Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
22 views
11 pages
2018 - Marking - HNDIT2302 Project Management
Past paper
Uploaded by
akthar farvees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 2018 - Marking - HNDIT2302 Project Management For Later
Download
Save
Save 2018 - Marking - HNDIT2302 Project Management For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
22 views
11 pages
2018 - Marking - HNDIT2302 Project Management
Past paper
Uploaded by
akthar farvees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 2018 - Marking - HNDIT2302 Project Management For Later
Carousel Previous
Carousel Next
Download
Save
Save 2018 - Marking - HNDIT2302 Project Management For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 11
Search
Fullscreen
40 Red) © SuATE sh |. SRILANKA INSTITUTE OF ADVANCED TECHNOLOGICAL EDUCATION atest ity ott arene na) Higher National Diploma in information Technology ‘Second Year, Fst Semester Examination ~ 2018 ewT2302 TT Projet Monagement~ Medel Answer Inpractonsor Caste No.ofquesians 08 ‘oss Quite Novsogee 0: ‘Asansol ts te “wo 2)tows niyo lek wena coy + Detge the een Prajeet Management, (03 Marks} answer points Project managesent is “the application of knowledge, skills, tools, and techniques to project activities in order vo neet project requirements” Li, Nome FOUR crtsa by which a projet canbe judgod as sucess post. (04 Maris) Answer points (1'4 Marks) + completed te schedule + completed within buaget business case) + Providing proven or adequate quality Ui Project management canbe viewed as a mumber of intend peoesss, Nara those ite resis. (05 Matis) Answer points (J*5 Marks) © Project initiation © Project planning © Project execution Project renitoring and contol © Project closureiv, Lis sve (05) advantages of sg form angwer points (1*5 Sarka| Projet Manageren (05 Marks) * Better control of financial, physical, and huhan resources + Tuproved customer relations + Shorter development tines + Lower costs + Wigher quality and ineveased retiabilicy + Bigher profic margins + Improved productivity # Getter internal coordination ; + Higher worker, morale + [T project managers ae expected io poset cera skills Desctie fur sls of (004 TF project managers, (08 Marks) answer points 244 marks Belef description o + Project Management axi21s + People seit + Knowledge of organization + ancegraraen kill # Technical skitt {Tota 25 Marks) @ A. What is Project Human Resource Managercat? (03 Marts) Answer points Project hanan ressurce management includes the processes Fequired to make the most effective use of the prople involved itn a project. Processes include a. Organizational planning b. Start acquisition © Team davaiopment, NDI Sac 0-1 oj Masao 301844, “God project imegaion management i the key to overall projet sucess” Explain the validity ofthis statment (o4 Marks) Answer potnts (2*2 mark! : + coordinating all of the peoste, plans, and work required to complete a project + Focus on the big picture of the projact and steer the Project tear tovare successful completion + Wake sinat decision when there are conflicts anong project goals or people involves + Communicate xey projact information to top management 481, Therisusually not enough ime o reso t plement all ave projets. What sre the sua thos to slat a ice? (05 Macks) Answer points Methods for selecting projects include: (1*S Marks} + Focusing 00 broad organizational needs. + Categorizing infomation technology projects. + Pesfoiming not prosent value or ather Financia! anetyses. + Using 2 weighted searing mode! + Implesenting 2 balance! scoranaet in. CAN Company is onsderng two murally exclave projet, projet and projet B ‘The cash lows foreach would be a follow. All fgaes ae given in S1iLankan Rupees. [Yer] Discoanicir] Projet [Prager] 7 0 0300), 1 ‘06? 