N 18800A - RS 5000 Q 2151 - RD (S) - Overall Equipment Layout
N 18800A - RS 5000 Q 2151 - RD (S) - Overall Equipment Layout
E 683781.106 E 684070.827
NORTH TRUE N 2666999.742
PLOT LIMIT
N 2667077.247
E 683781.106 E 684070.827
PLOT LIMIT
NORTH
299909
N 2666999.742 N 2667077.247
37909
37909 250000 12000
E 683827.523 E 684069.031
N 2666972.917 N 2667037.524
MAIN GATE-2
6m WIDE ROAD 6m WIDE ROAD
PLOT LIMIT
6m WIDE ROAD
220kV CABLE TRENCH
6m WIDE ROAD
FUTURE OHL-1
R
SPACE FOR
+0.00(FRL)
+0.210(FPL)
FUTURE DEVELOPMENT
PAVEMENT
+1.400(SSL/FFL)
+1.320(SSL/FFL)
+1.320(SSL/FFL)
FUTURE OHL-2
R
-0.488(SSL/FFL)
SLOPE
1%
+1.400(SSL/FFL)
STAIR-3
OFF LOADING PLATFORM-2 Y
SPARE OHL -1
PAVEMENT
PAVEMENT
+1.320(SSL)
+1.400(FFL)
B
+0.210(FPL)
6m WIDE ROAD
37909
R
SPARE OHL -3
SPARE IBT -01
Y
CABLE TRENCH
CABLE TRENCH
SPARE OHL -2
Y
IBT -03
B
800mm W x 600mm D
IBT -04
R
SPARE OHL -4
Y
299909
299909
6m WIDE ROAD
220kV CABLE TRENCH 220kV CABLE TRENCH
DN
220kV CABLE TRENCH
250000
220kV CABLE TRENCH
6.4m WIDE ROAD
220kV CABLE TRENCH CONTROL
CABLE
TUNNEL
+0.350
+1.375 (FFL/SSL)
(FFL/SSL) SLOPE 1:8 OFF LOADING PLATFORM
UP
RAMP +1.400 (FFL/SSL)
CO2
10m WIDE ROAD
FENCE
+0.400 (TOC) BATTERY EYE WASH &
+0.350 (TOC) ROOM SINK STATION
+1.400 (FFL)
ROOM
MV CABLE +1.320 (SSL)
TRENCH
CORRIDOR TOILET
STAIR-1
+0.300 (TOG)
SOAK
WAY
SUMP PIT WITH
CHEQUER PLATE COVER
1000X1000X2580mm
CHAINLINK
REMOVABLE
FENCE LV CABLE SEPTIC TANK
PORTABLE TRENCH
AUX. TR. -3
WATER TANK +0.400 (TOC)
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
+0.300 (TOG)
TOP OF GRAVEL (TYP)
DC ROOM
CHEQUER PLATE CHEQUER PLATE CHEQUER PLATE
COVER COVER COVER
+0.350(TOC) +0.350(TOC)
TELECOM INTERFACE
+0.350(TOC)
+0.400 OFF LOADING PLATFORM
ROOM ROOM
+0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC)
+0.400(TOC) +0.400(TOC) +0.400(TOC) +1.400 (FFL/SSL) LVAC ROOM
1% SLOPE
6m WIDE ROAD
IN SCREED
+1.400 (FFL/SSL)
VALVE STATION
DELUGE
AIR LOCK
CORRIDOR
+0.350(TOC) +0.350(TOC) +1.400 (FFL)
+1.320 (SSL)
CIS
+0.350(TOC)
+0.350(TOC)
+0.400(TOC) +0.300(TOG)
+0.400(TOC)
+0.350(TOC)
CIS
+0.350(TOC) +0.400(TOC)
+0.350 ROOM
JACKING PAD
500MVA IBT-2 500MVA IBT-3 700X550X20mm THK.
GALVANIZED PLATE
500MVA IBT-4
(TYP 4nos.)
+0.350(TOC) +0.350(TOC) +0.350(TOC)
CIS CIS CIS
+0.350(TOC) +0.350 +0.350
+0.300
33KV CABLE
TRENCH
TRENCH
400kV/200kV CONTROL BUILDING
33KV CABLE
TRENCH
FUEL TANK +0.300(TOG) +0.300(TOG) +0.300(TOG)
+0.300(TOG) +0.350(TOC)
OUTDOOR
CABLE DUCT BANK PIT CABLE DUCT BANK PIT 33kV CABLE TRENCH
+0.350 (FFL/SSL)
REMOVABLE
FIRE PUMP ROOM HANDRAIL
+1.375
(FFL/SSL)
+0.350
+0.320 (FFL/SSL)
-1.020
(FFL/SSL)
33kV CABLE TRENCH (FFL/SSL)
1% SLOPE
MONORAIL +0.350 +0.300(T0C) +0.300(T0C) EXPANSION
ABOVE (FFL/SSL) DN JOINT 20mm
ELECTRICAL +0.300 STAIR-3 +1.400
(TOC)
PUMP BASE (FFL/SSL)
CABLE TRENCH
FIRE WATER COVERED CAR PARKING AREA
+0.800 (TOC)
TANK-1
E=683827.523 E=684069.031
GD01
1% SLOPE
STAIR-1
1:8 SLOPE
=C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
SPACE FOR FUTURE
RAMP
UP
400kV SWGR. HALL EXTENSION OFF LOADING
400KV SWITCH ROOM
400KV SWITCH ROOM
+1.400(FFL)
REMOVABLE
HANDRAIL
SLIDING DOOR
SLIDING DOOR
+1.320(SSL) (FFL/SSL)
(FFL/SSL) 1% SLOPE
+1.370 +1.400
(FFL/SSL) (FFL/SSL)
6m WIDE ROAD REMOVABLE
1% SLOPE
+1.400
(FFL/SSL)
HANDRAIL
N=2666972.917 N=2667037.524
UP
8R-UP
+1.400
OFFLOADING
PLATFORM
6m WIDE ROAD
RAMP-UP (FFL/SSL) RAMP-UP
SLOPE 1:8 SLOPE 1:8
1% SLOPE
STAIR-2 STAIR-1 +0.350
UP
(FFL/SSL)
250000
(FFL/SSL)
+0.200
REMOVABLE
+1.380 (FPL)
(FFL/SSL) HANDRAIL
37909 12000
(FFL/SSL)
DN DN
PIT PIT
CABLE TRENCH
6m WIDE ROAD
CABLE TRENCH
6m WIDE ROAD
4725
PIT
MAIN GATE
6m WIDE ROAD 6m WIDE ROAD
GDO2
GD01
TOILET
+0.500 (FFL)
+0.450 (SSL)
FD
SOAK
GUARD ROOM
+0.500 (FFL)
WAY
+0.450 (SSL)
PANTRY
GATE HOUSE +0.500 (FFL)
+0.450 (SSL)
FD
SEPTIC TANK
100Ø RAIN
WATER PIPE
GATE
CAGE LADDER
ADDC INTERFACE
+1.000
(TOC)
6000
TRANSFORMER
TR.
ROOM
BOUNDARY WALL
CO2
N 2666731.410
EXISTING 11kV CABLE
E 684133.638
12000
N 2666796.017
KEY PLAN
6000
NOTES :-
1. ALL DIMENSIONS ARE IN MILIMETRES AND LEVELS IN METERS.
2. EQUIPMENT SHOWN IN DOTTED LINE ARE FUTURE.
3. FINISHED GROUND LEVEL EL. ±0.00 CORRESPONDS TO +7.40 NADD
6m WIDE ROAD
4. FOR HVAC, FF PIPE LINES & CABLE TRAYS ARE SHOWN INDICATIVE ONLY.
LEGEND :-
8500
220kV CABLE TRENCH
1000 WITH REMOVABLE HANDRAIL
RL - ROAD LEVEL
6m WIDE ROAD
FUTURE OHL-1
R
9800
- GRAVEL FILL AREA
UP
FOR DN
98000
CE
FUTURE OHL-2
R
DN
SPA
STAIR-3
- FUTURE
3125
OFF LOADING PLATFORM
Y LVL - LEVEL
9800
UP
DM DM
B
E 684031.824
MIMIC
N 2666956.960 - GIB SUPPORT STRUCTURE FOUNDATION
3850
E 684020.811 PANEL-2
5750
APPARATUS
N 2666954.014 E 684051.824
BREATHING
+XV09
=D00
2000 5075 2525 N 2666957.652
=D01+S1
=D01
FUTURE OHL-1
3300
DL R
=D02+S1
- DELUGE VALVE
=D02
FUTURE TR. -1
R DV
SPARE OHL -1
Y
B
1600 1600
6m WIDE ROAD
5900
=D03+S1
Y
=D04 =D03
SPARE OHL -1
=D04+S1
B
6m WIDE ROAD
SPARE OHL -2
DK
- FIRE MAIN RING
=D05+S1
3300
=D06 =D05
CAB. FDR. -3
=D06+S1
4850
B/C -1
- CO2 NOZZLES
=D00
+P1
METERING
DJ R =SYN3 15500 4000 4000
R
SPARE OHL -3
=D07+S1
=D07
SPARE IBT -04 SPARE IBT -04
Y
B Y - PRESSURE RELIEF DAMPER
9800
=D08+S1
=D08
5250
CAB. FDR. - DP01
R B
=D09
IBT -03 IBT -03
HVAC LEGEND :-
GH Y
500
B
=D11 =D10
DG B/S -1
CABLE TRENCH
=D10+S1
800mm W x 800mm D
3950
49750
B/S -2 CABLE TRENCH
49750
=D11+S1
UP
DF
R
=D12+S1
SPARE OHL -2
=D13 =D12
CAB. FDR. - DP02
R
Y
9800
=D13+S1
IBT -02 Y IBT -02
6750
BOUNDARY WALL
=D14+S1
=D14
STAIR-2
UP
CAB. FDR. -4
800mm W x 600mm D
=D00
+P2
PLOT LIMIT
METERING
DE =SYN4
=D15
=D15+S1
B/C -2
R
3300
=D17 =D16
=D16+S1
IBT -01 IBT -01
Y
7000
B R
SPARE OHL -4
=D17+S1
SPARE OHL -3
16001600
Y
=D18+S1
=D18
SPARE OHL -4
DD B
R
=D19+S1
=D19
3300
FUTURE TR. -2
299909
299909
Y
B
6100
=D20+S1
=D21 =D20
FUTURE OHL-2
R
=D21+S1
FUTURE TR. -3
Y
DC B E 684061.955
+XV10
N 2666919.784
=D00
220kV TRENCH = 1600mm W x 1450mm D
8500
3700
3935
BREATHING
APPARATUS
10500 220kV CABLE TRENCH 220kV CABLE TRENCH
12
DB
220kV CABLE TRENCH 220kV CABLE TRENCH
STAIR-1
UP
3125
1000
DN
220kV TRENCH = 1600mm W x 1450mm D
DA
E 684044.686
UP
220kV CABLE TRENCH N 2666908.879
250000
16725
E 684033.674
N 2666605.933
11400
220kV CABLE TRENCH
13615
D3 D6
CONTROL
220kV CABLE TRENCH CABLE 6m WIDE ROAD
TUNNEL
8950
CONTROL
E. 684045.879 CABLE
N. 2666895.092 TUNNEL E. 684082.199
N. 2666904.819
+1.375 (FFL/SSL)
+0.200 (FPL) UP
RAMP OFF LOADING PLATFORM
+0.350 (SSL)
E. 684039.994 6000
N. 2666892.711 C1
+1.400 (FFL)
+1.225 (SSL)
REV.D
AUX. TR. -2 AIRLOCK
5355
UP
+1.320 (SSL)
+1.400 (FFL)
+0.200 (FPL)
CO2 ROOM
+0.400 (PL)
n
r
b
y
8000
6100
7250
+1.300 (FFL)
TRANSFORMER
+1.225 (SSL) REV.D
BREATHING
8m WIDE ROAD
B
R
Y
APPARATUS
9700
+1.400 (FFL)
C2
PIPE TO
+1.320 (SSL) DN
TOILET SOAK
BATTERY ROOM STAIR-1
+0.480 (FFL/SSL)
4845
8610
WAY
FHRC
19000 19000 19000 19000 AUX. TR. -3
MV CABLE
TRENCH
N 2666882.060
SEPTIC TANK
+0.400 (PL)
n
r
b
y
E 684025.659 PANTRY
PORTABLE +1.400 (FFL)
6100
+1.225 (SSL)
WATER TANK C4
SUMP
500MVA IBT -3 (T130) SUMP
500MVA IBT -2 (T120) SUMP
500MVA IBT -1 (T110)
CORRIDOR
WITH SUNSHADE N 2666864.613 INTERFACE ROOM
B
Y
PIT PIT PIT
1750
1750
(220kV FUTURE)
MV CABLE
1625 15150 2025 1525 7575 7575 1975 9150 9600
TRENCH
E 683970.598
1200
4675
PIT
4250
1000
1200 2000
DC ROOM +1.400 (FFL)
11430
+0.200 (FPL)
STAIR-3 TELECOM ROOM +1.320 (SSL)
DN 19180
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
9170
+1.375 (FFL/SSL)
FUTURE C6
OFF LOADING PLATFORM
500MVA IBT -4 (T140) LVAC ROOM
220kV CABLE TRENCH
4335
12800
6m WIDE ROAD
4280
7760 7010
20000 DV
+1.400 (FFL/SSL)
+1.400 (FFL)
+1.320 (SSL) REV.D
MIMIC
PANEL-3 C8
20000
15050
MV SWGR. ROOM
FHRC
CORRIDOR
APPARATUS
AIRLOCK CONSULTANT STAMP:
5690
+1.400 (FFL)
9070
+1.320 (SSL)
25560
E1 E2 E3 3W
1W 1V 1U
3W
1W 1V 1U
3W
1W 1V 1U
3V 3V 3V +1.400 (FFL)
+1.320 (SSL)
9620
3U 3U 3U
33kV CABLE TRENCH
11100
C9
4000
EA 6010
INTERFACE ROOM
FIRE WATER RELAY / SCMS ROOM (400kV FUTURE)
TANK-2 2N 2N 2N
8150
6800
2W 2V 2U 2W 2V 2U 2W 2V 2U N 2666860.023
6050
+0.050(FFL) E 684030.831
-0.100(SSL) PIPE TO WATER SPRAY SYSTEM
N 2666845.292
CAB. TRENCH
CAB. TRENCH
CAB. TRENCH
+1.400 (FFL)
RUNNING THROUGH BASEMENT
CONTROL
CONTROL
CONTROL
+1.320 (SSL)
+0.350 (FFL/SSL)
2800
2800
+0.071(FFL)
E 683975.767 TRENCH
LE
AB
LC L
+0.800(TOC) PIT
UP
CABLE 2x3 - 150mmØ PIPES RO NE
NT UN
10500
PIT
CO T
-0.600(FFL/SSL)
EB CABLE DUCT BANK PIT CABLE DUCT BANK 33kV CABLE TRENCH 725
C10
FIRE PUMP UP
STAIR-2
ROOM
33kV TRENCH = 1000mm W x 1000mm D E. 684041.751
5010
4050
REFERENCE DRG.
