Boq Tennis Court & Rehabilitation of Gymnasium - 15155675531
Boq Tennis Court & Rehabilitation of Gymnasium - 15155675531
TENDER
1 TENNIS COURT & REHABILITATION OF
GYMNASIUM
TOTAL AMOUNT
SEAL SEAL
SUB TOTAL A =
B Cost Summary Rehablitation of Gymnasium
Civil Works
Schedule Items 2,973,731
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF CIVIL WORK
Plumbing
Schedule Items 48,697
____ % Premium on Schedule Items
Non Schedule Items
TOTAL OF PLUMBING WORK
Electrical
10% of Civil Work
____ % Premium on Schedule Items
TOTAL OF ELECTRICAL WORK
SUB TOTAL B =
SUB (A+B) TOTAL
ENGINEER'S ESTIMATE OF
TENNIS COURT & FEMALE GYMNASIUM
AT SMBBMU LARKANA
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
(d) Socket 110 mm dia Each 4 799 3,196
(e) UPVC Tee With Door 110 mm dia Each 5 5517 27,585
2 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.
Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Ton % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17
1 Cement Concrete( 1:4:8) #REF! 9.60% #REF! 48.0% #REF! 96.0% #REF! - - - -
3 Cement Concrete ( 1:2:4 ) #REF! 17.60% #REF! 44.0% #REF! 88.0% #REF! - -
4 Cement Concrete( 1:3:6) #REF! 13.0% #REF! 46.0% #REF! - - 92.0% #REF! - -
5 3" Thick Flooring #REF! 17.60% #REF! 44.0% #REF! 88.0% #REF! - -
6 Fabrication of steel #REF! - - - - - - - #REF! 1350% - 5% #REF!
Total Quantities :- #REF! #REF! #REF! #REF! #REF!
Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17
T= 740 Sft
(II)Schedule Items Marbel works,Glazed tile Work,As per notification 2017 At Par
ITEM # 1
Glazing tiles 6"x6"x1/4" on floor
BATH 4 5.00 5.00 - 100 Sft
Dado
BATH 4 20.00 - 5.00 400 "
T= 500 Sft
(III)Schedule Items: Fabrication of steel work Steel Grill steel Grated Foor & other Steel Works.
ITEM # 6
Steel
Total sum of R.c .c concrete = 2079 cft
2079 Cft
ITEM # 4
Lean 1:9
Court Area 1 78 36 0.25 702 Cft
T= 702.00 Cft
ITEM # 5
C.C Plain 1:1.5:3
Court Area 1 78 36 2808 SFT
T= 2808.00 SFT
QUANTITIES OF THE GROUND FLOOR
ITEM # 1
Porcelain Tiles
ROOM 2 268.79 - 537.58 "
T= 537.58 SFT
ITEM # 2
Porcelain Tiles skirting
CHAN 2 18 - 0.33 11.99 SFT
Room 2 86.25 - 0.33 57.44 "
DEDUCTION "
MAIN DOOR -2 4.00 - 0.33 -2.66 "
D2 -3 2.50 - 0.33 -2.50 "
T= 64.27 SFT
ITEM # 3
Verona Marble
Sitting Area 12 36.00 4.00 - 1728 SFT
Sitting Area 2 36.00 2.00 - 144
Riser 2 36.00 2.00 - 144
Riser 12 36.00 1.50 - 648
T= 2664.00 SFT
ITEM # 4
8580 Sft
ITEM # 5
Steel stair railing
Railing
4 26.00 - - 104 Rft
104 Rft
ITEM # 6
Chairs T= 71 No
BILL OF QUANTITIES OF
TENNIS COURT AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
2 (B) SCHEDULE OF ITEM (B), PLUMBING WORKS
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
1 Providing & fixing 1/2" dia, lead connection complete with a
1/2" dia brass stop cock, two brass nuts & lining jointed to lead
pipe with plumber wiped solder joints 1/2" inches lead pipe to
be of not less than 4lbs per lineal yard (S.I. No. 22/P-6).
Each 6 689.70 4,138
2 Providing & fixing M.S clamps of the approved design to 4" i/c
the cost of cutting and making good to wall or M.S bolts and
nuts, 4" into wall including pipe distance pieces extra painting
to match the colour of the building (S.I. No. 2/P-9). Each 8 72.16 577
3 Providing & fixing M.S clamps of the approved design to 3" i/c
the cost of cutting and making good to wall or M.S bolts and
nuts,3" into wall including pipe distance pieces extra painting to
match the colour of the building (S.I. No. 14/P-10).