00 2 O43 5.000, 5 oo 3.08 “The company’s costa epital 16% | Calculate the Ne rosent Vato ofeach projet (06 Marks) HvOIT Sco year jot Magee 218Answer points For calculating present value [0.5* © > § Marks) Far calculating NPV (It 2-9 2 Marks) ae Project A-| Project Bo wear [i200 |progect a | erofect | discounted | Dincounte; cash flow [essh flow 7 =35, 250 [710,900 __|=35, 250 1 fonse2 ig, 000_|5, 172 75,518 2 [ours 35,000) 3,715 11,138 3 [ena as,000 [1,023 Ps wey =50 1026 Give your reotmendation end reasons 2s 0 which project shouldbe accepted (4 Marks) newer points, Project 8 is viable. (02 warks) Because it has the highest positive NPV. (02 Marks) 1 List two advantages ofthe Discount Factor (OCF) method of projet appraisal over other appraisal methods (03 Marks) Ansuar points + Te cakes account of the time value of the money. + Te uses all cash flous relating to a project. + Te allows for the tiaing of cash flo {otal 25 Marks} ro) 4. Explain she term Work Rreadown Siuctirs (WBS) and give tw approaches Develop WBS. (03 Masks} ve evs ert Post Meramec 2018Ansvor points was - 2 sak : AMBS is 0 deliverable-oriented grouping of the work involved in a project that defines the total scope of the project. Approaches ~1*2 tarks * Anaiogy approach: + Top-down approach: + Bottom-up approach: + Mind-napping approach: 4 SLIATE management has docide to buy in and install new software packaye to ‘place the existing i-house system to repare exasinaton esate. Assume that vow a the pojce manager and have drawn vp an oline projet plan fhe main roe activities allows: [Aetiviy [Predecessor — | Duration weeks) ] aH 8 x ie Ie Aaa leasceuac| D a tz E D f a F t i c eB a ERG 3 Draw network agra for the projec (05 Macks) On the singram, coma Ealy Start ES), Early Finish (EF), Late Star (LS) and Late Finish (LF cc estimates and tual lat for cach atvily. (08 Maks) {Find he ertcal path and projet craton, (06 Mars) ANDI Sed ea 7 ut Manager 2018Moda answer fr question , band (Question 5 mats fr drawing diagram by indicating atvity label and duration (Question b> 18-95 mks formarking ES.EF, LS, LF and wal Maton the diagram comet inthe each nde British Standard 254335 ie used here. Allocate macks for any corsect notation of ADA or Ack S Joon] & ‘tty abe es] ] oe > Hy > ib IN dele | abe a ~ / ‘ son ff . ea © ado [i ao ie J \EP / We? F aye pe 42 AOBDDIEDH —4e4sa4Ge2 18 weeks APBDD-—SCH 4s4sG6e2 = 20 Menke 18d Maris apededu — as124642 = 24 weaks ADCPESH — GaazHUTZ = 22 Weeks ceitieal path = a30969" 1 Mark Project Duvation = 24 Weeks «2 Mark, NDE Sond et jet Manage 208141, Woe advantages of wing an Activity on Node netork diagram over an Action Arrow nstwor agar in projet paging (o2Marts) answer points i AON is better at showing ateferent types of ependencies Consider any correct answer. {Tota125 Marks) oo) "Your company as decided w develop anew inormation system 44+ Define the tem stakcholee"in elton oan development proc, (3 Mats) answer points Project stakeholders -reopie involved in or affected by Project activities. (02 narke) %g 1 49 project manager, programmers, system scenitects pete. (1 maek) fi “Aatve ur involvement is hey in stishing user requirements. Da you agree with this tatemcnis? asty your answer (04 Mets) answer points Yes D1 ttark ‘i, Deserted purpose of ellowing doen in projet managemeat proces, a Prajcscher Project scope saement (05 Marts) Answer points (2,5 +2 Marks) 4+ Project charter: document that formally rocomices the existence of @ project and provides alzection on the project's cbJectives and managenent. Key project staksholders should siga 2 Project charter to acknowledge agrsenent on the need and intent of the project ANDI Second ean Pj Nansen! 05bs Project scope statanent: a document used to develop ene confirm a common understanding of the project scoye. Iz should include 2 project justification, a brief description of the project's products, a summary of all project deliverables, 9 statement of what determines project success jv. Supposethata software projet was estimated tobe 400 00 ine of codes. Caleta the effort and development time fr crganic mode using base COCOMO equation Hin: Bffor =a" Ge? , Development Time =< E* ; Whare ab cand d equals 24, 1.08,2.5 and 0.38 (05 Mates) Answer" points, Estimated cize = 400 KLOC (01 Mark) Tn organic node, Bffort= 2.4 * 4001.08 = 1295.51 PM (02 Marks! Developmont timo= 2.5 *1295.310.38- 38.07 M {02 Harks) ‘vs Brey explain the fpical problems ofcost estimates i IT pees, (08 Marks) ancwer paints (2°4 Marks for sny velid point! 