N. 2666861.961
PIT DN E. 684090.197
UP N. 2666874.921
DN
+0.800(TOC)
AB +0.480 (FFL/SSL)
850 100
RE SI =C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
3585
1:8 SLOPE
TU EN 3585
FU EXT
13200
R L
(5000mm Wx5000mm H)
(5000mm Wx5000mm H)
UP
FO AL -
12200
- -
OFF LOADING PLATFORM
ACER. H -
SP WG
S
0k
V
DRG. NO. TITLE REV. STATUS
6000
6m WIDE ROAD 40
5325
6m WIDE ROAD
3000
UP UP
3000
RAMP-UP RAMP-UP
AE
STAIR-2
UP UP
N 2666824.044 N 2666842.263
E 683966.726 DN A11 A12 E 684034.831 - D 06-05-24 DRAWING REVISED BASED ON COMMENTS CS:0209 SNR SNR JACOB
70500
0209 C 02-11-23 DRAWING REVISED BASED ON COMMENTS CS:0091 SNR SNR JACOB
REVISIONS
PIT
A3
PIT
A19 & AS PER TRANSCO WORKSHOP ON 26-09-23
4x2 - 200mmØ PIPES
0091 B 23-05-23 DRAWING REVISED BASED ON COMMENTS CS:0015 SNR SNR JACOB
CABLE TRENCH
800mm W x 800mm D
E 683970.420 E 684032.246
6m WIDE ROAD
41140
N 2666798.625 Y Y Y Y N 2666815.165 Y Y Y Y
800mm W x 600mm D
DTS NO: N-18800A- ****
6500
CABLE TRENCH
TRANSCO
6500
6000
6m WIDE ROAD
Endorsement from approved Designer/Subcontractor and Coordinators
7040
TOILET
SOAK
GATE WAY
4600
HOUSE
PANTRY
PIT SEPTIC TANK
CONTRACTOR:
Siemens Energy LLC
PIT PIT PIT P.O. BOX # 47015, Abu Dhabi
CABLE PIT
PIT
1600
DETAIL -4 United Arab Emirates
22625
TR.
1000
ROOM
FCU-1
1276
C02 ROOM
CONTRACT TITLE: Supply & Installation of 400/220kV Grid Station at Ruwais (VLTA)
FCU-2
1242
METERING
BOX
E 683892.130 4450
12000
N=2666796.017 OVERALL SUBSTATION EQUIPMENT LAYOUT
Subramanian
CHD SNR 06-05-24 Nagarasan
Jacob Pallathu
- PLAN & SECTIONS
+1.400(FFL) APPR JACOB 06-05-24 Abraham
PLOT LIMIT
(+8.800 NADD)
(Overall Layout)
0.200(FPL) DOC N0: N-18800A-RS-5000-Q-2151-S1_RD
E 683858.611 299909 E 684148.332 ±0.000(FRL/FGL) (+7.600 NADD)
N 2666710.021 N 2666787.526 ORIGINATOR REF: 400/220kV GRID STATION AT RUWAIS (VLTA)
(+7.40 NADD)
CURRENT SHEET SHEETS
CONTRACT NO ORIG SUBJECT TYPE NO REV SHEET NO. LAST QTY.
SUBSTATION TYPICAL LEVEL DETAILS CSD
NO -
N 1 8 8 0 0 A R S 5000 Q 2151 D 0 0 0 1 09
299909
E 683781.106 E 684070.827
N 2666999.742 N 2667077.247
PLOT LIMIT
PLOT LIMIT
37909
PROJECT
NORTH TRUE
37909 250000 12000
NORTH E 683827.523 E 684069.031
N 2666972.917 N 2667037.524
MAIN GATE-2
220kV CABLE TRENCH
6m WIDE ROAD
220kV CABLE TRENCH
6m WIDE ROAD
FUTURE OHL-1
R
B1 C3 B2 B3 B4 SPACE FOR
+0.00(FRL)
19000 19000 19000 19000 FUTURE DEVELOPMENT
+0.210(FPL)
PAVEMENT
+1.400(SSL/FFL)
+1.320(SSL/FFL)
FUTURE OHL-2
+1.320(SSL/FFL)
R
-0.488(SSL/FFL)
SLOPE
1%
+1.400(SSL/FFL)
STAIR-3
400kV System SWITCHGEARS :-
OFF LOADING PLATFORM-2
Y
SPARE OHL -1
PAVEMENT
PAVEMENT
+1.320(SSL)
+1.400(FFL)
B
N 2666882.060
Bay LCC / PANEL Bay LCC / PANEL
+0.210(FPL)
6m WIDE ROAD
E 684025.659 Description Description
R
SPARE OHL -3
SPARE IBT -01
Y
CABLE TRENCH
CABLE TRENCH
BA R
SPARE OHL -2
Y
IBT -03
B
SUMP
500MVA IBT -3 (T130) SUMP
500MVA IBT -2 (T120) SUMP
500MVA IBT -1 (T110) =C17+S1 *
800mm W x 600mm D
=C01 SPACE FOR FUTURE OHL -4 =C01+S1 =C17 SPACE FOR BUS SECTION -3
1760
1750
N 2666864.613 PIT PIT PIT IBT -04
R
SPARE OHL -4
Y
E 683970.598 1637.5 15125 2037.5 1537.5 7562.5 7562.5 1987.5 9150 9600 B
299909
299909
=C02 SPACE FOR FUTURE OHL -3 =C02+S1 =C18 SPACE FOR BUS SECTION -4 =C18+S1 *
6m WIDE ROAD
220kV CABLE TRENCH 220kV CABLE TRENCH
DN
220kV CABLE TRENCH
250000
=C03 I B T -1 (T110) =C03+S1 =C19 SPACE FOR FUTURE OHL -1 =C19+S1 *
220kV CABLE TRENCH
6.4m WIDE ROAD
220kV CABLE TRENCH CONTROL
+0.350
+1.375 (FFL/SSL)
(FFL/SSL) SLOPE 1:8 OFF LOADING PLATFORM
UP
RAMP +1.400 (FFL/SSL)
8m WIDE ROAD
*
LV CABLE
CHAINLINK
TRENCH
REMOVABLE
FENCE
BATTERY CO2
10m WIDE ROAD
=C04 OHL FEEDER : WMZD -2 =C04+S1 =C20 SPACE FOR FUTURE CABLE -1 =C20+S1
+0.400 (TOC)
ROOM
EYE WASH &
SINK STATION ROOM
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
Cooler Bank 3
Cooler Bank 2
Cooler Bank 1
+0.350 (TOC) +1.400 (FFL)
MV CABLE +1.320 (SSL)
TRENCH
CORRIDOR TOILET
STAIR-1
+0.300 (TOG)
SOAK
SUMP PIT WITH
WAY
CHEQUER PLATE COVER
1000X1000X2580mm
CHAINLINK
REMOVABLE
FENCE
LV CABLE
SEPTIC TANK
PORTABLE TRENCH
AUX. TR. -3
WATER TANK +0.400 (TOC)
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
+0.300 (TOG)
TOP OF GRAVEL (TYP)
DC ROOM
CHEQUER PLATE CHEQUER PLATE CHEQUER PLATE
FUTURE
COVER COVER COVER
TELECOM INTERFACE
*
+0.350(TOC) +0.350(TOC)
+0.350(TOC)
OFF LOADING PLATFORM ROOM ROOM
=C05 BUS COUPLER -1 / METERING =C05+S1 =C21 SPACE FOR BC -3 / METERING =C21+S1
+0.400
6m WIDE ROAD
1% SLOPE
IN SCREED
+1.400 (FFL/SSL)
VALVE STATION
AIR LOCK
500MVA IBT -4 (T140)
CORRIDOR
+0.350(TOC) +1.400 (FFL)
+0.350(TOC) +1.320 (SSL)
+0.350(TOC)
CIS
+0.350(TOC)
+0.400(TOC) +0.300(TOG)
+0.400(TOC)
+0.350(TOC)
CIS
+0.350(TOC) +0.400(TOC)
+0.350 ROOM
12800
+0.350(TOC) +0.350 +0.350
+0.300
FIRE WATER RELAY / SCMS ROOM
*
FIRE PUMP ROOM +0.350(TOC)
220KV CABLE
TRENCH
220KV CABLE
TRENCH
220KV CABLE
TRENCH
INTERFACE
TANK-2 CONTROL CABLE
ROOM
33KV CABLE
TRENCH TRENCH
TRENCH
33KV CABLE
400kV/200kV CONTROL BUILDING
TRENCH
FUEL TANK +0.300(TOG) +0.300(TOG) +0.300(TOG)
+0.300(TOG) +0.350(TOC)
OUTDOOR
3 DV & 1 Future
BASE
CABLE DUCT BANK PIT CABLE DUCT BANK PIT 33kV CABLE TRENCH
+0.350 (FFL/SSL)
FIRE PUMP ROOM REMOVABLE
HANDRAIL
+1.375
(FFL/SSL)
+0.350
+0.320 (FFL/SSL)
-1.020
(FFL/SSL) 33kV CABLE TRENCH (FFL/SSL)
1% SLOPE
MONORAIL +0.350 +0.300(T0C) +0.300(T0C) EXPANSION
(FFL/SSL) DN JOINT 20mm
11040
ABOVE
+0.300 STAIR-3
ELECTRICAL +1.400
PUMP BASE (TOC)
CABLE TRENCH
(FFL/SSL)
Connection
+0.800 (TOC)
TANK-1
GD01
*
1% SLOPE
STAIR-1
=C07 OHL FEEDER : SHPS -1 =C07+S1 =C23 SPACE FOR FUTURE CABLE -1 =C23+S1
1:8 SLOPE
=C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
SPACE FOR FUTURE
RAMP
UP
400kV SWGR. HALL EXTENSION OFF LOADING
400KV SWITCH ROOM
400KV SWITCH ROOM
+1.400(FFL)
REMOVABLE
HANDRAIL
SLIDING DOOR
SLIDING DOOR
+1.320(SSL) 1% SLOPE (FFL/SSL)
(FFL/SSL)
+1.370 +1.400
(FFL/SSL) (FFL/SSL)
6m WIDE ROAD REMOVABLE
1% SLOPE
+1.400
(FFL/SSL)
HANDRAIL
UP
8R-UP 400 kV SWGR. BUILDING OFFLOADING 6m WIDE ROAD
+1.400 PLATFORM
RAMP-UP (FFL/SSL) RAMP-UP
SLOPE 1:8 SLOPE 1:8
1% SLOPE
STAIR-2 STAIR-1
UP +0.350
(FFL/SSL)
(FFL/SSL)
+0.200
15025
PIT PIT
20000
20000
CABLE TRENCH
6m WIDE ROAD
=C09 BUS SECTION -2 =C09+S1 SYNCHROSCOPE =SYN1 & 2
6m WIDE ROAD
CABLE TRENCH
6m WIDE ROAD
=C10 I B T -3 (T130) =C10+S1 ONLINE GAS MONITORING PANEL =C00+P1 & P2
DVS
CABLE PIT
CABLE PIT
CABLE PIT
PIT
3W 3W 3W
1W 1V 1U 1W 1V 1U 1W 1V 1U =C11 OHL FEEDER : WMZD -1 =C11+S1 SCMS ETHERNET SWITCH PANEL =C00+XV07 & +XV08
MAIN GATE
6m WIDE ROAD 6m WIDE ROAD
3V 3V 3V
3U 3U 3U
=C12 BUS COUPLER -2 / METERING =C12+S1
GD01 GDO2
TOILET
+0.500 (FFL)
FD
SOAK
GUARD ROOM
+0.500 (FFL)
+0.450 (SSL)
WAY
GATE HOUSE PANTRY
+0.500 (FFL)
+0.450 (SSL)
FD
SEPTIC TANK
*
100Ø RAIN
WATER PIPE
CAGE LADDER
ADDC INTERFACE
TR.
