S+3 Schedule.

schedule

Uploaded by

vinothjkb24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

S+3 Schedule.

schedule

Uploaded by

vinothjkb24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

S+3 9 MONTHS

Project Name 9/1/2024


Task Name Duration Start

FOUNDATION 60 days 9/1/2024


1 EXCAVATION 5 days 9/1/2024
2 FOUNDATION UPTO PLINTH 45 days 9/6/2024
3 BASEMENT WORK 10 days 10/21/2024
RCC SUPERSTRUCTURE 100 days 10/31/2024
1 SILT SLAB 25 days 10/31/2024
2 01 SLAB 20 days 11/26/2024
3 02 SLAB 20 days 12/17/2024
4 TERRACE SLAB 20 days 1/7/2025
5 STRUCTURE OVER TERRACE 15 days 1/28/2025
BRICK WORK 92 days 12/10/2024
1 STILT FLOOR 7 days 12/10/2024
2 01 FLOOR 25 days 12/31/2024
3 02 FLOOR 25 days 1/21/2025
4 03 FLOOR 25 days 2/11/2025
5 ABOVE TERRACE 10 days 2/19/2025
INTERNAL PLASTER 105 days 12/17/2024
1 STILT FLOOR 15 days 12/17/2024
2 01 FLOOR 25 days 1/25/2025
3 02 FLOOR 25 days 2/15/2025
4 03 FLOOR 25 days 3/8/2025
5 ABOVE TERRACE 15 days 3/1/2025
EXTERNAL PLASTER 35 days 3/8/2025
1 TERRACE TO STILT FLOOR 30 days 3/8/2025
2 ABOVE TERRACE 5 days 3/1/2025
FABRICATION WORKS 16 days 4/8/2025
1 BALCONY RAILING 8 4/8/2025
2 WINDOW GRILL 8 5/4/2025
PH WORKS 36 days 2/19/2025
1 FLAT INTERNAL 21 2/19/2025
2 EXTERNAL PLUMBING 15 4/8/2025
WATER PROOFING 24 days 2/20/2025
1 FLAT INTERNAL 10 days 2/20/2025
2 WATER TANK TREATMENT 7 days 3/19/2025
3 ROOF TREATMENT 7 days 3/19/2025
SCAFFOLDING & SAFTEY NET
21 days 3/8/2025
FIXING
1 SCAFFOLDING' 14 days 3/8/2025
2 DESCAFFOLDING 7 days 4/15/2025
DADO FIXING 12 days 1/8/2025
1 01 FLOOR 3 days 3/22/2025
2 02 FLOOR 3 days 3/19/2025
3 03 FLOOR 3 days 4/9/2025
4 SILT FLOOR 3 days 1/8/2025
FLOORING 42 days 3/26/2025
1 01 FLOOR 7 days 3/26/2025
2 02 FLOOR 7 days 3/23/2025
3 03 FLOOR 7 days 4/13/2025
4 STILT FLOOR 7 days 1/12/2025
5 TEERACE FLOOR 7 days 3/29/2025
INT ELECT WIRING + D/SHUTTERS 28 days 1/4/2025
1 SILT FLOOR 7 days 1/4/2025
2 01 FLOOR 7 days 1/11/2025
3 02 FLOOR 7 days 1/19/2025
4 03 FLOOR 7 days 1/27/2025
LIFT WORK 40 days 4/2/2025
1 GUIDE CHANNEL FIXING 3 days 4/2/2025
2 MECH INSTALLATION 30 days 4/5/2025
3 FACIA COMPLETION 7 days 5/5/2025
EXTERNAL PAITING 20 days 4/23/2025
1 FIRST COAT INCL TEXTURE 14 days 4/23/2025
2 SECOND COAT 6 days 5/8/2025
INTERNAL PRIMER 35 days 1/22/2025
1 01 FLOOR 10 days 4/2/2025
2 02 FLOOR 10 days 4/2/2025
3 03 FLOOR 10 days 4/23/2025
4 SILT FLOOR 5 days 1/22/2025
5 DOOR FITTINGS 10 days 4/12/2025
UPVC WINDOWS 10 days 4/22/2025
1 01 FLOOR 3 days 4/22/2025
2 02 FLOOR 3 days 4/25/2025
3 03 FLOOR 3 days 4/28/2025
4 SILT FLOOR 1 days 5/1/2025
INTERNAL PAINTING 1ST COAT 35 days 4/23/2025
1 01 FLOOR 10 days 4/23/2025
2 02 FLOOR 10 days 4/26/2025
3 03 FLOOR 10 days 4/29/2025
4 SILT FLOOR 5 days 5/2/2025
CP & VITROUS FITTINGS 10 days 5/4/2025
1 01 FLOOR 3 days 5/4/2025
2 02 FLOOR 3 days 5/7/2025
3 03 FLOOR 3 days 5/10/2025
4 SILT FLOOR 1 days 5/10/2025
FLAT CLEANING 7 days 5/8/2025
256.00 8.5 36

