. Lump sum. 200.00
Total (C) Rs. 350.00
Total A + B + C Rs. 25,641.91
Add 0.50 % Water Charges. Rs. 128.21
Add 10 % Contractor's Profit. Rs. 2,564.19
Total (D) Rs. 28,334.31
Add 7.5% Income Tax Rs. 2,125.07
Cost of 46.70 Rft. Rs. 30,459.38
F P S Cost in Final Cost Units. Rs. 652.24 Per Rft.
MATERIAL CARTAGE STATEMENT TENNIS COURT CMCLARKANA
(1) (Foundation)

Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Ton % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17

1 Cement Concrete( 1:4:8) 1470 9.60% 141 48.0% 706 96.0% 1411 - - - -
3 Cement Concrete ( 1:2:4 ) 2079 17.60% 366 44.0% 915 88.0% 1830 - -
4 Cement Concrete( 1:3:6) 104 13.0% 13 46.0% 48 - - 92.0% 95 - -
5 3" Thick Flooring 95 17.60% 17 44.0% 42 88.0% 83 - -
6 Fabrication of steel 166 - - - - - - - 8.32 1350% - 5% 8
Total Quantities :- 537 1710 1411 2016 8

Rate as per R.A.A 168.33 4418.68 2139.48 2139.48


Amount :- 90412 75540 30192 43137

Total Amount :- 239,280


MATERIAL CARTAGE STATEMENT TENNIS COURT CMC LARKANA
(2) (Ground Floor)

Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17

1 R.C.C 1:1.5:3 1097 21.91% 240 41.1% 451 - - 82.00% 900


4 Cement plaster (1:6 )1/2" thick 5098 1.16% 59 8.70% 443 - - - - - - - -
2 Cement plaster (1:4 )1/2" thick 725 0.53% 4 4.00% 29 - - - -
3 Cement plaster(1:4) 3/8" thick 5098 0.57% 29 3.00% 153 - - - -
6 Fabrication of steel 68 - - - - - - - 3 5% 3
7 Brick Masonary (1:4) 863 4.80% 41 24.0% 207 1350% 11652.26
Total Quantities :- 332 1076 0 900 11652.26 3

Rate as per R.A.A 168.33 4418.68 2139.48 2139.48 721.74 3253.63


Amount :- 55966 47564 0 19253 8410 11052.38

Total Amount :- 142,245


REHABILITATION OF
GYMNASIUM
BILL OF QUANTITIES OF
REHABILITATION OF GYMNASIUM AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
PART-A: SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
1 SCH/C2/ Dismantling C C Plain Dismantling
(S.I. No. C C Plain 1:2:4
19(c)/P-10) %cft 3327.50 1650.00 54,904

2 SCH/C9/ Cement plaster


(S.I. No.
13(c)/P-52) %Sft 2590.50 2000.00 51,810
Cement plaster 1:6 3/4" thick
3 SCH/C9/ Primary coat of Chalk under
(S.I. No.
23/P-53) distemperPrimary coat of Chalk under %Sft 442.75 14000.00 61,985
distemper (for ceiling)
4 SCH/C9/ Distempering (c) three
(S.I. No.
24/P-53) coatsDistempering (c) three coats.(for %Sft 1079.65 14000.00 151,151
ceiling)

5 SCH/C9/ matt finish Preparing the surface and


(S.I. No.
36(a)/P-54) painting with matt finish i/c rubbing the
surface with bathy (Silicon carbide rubbing
brick) filling the voids with
zink/chalk/plaster of paris mixture, applying
%Sft 3444.38 13911.84 479,177
first coat premix making the surface
smooth and then painting 3 coats with matt
finish of approved make etc: complete ( 3
coats )

6 SCH/C9/ weather coat Preparing the surface and


(S.I. No.
38(b)/P-55) painting with weather coat including
rubbing the surface with rubbing brick /
sand paper filling the voids with chalk / %Sft 2567.95 8011.99 205,744
plaster of paris and then painting with
weather coat of approved make.
3 coats (S.I No. (B) 38/P-55).
7 Highways/ Thermo Plastic Paint
(S.I. No. Pavement marking in Reflective Thermo
13/P-15) Plastic Paint for Lines of 6" Width. P.Rft 41.24 500.00 20,620
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
8 SCH/C17/ Aluminum channels for Door
(S.I. No. Supplying and fixing in
83(a)/P-108) position aluminum channels framing for
hinged doors of alcop made with 5mm
thick tinted glass glazing (belgium) and
alpha (japan) lock i/c handles stoppers P.Sft 1450.76 119.00 172,640
etc,