ROOM
3985
3x150Ø PIPES
3x150Ø PIPES
3x150Ø PIPES
CO2
+0.500
(FFL/SSL)
TRM 100Ø RAIN
E 683892.130
WATER PIPE
N 2666731.410
E 684133.638
N 2666796.017
12000
6800
2N 2N 2N
2W 2V 2U 2W 2V 2U 2W 2V 2U N 2666860.023 E 683858.611
PLOT LIMIT PLOT LIMIT
E 684148.332
E 684030.831 =C15 SPACE FOR FUTURE OHL -2 =C15+S1 N 2666710.021 299909 N 2666787.526
CAB. TRENCH
CAB. TRENCH
CAB. TRENCH
N 2666845.292
KEY PLAN
CONTROL
CONTROL
CONTROL
=C16 SPACE FOR FUTURE OHL -1 =C16+S1
2815
2815
E 683975.767 3x150Ø PIPES
BB
GRP LADDER WITH
CHEQUER PLATE COVER NOTES :-
B LE POWER TRANSFORMERS :-
CA
4x200Ø PIPES 4x200Ø PIPES
CABLE DUCT BANK 33kV CABLE TRENCH 33kV CABLE TRENCH
2x2-200Ø PIPES
R OL NEL IBT -1 (T110) 400/230/34.5kV, 500 MVA POWER TRANSFORMER -1 1. ALL DIMENSIONS ARE IN MILIMETRES AND LEVELS IN METERS.
5010
33kV TRENCH = 1000mm W x 1000mm D NT UN
3x150Ø PIPES
CAGE LADDER 33kV CABLE TRENCH 2. EQUIPMENT SHOWN IN DOTTED LINE ARE FUTURE.
CO T IBT -2 (T120) 400/230/34.5kV, 500 MVA POWER TRANSFORMER -2
5000
PIT UP
+0.200 (FPL) C2 DN 3x150Ø PIPES
C1 +0.200 (FPL)
IBT -3 (T130) 400/230/34.5kV, 500 MVA POWER TRANSFORMER -3 3. FINISHED GROUND LEVEL EL. ±0.00 CORRESPONDS TO +7.40 NADD
AB IBT -4 (T140) 400/230/34.5kV, 500 MVA POWER TRANSFORMER -4 (FUTURE) 4. FOR HVAC, FF PIPE LINES & CABLE TRAYS ARE SHOWN INDICATIVE ONLY.
100
=C16+S1 =C15+S1 =C14+S1 =C13+S1 =C12+S1 =C00 =C00 =C11+S1 =C10+S1 =C09+S1 =C08+S1 =C07+S1 =C06+S1 =C05+S1 =C04+S1 =C03+S1 =C02+S1 =C01+S1
APPARATUS +P1 +P2 =SYN2 =SYN1 +XV07 +XV08
E 683963.315
CAGE LADDER 2000 815 2000 2040 2000 815 2000 815 2000 1400 1200 1200 1400 2000 815 2000 1600 2000 1600 2000 400 2000 815 2000 1500 800 800 2100 2000 815 2000 815 2000 2040 2000 710 2000 555 BREATHING N 2666855.015
N APPARATUS
RE SIO
ACCESS TO CRANE +1.400 (FFL) E 684031.420
+1.400 (SSL/FFL)
2750
(5000mm W x 4800mm H)
SP WG
12200
OFF LOADING PLATFORM
S
6000
V
0k
40
+1.400 (SSL/FFL)
6m WIDE ROAD
5325 2815 4025 2815 2815 2815 4400 2815 2815 3300 5470 2815 2815 4400 2815 2815 2815 4025 2815 5325
2500
3000
UP UP 6m WIDE ROAD
3000
RAMP-UP RAMP-UP
AE
STAIR-2
BOUNDARY WALL
N 2666824.044 N 2666842.263
E 683966.726 DN
5600 4250 5400 4500 5600 3600 3600 500 3600 6000 4400 5400 4250 5600 E 684034.831
A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17
422 C3 422
4100 70500 4100
A3 A4 A18 A19
PIT PIT
CABLE TRENCH
19000
25500
6m WIDE ROAD
N 2666798.625 N 2666815.165
800mm W x 600mm D
6500
CABLE TRENCH
6500
CONSULTANT STAMP:
7500 5000 3000 3000 5000 16000 16000 5000 3000 3000 5000 16000 16000 16000 16000 7500 6235 6000 9265
6000
PIT
SHPS -2 SHPS -1 WMZD -1 WMZD -2 FUTURE -1 FUTURE -3 FUTURE -2 FUTURE -4
REFERENCE DRG.
3100
- - - -
6m WIDE ROAD
0209 C 02-11-23 DRAWING REVISED BASED ON COMMENTS CS:0091 SNR SNR JACOB
REVISIONS
& AS PER TRANSCO WORKSHOP ON 26-09-23
0091 B 23-05-23 DRAWING REVISED BASED ON COMMENTS CS:0015 SNR SNR JACOB
C2 C1 & SUPERSEDED AS PER TRANSCO WORKSHOP
0015 A 23-05-23 FIRST ISSUE SNR SNR JACOB
CONSULTANT:
BOUNDARY WALL
Endorsement from approved Designer/Subcontractor and Coordinators
E=684133.638
N=2666796.017
CONTRACTOR:
Siemens Energy LLC
P.O. BOX # 47015, Abu Dhabi
United Arab Emirates
Tel. (+971) 2 6165200
Fax. (+971) 2 6165300
CONTRACT TITLE: Supply & Installation of 400/220kV Grid Station at Ruwais (VLTA)
+20.100 (TOP)
+13.800(TOP)
C2 C3 C1
A A
+12.600(FFL)
AB +12.200(SSL) AB
+12.600(FFL)
+12.600(FFL)
+12.600(FFL)
+12.200(SSL)
+12.200(SSL)
+12.200(SSL)
+18.900(FFL)
+18.500(SSL)
ACCU-1C BMS PANEL - 02
+12.520(FFL)
+12.200(SSL)
+12.800(FFL)
+12.200(SSL)
BMS ROOM
+13.800(TOP) BMS PANEL - 01
CAGE LADDER
RESERVE
MAIN
CO2 ROOM
+20.100 (TOP)
13835
13200
13200
+13.800(TOP)
UPPER ROOF AREA
LOWER ROOF AREA
LOWER ROOF AREA
+12.200(SSL)
HVAC ROOM
+18.500(SSL)
+18.675(FFL)
+12.375FFL)
ACCU-1A
B B
+12.200(SSL)
+12.400(FFL)
+18.675(FFL)
+12.200(SSL)
+12.275(FFL)
+18.500(SSL)
+18.500(SSL)
+18.620(FFL)
+12.200(SSL)
+12.200(SSL)
+12.320(FFL)
+12.320(FFL)
+12.415(FFL)
+12.200(SSL)
AE AE
+20.100 (TOP)
DN
STAIR-2
DN
STAIR-1
C2 C3 C1
C C
NOTE :-
TO 220kV SWGR. ROOM TO 220kV SWGR. ROOM TO 220kV SWGR. ROOM TO 220kV SWGR. ROOM
1. FOR GENERAL NOTES AND LEGEND REFER TO SHEET 1 OF THIS DRAWINGS.
CAB. TRENCH
CAB. TRENCH
CAB. TRENCH
CAB. TRENCH
220kV
220kV
220kV
220kV
4500
4100 5200 5200 9300 9700 4100 5200 5200 4500
D D
RAD. FDN. RAD. FDN. RAD. FDN.
+0
+0
+0
.40
.40
.40
0
0
1600
4310
+0
+0
.40
.40
.40
0
0
RAD. FDN. RAD. FDN. RAD. FDN.
20000
500MVA IBT -4 9300 9700 3800 5500 6500
5445
2080
CONTROL PIT
CONTROL PIT
CG CG CG CONSULTANT STAMP:
E FOUNDATION FOUNDATION FOUNDATION E
33kV CABLE TRENCH
D D
REFERENCE DRG.
7000
CAB. TRENCH
4x200Ø PIPES FOR
CONTROL
CABLE ENTRY GIB SUPP. CONTROL CONTROL GIB SUPP.
STR. FDN. CAB. TRENCH CAB. TRENCH STR. FDN.
