PROGRAMMATIC ENVIRONMENTAL PERFORMANCE REPORT AND MANAGEMENT
(PEPRMP) OUTLINE
PEPRMP OUTLINE
(Maximum of about 200 pages)
Project Fact Sheet
Table of Contents
Executive Summary
1) Brief Description of the Co-located Projects vis-à-vis the proposed expansion or changes
2) Brief Summary of Project’s EIA Process
3) Brief description of the baseline environmental conditions focused on the critical parameters
4) Summary on the EIA Findings on the Key Significant Impacts of the Project and corresponding EMP
highlights
5) Summary of the Environmental Monitoring Plan on the most significant impacts and key measures
4.3 The Air - (This section shall include carrying capacity assessments for the applicable
regulated pollutants based on actual discharges/emissions. However, in the case of
stand-alone project/s, the requirement of carrying capacity assessment/s may be waived
by the EIARC. Monitoring results for the preceding six months [minimum] should also be
included.)
155
ANNEX 2-13
4.4 The People - (This section shall discuss actual and applicable impacts on the social
environment based on actual or incremental effects [both positive and negative] for the
preceding two years.)
NOTE: The EIA Findings on the project’s environmental impacts and management measures will advise DOH if
the project will pose a public health risk to the environment. For this purpose, DOH shall provide DENR-EMB with
a declaration of Health Sensitive Projects and Health Sensitive Areas. Until such time, DOH shall review EHIA
independently of the EIA Process. Further, workers’ HIA component of the EHIA is recommended to be
coordinated by DOH with DOLE for the latter’s consideration in its requirement of an Occupational Health and
Safety Program from the Proponent.