9 SCH/C17/ Aluminum channels for window


(S.I. No.
84(a)/P-108) and Ventilator Supplying
and fixing in position aluminum channels
framing for sliding windows and P.Sft 1592.69 464.00 739,008
ventilators of alcop made with 5mm thick
tinted glass glazing (belgium) and alpha
(japan) lock i/c handles stoppers etc,
10 SCH/C8/ Glazed tile
(S.I. No.
28/P-43) Laying floor of approved coloured with
glazed tile 1/4" thick in white cement 1:2 %Sft 27747.06 61.25 16,994
over 3/4" thick cement mortar 1:2
complete.(S.I. No. 25/P-43)
11 SCH/C8/ Glazed tile dado
(S.I. No.
38/P-45) Glazed tile dado 1/4" thick laid in
pigment over 1:2 cement sand mortar %Sft 28299.30 339.49 96,072
3/4"thick including finishing.(S.I. No. 38/P-
45)

G.I Frame
Providing & fixing G.I frames/choukhats of
SCH/C17/ size 7"x2" or 4 1/2"x3" for door using 20
ITEM guage G.I sheet i.e welded hinges and fixing
12 P.Rft 228.90 49.50 11,331
no.29-/ at site with necessary hold fasts, filling with
P-93 cement sand slurry of ratio 1:6 and
repairing the jambs. The cost also i.e all
carriage, tools and plants used in making
and fixing
PART-A (SCHEDULE ITEMS) TOTAL IS = 2,061,436
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
PARTA: NON-SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
C.C Flooring
Providing and laying 4" (102 mm) thick not
leaner than 1:1.5:3 cement concrete
(minimum works cube crushing strength of
5000 Lbs. PSI (at 28 days) in tennis court
etc. compacting with vibrators (immersion
or screen or both) (with admixture) of
required thickness power float finished for
1 OR-1 perfect floor level etc complete and as per Sft 5000.00
direction of engineer in charge.

Procelain tiles
Providing and laying Procelain tiles laid in
cement mortar or lime mortar 1:2 as per
2 OR-2 approved quality & design complete. size Sft 900.72
16" x 16"

veneered flush
Providing and fixing solid core 1st class
deodar wood veneered flush door shutter
1-1/2 inches (38 mm) thickness with and
including the cost of commercial veneer
facing of not less than 1 mm thickness on
either side, cross band of standard
specification with solid fully laminated core,
2 inches (51 mm) wide best quality deodar
wood outer faces alround as commercially
produced by standard manufacturers under
power driven hydraulic press as approved
3 OR-3 by Engineer-in-charge including iron fittings Sft 52.50
etc., complete but excluding the cost of
handles and locking arrangement.

PART-A(NON SCHEDULE ITEMS) TOTAL IS =


Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
STEEL GRILLS
PART B SCHEDULE ITEMS
Rate
S.No ITEM # Description of ITEM Unit Qty Amount
(Rs.)

EXCAVATION:
Excavation in foundation of
building bridges and other structures
SCH/C1/ including dagbelling dressing refilling
1 (S.I. No. 18 around structure with excavated earth %0Cft 3176.25 1630 5,177
(b)/P-4) watering and ramming lead up to 5ft (S.I.
No. 18 (b)/P-5) (for foundation)

LEAN CONCRETE (1:4:8):

Cement concrete plain including placing


SCH/C18/ compacting, finishing and curing, complete
2 ITEM5i/P- (includingscreening and washing of stone %Cft 11288.75 408 46,002
16) aggregate without shuttering). (b)
Ratio 1:4:8 ).

C.C. PLAIN (1:2:4):


SCH/C4/ Cement concerete plain including
ITEM placing compacting, finishing and curing,
3 no.5f/ P- complete (including screening and washing %CFT 14429.25 857 123,695
16 at stone aggregate without shuttering (f)
Ratio 1:2:4

C.C. PLAIN(1:3:6):
SCH/C4/ Cement concerete plain including placing
ITEM compacting, finishing and curing, complete
4 no.5h/ P- (including screening and washing at stone %CFT 12595.00 1834 230,961
16 aggregate without shuttering (h) Ratio 1:3:6