3x150mm Ø PIPES
- - - -
3x150mm Ø PIPES
5000
1200
TO FF PUMP ROOM - D 06-05-24 DRAWING REVISED BASED ON COMMENTS CS:0209 SNR SNR JACOB
3x150mm Ø PIPES
2x3 - 200mm Ø PIPES
C2 C3 UP C1 0209 C 02-11-23 DRAWING REVISED BASED ON COMMENTS CS:0091 SNR SNR JACOB
REVISIONS
& AS PER TRANSCO WORKSHOP ON 26-09-23
3x150mm Ø PIPES
0091 B 23-05-23 DRAWING REVISED BASED ON COMMENTS CS:0015 SNR SNR JACOB
AB & SUPERSEDED AS PER TRANSCO WORKSHOP
F F
-2.085(FFL) -2.085(FFL) -2.085(FFL)
0015 A 23-05-23 FIRST ISSUE SNR SNR JACOB
-2.180(SSL) -2.180(SSL) -2.180(SSL)
CABLE TUNNEL -3 DTS NO. REV. DATE DESCRIPTION PREP CHD APPR
FAD FAD FAD FAD
FAD FAD EAD
5125
EAD
OWNER:
TRANSCO
13200
ESCAPE ROUTE
WITH GRATING COVER
DRAIN CHANNEL
CONSULTANT:
8075
-2.180(SSL)
-2.085(FFL)
-2.180(SSL)
-2.085(FFL)
=C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
FAD 1200 1200
G G
2x4 - 100mm Ø PIPES
DV Endorsement from approved Designer/Subcontractor and Coordinators
F.H.C.R DV F.H.C.R
AE
CABLE TRENCH
UP CONTRACTOR:
UP 3x2- 100 Ø PIPES 3x 100 Ø PIPES
Siemens Energy LLC
STAIR-2
STAIR-1
P.O. BOX # 47015, Abu Dhabi
United Arab Emirates
Tel. (+971) 2 6165200
Fax. (+971) 2 6165300
A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 PREP SNR 05-07-23 SNR
H OVERALL SUBSTATION EQUIPMENT LAYOUT H
+1.400(FFL)
C2 C3 70500
C1 (+8.800 NADD)
CHD SNR 05-07-23 SNR
- PLAN & SECTIONS
0.200(FPL) APPR JACOB 05-07-23 JACOB
±0.000(FRL/FGL) (+7.600 NADD) (IBTs & 400kV Swgr. Cable Tunnel & Roof Floors)
(+7.40 NADD) DOC N0: N-18800A-RS-5000-Q-2151-S3_RD
BASEMENT FLOOR - PLAN ORIGINATOR REF: 400/220kV GRID STATION AT RUWAIS (VLTA)
(400kV SWITCHGEAR ROOM & IBT COMPOUNDS)
SUBSTATION TYPICAL LEVEL DETAILS CONTRACT NO ORIG SUBJECT TYPE
CURRENT
REV SHEET NO.
SHEET SHEETS
CSD NO LAST QTY.
NO
N 1 8 8 0 0 A R S 5000 Q 2151 D 0 0 0 3 02 09
1 2 3 5 6 7 8 9 10 11 12
299909
PROJECT E 683781.106
N 2666999.742
E 684070.827
N 2667077.247
NORTH TRUE PLOT LIMIT
PLOT LIMIT
NORTH
37909
37909 250000 12000
E 683827.523 E 684069.031
N 2666972.917 N 2667037.524
6m WIDE ROAD
MAIN GATE-2
E 684081.258 6m WIDE ROAD 6m WIDE ROAD
6m WIDE ROAD
CAB. FDR. -3 220kV CABLE TRENCH
6m WIDE ROAD
FUTURE OHL-1
R
8500
SPACE FOR
+0.00(FRL)
+0.210(FPL)
FUTURE DEVELOPMENT
PAVEMENT
+1.400(SSL/FFL)
+1.320(SSL/FFL)
+1.320(SSL/FFL)
FUTURE OHL-2
R
-0.488(SSL/FFL)
SLOPE
1%
+1.400(SSL/FFL)
STAIR-3
OFF LOADING PLATFORM-2 Y
+0.210(FPL)
R
SPARE OHL -1
PAVEMENT
PAVEMENT
+1.320(SSL)
+1.400(FFL)
B
+0.210(FPL)
6m WIDE ROAD
R
SPARE OHL -3
SPARE IBT -01
Y
CABLE TRENCH
1000
CABLE TRENCH
SPARE OHL -2
Y
IBT -03
E 684081.736
B
800mm W x 600mm D
IBT -04
R
SPARE OHL -4
Y
N 2666990.035
B
299909
299909
6m WIDE ROAD
220kV CABLE TRENCH 220kV CABLE TRENCH
DN
220kV CABLE TRENCH
250000
220kV CABLE TRENCH
6.4m WIDE ROAD
220kV CABLE TRENCH CONTROL
CABLE
TUNNEL
CO2
10m WIDE ROAD +0.400 (TOC) BATTERY EYE WASH &
+0.350 (TOC) ROOM SINK STATION
+1.400 (FFL)
ROOM
MV CABLE +1.320 (SSL)
TRENCH
CORRIDOR TOILET
STAIR-1
+0.300 (TOG)
SOAK
SUMP PIT WITH
WAY
CHEQUER PLATE COVER
1000X1000X2580mm
CHAINLINK
REMOVABLE
FENCE LV CABLE
PORTABLE TRENCH
SEPTIC TANK
AUX. TR. -3
WATER TANK +0.400 (TOC)
+0.300
+0.300
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
GRP LADDER
WITH 800x800mm
+0.300 (TOG)
TOP OF GRAVEL (TYP)
DC ROOM
CHEQUER PLATE
CHEQUER PLATE CHEQUER PLATE
COVER
COVER COVER
INTERFACE
+0.350(TOC) +0.350(TOC)
TELECOM
+0.350(TOC)
OFF LOADING PLATFORM ROOM
+0.400
ROOM
+0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC) +0.400(TOC)
+0.400(TOC) +0.400(TOC) +0.400(TOC) +1.400 (FFL/SSL) LVAC ROOM
6m WIDE ROAD
IN SCREED
1% SLOPE
+1.400 (FFL/SSL)
VALVE STATION
AIR LOCK
CORRIDOR
+0.350(TOC) +0.350(TOC) +1.400 (FFL)
+1.320 (SSL)
CIS
+0.350(TOC)
+0.350(TOC)
+0.400(TOC) +0.300(TOG)
+0.400(TOC)
+0.350(TOC)
CIS
+0.350(TOC) +0.400(TOC)
+0.350 ROOM
JACKING PAD
500MVA IBT-2 500MVA IBT-3 700X550X20mm THK.
GALVANIZED PLATE
500MVA IBT-4
(TYP 4nos.)
+0.350(TOC) +0.350(TOC) +0.350(TOC)
CIS CIS CIS
+0.350(TOC) +0.350 +0.350
+0.300
33KV CABLE
TRENCH TRENCH
TRENCH
400kV/200kV CONTROL BUILDING
33KV CABLE
TRENCH
FUEL TANK +0.300(TOG) +0.300(TOG) +0.300(TOG)
+0.300(TOG) +0.350(TOC)
OUTDOOR
CABLE DUCT BANK PIT CABLE DUCT BANK PIT 33kV CABLE TRENCH
+0.350 (FFL/SSL)
REMOVABLE
FIRE PUMP ROOM HANDRAIL
+1.375
(FFL/SSL)
+0.350
+0.320 (FFL/SSL)
-1.020
(FFL/SSL)
33kV CABLE TRENCH (FFL/SSL)
1% SLOPE
MONORAIL +0.350 +0.300(T0C) +0.300(T0C) EXPANSION
ABOVE (FFL/SSL) DN JOINT 20mm
+0.300 STAIR-3
ELECTRICAL +1.400
PUMP BASE (TOC) (FFL/SSL)
CABLE TRENCH
FIRE WATER COVERED CAR PARKING AREA
+0.800 (TOC)
TANK-1
GD01
1% SLOPE
STAIR-1
=C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
1:8 SLOPE
SPACE FOR FUTURE
RAMP
UP 400kV SWGR. HALL EXTENSION 400KV SWITCH ROOM
400KV SWITCH ROOM
+1.400(FFL)
REMOVABLE
HANDRAIL
OFF LOADING
PLATFORM +1.400(FFL) +1.320(SSL) +1.370
SLIDING DOOR
+1.400
SLIDING DOOR
+1.320(SSL) 1% SLOPE (FFL/SSL)
(FFL/SSL)
+1.370 +1.400
(FFL/SSL) (FFL/SSL)
6m WIDE ROAD REMOVABLE
+1.400
(FFL/SSL)
HANDRAIL 1% SLOPE
UP
8R-UP 400 kV SWGR. BUILDING OFFLOADING 6m WIDE ROAD
+1.400 PLATFORM
RAMP-UP (FFL/SSL) RAMP-UP
SLOPE 1:8 SLOPE 1:8
1% SLOPE
STAIR-2 STAIR-1 +0.350
UP
FUTURE OHL-1
R
(FFL/SSL)
(FFL/SSL)
+0.200
REMOVABLE
+1.380 (FPL)
(FFL/SSL) HANDRAIL
(FFL/SSL)
DN DN
PIT PIT
CABLE TRENCH
6m WIDE ROAD
CABLE TRENCH
6m WIDE ROAD
Y
9800
PIT
6m WIDE ROAD
MAIN GATE
6m WIDE ROAD
TOILET
+0.500 (FFL)
+0.450 (SSL)
FD
SOAK
GUARD ROOM
+0.500 (FFL)
+0.450 (SSL)
WAY
GATE HOUSE PANTRY
+0.500 (FFL)
+0.450 (SSL)
FD
SEPTIC TANK
B
CABLE DUCT BANK
PIT PIT PIT
100Ø RAIN
WATER PIPE
CAGE LADDER
ADDC INTERFACE
+1.000
(TOC)
TRANSFORMER
TR.
ROOM
CO2
+0.200 (FPL)
+0.500
TRM
E 683892.130
(FFL/SSL) 100Ø RAIN
WATER PIPE
N 2666731.410
EXISTING 11kV CABLE
E 684133.638
N 2666796.017
12000
PLOT LIMIT PLOT LIMIT
E 683858.611 E 684148.332
N 2666710.021 299909 N 2666787.526
KEY PLAN
+0.200 (FPL)
Bay LCC / PANEL
No.
Description
Ref. NOTES :-
DN
FUTURE OHL-2
R =D01 SPACE FOR FUTURE OHL -1 =D01+S1
DN
STAIR-3
OFF LOADING PLATFORM =D02 SPACE FOR FUTURE TR -1 =D02+S1 2. EQUIPMENT SHOWN IN DOTTED LINE ARE FUTURE.
Y =D03 SPARE OHL -1 =D03+S1 3. FINISHED GROUND LEVEL EL. ±0.00 CORRESPONDS TO +7.40 NADD
9800
+1.400 (SSL/FFL)
UP
=D04 SPARE OHL -2 =D04+S1 4. FOR HVAC, FF PIPE LINES & CABLE TRAYS ARE SHOWN INDICATIVE ONLY.
DM
B =D05 CABLE FEEDER -3 =D05+S1
E 684031.824 =D06 BUS COUPLER -1 / METERING =D06+S1
MIMIC
N 2666956.960 LEGEND :-
=D07 FUTURE IBT -4 (T140) =D07+S1
3850
E 684020.811 PANEL-2
4590
800
5750
APPARATUS
450 800
50 850 2000 5075 2525 N 2666957.652 =D09 I B T -3 (T130) =D09+S1 - PAVEMENT / KERB STONE NGL - NATURAL GROUND LEVEL
=D10 BUS SECTION -1 =D10+S1
=D01+S1
=D01
DL
3300
R
=D13 I B T -2 (T120) =D13+S1
=D02+S1
=D02
FUTURE TR. -1
=D14 CABLE FEEDER -4 =D14+S1
SPARE OHL -1
Y
B =D15 BUS COUPLER -2 / METERING =D15+S1 FFL - FINISHED FLOOR LEVEL
580
2380
6m WIDE ROAD
1600 1600
5900
D1 D1
1600
3300
=D06 =D05
1600
CAB. FDR. -3
REV.D MIMIC PANEL-2 MIMIC PANEL-2
1500
=D06+S1
4850
B/C -1
ONLINE GAS MONITORING PANEL =D00+P1 & P2
1900
METERING
4000 4000 6000 3550 6000 17715
DJ R
=SYN3 R
1500
15500
D4 D4
SPARE OHL -3
=D07+S1
=D07
1600
B Y
=D08+S1
5250
9800
=D08
D5 D5
1600
D3
220kV SWITCHGEAR ROOM
=D09+S1
1600
=D09
B B
1130
=D11 =D10
DG B/S -1
=D10+S1
+0.200 (FPL)
CABLE TRENCH
800mm W x 800mm D
1600
CONSULTANT STAMP:
1500
3950
=D11+S1
1500
1600
UP
550
DF R
1500
SPARE OHL -2
=D12+S1
=D13 =D12
1600
REFERENCE DRG.