5/15/2025
TOTAL
Finish
QUANTITY
10/31/2024
9/6/2024
10/21/2024
10/31/2024
2/12/2025
11/25/2024
12/16/2024
1/6/2025
1/27/2025
2/12/2025
3/8/2025
12/17/2024
1/25/2025
2/15/2025
3/8/2025
3/1/2025
4/2/2025
1/1/2025
2/19/2025
3/12/2025
4/2/2025
3/16/2025
4/7/2025
4/7/2025
3/6/2025
5/12/2025
4/16/2025
5/12/2025
4/23/2025
3/21/2025
4/23/2025
3/26/2025
3/2/2025
3/26/2025
3/26/2025
4/22/2025
3/22/2025
4/22/2025
4/12/2025
3/25/2025
3/22/2025
4/12/2025
1/11/2025
4/20/2025
4/2/2025
3/30/2025
4/20/2025
1/19/2025
4/5/2025
2/3/2025
1/11/2025
1/18/2025
1/26/2025
2/3/2025
5/12/2025
4/5/2025
5/5/2025
5/12/2025
5/14/2025
5/7/2025
5/14/2025
5/3/2025
4/12/2025
4/12/2025
5/3/2025
1/27/2025
4/22/2025
5/4/2025
4/25/2025
4/28/2025
5/1/2025
5/4/2025
5/9/2025
5/3/2025
5/6/2025
5/9/2025
5/7/2025
5/13/2025
5/7/2025
5/10/2025
5/13/2025
5/13/2025
5/15/2025
S+5 20 MONTHS