FORMWORK:
SCH/C4/ Erection and removal of
ITEM centering for RCC or plain cement works of
5
no.19b(ii)/ partal wood (ii)vertical
P-18
b)For CC plain below external plinth beam.
%SFT 3127.41 6197 193,806

BRICK MASONRY
SCH/C5/
ITEM no.5-
6 1(c)/ Pacca brick work in ground floor in cement
%Cft 13227.41 254 33,556
P-21 sand mortar (1:4)
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
COLOUR CRETE :
Providing & fixing
colour crete wall surface to provide,
SCH/C9/ durable crust and aesthetics having
7 ITEM no.44/ thickness upto 3/4" with specified colour %SFT 6319.50 3871 244,644
P-56 having water, fire and termite resistance
(upto 20'-0" height).

PAINTING GUARD BARS, IRON


BARS: (d)
SCH/C11/ Preparing surface and painting guard bars,
ITEM gate of iron bars, gratings, railing (including
no.5d/ standard braces, etc) And similar open
8 P-70 work.

(i) Primer coat %SFT 521.95 3844 20,062


(ii) Each subsequent coat of paint. %SFT 374.44 3844 14,393
PART-B (SCHEDULE ITEMS) TOTAL IS = 912,295
SUB TOTAL PART-A+B (SCHEDULE ITEMS) = 2,973,731
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
PART B NON SCHEDULE ITEMS
IRON STEEL GRILL:

Providing and fixing iron grills with


required section of flat iron as per approved
design with Sq bars 3/4" x3/4" including
welding all sides of the section at the
junction, and fixing with sunk iron screws,
1 OR 1 painting two coats of red oxide paint etc. KG 22940.00
complete as required in any floor in
masonry or concrete work. as per Direction
of Engineer incharge

PART-B(NON SCHEDULE ITEMS) TOTAL IS =


SUB TOTAL PART-A+B (NON SCHEDULE ITEMS) =
MEASURMENT SHEET OF REHABILITAION OF GYMNASIUM
AT SMBBMU LARKANA
S.No. Description No. Length Width Height Total Unit
SCHEDULE ITEM
(I)Schedule Items: (except Steel fabrication,Steel Work,Steel grils,Marbel works,Glazed tile
Work,Aluminum Door& Window,G.I Door Frames
ITEM # 1
Dismantling of existing floor
1 100.00 50.00 0.33 1650.00 Sft
TOTAL= 1650.00 Sft
ITEM # 2
Plastering patch plaster
L-S 2000.00 Sft
TOTAL= 2000.00 Sft
ITEM # 3
Chalk Coating
Ribs 2x45 2.00 50.00 9000.00 Sft
1 50.00 100.00 5000.00
TOTAL= 14000.00 Sft
ITEM # 4
Distemper
Quantity same as above 14000.00 Sft
TOTAL= 14000.00 Sft
ITEM # 5
Matt Finish
2 50+100 24.00 7200.00 Sft
2 71.00 24.00 3408.00 "
2 7.00 24.00 336.00 "
2 16.833+21.667 24.00 1848.00 "
2 12+11.33 24.00 1119.84 "
TOTAL= 13911.84 Sft
ITEM # 6
Weather coat
2 100.00 24.00 4800.00 Sft
2 58.50 24.00 2808.00 "
1 16.83 24.00 403.99 "
TOTAL= 8011.99 Sft
ITEM # 7
Color Paint on Floor
500.00 Rft
T= 500.00 Rft
(II)Schedule Items Marbel works,Glazed tile Work,As per notification 2017 At Par
PART C STEEL GRILLS T 30936 Cft

25% OF SAND 7734 Cft

ITEM # 6
RCC PIPE FOR SERVICES
Road No 3 (Purpose Width 24') 4 36.00 135.54 Rft
Road No 4 (Purpose Width 24') 3 36.00 110.52 "
Road no 3,4 Fountain 2 36.00 79.2 "
Road No 5 (Purpose Width 21') 4 37.00 149.9425 "
Road No 5 Left Side(Purpose Width 16') 3 26.00 73.4058 "
Road No 6 (Purpose Width 24') 9 36.00 338.31 "
Road 5,6 Fountain 2 36.00 79.38 "
Road No 6A (Purpose Width 15') 2 26.00 43.0742 "
Road No 6B (Purpose Width 12') 2 26.00 43.0742 "
Road No 6C (Purpose Width 18') 7 26.00 194.5242 "
Road No 6D (Purpose Width 16') 7 26.00 176.995 "
T 1424 Rft
ITEM # 7
Chamber
2 45.12 90 No's
T 90 No 's
(II)Schedule Items Marbel works,Glazed tile Work Hala pettern Tiles work Alcop Door & window ply Doors
(flush Doors) Wire Guage & Paving Block,As per notification 2017 At Par