R
1500
Y
=D13+S1
9800
1600
Y
D2
1900
=D14+S1
1600
=D14
-
STAIR-2
- - -
UP
CAB. FDR. -4
1200 200
1500
METERING
DE
1900
+1.320 (SSL)
=D15+S1
B/C -2
1600
REVISIONS
& AS PER TRANSCO WORKSHOP ON 26-09-23
3300
=D17 =D16
=D16+S1
IBT -01 IBT -01 0091 B 23-05-23 & SUPERSEDED AS PER TRANSCO WORKSHOP SNR SNR JACOB
Y R
7000
1900
D3
+0.200 (FPL)
1600
SPARE OHL -3
DTS NO. REV. DATE DESCRIPTION PREP CHD APPR
1600 1600
Y
1500
CONTRACTOR STAMP
=D18+S1
FOR APPROVAL
=D18
1600
6m WIDE ROAD
SPARE OHL -4
R Date:
This Document is Checked and Verified by Concerned Engineer In Charge
=D19+S1
=D19
1600
FUTURE TR. -2 B
3300
Y OWNER:
TRANSCO
1900
=D20+S1
=D21 =D20
DC B E 684099.102
+XV10
N 2666919.784
=D00
CAGE LADDER
220kV TRENCH = 1600mm W x 1450mm D N 2666925.115
4675
ACCESS TO CRANE
3700
8500
3935
10500 220kV CABLE TRENCH 220kV CABLE TRENCH CAB. FDR. - DP02
12
12
NOTE :-
11400 PROJECT
NORTH TRUE
1. FOR GENERAL NOTES AND LEGEND REFER TO SHEET 1 OF THIS DRAWINGS.
NORTH
D3 D4 D6
4525 6875 D3 D6
11400
A A
DN DN
STAIR-3
DN
3125
3125
UP
DM DM
+12.700(TOLP)
PIPE FROM MAIN LINE
F.H.C.R
+11.100(SSL)
+11.290(FFL)
DV
+11.490(FFL)
FAD
-2.255FFL)
+11.100(SSL)
5750
5750
1200 TO DP SIDE
D3 D6
9136 LOWER ROOF AREA 11400
=D01
B B
WITH GRATING COVER
DL DL
DRAIN CHANNEL
=D02
5900
FAD
CLUSTRA WALL)
+14.200(TOP OF
CONDENSING UNIT AREA CLUSTRA WALL)
OF
D1 =D03 D1 D1 D1
+14.200(TOP
CU-4C
D2 =D04 D2 D2 D2
=D05
2- 150mm Ø PIPES
FOR GDM CABLES +12.700(TOLP)
4850
4850
C -2.085(FFL) C
VOID
-2.180(SSL) =D06
CU-4B
TO SPARE IBT -04
DJ 2- 150mm Ø PIPES DJ
EAD
D4 220kV D4 D4 D4
Cable Trench =D07
+11.490(FFL)
+11.100(SSL)
5250
5250
FAD
D5 D5 D5 D5
+11.100(SSL)
+11.290(FFL)
=D08
CU-4A
+14.200(TOP OF
CLUSTRA WALL)
TO IBT -03
220kV
FOR GDM CABLES
2- 150mm Ø PIPES
500
-2.335(FFL)
D DG D
+18.900(TOUP)
DG =D10 DG
2x4 - 100mm Ø PIPES +17.300(SSL)
+17.710(FFL)
3950
3950
TO GANTRY AREA
CABLE TRENCH
49750
49750
49750
=D11
2- 150mm Ø PIPES
DF DF +11.355(FFL)
EAD
AHU 4C +11.100(SSL)
=D12
+18.900(TOUP)
TO IBT -02
+17.300(SSL)
+17.510(FFL)
220kV
Cable Trench =D13 HVAC ROOM
6750
6750
FAD
17700
UP
=D14
-2.255(FFL)
-2.430SSL)
E AHU 4B E
220kV CABLE TRENCH
BASEMENT STAIR
+11.100(SSL)
+11.265(FFL)
DE DE
2- 150Ø
=D15
-2.215(FFL)
-2.430SSL)
1830
REFERENCE DRG.
+18.900(TOUP)
3x2- 150mm Ø PIPES
TO IBT -01
220kV
Cable Trench =D16 PIT
VOID
7000
7000
- - - -
AHU 4A
2- 150mm Ø PIPES DRG. NO. TITLE REV. STATUS
D3 =D17 D3 D3 D3
2x2- 150Ø
TO DP SIDE
EAD
CABLE TUNNEL -1
2- 150Ø
REVISIONS
+17.710(FFL) & AS PER TRANSCO WORKSHOP ON 26-09-23
DD DD DD 0091 B 23-05-23 DRAWING REVISED BASED ON COMMENTS CS:0015
& SUPERSEDED AS PER TRANSCO WORKSHOP SNR SNR JACOB
F F
ESCAPE ROUTE
BMS ROOM
BMS PANEL - 02
=D19
FAD
6100
6100
DTS NO: N-18800A- ****
=D20
-2.180(SSL)
-2.085(FFL)
=D21 OWNER:
C02 ROOM
+17.300(SSL)
+17.550(FFL) TRANSCO P.O. BOX 173
ABU DHABI - U.A.E.
DC DC DC Tel : +971 2 416 4000
+11.290(FFL) Fax : +971 2 416 4444
EAD
CONSULTANT:
3700
3700
DRAIN CHANNEL
WITH GRATING COVER
G G
F.H.C.R Endorsement from approved Designer/Subcontractor and Coordinators
12
12
12
12
DB DB
+12.700(TOLP)
STAIR-1
3125
CONTRACT TITLE: Supply & Installation of 400/220kV Grid Station at Ruwais (VLTA)
CABLE
SCALE: 1 : 125 STANDARD: A1 DOCUMENT TITLE:
TUNNEL LOWER ROOF FLOOR - PLAN DATE NAME SIGN
(220kV SWITCHGEAR ROOM) PREP SNR 05-07-23 SNR
H OVERALL SUBSTATION EQUIPMENT LAYOUT H
+1.400(FFL) CHD SNR 05-07-23 SNR
(+8.800 NADD) - PLAN & SECTIONS
0.200(FPL) APPR JACOB 05-07-23 JACOB
±0.000(FRL/FGL) (+7.600 NADD) (220kV Swgr. Cable Tunnel & Roof Floors)
(+7.40 NADD) DOC N0: N-18800A-RS-5000-Q-2151-S5_RD
BASEMENT FLOOR - PLAN ORIGINATOR REF: 400/220kV GRID STATION AT RUWAIS (VLTA)
(220kV SWITCHGEAR ROOM) SUBSTATION TYPICAL LEVEL DETAILS CONTRACT NO ORIG SUBJECT TYPE
CURRENT
REV SHEET NO.
SHEET SHEETS
CSD NO LAST QTY.
NO
N 1 8 8 0 0 A R S 5000 Q 2151 D 0 0 0 5 04 09
1 2 3 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
299909
E 683781.106 E 684070.827
N 2666999.742 N 2667077.247
PLOT LIMIT
PLOT LIMIT
B3
37909
PROJECT
NORTH TRUE 37909 250000 12000
B2 NORTH E 683827.523
N
2666972.917
±0.00
GRAVEL
±0.00
GRAVEL
N
E
684069.031
2667037.524
MAIN GATE-2
6m WIDE ROAD 6m WIDE ROAD
±0.00
GRAVEL
CONTROL
±0.00
WICKET GATE GRAVEL
N. 2666904.819
6m WIDE ROAD
220kV CABLE TRENCH
A A
6m WIDE ROAD
+1.375 (FFL/SSL) ±0.00
FUTURE OHL-1
GRAVEL R
SPACE FOR
+0.00(FRL)
OFF LOADING PLATFORM
+0.210(FPL)
FUTURE DEVELOPMENT
PAVEMENT
+1.400(SSL/FFL)
+1.320(SSL/FFL)
+1.320(SSL/FFL)
FUTURE OHL-2
R
-0.488(SSL/FFL)
SLOPE
1%
+1.400(SSL/FFL)
STAIR-3
Y
OFF LOADING PLATFORM-2
±0.00
RAMP
B GRAVEL
SPARE OHL -1
PAVEMENT
PAVEMENT
+1.320(SSL)
+1.400(FFL)
B
E. 684039.994 6000
+0.210(FPL)
C1
6m WIDE ROAD
R
SPARE OHL -3
SPARE IBT -01
Y
N. 2666892.711
CABLE TRENCH
CABLE TRENCH
SPARE OHL -2
Y
IBT -03
B
800mm W x 600mm D
+1.400 (FFL) IBT -04
R
SPARE OHL -4
Y
-0.200(FPL)
B
+1.225 (SSL)
299909
299909
2700
400kV SYSTEM PROTECTION PANELS :-
6m WIDE ROAD
1480
1500
220kV CABLE TRENCH 220kV CABLE TRENCH
SUMP
220kV CABLE TRENCH 220kV CABLE TRENCH
AUX. TR. -2
DN
1000
AIRLOCK
250000
220kV CABLE TRENCH
1010 1160
6.4m WIDE ROAD
1500
220kV CABLE TRENCH CONTROL
CABLE
PIT
TUNNEL
RAMP
+1.375 (FFL/SSL)
OFF LOADING PLATFORM
+1.400 (FFL/SSL)
Description
SUMP PIT WITH
CHEQUER PLATE COVER
1000X1000X2580mm
AIR LOCK
CO2
10m WIDE ROAD +0.400 (TOC) BATTERY EYE WASH &
+0.350 (TOC) ROOM SINK STATION
+1.400 (FFL)
ROOM
MV CABLE +1.320 (SSL)
TRENCH
STAIR-1
+0.300 (TOG)
SOAK
SUMP PIT WITH
WAY
CHEQUER PLATE COVER
HAND
1000X1000X2580mm
5355
CHAINLINK
REMOVABLE
FENCE
-0.250(FPL) LV CABLE
SEPTIC TANK
PORTABLE TRENCH
AUX. TR. -3
WATER TANK
2900
+0.400 (TOC)
WITH SUNSHADE
+1.320 (SSL)
+0.300 CORRIDOR
+0.400(TOW) +0.400(TOW)
+1.400 (FFL)
+0.400(TOC) +0.350 (TOC) PIT
+0.300
+0.300
+0.200 (FPL)
WITH 800x800mm
WITH 800x800mm WITH 800x800mm
CHEQUER PLATE
CHEQUER PLATE CHEQUER PLATE
COVER COVER COVER
INTERFACE
WASH
+0.350(TOC) +0.350(TOC) TELECOM
ROOM
CO2 ROOM
+0.350(TOC)
6m WIDE ROAD
1% SLOPE
IN SCREED
±0.00
VALVE STATION
DELUGE
AIR LOCK
CORRIDOR
1500
+0.350(TOC) +0.350(TOC) +1.400 (FFL)
+1.320 (SSL)
+0.350(TOC)
+0.300(TOG) +0.350(TOC)
ROOM
=NL01-G03 =NK01-G03
CIS +0.400(TOC) CIS +0.350
+0.400(TOC) +0.400(TOC)
+0.350(TOC) +0.350(TOC)
JACKING PAD
500MVA IBT-2 500MVA IBT-3 700X550X20mm THK.
GALVANIZED PLATE
500MVA IBT-4
(TYP 4nos.)
