Sulzer RT-flex - ICU - Assembly Instruction
Sulzer RT-flex - ICU - Assembly Instruction
Attention:
1.) Every part must be cleaned and degreased before assembly
2.) For Lubrication of all screws only use Neverseez
3.) For Lubrication of the O-Rings use Molykote 33 Medium (black)
Please note that the assembly sequence in this instruction was used for the units of the Genesis engine
(RT-flex58TB) so that the pictures in this instruction are from such an injection-control unit made in
Oberwinterthur Switzerland. For this assembly instruction however, the article numbers and drawing numbers
are changed to the RT-flex60C.
2.4 Stick the screws into the valve block 015.251.404.521 Lubricate the thread and the seat of the Neverseez Anti- 1-107.284.065
screw head with grease Seize &
Lubricating
Compound
2.5 Insert the pistons 107.038.749.001 Pay attention to the 3-107.038.749
correct matching of 1-107.012.830
pistons and bores
2.6 Mount the valve block on the a.) Torque load ca. 20 Nm 1-107.284.065
injection control block b.) Tighten the screws crosswise
carefully
2.7 Insert the O- rings in the pre- control 021.501.000.507 Lubricate the O- rings Molykote 33 1-107.284.065
valves 107.038.650.200 Medium
2.8 Mount the pre- control valves 107.038.650.200 a.) Torque load ca. 2,5 Nm 1-107.284.065
015.251.431.091
2.9 Insert the distance pieces 107.315.179.001 1-107.284.065
2.10 Measure the stroke The stroke has to be 1-107.284.065
(Picture Nr. 1) between 3,25 mm
and 3,4 mm
4.3 Mount the intermediate flange with a.) Lubricate the threat and the seat of Neverseez Anti- At all times the 1-107.319.157
the injection control block the screw head with grease Seize & push rod must be
b.) first tighten the screws with 80 Nm, Lubricating easily moveable
then with 140 Nm and finaly with 200 Compound
from one stop to
Nm. Use the sequence shown in the
sketch the other
3 1
7 5
9 10
2 4
6 8
4.12 Stroke measurement Move the injection control piston to the 1-107.319.160
back stop (to the cup springs) and
Picture Nr.6
measure the distance between piston
rod and intermediate flange
4.13 Final mount of the connecting Stick on with Loctite 648 1-107.319.157
element
4.14 Check the correct positioning of the Rotate the control piston (when it is at
connecting element the back stop) and measure the round The out of round
at the end of the aluminium pipe with a must be less than
dial gauge 0.9 mm
(Picture Nr.7)
4.15 Mount the housing on the 107.319.710.001 a.) Lubricate the O- ring with Molykote Molykote 33 1-107.319.157
intermediate flange 021.501.003.605 b.) Lubricate the thread and the seat of Medium +
015.251.405.341 the screw heads with Neverseez Neverseez Anti-
c.) Torque load ca. 48 Nm Seize &
Lubricating
Compound
4.16 Mount the control piston position 107.319.710.001 a.) Lubricate the O- ring with Molykote Molykote 33 1-107.319.157
sensor on the housing 021.702.004.105 b.) Lubricate the thread and the seat of Medium +
015.251.404.241 the screw heads with Neverseez Neverseez Anti- check the correct
c.) Torque load ca. 20 Nm Seize & positioning of the
Lubricating position sensor
Compound
< 0.9 mm