Project Name 7/1/2024


Task Name Duration Start

FOUNDATION 90 days 7/1/2024


1 EXCAVATION 10 days 7/1/2024
2 FOUNDATION UPTO PLINTH 70 days 7/11/2024
3 BASEMENT WORK 10 days 9/19/2024
RCC SUPERSTRUCTURE 100 days 9/29/2024
1 SILT SLAB 45 days 9/29/2024
2 01 SLAB 45 days 11/14/2024
3 02 SLAB 45 days 12/30/2024
4 3 SLAB 45 days 2/14/2025
5 4 SLAB 45 days 4/1/2025
6 TERRACE SLAB 45 days 5/17/2025
7 STRUCTURE OVER TERRACE 30 days 7/2/2025
BRICK WORK 92 days 12/3/2024
1 STILT FLOOR 14 days 12/3/2024
2 01 FLOOR 30 days 1/18/2025
3 02 FLOOR 30 days 3/5/2025
4 03 FLOOR 30 days 4/20/2025
5 04 FLOOR 30 days 6/5/2025
6 05 FLOOR 30 days 7/21/2025
7 ABOVE TERRACE 15 days 8/8/2025
INTERNAL PLASTER 105 days 12/17/2024
1 STILT FLOOR 15 days 12/17/2024
2 01 FLOOR 50 days 2/17/2025
3 02 FLOOR 50 days 4/4/2025
4 03 FLOOR 50 days 5/20/2025
5 04 FLOOR 50 days 7/5/2025
6 05 FLOOR 50 days 8/20/2025
7 ABOVE TERRACE 20 days 8/23/2025
EXTERNAL PLASTER 35 days 8/23/2025
1 North Elevation 15 days 8/23/2025
2 East Elevation 15 days 9/8/2025
3 West Elevation 15 days 9/24/2025
4 South Elevation 30 days 10/10/2025
FABRICATION WORKS 16 days 11/10/2025
1 BALCONY RAILING 8 11/10/2025
2 WINDOW GRILL 8 11/19/2025
PH WORKS 36 days 4/8/2025
1 01 FLOOR 15 days 4/8/2025
2 02 FLOOR 15 days 5/24/2025
3 03 FLOOR 15 days 7/9/2025
4 04 FLOOR 15 days 8/24/2025
5 05 FLOOR 15 days 10/9/2025
EXTERNAL PLUMBING 30 days 9/14/2025
1 North Elevation 10 days 9/14/2025
2 East Elevation 10 days 9/30/2025
3 West Elevation 10 days 10/16/2025
WATER PROOFING 24 days 4/9/2025
1 01 FLOOR 10 days 4/9/2025
2 02 FLOOR 10 days 5/25/2025
3 03 FLOOR 10 days 7/10/2025
4 04 FLOOR 10 days 8/25/2025
5 05 FLOOR 10 days 10/10/2025
6 WATER TANK TREATMENT 7 days 9/15/2025
7 ROOF TREATMENT 7 days 9/15/2025
SCAFFOLDING & SAFTEY NET
21 days 8/20/2025
FIXING
1 SCAFFOLDING' 14 days 8/20/2025
2 DESCAFFOLDING 7 days 11/16/2025
DADO FIXING 12 days 4/24/2025
1 01 FLOOR 10 days 4/24/2025
2 02 FLOOR 10 days 6/9/2025
3 03 FLOOR 10 days 7/25/2025
4 04 FLOOR 10 days 9/9/2025
5 05 FLOOR 10 days 10/25/2025
6 SILT FLOOR 3 days 1/8/2025
FLOORING 42 days 5/5/2025
1 01 FLOOR 15 days 5/5/2025
2 02 FLOOR 15 days 6/20/2025
3 03 FLOOR 15 days 8/5/2025
4 4 FLOOR 15 days 9/20/2025
5 5 FLOOR 15 days 11/5/2025
6 STILT FLOOR 15 days 1/12/2025
7 TEERACE FLOOR 15 days 9/25/2025
INT ELECT WIRING + D/SHUTTERS 28 days 1/4/2025
1 SILT FLOOR 10 days 1/4/2025
2 01 FLOOR 10 days 5/20/2025
3 02 FLOOR 10 days 5/31/2025
4 03 FLOOR 10 days 6/11/2025
5 4 FLOOR 10 days 6/22/2025
6 5 FLOOR 10 days 7/3/2025
LIFT WORK 90 days 10/9/2025
1 GUIDE CHANNEL FIXING 20 days 10/9/2025
2 MECH INSTALLATION 60 days 10/29/2025
3 FACIA COMPLETION 10 days 12/28/2025
EXTERNAL PAITING 20 days 9/24/2025
1 North Elevation -First coat 15 days 9/24/2025
2 East Elevation -First coat 15 days 10/10/2025
3 West Elevation - First coat 15 days 10/26/2025
4 South Elevation - First coat 15 days 10/20/2025
5 SECOND COAT 6 days 2/12/2026
INTERNAL PRIMER 35 days 1/30/2025
1 01 FLOOR 30 days 5/20/2025
2 02 FLOOR 30 days 7/5/2025
3 03 FLOOR 30 days 8/20/2025
4 04 FLOOR 30 days 1/27/2025
5 05 FLOOR 30 days 10/10/2025
6 SILT FLOOR 5 days 1/30/2025
7 DOOR FITTINGS 6/19/2025
UPVC WINDOWS 10 days 9/14/2025
1 North Elevation 3 days 9/14/2025
2 East Elevation 3 days 9/30/2025
3 West Elevation 3 days 10/16/2025
4 South Elevation 3 days 11/16/2025
INTERNAL PAINTING 1ST COAT 35 days 6/19/2025
1 01 FLOOR 15 days 6/19/2025
2 02 FLOOR 15 days 8/4/2025
3 03 FLOOR 15 days 9/19/2025
4 04 FLOOR 15 days 2/26/2025
5 05 FLOOR 15 days 11/9/2025
6 SILT FLOOR 5 days 2/4/2025
CP & VITROUS FITTINGS 10 days 7/5/2025
1 01 FLOOR 3 days 7/5/2025
2 02 FLOOR 3 days 8/20/2025
3 03 FLOOR 3 days 10/5/2025
4 04 FLOOR 3 days 3/14/2025
5 05 FLOOR 3 days 11/25/2025
6 SILT FLOOR 1 days 2/10/2025
FLAT CLEANING 25 days 11/25/2025
597.00 19.6 122 4