Each 8 264.00 2,112
4 (b) S/Fixing concealed Tee stop cock of superior quality with
c.p head 1/2" dia (S.I.No. 14(A)/P-18). Each 10 1097.00 10,970
5 (b) S/Fixing long bib-cock of superior quality with c.p head 1/2"
dia (S.I. No. 13(a)/P-19). Each 10 1109.46 11,095
6 Supplying & fixing 6" x 4" earthen gully trap with 4" outlet
complete with 4" thick 1:2:4 C.C for bed & 1/2 thick cement
plaster (1:3) to the karb C.I grating 6" x 6" and C.I. cover and
frame 12"x12" (inside) etc Complete (b) earthen ware glazed Each 4 1220.67 4,883
7 Constructing manhole or inspection chamber for the required
diameter of circular sewer and 3’-6”(1067mm) depth with walls
Each 4 14748.00 58,992
of B.B in cement sand mortar 1:3 cement plastered 1:3,1/2”
8 Providing and fixing chrome plated brass towel rail complete
with brackets fixing on wooden cleats with 1" long C.P brass
Screws.(I) Towel rail 36" long (a) 3/4" dia round or square
(standard pattern) (S.I. No.1(i)(a)/P-7). Each 4 1269.95 5,079.80
10 Supplying & fixing soap tray of made of plastic of superior
quality and design with fine finishing with c.p screws etc
complete (S.I. No.6/P-8). Each 4 169.40 677.60
11 Providing & fixing C.P muslim shower with double bib cock &
ring pipe (S.I. No.19(a)/P-19). Each 4 3432.00 13,728
12 Supplying & fixing ball valves (china ) (S.I. No.5/P-18)
i) 3/4" dia Each 4 271.92 1,087.68
ii) 1" dia Each 3 365.42 1,096.26
14 Supplying & fixing telephonic shower with ring pipe etc
complete (S.No 20 / P-19) Each 4 1122.00 4,488.00
17 Supplying & fixing wash basen mixture of superior quality with
c.p head 1/2" dia
(S.I. No.14 b /P-19) Each 4 3179.00 12,716.00
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
18 Providing and fixing orisa type white or color glazed earthen
ware w.c pan with cost of low level plastic flush tank of 3
gallons capacity of approved quality i/c making requiste
numbers of holes in walls , plinth & floor and making good in
cement concrete 1:2:4
W.C pan orisa type 23" with plastic tank of low down 3 gallons
C.I trap & C.I thumble (Superior Quality )
With 4" dia. earthen ware trap and plastic thumble (S.No 3 / P-
2)
Each 2 6166.60 12,333
19 Providing & fixing 24" x 18" lavatory basin in white glazed
earthen ware complete with and including the cost of W.I or C.I
cantilever brackets 6 inches built into wall, painted white in to
two coats after a primary coat of red lead paint , a pair of 1/2"
dia rubber plug & chrome plate brass chain 1-1/4" dia
malloable iron or c.p brass traps malloable iron or brass unions
and making requiste number of holes in wall plinth & floor for
pipe connection and making good in cement concrete 1:2:4
(Standard pattern ) (S.No 8 / P-3 )
Each 4 4253.90 17,016
20 Providing & fixing European type white glazed earthen ware
wash down w.c pan complete with including the cost of white /
black plastic seat ( Best Qty ) and lid with c.p brass hinges best
quality and buffers 3 gallons plastic flushing cistern with
internal fitting with fitting clamp 3/4" dia. and cutting and
making requistic number of holes in walls, plinth and floor for
pipe connection and making good in cement concrete 1:2:4
( S.No 4 / P-2 )
Each 2 5339.40 10,679
21 Add extra for labour for providing and fixing of earthen ware
pedestal white or coloured glazed (S.No 9 / P-3 ) Each 4 938.47 3,754
22 Providing and fixing 15" x 12" bavelled edge mirror of belgium
glass complete with 1/8" thick hard board and c.p screws fixed
to wooden pleat
(b) Superior Quality (S.No 4(b) / P - 7 ) Each 6 2047.76 12,287
Total Of Schedule Items = 187,708
Rate Amount
S.No Description of Item Unit Qty
(Rs.) (Rs.)
