0% found this document useful (0 votes)
8 views

Ex 12 Chap 8

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Ex 12 Chap 8

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Microsoft Excel 16.

0 Sensitivity Report
Worksheet: [Book1]Sheet1
Report Created: 20/03/2023 11:50:43 CH

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$10 E 80 0 63 12 15.5
$C$10 S 120 0 95 31 8.0
$D$10 D 0 -24 135 24 1E+030

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$B$15 M1 E 200 31 200 80 40
$B$16 M2 E 320 32 320 80 120
$B$17 M3 E 2080 0 2400 1E+030 320
The range of optimality

47.5 75
87.0 126
-10000000000000000 159
Microsoft Excel 16.0 Answer Report
Worksheet: [Book1]Sheet1
Report Created: 20/03/2023 11:50:50 CH
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0,031 Seconds.
Iterations: 3 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0,000001
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Max)


Cell Name Original Value Final Value
$B$11 Max Total Profit E 16440 16440

Variable Cells
Cell Name Original Value Final Value Integer
$B$10 E 80 80 Contin
$C$10 S 120 120 Contin
$D$10 D 0 0 Contin

Constraints
Cell Name Cell Value Formula Status Slack
$B$15 M1 E 200 $B$15<=$D$15 Binding 0
$B$16 M2 E 320 $B$16<=$D$16 Binding 0
$B$17 M3 E 2080 $B$17<=$D$17 Not Binding 320
Material E S D Amount Available
M1 1 1 1 200
M2 1 2 4 320
M3 8 12 14 2400
Objective function 63 95 135

Decision variables
Tons produced E S D
80 120 0
Max Total Profit 16440

Constraints
M1 200 <= 200
M2 320 <= 320
M3 2080 <= 2400
Material E S D Amount Available
1 1 1 1 200
2 1 2 4 320
3 8 12 14 2400
Objective function 69 93 139

E S D
100 140 0
Max profit 18680

Constraints
1 240 <= 200
2 380 <= 320
3 2480 <= 2400

You might also like