4 complex task requiring a significant amount of effort. Also estinates are done at various stages of the project ‘+ Neny people doing estimates hove Little euperience doing them, Try te provide training and mentoring + People have a bias towsed underestimation. Reviow estimates ond ask inportant questions to make sure oetamatas are not biased + Management wants a nunber for a bid, not a rea] estimate Project managere must negotiate with project sponsors to create realistic cost astinates ANDI Sind ar TP Mage 2018(Tota 25 Marks) 05 4. Wht is meant by quality n projet management? (08 Marks) answer points The degree to which » set of inherent cheracteristica fulfils requicenents. ~ CONFORMANCE to stated CRITERIA agreed by the CUSTOLER or ite representatives = conformance to equirenents: meeting written spect tioations = fitness for uso: ensuring a product can be used as it was intended Si, Stte the most sigaiticant characterises of efisctive and ineffective project, managers. Give two points preach. (0¢ Marks) answer points Effective Project Managers (1*2 marke} + ead by example + ars good motivators + Are visionaries + stend up te upper + Are technically competent management when aeeaseary + Support ceam embers + are dactaive + encourage new Seas + are cood comrunicators Inercective eroject vanagerzs (1*2 Marks! + Set bad oxamplee + kre not sele~aseured + ack technical expertise + Are poor communicators + kre poor motivators HRDIT Sn year Pej Mung 218‘What a he dienes between quality assurance an quali conto! (05 Marks) Answer points (2.5* 2 Marks) Te differences between quality control and quality assurance are: Quality Conto Quality assurance lidae withia the prodéct Tone external te it Ghacks prodicta/deliverables ~ Checks prOckeses Checks are dene against unique Done against good practice Briefly describe the impact of using modcen sofware took and techniques in project communications, (0S Marks) ansuex pointe Briefly expen the following es Project Risk Managensent be Project Procurement Management (08 Marks) angver points (442 Marks} Project Risk Management (02 Marks} Risk Managenent is the systenatic process of Adentifying, analyzing, and responding to project risk, ‘The major processes in Project Risk Managenent: (02 Macks) Risk anagement Planning isk Identification Qualitative Risk Analysis Quantitative Risk Analysis Risk Response Planning Risk Nonitoring and Control 0b, Proxect Procurement wanagenent {02 Harks) Project Procurenent Wanagenent includee the processes required to Acquiring goods and services foro project, from cutsice the performing otganization. ‘he major processes in Project Procurenent Management: (2 marks) Planning purchases and acquisitions Planning contvacting Requesting seller responses Selecting sellers Aaninistering the contract closing the contract (Tota 25 Marks] NDI Second ea aj Mareen 208
You might also like
IQN CPMA Practice Book 2023
PDF
No ratings yet
IQN CPMA Practice Book 2023
78 pages
Solution Manual For Project Management Process Technology and Practice 1st Edition Vaidyanathan 0132807181 9780132807180
PDF
100% (52)
Solution Manual For Project Management Process Technology and Practice 1st Edition Vaidyanathan 0132807181 9780132807180
36 pages
PM Dec16
PDF
No ratings yet
PM Dec16
2 pages
Marking Scheme
PDF
No ratings yet
Marking Scheme
8 pages
Project Management Copy
PDF
No ratings yet
Project Management Copy
19 pages
CAPM Summary
PDF
No ratings yet
CAPM Summary
24 pages
Project Management Principles
PDF
No ratings yet
Project Management Principles
11 pages
Question Bank & Model Answer for Project Management Unit 1 & 2
PDF
No ratings yet
Question Bank & Model Answer for Project Management Unit 1 & 2
30 pages
Solutions for Contemporary Project Management, Plan-Driven and Agile Approaches, 5th Edition by Kloppenborg - converted
PDF
No ratings yet
Solutions for Contemporary Project Management, Plan-Driven and Agile Approaches, 5th Edition by Kloppenborg - converted