4 (B) NON SCHEDULE OF ITEM (B), PLUMBING WORKS
1 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.
(a) Elbow / Bend 110 mm or 4" dia Each 4
(b) Elbow / Bend With Door 110 mm or 4" dia Each 4
(c) Tee 110 mm dia Each 3
(d) Socket 110 mm dia Each 4
(e) UPVC Tee With Door 110 mm dia Each 5
2 Supply & fix UPVC (Dadex or Equivalent or approved by
engineer incharge) fitting with 'Z' joint & rubber ring etc.
(a) Elbow / Bend 75 mm or 3" dia Each 4
(b) Tee 75 mm dia Each 2
(c) Socket 75 mm dia Each 3
(d) UPVC Tee With Door 75 mm dia Each 4
3 Providing & laying PPR PN-20 (Dadex or approved by engineer
incharge) pipe with all fittings i.e socket, bend tee, elbow where
required.(for cold water pipe )
(a) 20mm (3/4") dia PPR Rft 200
(b) 1 mm ( 1" ) Rft 150
4 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and rubber ring
all as specified including socket, bend, tee all fittings 4" dia
(110 mm) etc complete. Rft 270
5 Supply & laying UPVC (Dadex or approved by engineer
incharge) soil and waste pipe complete 'Z' joint and rubber ring
all as specified including socket, bend, tee all fittings 3" dia (75
mm) etc complete.
Rft 215
6 Supply & fix UPVC Dadex or approved by engineer incharge
vent cowel 110mm (4" dia) on top of vent pipe.
Each 35
7 Supply & fix UPVC Dadex or approved by engineer incharge
vent cowel 110mm (3" dia) on top of vent pipe. Each 35
8 Providing & fixing UPVC floor trap(DADEX or approved by
engineer incharge) with 4" dia inlet and 4" dia outlet of the
approved self cleaning design with a UPVC Grating with or
without a vent arm i/c cost of making requisite number of holes
in walls plinth and floor for pipe connectons and making good
cement concrete 1:2:4.
Each 4
9 Providing UPVC pipe with collars class "B" and digging the
the top of the highest pipe and refilling with excavated staff.
a.9" dia RCC Pipe Class B Rft 350
Total
BILL OF QUANTITIES OF
TENNIS COURT AT
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
SCHEDULE ITEM ELECTRICAL WORKS
DISTRIBUTION BOARD
LABOUR
LABOUR
9130 Road roller 6 Ton capacity, hire charges. 0.01 No. 4,550.00 Day 45.50
9003 Beldar 0.02 No. 455.00 Day 9.10
9027 Coolie (boy or girl). 0.02 No. 455.00 Day 9.10
Sundries/Labour. Lump sum. 32.50
Total Rs. 96.20
Total Rs. 96.20
Add 0.50 % Water Charges. Rs. 0.48
Add 10 % Contractor profit. Rs. 9.62
Total Rs. 106.30
Add 7.5% Income Tax Rs. 7.97
Cost of 100 Sqft. Rs. 114.27
F P S Cost in Final Cost Units. Rs. 114.27 Per 100 Sq.ft.
F P S Cost in Final Cost Units. Rs. 1.14 Per Sq.ft.
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
3.STONE SOLING
Providing and laying soling stones 6 inches to 9
inches (152 mm to 229 mm) size under floors
including packing with spawls and chips and
consolidating etc. complete.
MATERIAL
Soling stone 6" to 9" (152 mm to 229 mm) size. =
100 Cft. Add extra for voids 16.67 %. 1.17 %Cft 2,250.00 %Cft 2,632.50
Total (A) Rs. 2,632.50
LABOUR
Beldar. 2.00 Nos. 437.50 Day 875.00
Bhishti with mashak. 0.25 No. 500.00 Day 125.00
Sundries / Labour. Lump sum 12.50
Total (B) Rs. 1,012.50
Total A +B Rs. 3,645.00
Add 1.50 % Water Charges. (1% for constructional
and 0.5% drinking purpose) Rs. 54.68
Add 10% Contractor profit. Rs. 364.50
Total (C) Rs. 4,064.18
Add 7.5% Income Tax Rs. 304.81
Cost of 100 Cft. Rs. 4,368.99
F P S Cost Per 100 Cft Rs. 4,370.00 Per 100 Cft.
