0% found this document useful (0 votes)
67 views

Non Modular

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views

Non Modular

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Brick work with common burnt F.P.S.

(non modular)
bricks of class designation 7.5 in foundation and plinth
in:
Cement mortarVolume
1:4 (1ofcement
brickwork
: 4 coarse sand)
When different dry ingredients of mortar like cement and sand mix with by adding
water then the Calculation of dry volume of mortar.

DESCRIPTION QUANTITY UNIT RATE


Details of cost for 1 cum Material
MATERIAL
Common burnt clay F.P.S.(non modular)
bricks classdesignation 7.5 434.03 NOS 4.5
Rate as per item No 3.9 of SH: Mortar 0.231 CUM 4010
CARRIAGE OF MATERIALS
Carriage of Bricks 434.03 NOS 0.276
LABOUR

Mason (brick layer) 1st class 0.47 DAY 728


Mason (brick layer) 2nd class 0.47 DAY 679
Coolie 1.8 DAY 558
Bhisti 0.2 DAY 617
EQUIPMENTS
Sundries 2.73 L.S 2
TOTAL

1.5% Water Charge

TOTAL

CONCTRACTORS PROFIT AND OH

TOTAL

Cost of 1 Cum.
on modular) Mortar ratio 1:04
on and plinth
Cement 1

rse sand) 1 CUM Sand 4


mix with by adding
tar. 1.33 SUM 5

AMOUNT
Size of brick with mortar 240*120*80mm 0.0023
Size of brick without mortar 230*110*70mm 0.00177

MATERIALS UNIT RATE


1953.125
927.74156 Bricks Nos 4.5
Mortar CUM 4010.35
LABOURS UNIT RATE
119.79167 Mason (brick layer) 1st class DAY 728
Mason (brick layer) 2nd class DAY 679
Coolie DAY 558
342.16 Bhisti DAY 617
319.13 CARRIAGE UNIT RATE
1004.4 Carriage of Bricks nos 0.276
123.4 CUM 103.77
SUNDRIES L.S 2

5.46

4795.2082
71.928123

4867.1363
730.07045

5597.2068

5597.2068