30 pages
DocScanner
PDF
No ratings yet
DocScanner
27 pages
Leshan - 2
PDF
100% (1)
Leshan - 2
48 pages
Project Management Tutorial 1 Sunway
PDF
No ratings yet
Project Management Tutorial 1 Sunway
6 pages
PMF Previous Ques Papers
PDF
No ratings yet
PMF Previous Ques Papers
6 pages
Assignment1 PDF
PDF
No ratings yet
Assignment1 PDF
5 pages
MGT - Midterm1
PDF
No ratings yet
MGT - Midterm1
15 pages
PM For Bex&bct Merged
PDF
No ratings yet
PM For Bex&bct Merged
26 pages
PM PYQS
PDF
No ratings yet
PM PYQS
9 pages
Project Management Fundamentals
PDF
No ratings yet
Project Management Fundamentals
25 pages
PM Unit 1 Q & A
PDF
100% (1)
PM Unit 1 Q & A
17 pages
Pm Reviewer Finals
PDF
No ratings yet
Pm Reviewer Finals
8 pages
Bit2305 Ict Project Management Bbit204 It Project Management Bac
PDF
No ratings yet
Bit2305 Ict Project Management Bbit204 It Project Management Bac
3 pages
IMS654 Exercise
PDF
No ratings yet
IMS654 Exercise
6 pages
PRO4801 Outcomes And Assessment Criteria 2022
PDF
No ratings yet
PRO4801 Outcomes And Assessment Criteria 2022
5 pages
Daffodil International University Spring-2021 Teacher Initial:MKS
PDF
No ratings yet
Daffodil International University Spring-2021 Teacher Initial:MKS
7 pages
Task 1 Wong Min Khang A138505
PDF
No ratings yet
Task 1 Wong Min Khang A138505
1 page
PM -1 IAT ANSWER KEY
PDF
No ratings yet
PM -1 IAT ANSWER KEY
4 pages
Software Project Management Syllabus
PDF
No ratings yet
Software Project Management Syllabus
3 pages
Project Management
PDF
No ratings yet
Project Management
33 pages
Allama Iqbal Open University Islamabad (Department of Business Administration)
PDF
No ratings yet
Allama Iqbal Open University Islamabad (Department of Business Administration)
7 pages
Easy-: Solutions
PDF
No ratings yet
Easy-: Solutions
88 pages
PM CIE-1
PDF
No ratings yet
PM CIE-1
4 pages
12345unit Short
PDF
No ratings yet
12345unit Short
24 pages
ASSG024 (1)
PDF
No ratings yet
ASSG024 (1)
2 pages
SEG5790. Project and Technology Management
PDF
No ratings yet
SEG5790. Project and Technology Management
42 pages
Project Management
PDF
No ratings yet
Project Management
40 pages
FEB-MARCH 2023 - Answer Key 20PM01T-PMS - Watermark
PDF
No ratings yet
FEB-MARCH 2023 - Answer Key 20PM01T-PMS - Watermark
27 pages
20PM01T-PMS
PDF
No ratings yet
20PM01T-PMS
27 pages
Code: 20PM01T: Scheme of Valuation & Model Answers
PDF
No ratings yet
Code: 20PM01T: Scheme of Valuation & Model Answers
108 pages
Code: 20PM01T: Scheme of Valuation & Model Answers
PDF
100% (1)
Code: 20PM01T: Scheme of Valuation & Model Answers
27 pages
1st chepter (Material Review and Class Discussion Questions)
PDF
No ratings yet
1st chepter (Material Review and Class Discussion Questions)
27 pages
IT Project Management
PDF
No ratings yet
IT Project Management
3 pages
PM Discussion CH1
PDF
No ratings yet
PM Discussion CH1
3 pages
Project Management (CT701)
PDF
No ratings yet
Project Management (CT701)
15 pages
MCL760-Assignment Set - DoS-15 June 2024
PDF
No ratings yet
MCL760-Assignment Set - DoS-15 June 2024
4 pages
5539 Project Management
PDF
No ratings yet
5539 Project Management
6 pages
Assignment EPM
PDF
No ratings yet
Assignment EPM
22 pages
? Project Management Notes
PDF
No ratings yet
? Project Management Notes
31 pages
Notes Chapter No 1
PDF
No ratings yet
Notes Chapter No 1
5 pages
PM1
PDF
No ratings yet
PM1
9 pages
Assignment 1
PDF
No ratings yet
Assignment 1
18 pages
By Mantiri, Astria (Assignment Chpter 17)
PDF
No ratings yet
By Mantiri, Astria (Assignment Chpter 17)
4 pages
PJM721S - Assignment 1 - Handout
PDF
No ratings yet
PJM721S - Assignment 1 - Handout
6 pages
Ole_1740519367735310_876992512
PDF
No ratings yet
Ole_1740519367735310_876992512
12 pages
Comptia Project Pk0 005 Study Guide Undefined 1728900878
PDF
No ratings yet
Comptia Project Pk0 005 Study Guide Undefined 1728900878
187 pages
Engineering Project Management
PDF
No ratings yet
Engineering Project Management
34 pages
PM Question Bank
PDF
No ratings yet
PM Question Bank
8 pages
Mse1 PM
PDF
No ratings yet
Mse1 PM
6 pages