F P S Cost Per Cft Rs. 43.70 Per Cft
Say Rs. 44.00 Per Cft
S. Code Description Qty/Unit Rate Rs. Unit DF MF Amount
No. Rs.
4.C.C 1:9
Providing and laying 1:9 (1 cement 9 screened
bajri) cement concrete using 3/4 inch (19 mm) and
down gauge screened bajri in foundation including
levelling, compacting and curing etc. complete .
MATERIAL
2390 Grey cement Portland 11.67 Cft. 9.73 Cwt. 537.50 Cwt. 5,229.88
0017 Screened graded bajri 3/4" 19 mm & down gauge.
1.05 % Cft 2,835.00 % Cft 2,976.75
cartages L.S 30.00
Total (A) Rs. 8,236.63
LABOUR
MATERIAL
MATERIAL
MATERIAL
9087 Tile layer (floor, walls & marble work). 3.50 No. 875.00 Day 2,450.00
9027 Coolie (boy or girl). 1.75 No. 437.50 Day 612.50
9005 Bhishti with mashak. 0.06 No. 500.00 Day 24.00
Total (B) Rs. 3,086.50
MISCELLANEOUS
MATERIAL
MATERIAL
Hire charges of die / tools / cement gun etc. Lump sum. 150.00
Cartage of S.SPipes & special. Lump sum. 200.00
Total (C) Rs. 350.00
Total A + B + C Rs. 25,641.91
Add 0.50 % Water Charges. Rs. 128.21
Add 10 % Contractor's Profit. Rs. 2,564.19
Total (D) Rs. 28,334.31
Add 7.5% Income Tax Rs. 2,125.07
Cost of 46.70 Rft. Rs. 30,459.38
F P S Cost in Final Cost Units. Rs. 652.24 Per Rft.
MATERIAL CARTAGE STATEMENT TENNIS COURT CMCLARKANA
(1) (Foundation)
Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Ton % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17
1 Cement Concrete( 1:4:8) 1470 9.60% 141 48.0% 706 96.0% 1411 - - - -
3 Cement Concrete ( 1:2:4 ) 2079 17.60% 366 44.0% 915 88.0% 1830 - -
4 Cement Concrete( 1:3:6) 104 13.0% 13 46.0% 48 - - 92.0% 95 - -
5 3" Thick Flooring 95 17.60% 17 44.0% 42 88.0% 83 - -
6 Fabrication of steel 166 - - - - - - - 8.32 1350% - 5% 8
Total Quantities :- 537 1710 1411 2016 8
Sr. Cement Hill Sand Stone Metal Stone Bajri Bricks Steel
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Nos % Tons
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17
G.I Frame
Providing & fixing G.I frames/choukhats of
SCH/C17/ size 7"x2" or 4 1/2"x3" for door using 20
ITEM guage G.I sheet i.e welded hinges and fixing
12 P.Rft 228.90 49.50 11,331
no.29-/ at site with necessary hold fasts, filling with
P-93 cement sand slurry of ratio 1:6 and
repairing the jambs. The cost also i.e all
carriage, tools and plants used in making
and fixing
PART-A (SCHEDULE ITEMS) TOTAL IS = 2,061,436
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
PARTA: NON-SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
C.C Flooring
Providing and laying 4" (102 mm) thick not
leaner than 1:1.5:3 cement concrete
(minimum works cube crushing strength of
5000 Lbs. PSI (at 28 days) in tennis court
etc. compacting with vibrators (immersion
or screen or both) (with admixture) of
required thickness power float finished for
1 OR-1 perfect floor level etc complete and as per Sft 5000.00
direction of engineer in charge.
Procelain tiles
Providing and laying Procelain tiles laid in
cement mortar or lime mortar 1:2 as per
2 OR-2 approved quality & design complete. size Sft 900.72
16" x 16"
veneered flush
Providing and fixing solid core 1st class
deodar wood veneered flush door shutter
1-1/2 inches (38 mm) thickness with and
including the cost of commercial veneer
facing of not less than 1 mm thickness on
either side, cross band of standard
specification with solid fully laminated core,
2 inches (51 mm) wide best quality deodar
wood outer faces alround as commercially
produced by standard manufacturers under
power driven hydraulic press as approved
3 OR-3 by Engineer-in-charge including iron fittings Sft 52.50
etc., complete but excluding the cost of
handles and locking arrangement.
