Appendix A - Layout Geotechnical Survey Locations - Layout-BH1
Appendix A - Layout Geotechnical Survey Locations - Layout-BH1
PROPOSED BOX-CORE
PROPOSED BOREHOLE
PROPOSED CPT
S2
S1
134
LOCATION DIAGRAM/KEYMAP
Easting
Roabiba-1
Northing
ROA-DB-01
ROA-DB-02
[2.0x0.2x0.1]
[0.5x0.1x0.1]
ROA-DB-06
Scaffold Plate
[2.5xumh]
Scaffold Plate
ROA-DB-05
ROA-DB-03
[1.8x1.8x0.3]
[2.2x2.2x0.5]
11500
GENERAL
REMOVABLE
LAYDOWN
GRATING
ROA-DB-04
[2.2x2.2x0.5] NOTE
7 (TYP)
NOTE
15
NOTE
15
9MARK
EGR
632 BENCHE N
NU325.751
739339.168
2 3 4 A
14" J-TUBE
(TO ORF)
B
UCC-SA-UBAORF-BC-03
N
0.800
UP UP LANDING
BOAT EGR 346.00
632
0.560 E DATUM
PLATFORM
(A1)
2.050
7.70
14" J-TUBE
(TO ORF)
2.760
UP
1.100
9 739 319.00
N
UP LANDING
BOAT C
2.600
12" PIPELINE
FROM ORF
UP
UP UP
PFOC
24"
ROA-ORF WDA-ROA
PFOC
WDA Pipeline Cable
- ORF
Cable
PFOC
24"
PFOC
ROA-ORF - ORF
WDA-ROA
WDA
Pipeline
Cable
Cable
S1
S1
152 P1
UCC-SA-HDD-BH-02
128
S1
UCC-SA-HDD-BH-ALT
P2
LOADING PLATFORM
118
177.48°
CORNER
G.E 625171.7139
G.N 9731627.6030 P1
194 UCC-SA-HDD-BH-03
P1
627471.46 9732170.76
P2
177.48°
177.48°
24" PIPELINE UBA-ORF, HEADING 177
x
x x
x
x x x x x x x xx
x
x
x
x
UP
UP
UP
CENTER LINE OF x x
2W
2V
2U
2N
1W
1V
1U
EXISTING ROAD x
TO JETTY-2
G.E 626198.043
x G.N 9730386.077
xx
x
x
x
x
CENTRE OF SELF
SUPPORT STRUCTURE
x
x
FOR TANKAGE FLARE
GE. 625971.760
x
GN. 9730436.551 x x x
H
xx
x
x
x
x
x
x
x
x
x
x
x
x
x x x x
x
x
ROAD
x xx
CONSTR.
x
ROAD
x
CONSTR.
xx
x
x
x x
x
x x
x
x x x
x
ROAD x
x
CONSTR.
ROAD
x x
x
CONSTR.
x
D
x
x
x
CENTRE OF DERRICK ROAD
STRUCTURE FOR FLARE
x
G.E
TR-3625776.7402
CONSTR.
G.N 9729951.5209
x
x
x
x
R61
x
x
x
168-D-31002
x
~
168-D-31003
x
168-D-31001
x
x
P2
x
x
R108
x
x
x x
x x
x
PERMANENT
BRIDGE RETAINING
WALL
x x x x x x x
x
"B"
x
x
x x
"B"
x x
x
WALL
RETAINING
x x
x
x
x
x
x
x
+ 13.303 + 13.303 + 13.303
x
820.0000
x
x
x
x
x
x
x +12.783
x
x
+12.647 +12.647 +12.647 EQUIPMENT ACCESS
x
TRUCK+ TURNING
15.350 AREA
x
x
+ 15.350
x
BULLDOZERFI RE TRUCK
A TURNING
ARE
x
PERMANENT
PARK (6.0 M WIDTH) +15.350
x
x
x
BRIDGE
x x x
CONTROL BOX#4 LEACHATE
LINE
x
x
DRAIN LINE
CONTROL BOX#3
x
EXISTING
x
x
BOX#2
CONTROLSHELTER
POND
DRAIN LINE
DRAIN LINE
POND ACCES
CONTROL BOX#1
x
LEACHATE
+10.800
x
ACCESS FOUNDATION
BLOWER
LEACHATE
ACCESS LEACHATE PUMP
5002
5001
LT
x FLBS
x
TO SHOWER LINE
x
x
x
x
x
x 1
)
162-D-31001
(NOTE
x x
x
x
x
x
x x
x
x 162-F-31001A 161-E-31003
x
x
161-E-31002
x
B05
x 162-F-31001B 161-E-31001
x
x
x
x x
x
164-TK-31003
±0.00
x
x
x
x x x
106
x x 164-TK-31001
114
116
115
103
x
111
113
105
102
110
109
112
104
107
x 160-B-31001
x
x
108
x
±0.00
x
164-E-31001C
164-E-31001B
1
164-E-31001A
x
x
x
627955.57 9731794.95
x x
x
x x x
x
1
x
x
x
x
x x
PASSENGER
x
x
TERMINAL
x
x
x
x
x
x
x
x
x
x
x
OSMOSIS x
x
REVERSEAREA
x x
x x
x
x x
x x
CONTROL
PANEL
TRENCH
CABLE
FENCE
x
x
x
x
H
x
x
x
x
V
x
x
x
x x
x x x
x
x
x
x
MOSQUE
TP - 03 TP - 03
TP - 04 TP - 04 TP - 04 TP - 04
x
x x
x
x
GL+13.5
MUSTER
POINT
STORAGE
CUTTING
VEGETABLE
GARBAGE
KITCHEN
TOILET
ENTRANCE
WASHING
DISH
& POT
SERVICE
GL+12.0
S2
x
157 627957.31 9732319.95 9726000mN
P1
SURVEY DETAILS
GEODETIC PARAMETERS
Datum : WGS84 Projection : UTM (SOUTH)
UCC-SA-HDD-BH-02 Spheroid
Semi-major axis
: WGS84
: 6378137.000
Zone
Central Meridian
: 53 S
: 132° E
Semi-minor axis : 6356752.314 Latitude of origin : 00° (Equator)
Inverse flattening : 298.257223563 False Easting : 500 000m
Unit of Measurement : International meter False Northing : 10 000 000m
Scale Factor at CM : 0.9996
SURVEY EQUIPMENTS
Navigation System : MRU :
Positioning systems : Sub-Bottom Profiler :
Heading System : Magnetometer :
USBL System : SBES :
DING 177.48°
P2 VERTICAL DATUM
All water depth is expressed with reference to Lowest Astronomical Tide (LAT)
NOTES
.48°
NORTH UP CHART
PROPOSE ANCHOR PATTERN
MV TRINITY SURVEYOR
UCC-SA-HDD-BH-03 UCC-SA-HDD-BH-01
75
EXISTING CABL
Meters