+0.350(TOC)
EYE
+0.350(TOC) +0.350(TOC)
2n 2v 2w
CIS CIS CIS
TRENCH
220KV CABLE 220KV CABLE 220KV CABLE
TRENCH TRENCH TRENCH
33KV CABLE
TRENCH TRENCH
TRENCH
400kV/200kV CONTROL BUILDING
33KV CABLE
TRENCH
FUEL TANK +0.300(TOG) +0.300(TOG) +0.300(TOG)
+0.300(TOG) +0.350(TOC)
OUTDOOR
+0.350 (FFL/SSL)
REMOVABLE
FIRE PUMP ROOM HANDRAIL
+1.375
+0.350 -0.200(FPL)
(FFL/SSL)
+0.320 (FFL/SSL)
-1.020
(FFL/SSL) 33kV CABLE TRENCH (FFL/SSL)
1% SLOPE
+0.350
MONORAIL
ABOVE (FFL/SSL) DN
+0.300(T0C) +0.300(T0C) -0.200(FPL) EXPANSION
JOINT 20mm
+0.300 STAIR-3
ELECTRICAL
PUMP BASE -0.200(FPL) (TOC)
+1.400
(FFL/SSL)
CABLE TRENCH
FIRE WATER COVERED CAR PARKING AREA
+0.800 (TOC)
TANK-1
GD01
1% SLOPE
STAIR-1
1:8 SLOPE
=C16 =C15 =C14 =C13 =C12 =C11 =C10 =C09 =C08 =C07 =C06 =C05 =C04 =C03 =C02 =C01
SPACE FOR FUTURE
RAMP
400kV SWGR. HALL EXTENSION
1520
UP REMOVABLE
400KV SWITCH ROOM
400KV SWITCH ROOM HANDRAIL
OFF LOADING +1.400(FFL)
PLATFORM+1.400 +1.400(FFL) +1.320(SSL) +1.370
SLIDING DOOR
SLIDING DOOR
+1.320(SSL) 1% SLOPE (FFL/SSL)
(FFL/SSL)
6100
+1.370 +1.400
=C03+R1, +R2
(FFL/SSL) (FFL/SSL)
6m WIDE ROAD +1.400
=C03 I B T -1 (T110)
REMOVABLE (FFL/SSL)
HANDRAIL 1% SLOPE
REV.D
6m WIDE ROAD
7250
8R-UP
UP
48V BAT.-1B
48V BAT.-2B
OFFLOADING
1500
+1.400 PLATFORM
=NQ01+G02
=NR01+G02
RAMP-UP (FFL/SSL) RAMP-UP
SLOPE 1:8 SLOPE 1:8
1% SLOPE
7250
STAIR-2
-0.200(FPL) STAIR-1
UP +0.350
(FFL/SSL)
+1.300 (FFL)
(FFL/SSL)
+0.200
REMOVABLE
+1.380 (FPL)
(FFL/SSL) HANDRAIL
(FFL/SSL)
DN DN
PIT PIT
+1.225 (SSL)
CABLE TRENCH
=C04 OHL FEEDER : WMZD -2 =C04+R1, +R2
6m WIDE ROAD
BREATHING
±0.00
GRAVEL
1U 1V 1W ±0.00
GRAVEL
CABLE TRENCH
6m WIDE ROAD
110V BATTERY-2B 110V BATTERY-1B APPARATUS
9700
TRENCH
2900
C2
PIT
MAIN GATE
6m WIDE ROAD 6m WIDE ROAD
+1.400 (FFL)
=C07+R1, +R2
600
=C07
GDO2
WICKET GATE FD
TOILET
+0.500 (FFL)
+0.450 (SSL)
SOAK
GUARD ROOM
+0.500 (FFL)
+0.450 (SSL)
WAY
GATE HOUSE PANTRY
2910 2950
+0.500 (FFL)
+0.450 (SSL)
+1.320 (SSL)
FD
SEPTIC TANK
B TOILET B
PIT PIT PIT
100Ø RAIN
WATER PIPE
±0.00
CAGE LADDER
GRAVEL
ADDC INTERFACE
+1.000
(TOC)
TRANSFORMER
TR.
ROOM
1500
+0.480 (FFL/SSL)
+0.500 TRM
E 683892.130
(FFL/SSL) 100Ø RAIN
WATER PIPE
STAIR-1
N 2666731.410 684133.638
8610
48V BAT.-1A
48V BAT.-2A
=NQ01+G01
N
=NR01+G01
EXISTING 11kV CABLE
12000
2666796.017
1320
=C09 BUS SECTION -2 =C09+R1 PLOT LIMIT PLOT LIMIT
4845
E 683858.611 E 684148.332
N 2666710.021 299909 N 2666787.526
KEY PLAN
1620
910
=C12 BUS COUPLER -2 / METERING =C12+R1
2020
LV CABLE
+0.400 (PL)
2n 2u 2v 2w
TRENCH PANTRY =**Y =**Y =**Y =**Y =**Y =**Y =C13 OHL FEEDER : SHPS -2 =C13+R1, +R2
800
1545
+CYX31 +CYX32 +CYX33 +CYX34 +CYX35 +CYX36
=NL01+F01 =NK01+F01 +1.400 (FFL) =NR01+F01 =NQ01+F01 =C14 FUTURE IBT -4 (T140) =C14+R1, +R2 **
6100
2550
+1.225 (SSL) F
C4 =C15 SPACE FOR FUTURE OHL -2 =C15+R1, +R2 NOTES :-
WALL MOUNTED BOX
INTERFACE ROOM
1W
2400
=C16+R1, +R2
1U 1V
1500
1150
MV CABLE 10626 480 5619 1430 1. ALL DIMENSIONS ARE IN MILIMETRES AND LEVELS IN METERS.
1150 5600
(220kV FUTURE)
CORRIDOR
TRENCH
MV CABLE
110V DCDB 48V DCDB 2. EQUIPMENT SHOWN IN DOTTED LINE ARE FUTURE.
1630
B1 =NK01 =NK01 =NK01 =NK01 =NK01 =NKL =NL01 =NL01 =NL01 =NL01 =NL01 =NQ01 =NQ01 =NQ01 =NR01 =NR01 =NR01 F B1 =C18 SPACE FOR BUS SECTION -4 =C18+R1 * 3. FINISHED GROUND LEVEL EL. ±0.00 CORRESPONDS TO +7.40 NADD
1000
=**Y
800
4675
1805 2225 1830 +NG1 +NG2 +NG3 +NG4 +N01 +N02 +N03 +N01 +N01 +N02 +N03 +NG3 +NG4 +NG1 +NG2 FUTURE PANELS (FODP)
+NG1 +NG2 +NG3 +N01 +N01 +NG3 +NG1 +NG2 +CYX11
4250
=**Y RTU =D00 =D00 =C19+R1, +R2 *
=C19 SPACE FOR FUTURE OHL -1
800
SPACE 4. FOR HVAC, FF PIPE LINES & CABLE TRAYS ARE SHOWN INDICATIVE ONLY.
F F F TELE. PANELS 1000 +CYX37 +Q32 +Q31 2x2 -100Ø Pipes
1025 =C20 SPACE FOR FUTURE CABLE -1 =C20+R1, +R2 *
for FOC
+1.400 (FFL)
11430
TELECOM ROOM LEGEND :-
2100
2200
+0.200 (FPL)
DC ROOM
1600
STAIR-3 19180
+1.320 (SSL)
C DN
=C22 SPACE FOR FUTURE OHL -1 =C22+R1, +R2 * C
I/F PANELS
WALL MOUNTED DBs F =C23 SPACE FOR FUTURE CABLE -1 =C23+R1, +R2 *
9170
+1.375 (FFL/SSL) =D14 =D14 =D05 =D08 =D12 =D14
C6
800
=**Y =**Y =**Y +R1 +R2 +V1 +V1 +V1 +V1
- PAVEMENT / KERB STONE NGL - NATURAL GROUND LEVEL
800
WALL MOUNTED DBs SPACE
+CYX10 +CYX09 +CYX08
OFF LOADING PLATFORM F F
2500
=**Y =**Y =**Y =**Y =**Y =**Y =**Y 220kV SYSTEM PROTECTION PANELS :- - CONCRETE LOADING PLATFORM
GRL - GRAVEL LEVEL
1945
800
LVAC ROOM +CYX01 +CYX02 +CYX03 +CYX04 +CYX05 +CYX06 +CYX07 WITH REMOVABLE HANDRAIL
RL - ROAD LEVEL
2400
2220 19850 400 800 2040
F TELE. PANELS Bay Description Protection
4335
F No. Panels Ref.
4280
7760 7010 - FALSE CEILING
=NE01 =NG01
=D01 SPACE FOR FUTURE OHL -1 =D01+R1, +R2 PVL - PAVEMENT LEVEL
2200
1050
+N23 +N22 +N21 +N20 +N19 +N18 +N17 +N16 +N15 +N14 +N13 +N12 +N11 +N10 +N09 +N08 +N07 +N06 +N05 +N04 +N03 +N02 +N01 +N01 F
(IC-3) (BC) (IC-2) (IC-1)
UPS =D12 =D12 =D08 =D08 =D05 =D05 +1.400 (FFL/SSL) =D02 SPACE FOR FUTURE TR -1 =D02+R1, +R2 FFL - FINISHED FLOOR LEVEL
- GRAVEL FILL AREA
800
+1.400 (FFL) 415V AC DIST. PANELS +R2 +R1 +R2 +R1 +R2 +R1
2306
1200
FGL - FINISHED GROUND LEVEL
620
MIMIC4800 1200
800
2775 1625 1600 FUTURE PANELS =D04 SPARE OHL -2 =D04+R1, +R2 ** - CONCRETE CABLE TRENCH
PANEL-3 C8 SSL - STRUCTURE SLAB LEVEL
=D05 CABLE FEEDER -3 =D05+R1, +R2 **
BREATHING
1100
MV SWGR. ROOM
2500
AUTO =D01 =D01 =D02 =D02 =D03 =D03 =D04 =D04 =D06 =D07 =D09 =D10 =D11 =D13 =D15 =D16 =D17 =D17
CORRIDOR
800
5690
+1.320 (SSL) =D09 I B T -3 (T130) =D09+R1
=H04+H04 25560
3904
F
=D10 BUS SECTION -1 =D10+R1
2400
=H05+H05
9620 =D11 BUS SECTION -2 =D11+R1
900
+1.400 (FFL)
1050
5600
Doc. Cupboards
=H06+H06 +1.320 (SSL)
+0.200 (FPL) 1520 =D12 CABLE FEEDER - DP02 =D12+R1, +R2 **
F F F F =**Y =**Y =**Y =**Y =**Y =**Y =**Y
=H07+H07
800
SPACE
=D13 I B T -2 (T120) =D13+R1
900
FUT. =C00 =C00 =C00 FUT. =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D00 =D21 =D21 =D20 =D20 =D19 =D19 =D18 =D18 +CYX21 +CYX22 +CYX23 +CYX24 +CYX25 +CYX26 +CYX27
800
+WJ3 +WJ2 +WJ1 +R15 +R14 +R13 +R12 +R11 +R7 +R6 +R5 +R4 +R3 +R2 +R1 +R2 +R1 +R2 +R1 +R2 +R1 +R2 +R1 =D14+R1, +R2
600
11100
3200 400kV AVR 600 220kV BFP 220kV BBP
6010
800 600 4000 400 5600 800 6400 C9 =D15 BUS COUPLER -2 / METERING =D15+R1
SEC.
INTERFACE ROOM
1800
2400
1600
1660
8150
=C13 =C13 =C12 =C11 =C11 =C10 =C10 =C09 =C08 =C07 =C07 =C06 =C06 =C05 =C04 =C04 =C03 =C03 =C02 =C02 =C01 =C01 =C00 =C00 =Y00 =Y00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 F F
800
800
+R2 +R1 +R1 +R2 +R1 +R2 +R1 +R1 +R1 +R2 +R1 +R2 +R1 +R1 +R2 +R1 +R2 +R1 +R2 +R1 +R2 +R1
FUTURE
+X2 +X1 +DMZ2 +DMZ1
FUT. FUT.