EXCAVATION:
Excavation in foundation of
building bridges and other structures
SCH/C1/ including dagbelling dressing refilling
1 (S.I. No. 18 around structure with excavated earth %0Cft 3176.25 1630 5,177
(b)/P-4) watering and ramming lead up to 5ft (S.I.
No. 18 (b)/P-5) (for foundation)
C.C. PLAIN(1:3:6):
SCH/C4/ Cement concerete plain including placing
ITEM compacting, finishing and curing, complete
4 no.5h/ P- (including screening and washing at stone %CFT 12595.00 1834 230,961
16 aggregate without shuttering (h) Ratio 1:3:6
FORMWORK:
SCH/C4/ Erection and removal of
ITEM centering for RCC or plain cement works of
5
no.19b(ii)/ partal wood (ii)vertical
P-18
b)For CC plain below external plinth beam.
%SFT 3127.41 6197 193,806
BRICK MASONRY
SCH/C5/
ITEM no.5-
6 1(c)/ Pacca brick work in ground floor in cement
%Cft 13227.41 254 33,556
P-21 sand mortar (1:4)
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
COLOUR CRETE :
Providing & fixing
colour crete wall surface to provide,
SCH/C9/ durable crust and aesthetics having
7 ITEM no.44/ thickness upto 3/4" with specified colour %SFT 6319.50 3871 244,644
P-56 having water, fire and termite resistance
(upto 20'-0" height).
ITEM # 6
RCC PIPE FOR SERVICES
Road No 3 (Purpose Width 24') 4 36.00 135.54 Rft
Road No 4 (Purpose Width 24') 3 36.00 110.52 "
Road no 3,4 Fountain 2 36.00 79.2 "
Road No 5 (Purpose Width 21') 4 37.00 149.9425 "
Road No 5 Left Side(Purpose Width 16') 3 26.00 73.4058 "
Road No 6 (Purpose Width 24') 9 36.00 338.31 "
Road 5,6 Fountain 2 36.00 79.38 "
Road No 6A (Purpose Width 15') 2 26.00 43.0742 "
Road No 6B (Purpose Width 12') 2 26.00 43.0742 "
Road No 6C (Purpose Width 18') 7 26.00 194.5242 "
Road No 6D (Purpose Width 16') 7 26.00 176.995 "
T 1424 Rft
ITEM # 7
Chamber
2 45.12 90 No's
T 90 No 's
(II)Schedule Items Marbel works,Glazed tile Work Hala pettern Tiles work Alcop Door & window ply Doors
(flush Doors) Wire Guage & Paving Block,As per notification 2017 At Par
ITEM # 1
Cement Paver Block 80mm
Road No 3 (Purpose Width 24') 1 185.00 24.00 - 4440 Sft
ITEM # 1
P/f Aluminum doors
1 5.00 7.00 35.00 Sft
3 4.00 7.00 84.00 "
TOTAL= 119.00 Sft
ITEM # 2
P/f Windows and ventilators
L-S 9 6.00 4.00 216.00 Sft
4 8.00 4.00 128.00 "
10 6.00 2.00 120.00 "
TOTAL= 464.00 Sft
ITEM # 3
Glazed Tiles
Floor 3 3.50 5.83 61.25 Sft
TOTAL= 61.25 Sft
ITEM # 4
Glazed Tiles Dado
Floor 3 5.833+5.833+3.5+1 7.00 339.49 Sft
TOTAL= 339.49 Sft
(II)Schedule Items Marbel works,Glazed tile Work,As per notification 2017 At Par
ITEM # 1
P/f G.I frames
3 (7+7+2.5) 49.50 Rft
TOTAL= 49.50 Rft
NON SCHEDULE ITEM
ITEM # 1
C.C Plain 1:1.5:3
1 50 100 5000 Cft
T= 5000.00 Cft
ITEM # 2
Porcelain Tiles
1 12 11.5 138 Sft
1 16.833 21.667 364.72061 "
2 12+11.5 0.5 23.5 "
2 16.833+21.667 0.5 38.5 "
1 19 7 133 "
1 29 7 203 "
T= 900.72 Sft
ITEM # 3
ITEM # 5
FRAME WORK
2 815.00 0.5 815 Sft
82x4 2.00 0.75 492 "
2 815.00 3.0 4890 "
T 6197 Sft
ITEM # 6
BRICK MASONARY IN COLUMN
82 0.75 0.75 5.5 254 Cft
T 254 Cft
ITEM # 7
COLOUR CRETING ON SITU
1 815.00 4.75 3871.25 Sft
"
T 3871 Sft
T 5735 Sft
We take 4Kg/Sft (12617 x4 ) 22940 KG
BILL OF QUANTITIES OF
REHABILITATION OF GYMNASIUM
SHAHEED MOHTARMA BENAZIR BHUTTO MEDICAL UNIVERSITY LARKANA
PLUMBING WORKS
PART-I: SCHEDULE ITEMS
Rate
S.No ITEM # Description of Item Unit Qty Amount
(Rs.)