2/18/2026
TOTAL
Finish
QUANTITY
9/29/2024
7/11/2024
9/19/2024
9/29/2024
8/1/2025
11/13/2024
12/29/2024
2/13/2025
3/31/2025
5/16/2025
7/1/2025
8/1/2025
8/23/2025
12/17/2024
2/17/2025
4/4/2025
5/20/2025
7/5/2025
8/20/2025
8/23/2025
10/9/2025
1/1/2025
4/8/2025
5/24/2025
7/9/2025
8/24/2025
10/9/2025
9/12/2025
11/9/2025
9/7/2025
9/23/2025
10/9/2025
11/9/2025
11/27/2025
11/18/2025
11/27/2025
10/24/2025
4/23/2025
6/8/2025
7/24/2025
9/8/2025
10/24/2025
10/26/2025
9/24/2025
10/10/2025
10/26/2025
10/20/2025
4/19/2025
6/4/2025
7/20/2025
9/4/2025
10/20/2025
9/22/2025
9/22/2025
11/23/2025
9/3/2025
11/23/2025
11/4/2025
5/4/2025
6/19/2025
8/4/2025
9/19/2025
11/4/2025
1/11/2025
1/27/2025
5/20/2025
7/5/2025
8/20/2025
10/5/2025
11/20/2025
1/27/2025
10/10/2025
7/13/2025
1/11/2025
5/30/2025
6/10/2025
6/21/2025
7/2/2025
7/13/2025
1/7/2026
10/29/2025
12/28/2025
1/7/2026
2/18/2026
1/17/2026
2/2/2026
2/18/2026
2/12/2026
2/18/2026
9/19/2025
6/19/2025
8/4/2025
9/19/2025
2/26/2025
11/9/2025
2/4/2025
11/9/2025
11/19/2025
9/17/2025
10/3/2025
10/19/2025
11/19/2025
11/24/2025
7/4/2025
8/19/2025
10/4/2025
3/13/2025
11/24/2025
2/9/2025
2/13/2025
7/8/2025
8/23/2025
10/8/2025
3/17/2025
11/28/2025
2/13/2025
12/20/2025
S.No Activity No. of days

1 Marking 2
2 Excavation 5
3 PCC 2
4 Raft marking 1
5 Raft reinfocement 8
6 Raft Shuttering 2
7 Raft Concreting 2
8 Raft beam shuttering 2
9 Raft beam concreting 2
10 Column reinforcement upto plinth beam 2
11 Column shuttering 1
12 Column Concreting 1
13 Back filling 7
14 Consolidation 7
15 Plinth beam PCC 1
16 Plinth beam reinforcement 3
17 Plinth beam shuttering 1
18 Plinth beam concreting 1
19 Brick work in Basement 3
20 Back filling 2
21 Compaction 4
22 DPC 1
60.00
S.No Activity No. of days Task Name
Foundation
1 Marking 1 First 9 columns
2 Excavation 2 Excavation
3 PCC 2 PCC

Footing & Column Pedestal


4 Footing marking 2 reinforcement
5 footing reinfocement 2 Footing concrete
6 Footing Shuttering 2 Column pedestal concrete
7 Footing Concreting 2 Backfilling
Second 12 columns
8 Column pedestal reinforcement upto plin 1 Excavation
9 Column pedestal shuttering 1 PCC
Footing & Column Pedestal
10 Column pedestal Concreting 1 reinforcement
11 Back filling 2 Footing concrete
12 Consolidation 2 Column pedestal concrete
13 Plinth beam PCC 1 Backfilling
14 Plinth beam reinforcement 2 Consolidation
15 Plinth beam shuttering 1 Plinth beam PCC
16 Plinth beam concreting 1 Plinth beam reinforcement
17 Brick work in Basement 2 Plinth beam concreting
18 Back filling 1 Fly ash Brick work in Basement
19 Compaction 1 Back filling
20 DPC 1 Compaction
30.00 Grade slab concrete
Duration Start Finish
19 days 9/14/2024 10/3/2024

1.00 9/14/2024 9/14/2024


1.00 9/15/2024 9/15/2024

1.00 9/16/2024 9/16/2024

1.00 9/17/2024 9/17/2024


1.00 9/18/2024 9/18/2024

1.00 9/18/2024 9/18/2024


1.00 9/19/2024 9/19/2024

1.00 9/20/2024 9/20/2024

1.00 9/21/2024 9/21/2024


1.00 9/22/2024 9/22/2024
2.00 9/22/2024 9/24/2024
1.00 9/25/2024 9/25/2024
1.00 9/26/2024 9/26/2024
1 9/27/2024 9/27/2024
2.00 9/28/2024 9/29/2024
1.00 9/30/2024 10/1/2024
1.00 10/2/2024 10/2/2024
1.00 10/3/2024 10/3/2024