+XV06 +XV05 +XV04 +XV03 +XV02 +XV01 +X10
=D18 SPARE OHL -4 =D18+R1, +R2 **
RTU =C00 =C00 =C23 =C22 =C20 =C19
800
SPACE
COM. ALRM. 3200 SCMS +Q22 +Q21 +V1 +V1 +V1 +V1 =D19 SPACE FOR FUTURE TR -2 =D19+R1, +R2
14400 3200 1600 800 1480 800 3200 1600 800
6050
I/F PNLS
2150
1800
+1.400 (FFL)
1600
CONTROL +1.320 (SSL) =D21 SPACE FOR FUTURE TR -3 =D21+R1, +R2
+0.350 (FFL/SSL)
1400
CABLE F F F F 400kV BFP-M2 F 400kV BBP-M1 F F F FMS 1020 F 1400
CONSULTANT STAMP:
TUNNEL =H08 =H07 =H06 =H04 =H03 =H02 =H01 =H00 =H00 SPACE =C21 =C18 =C17 =C16 =C16 =C15 =C15 =C14 =C14 FUT. =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =C00 =D00 =C00 =D00 =C00 =X00
800
800
SPACE SPACE SPACE =C23 =C23 =C22 =C22 =C20 =C20 =C19 =C19
E E
800
+R1 +R1 +R1 +R1 +R1 +R1 +R1 +R2 +R1 +R1 +R1 +R1 +R2 +R1 +R2 +R1 +R2 +R1 +R16 +R15 +R14 +R13 +R12 +R11 +R8 +R7 +R6 +R5 +R4 +R3 +R2 +R1 +Q20 +Q20 +XP1 +XP1 +XV01 SPACE
+R2 +R1 +R2 +R1 +R2 +R1 +R2 +R1 OTHER PANELS :-
UP
33kV PROTN. PNLS. 720 4000 3200 1600 800 400 4800 400 6400 1480 5600 800
1000
1000
7200
Panels Ref. Description
850
7200
REFERENCE DRG.
STL-xx
STAIR-2
N. 2666861.961
=C00+XV01 & +XV02 SCMS PANELS
SAR-xx
DN E. 684090.197
N. 2666874.921 =C00+XV03, .... +XV06 SCMS COMMUNICATION PANELS -
STL-xx - - -
=C00+X1 & +X2 COMMON ALARM PANELS
DRG. NO. TITLE REV. STATUS
=Y00+DMZ1, ....+DMZ2 DMZ PANELS
+0.480 (FFL/SSL) =X00+XV01 400kV FMS ELEVATION PANEL
=C00+X10 FIRE ALARM PANEL - D 06-05-24 DRAWING REVISED BASED ON COMMENTS CS:0209 SNR SNR JACOB
6350 6320 6400 6400 6430 3000 8000 4150 3100 SEC. PHYSICAL SECURITY CABINET
0209 C 02-11-23 DRAWING REVISED BASED ON COMMENTS CS:0091 SNR SNR JACOB
REVISIONS
=D00+R1, ....+R7 220kV BB PROTN. PANELS - M1 & AS PER TRANSCO WORKSHOP ON 26-09-23
DRAWING REVISED BASED ON COMMENTS CS:0015
CA CB CC CD CE CF CG GH GI GJ =D00+R11, ....+R15 220kV BB/BF PROTN. PANELS - M2 0091 B 23-05-23 & SUPERSEDED AS PER TRANSCO WORKSHOP SNR SNR JACOB
F F
=C00+Q20 & =D00+Q20 PQMS PANELS (FUTURE) ** 0015 A 23-05-23 FIRST ISSUE SNR SNR JACOB
=C00+XP1 & =D00+XP1 FMS DAU PANEL (FUTURE) ** DTS NO. REV. DATE DESCRIPTION PREP CHD APPR
=**Y+CYX01, ... +CYX11 TELECOM PANELS CONTRACTOR STAMP
FOR APPROVAL
=H01+R1 SPACE FOR FUTURE FDR.
=H02+R1 AUX. TR -1 DTS NO: N-18800A- ****
=H03+R1 INCOMER -1 : IBT -2
This Document is Checked and Verified by Concerned Engineer In Charge Date:
=H04+R1 BUS SECTION
OWNER:
=H06+R1 INCOMER -2 : IBT -4
=H07+R1 AUX. TR -2 TRANSCO P.O. BOX 173
ABU DHABI - U.A.E.
Tel : +971 2 416 4000
=H08+R1 SPACE FOR FUTURE FDR.
Abu Dhabi Transmission & Despatch Company Fax : +971 2 416 4444
B3 B2 =H00+R1 & +R2 33kV BB PROTECTION PANELS
CONSULTANT:
MIMIC PANEL-3 MIMIC PANEL-3 REV.D
GROUND FLOOR - PLAN - ONLY FREE GROUND SPACE FOR FUTURE EXTENSION
*
G ** - SPACE RESERVED G
Endorsement from approved Designer/Subcontractor and Coordinators
PANELS AT LAVC & DC ROOMS PANLES AT FUTURE INTERFACE ROOMS 33kV SYSTEM - SWITCHGEAR :- CONTRACTOR:
Siemens Energy LLC
Bay Bay P.O. BOX # 47015, Abu Dhabi
Panels Ref. Description AT 400kV IF ROOM AT 220kV IF ROOM Description Description United Arab Emirates
No. Ref. Tel. (+971) 2 6165200
=NE01+01F,....+23F 415V AC DISTRIBUTION PANELS =C19, =C20, =C22 =D05, =D08, =D12
PROTECTION PANELS =H01 SPACE FOR FUTURE FDR. =H01+H01 Fax. (+971) 2 6165300
& =C23+R1, +R2 & =D18+R1, +R2 =H02 AUX. TR -1 =H02+H02
=NK01-G01, ....-G03 110V BATTERY -1 =C19, =C20, =C22 =D05, =D08, =D12 CONTRACT NO.: N-18800/A
INTERFACE PANELS =H03 INCOMER -1 : IBT -2 =H03+H03
=NL01-G01, ....-G03 110V BATTERY -2 & =C23+V1 & =D18+V1 CONTRACT TITLE: Supply & Installation of 400/220kV Grid Station at Ruwais (VLTA)
=H04 BUS SECTION =H04+H04
=NK01+F01, =NL01+F01 110V FUSE BOX -1 & -2 =C00+Q21 & +Q22 =D00+Q21 & +Q22 METERING PANEL -1 & -2 =H05 BUS RISER =H05+H05 SCALE: 1 : 100 STANDARD: A1 DOCUMENT TITLE:
=NK01+NG1..., =NL01+NG1... 110V DC CHARGER / VCU / DCDB RTU RTU RTU PANEL =H06 INCOMER -2 : IBT -4 =H06+H06 DATE NAME SIGN
=**Y+CYX21 & +CYX22 =**Y+CYX31 & +CYX32 OLTE / MUX PANELS =H07 AUX. TR -2 =H07+H07
=NQ01+G01, +G02 48V BATTERY -1 PREP SNR 05-07-23 SNR
H =**Y+CYX23 & +CYX24 =**Y+CYX33 & +CYX34 PSE / MUX PANELS =H08 SPACE FOR FUTURE FDR. =H08+H08 OVERALL SUBSTATION EQUIPMENT LAYOUT H
=NR01+G01, +G02 48V BATTERY -2 =**Y+CYX25 =**Y+CYX35 MDF PANEL +1.400(FFL) CHD SNR 05-07-23 SNR
(+8.800 NADD) - PLAN & SECTIONS
=NQ01+F01, =NR01+F01 48V FUSE BOX -1 & -2 =**Y+CYX26 =**Y+CYX36 PSE MDE PANEL 0.200(FPL) APPR JACOB 05-07-23 JACOB
±0.000(FRL/FGL) (+7.600 NADD) (400/220kV Control Building Ground Floor)
=NQ01+NG1..., =NR01+NG1... 48V DC CHARGER / VCU / DCDB =**Y+CYX27 =**Y+CYX37 FODF PANEL
(+7.40 NADD) DOC N0: N-18800A-RS-5000-Q-2151-S6_RD
=NG01+N01 UPS PANEL
ORIGINATOR REF: 400/220kV GRID STATION AT RUWAIS (VLTA)
SUBSTATION TYPICAL LEVEL DETAILS CONTRACT NO ORIG SUBJECT TYPE
CURRENT
REV SHEET NO.
SHEET SHEETS
CSD NO LAST QTY.
NO
N 1 8 8 0 0 A R S 5000 Q 2151 D 0 0 0 6 05 09
1 2 3 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
PROJECT
B3 B2 B2
NORTH TRUE
NOTE :-
+ 14.180(TOP)
NORTH
For Fresh Air Duct For Extract Air Duct For Extract Air Duct For Extract Air Duct For Extract Air Duct For Extract Air Duct For Fresh Air Duct For Fresh Air Duct
For Fresh Air Duct For Control Cable
For Control Cable
Through Basement-2 Through Battery Room From Basement-1 From Toilet From Basement-2 From CO2 Room Through GF From BMS Room Through Basement-2 Through Stair-1 1. FOR GENERAL NOTES AND LEGEND REFER TO SHEET 1 OF THIS DRAWINGS.
For Extract Air Duct For Extract Air Duct For Extract Air Duct
From Toilet From Basement-2 From CO2 Room Through GF
+6.520 (FFL)
For Extract Air Duct +6.400 (SSL)
C1 EF-xx C1
+ 12.590 (FFL)
+ 12.400 (SSL)
From Battery Room EI
+6.475 (FFL) EI EF-07
+ 12.400 (SSL)
+ 12.400 (SSL)
+ 12.520 (FFL)
+ 12.520 (FFL)
+6.400 (SSL)
+6.400 (SSL)
+6.535 (FFL)
+6 6.40
EI
.53 0
EI
+
TOILET ROOM
5 ( (SS
For Fresh Air Duct
1200
FF L)
STL-16B EXTRACT FAN
L)
ExtractAir
For Fresh AirDuct
Duct
+6.590(FFL) From Basement-1 + 12.590 (FFL) EI
1885 +6.535 (FFL)
5355
+6.400 (SSL) +6.400 (SSL) + 12.400 (SSL) EI
SSMD-02
5065
EF-13A,13B MD-xx MD-xx
AD-xx AD-xx
7640
MD-xx MD-xx
AD-xx AD-xx
EI BMAF-xx
EI AHU-2A BMS ROOM BMAF-xx
EI
+ 12.400 (SSL)
+ 12.590(FFL)
EF-xx EF-xx
EI
DN
From GF (Sys.-2) C2
STL-xx
STL-xx
2200
STAIR-1
2285
For Supply Air Duct
Through GF (Sys.-2)
AHU-1A For Power Cable
From Pantry
+ 12.400 (SSL) + 12.400 (SSL)
AHU-2B
C3 For Extract Air Duct
From Pantry
C3
2560
2560
STL-xx + 14.180(TOP) EF-xx
1185
3890 +7.055 (FFL) For Main Fresh Air Duct
Through Sys.-1
EF-xx
+6.400 (SSL)
EI EI
C4 C4
2200
EI
3920
EF-xx
EI
For Fresh Air Duct
Through INTERFACE ROOM-2
1935
EF-xx
For Extract Air Duct
For Extract Air Duct From Telecom Room
4675
STL-24A
AHU-2C
F.H.C.