ITEM # 1
Cement Paver Block 80mm
Road No 3 (Purpose Width 24') 1 185.00 24.00 - 4440 Sft
ITEM # 1
P/f Aluminum doors
1 5.00 7.00 35.00 Sft
3 4.00 7.00 84.00 "
TOTAL= 119.00 Sft
ITEM # 2
P/f Windows and ventilators
L-S 9 6.00 4.00 216.00 Sft
4 8.00 4.00 128.00 "
10 6.00 2.00 120.00 "
TOTAL= 464.00 Sft
ITEM # 3
Glazed Tiles
Floor 3 3.50 5.83 61.25 Sft
TOTAL= 61.25 Sft
ITEM # 4
Glazed Tiles Dado
Floor 3 5.833+5.833+3.5+1 7.00 339.49 Sft
TOTAL= 339.49 Sft
(II)Schedule Items Marbel works,Glazed tile Work,As per notification 2017 At Par
ITEM # 1
P/f G.I frames
3 (7+7+2.5) 49.50 Rft
TOTAL= 49.50 Rft
NON SCHEDULE ITEM
ITEM # 1
C.C Plain 1:1.5:3
1 50 100 5000 Cft
T= 5000.00 Cft
ITEM # 2
Porcelain Tiles
1 12 11.5 138 Sft
1 16.833 21.667 364.72061 "
2 12+11.5 0.5 23.5 "
2 16.833+21.667 0.5 38.5 "
1 19 7 133 "
1 29 7 203 "
T= 900.72 Sft
ITEM # 3

P/f Doors (Wooden) Veenered Shutters


3 2.50 7.00 52.50 Sft
TOTAL= 52.50 Sft
PART C STEEL GRILL
ITEM # 1
Excavation
1 815.00 2.00 1.0 1630 "
T 1630 Cft
ITEM # 2
C.C 1:4:8
1 815.00 2.00 0.3 407.5 "
T 408 Sft
ITEM # 3
C.C 1:2:4
1 815.00 1.50 0.5 611 "
82 2.00 2.00 0.8 246 "
T 857 Cft
ITEM # 4
C.C 1:3:6
1 815.00 0.75 3.0 1834 Cft
T 1834 Cft

ITEM # 5
FRAME WORK
2 815.00 0.5 815 Sft
82x4 2.00 0.75 492 "
2 815.00 3.0 4890 "
T 6197 Sft
ITEM # 6
BRICK MASONARY IN COLUMN
82 0.75 0.75 5.5 254 Cft
T 254 Cft
ITEM # 7
COLOUR CRETING ON SITU
1 815.00 4.75 3871.25 Sft
"
T 3871 Sft

Say 3871 Sft


ITEM # 8
GRILL PAINTING
82 9.25 4.0 3034 Sft
82 2.00 0.3 41 "
T 3075 Sft
For Two Side Paint x1.25 3844 Sft
NON SCHEDULE ITEMS
ITEM # 1
IRON GRILLS
Gym & Road 155 9.25 4.00 5735 Sft

T 5735 Sft
We take 4Kg/Sft (12617 x4 ) 22940 KG
BILL OF QUANTITIES OF
REHABILITATION OF GYMNASIUM
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
PLUMBING WORKS
PART-I: SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
1 SCH/C1/ Providing & fixing 6" x 2" or 6" x 3" C.I floor
(S.I. No.
20/P-6) trap of the approved selt cleaning design
with a C.I scrrewed down gratting with or
without a vent arm complete with & I/c
Each 3.00 2042.43 6,127
making requisite number of holes in walls,
plinth & floor for Pipe connections &
making good cement concrete 1:2:4. (S.I.
No. 20/P-6)
2 SCH/C1/ P/f squating type white glazed earthen
(S.I. No.
20/P-6) ware W.C pan of with i/c the cost of
flushing cistern with internal fitting and
flush pipe with bend making good in
cement concrete 1:2:4.(S.I. No. 3a(ii)/P-2)
(i) W.C not less than 19" clear opening

between flushing and 3 gallons flushing Each 3.00 6166.60 18,500

tank with 4" dia C.P trap and C.I thumble.