1 SCH/C1/ Providing & fixing 6" x 2" or 6" x 3" C.I floor
(S.I. No.
20/P-6) trap of the approved selt cleaning design
with a C.I scrrewed down gratting with or
without a vent arm complete with & I/c
Each 3.00 2042.43 6,127
making requisite number of holes in walls,
plinth & floor for Pipe connections &
making good cement concrete 1:2:4. (S.I.
No. 20/P-6)
2 SCH/C1/ P/f squating type white glazed earthen
(S.I. No.
20/P-6) ware W.C pan of with i/c the cost of
flushing cistern with internal fitting and
flush pipe with bend making good in
cement concrete 1:2:4.(S.I. No. 3a(ii)/P-2)
(i) W.C not less than 19" clear opening
Sr. Cement Hill Sand Stone Metal Stone Bajri Earth Fill Paver Blocks Bricks
Description Qty
# Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty Ratio Qty
% Bags % Cft % Cft % Cft % Cft % No's % 1000 Nos
1 2 3 4 5 6 7 8 9 10 11 14 15 16 17 14 15
1 Cement Concrete( 1:4:8) 408 9.60% 39 48.0% 196 96.0% 391 - - - -
2 Cement Concrete ( 1:2:4 ) 857 17.60% 151 44.0% 377 88.0% 754 - -
3 Cement Concrete( 1:3:6) 1834 13.0% 238 46.0% 844 - - 92.0% 1687 - -
2 Cement plaster (1:6 )3/4" th 2000 0.56% 11 4.21% 80 - - - - - -
8 Brick Masonary 254 4.80% 12 24.0% 61 - - - - - - 1350% 3424.7813
Total Quantities :- 451 1557 391 2441 3424.7813
Per Bag % Cft %Cft %Cft %Cft %0No's %0No's
Rate as per R.A.A 164.73 7214.88 3213.96 3213.96 7214.88 5671.24 982.24
Amount :- 74320 112350 12573 78467 0 0 3364
1 CEMENT
Avg. Lead from Lucky Cement Factory to Site of Work: 264 MILES
For 1 2 mile at rate
st
RS 7.53 / BAG
EACH SUBSEQUENT @ 0.60 PER MILE 262 MILES
RS 157.2
TOTAL= 164.73 per mile
2 HILL SAND
Avg.Lead from Bholari quarry to site of work: 204 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @32.56 PER MILE 198
RS 6442.92
TOTAL= 7214.88 %Cft
3 STONE METAL
Lead from Ubhan Shah quarry to site of work: 81 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 75 MILES
RS 2442
TOTAL= 3213.96 % Cft
4 STONE BAJRI
Lead from Ubhan Shah quarry to site of work: 81 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 75 MILES
RS 2442
TOTAL= 3213.96 % Cft
5 BRICK
Lead from Killin to Site of Work: 20 MILES
1st six mile : Rs 617.54
Each subsequent 0 mile rate@ 26.05per mile 14
Rs 0
TOTAL= 617.54 % 0No.
6 STEEL
Lead from Karachi Site Area to Site of Work: 290 MILES
1 six mile :
st
RS 771.96
EACH SUBSEQUENT @ 32.56 PER MILE 284 MILES
RS 9247.04
TOTAL= 2504.75 per ton