B STAIR ROOF AHU-1B B
9010
+6.865 (FFL)
STEEL +6.400 (SSL) C6
CAGE LADDER
EF-xx
For Extract Air Duct
EI
From LVAC ROOM
5755
For Supply Air Duct For Return Air Duct
Through GF (Sys.-1) From GF (Sys.-1)
4335
For Supply Air Duct 1400
1400
UP STL-24A
Through GF (Sys.-2)
3635
STL-xx STL-xx
+ 12.400 (SSL)
+ 12.980 (FFL)
LOWER ROOF AREA
+6 6.40
1400
1400
.82 0
+
0 ( (SS
For Fresh Air Duct STL-xx From GF (Sys.-2) For Fresh Air Duct
For Fresh Air Duct Trough Telecom Room
L)
+ 14.180(TOP)
From INTERFACE ROOM-2
L)
+6 6.40
FF L)
0 ( SS
.78 0
+
2000
.78 00 (
0 ( (SS
FF L )
For Fresh Air Duct STEEL 6
+ 6.4
L)
STL-12B
Through RELAY & SCMS CAGE LADDER +
BSEF-01B
ROOM
+9.865 (TOW)
MD-xx
EI
EI
AD-xx
1500 2000
5690
For Fresh Air Duct
From INTERFACE ROOM-1
STL-12A
BSEF-01A
11740
C C9 C
EI CU-1A CU-1B 2100 2100
EF-xx
CU-2A CU-2B CU-2C
For Extract Air Duct BOOSTER
From Basement-1 PUMP SET
For Extract Air Duct +9.865 (TOW)
EF-xx
From MV SWGR ROOM
For Extract Air Duct
From RELAY & SCMS ROOM
6050
EI
1000 LTR. CAPACITY
GRP WATER TANK
WITH SUN SHADE ON
CONCRETE BASE
+6.400 (SSL)
+6.520 (FFL)
+6.400 (SSL)
+6.520 (FFL)
+6.400 (SSL)
+6.520 (FFL)
+6.400 (SSL)
+6.520 (FFL)
+6.400 (SSL)
+6.400 (SSL)
+6.590 (FFL)
+6.590 (FFL)
For Extract Air Duct
From INTERFACE ROOM-1
C10 C10
STAIR-2
DN
6350 6320 6400 6400 6430 3000 8000 4150 3100 6400 6430 3000 8000 7250
D CA CB CC CD CE CF CG GH GI GJ CD CE CF CG GH GJ D
B3 B2 B2
B3
B2
C1
CONSULTANT STAMP:
-2.095 (FFL) -2.095 (FFL) -2.095 (FFL) -2.095 (FFL)
-2.180 (SSL) -2.180 (SSL) -2.180 (SSL) -2.180 (SSL)
E E
UP
DRAIN CHANNEL DRAIN CHANNEL
WITH GRATING COVER WITH GRATING COVER
DV
5355
ESCAPE ROUTE
LV CABLE
TRENCH
DV
REFERENCE DRG.
MV CABLE
TRENCH C2
- - - -
4845
MV CABLE
TRENCH
1200 C4 - D 06-05-24 DRAWING REVISED BASED ON COMMENTS CS:0209 SNR SNR JACOB
2x2 - 100Ø Pipes
MV CABLE
MV CABLE
REVISIONS
& AS PER TRANSCO WORKSHOP ON 26-09-23
F.H.C.R
-2.180 (SSL)
-1.960 (FFL)
-1.960 (FFL)
ESCAPE ROUTE
UP
DTS NO. REV. DATE DESCRIPTION PREP CHD APPR
C6 CONTRACTOR STAMP
FOR APPROVAL
1200
ESCAPE ROUTE
DTS NO: N-18800A- ****
-2.180 (SSL)
-1.960 (FFL)
4335
-2.180 (SSL)
OWNER:
BASEMENT -1
G G
Endorsement from approved Designer/Subcontractor and Coordinators
C9
C10 CONTRACT TITLE: Supply & Installation of 400/220kV Grid Station at Ruwais (VLTA)
UP
SCALE: 1 : 100 STANDARD: A1 DOCUMENT TITLE:
DATE NAME SIGN
PREP SNR 05-07-23 SNR
H OVERALL SUBSTATION EQUIPMENT LAYOUT H
+1.400(FFL) CHD SNR 05-07-23 SNR
6350 6320 6400 6400 6430 3000 8000 4150 3100
(+8.800 NADD) - PLAN & SECTIONS
0.200(FPL) APPR JACOB 05-07-23 JACOB
CA CB CC CD CE CF CG GH GI GJ
±0.000(FRL/FGL) (+7.600 NADD) (400/220kV Control Buldg. Basement & Roof Floors)
B3 B2 (+7.40 NADD) DOC N0: N-18800A-RS-5000-Q-2151-S7_RD
ORIGINATOR REF:
BASEMENT FLOOR - PLAN 400/220kV GRID STATION AT RUWAIS (VLTA)
SUBSTATION TYPICAL LEVEL DETAILS CONTRACT NO ORIG SUBJECT TYPE
CURRENT
REV SHEET NO.
SHEET SHEETS
(400kV/200kV CONTROL BUILDING) CSD NO LAST QTY.
NO
N 1 8 8 0 0 A R S 5000 Q 2151 D 0 0 0 7 06 09
1 2 3 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTE :-
AE AB
13200 1. FOR GENERAL NOTES AND LEGEND REFER TO SHEET 1 OF THIS DRAWINGS.
ALUMINIUM
+16.900 TOCW CLAUSTRA DOOR
CLAUSTRA WALL
4700
+13.80 TOP
3600
OPGW
400kV SWITCHGEAR ROOM
820
(BY OTHERS) 3015 11585 3440
2300
+8.60 CRL PD 1960
4309.5688
6.3t
6500
1625
6500
DOUBLE TENSION INSULATOR -T5 Z2
(BY OTHERS)
400kV OHL - WMZD -2
10600
BB2B BB2A
9380
7200
-Q8
7000
~
2030x700mm
-Q2 WALL OPENING FOR
-Q9 BUSDUCT ENTRY (TYP)
5035
AT +5.715 (BOO)
4665
F1
-Q52 -Q1
-Q51
-T1
-T2
2300
-Q0 REMOVABLE WIRE
*+S1
F MESH FENCE
ACSR CONDUCTOR
(BY OTHERS) +1.40 FFL
SUSPENSION
INSULATOR
PIT
+0.480 LVL +0.400 PL
1400
(BY OTHERS)
+0.00 FGL 2800 850 50 +0.100(TOC.) +0.250 FPL +0.00 FGL
2500 6000
B 3x150Ø CABLE DUCT
B
12000
TUNNEL
33kV
ESCAPE ROUTE
CABLE
2080
CABLE 220kV OIL / WATER OIL / WATER OIL / WATER
2275
2000
TRENCH CABLE COLLECTION PIT COLLECTION PIT COLLECTION PIT
-1.880 TOP OF BLINDING TRENCH
GANTRY -2.080 FFL
(BY OTHERS)
-2.180 SSL
6800 12800
1600
+18.50 SSL
ACSR CONDUCTOR
(BY OTHERS)
CB CC CD CE CF CG GH GI GJ
43800
HVAC ROOM 6160 6560 6400 6430 3000 8000 4150 3100
6300
+14.180(TOP)
+14.180 TOP
ROOF OVER
C FFL VARIES HVAC ROOM C
(+12.520 TO +12.980) +12.400 (SSL)
+12.20 SSL +12.40 SSL
BY OTHERS
LOWER ROOF OPEN
3600
20470
SA
2300
5800
HVAC ROOM
SE SCOPE +8.60 CRL
4309.5688
6.3t
6325
Z1 FFL VARIES
(+6.520 TO +6.865)
(+6.475 TO +6.700) +6.40 SSL
7200
-Q52
7000
-T5
-Q9 INTERFACE ROOM
1800
T3 T3 +4.00 LVL AUX. TR-3 DC ROOM FALSE CEILING
TELECOM ROOM (FUTURE)
CORRIDOR
4800
+3.40 TOW
4380
-Q1 1805 2225 1830
-Q8
-Q51 +1.400(FFL)
3000
-T1
2600
(+8.800 NADD)
2300
2200
-T2 -Q0 REMOVABLE
*+S1
F1 F1 F
FENCE
110V DCDB 48V DCDB UPS TELECOM PANELS FUTURE
0.200(FPL)
4000
4000
+1.40 FFL
2525
+1.40 FFL
±0.000(FRL/FGL) (+7.600 NADD)
+0.480 (TOC)
PIT
1400
+0.40 PL
+0.00 FGL +0.200(FPL)
2500 6000
2800 850 50 +0.00 FGL +0.00 FGL +0.20 TOC +0.00 FGL (+7.40 NADD)
ROAD
D 3x150Ø CABLE DUCT D
3090
ESCAPE ROUTE
1300
TUNNEL
MV MV
CABLE
ESCAPE ROUTE
CABLE CABLE OIL/WATER
VOID
2080
6000 3300 6000 6500 6500 SUBSTATION TYPICAL LEVEL DETAILS
2000
TRENCH TRENCH COLLECTION PIT ESCAPE ROUTE
BASEMENT -1 BASEMENT -2
-1.880 TOP OF BLINDING FFL VARIES FFL VARIES
CL CL CL CL -2.080 SSL 1000 1000 -2.180 (SSL) -2.180 (SSL) 2x2 - 100Ø Pipes
-2.180 SSL (+1.960 TO -2.105) (+1.960 TO -2.105)
FENCE SF6 - AIR BUSHING GANTRY SF6 - AIR BUSHING for FOC
("R & B" Phase) ("Y" Phase) -2.780 LVL -2.780 LVL
HIGHEST WATER LVL -2.180 SSL HIGHEST WATER LVL
SECTION - C1 C1 SECTION - B1 B1
( 400kV OHL FEEDER :: =C04, [=C07 & =C13] ) (400/220kV CONTROL BUILDING)
C1 C2 C4 C6 C8 C9 C10
30950
5355 4845 4675 4335 5690 6050
~
+14.180 TOP
CONSULTANT STAMP:
OPGW ROOF OVER HVAC ROOM
E (BY OTHERS) E
+12.40 SSL STEEL CAGE LADDER
6500
ALUMINIUM CLAUSTRA
DOOR
HVAC ROOM +9.865 TOW
6500
DOUBLE TENSION INSULATOR
5800
CLAUSTRA BLOCK
REFERENCE DRG.
(BY OTHERS)
400kV OHL - WMZD -1 +8.065 TOP
~
FFL VARIES
CONDENSING AREA
(+6.475 TO +6.700) FFL VARIES
(+6.780 - 6.565)
+6.40 SSL +6.40 SSL
- - - -
ACSR CONDUCTOR
(BY OTHERS)
1800
SUSPENSION
INSULATOR CO2 ROOM PANTRY TELECOM ROOM
FASLE CEILING
RELAY/SCMS ROOM DRG. NO. TITLE REV. STATUS
CORRIDOR
4800
(BY OTHERS)
TELECOM PNL.
3000
FACP PNL.
FMS PNL.
FUTURE
FUTURE
FUTURE
FIXED
2200
12000
HANDRAIL F F F F F F
REVISIONS
ESCAPE ROUTE
& AS PER TRANSCO WORKSHOP ON 26-09-23
3135
0091 B 23-05-23 DRAWING REVISED BASED ON COMMENTS CS:0015 SNR SNR JACOB
& SUPERSEDED AS PER TRANSCO WORKSHOP
F BASEMENT -2 ESCAPE ROUTE
-1.960(FFL)
-2.180(SSL)
BASEMENT -2 F
-2.180(SSL)
0015 A 23-05-23 FIRST ISSUE SNR SNR JACOB
DOUBLE TENSION INSULATOR -2.780 LVL
(BY OTHERS) HIGHEST WATER LVL
DTS NO. REV. DATE DESCRIPTION PREP CHD APPR
400kV OHL - WMZD -1
LOWEST WATER LVL
CONTRACTOR STAMP
~
-3.480 LVL
FOR APPROVAL
AE
13200
AB
+13.80 TOP
TRANSCO P.O. BOX 173
ABU DHABI - U.A.E.
C1 C2 C4 C6 C8 C9 C10 Tel : +971 2 416 4000
30950 Abu Dhabi Transmission & Despatch Company Fax : +971 2 416 4444
BY OTHERS +12.20 SSL 5355 4845 4675 4335 5690 6050
+14.180 TOP CONSULTANT:
SE SCOPE
400kV SWITCHGEAR ROOM
2300
G G
+8.60 CRL Endorsement from approved Designer/Subcontractor and Coordinators
4309.5688
6.3t
Z1 Z1
6325
6325