3 SCH/C1/ Providing & fixing 24" x 18" lavatory basin
(S.I. No. in white glazed earthen ware complete with
8/P-3)
and including the cost of W.I or C.I
cantilever brackets 6 inches built into wall,
painted white in to two coats after a
primary coat of red lead paint , a pair of
1/2" dia rubber plug & chrome plate brass Each 3.00 4253.90 12,762
chain 1-1/4" dia malloable iron or c.p brass
traps malloable iron or brass unions and
making requiste number of holes in wall
plinth & floor for pipe connection and
making good in cement concrete 1:2:4
(Standard pattern)
4 SCH/C3/ (b) S/Fixing long bib-cock of superior
ITEM quality with c.p head 1/2" dia.
13(a)/P- Each 3.00 1109.46 3,328
19)

5 Providing and laying PVC pressure pipes of


class B (equivalent make) fixing in trench i/c
cutting, fitting, and jointing with Z joint with
one rubber ring i/c testing with water to a
head 61 meter or 200ft.(S.I. No. E1/P-22)
6" dia P.Rft 20.00 262.00 5,240
4" dia P.Rft 20.00 137.00 2,740
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
TOTAL OF SCHEDULE ITEMS 48,697
PART-II: NON-SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
P/F UPVC Pipe (AGM) SCH: 40 (E) on surface
using Clips/ Saddle of approved quality and
Material etc paid separatly recessed in
Masonry, C.C or R-C-C upto 60' height and
making good with C.C I/C cutting,finishing
etc complete as per instruction of the
Engineer Incharge. Specification of material
Should meet the requirement of class 12 &
1 5 B in accordance with AS + MD 1784 type
grade 1 rate I/C all cost of labour,material
charges Scaffolding Ladders etc complete

1" dia P.Rft 100.00


3/4" dia P.Rft 50.00
TOTAL OF NON-SCHEDULE ITEMS
MATERIAL CARTAGE STATEMENT REHABILITATION OF GYMNASIUM AT CMC LARKANA.

Sr. Cement Hill Sand Stone Metal Stone Bajri Earth Fill Paver Blocks Bricks
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Cft % No's % 1000 Nos
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17 14 15
1 Cement Concrete( 1:4:8) 408 9.60% 39 48.0% 196 96.0% 391 - - - -
2 Cement Concrete ( 1:2:4 ) 857 17.60% 151 44.0% 377 88.0% 754 - -
3 Cement Concrete( 1:3:6) 1834 13.0% 238 46.0% 844 - - 92.0% 1687 - -
2 Cement plaster (1:6 )3/4" th 2000 0.56% 11 4.21% 80 - - - - - -
8 Brick Masonary 254 4.80% 12 24.0% 61 - - - - - - 1350% 3424.7813
Total Quantities :- 451 1557 391 2441 3424.7813
Per Bag % Cft %Cft %Cft %Cft %0No's %0No's
Rate as per R.A.A 164.73 7214.88 3213.96 3213.96 7214.88 5671.24 982.24
Amount :- 74320 112350 12573 78467 0 0 3364

Total Amount :- 281,073


RATE ANALYSIS FOR CARTGES
REHABILITATION OF GYMNASIUM
CMC LARKANA

1 CEMENT
Avg. Lead from Lucky Cement Factory to Site of Work: 264 MILES
For 1 2 mile at rate
st
RS 7.53 / BAG
EACH SUBSEQUENT @ 0.60 PER MILE 262 MILES
RS 157.2
TOTAL= 164.73 per mile
2 HILL SAND
Avg.Lead from Bholari quarry to site of work: 204 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @32.56 PER MILE 198
RS 6442.92
TOTAL= 7214.88 %Cft

3 STONE METAL
Lead from Ubhan Shah quarry to site of work: 81 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 75 MILES
RS 2442
TOTAL= 3213.96 % Cft
4 STONE BAJRI
Lead from Ubhan Shah quarry to site of work: 81 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 75 MILES
RS 2442
TOTAL= 3213.96 % Cft
5 BRICK
Lead from Killin to Site of Work: 20 MILES
1st six mile : Rs 617.54
Each subsequent 0 mile rate@ 26.05per mile 14
Rs 0
TOTAL= 617.54 % 0No.

6 STEEL
Lead from Karachi Site Area to Site of Work: 290 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 284 MILES
RS 9247.04
TOTAL= 2504.75 per ton