a Flourecent fitting type philips TMW 065/2118 with 2xTLD 18watt Pcs 2,460.48 10.00 24,604.80
1.7 Socket Point(Schuko type or approved equivalent)
a Flush mounting socket outlet of 16A/1P +N+E , for elect fridge. Pcs 331.20 16.00 5,299.20
Carried to Summery 167,457.00
2 Excavation and Earth Works
Clear the site not exceeding 200mm including small shrubs and
a
grasses m2 81.66 6.00 489.96
b Balk Excavation in soft Rock not exceeding 1.5m m3 197.10 9.00 1,773.90
c Back fill borrowed selected material compacting within 200mm layer m3 193.57 4.50 871.06
d Cart away excavated material away from the site to appropriate. m 3
120.54 3.00 361.62
Carried to Summery 3,496.54
3 Concrete Works
C-5 Lean Concrete 1:2:8 Hand mix filled in to form work and vibrated
a around rod reinforcement
m2 634.62 2.00 1,269.24
Carried to Summery 1,269.24
4 Masonary Work
Basaltic or equivalent type stone masonry bedded in cement
a mortar(1:3) mix below ground surface. price shall include cement
mortar bed. m3 4,845.36 3.00 14,536.08
Carried to Summery 14,536.08
5 Water Work
a Hand wash Basin 50*60cm Golden dragon with complete accessories. No 11,115.60 1.00 11,115.60
b Water tanker 2000lt fibered with necessary accessories No 21,279.60 1.00 21,279.60
1/2 inch Gate Valves of approved quality complete with unions,
c
hand wheels No 394.95 2.00 789.90
1 inch Gate Valves of approved quality complete with unions, hand
d
wheels No 526.60 2.00 1,053.20
Supply and install 1/2 inch PPR Pipes for water distribution to all
e sanitary fixtures including necessary pieces such as tees,
bends,unions, etc. No 402.90 30.00 12,087.00
Supply and install 1 inch PPR Pipes for water distribution to all
f sanitary fixtures including Necessary pieces such as tees,
bends,unions, etc. ml 549.90 80.00 43,992.00
Carried to Summery 90,317.30
6 Metal work
a Grill for door and window as per engineers reccomendations. ml 200.00 90.00 18,000.00
Supply and fix 1 inch galvanized pipes for ladder as per design and
b specification and engineers recommendation.
No 8,000.00 1.00 8,000.00
c RHS pole used to support the roof at front side. ml 5,544.90 6.00 33,269.40
Carried to Summery 59,269.40
Total 336,345.56
Vat(15%) 50,451.83
Grand Total 386,797.40
Project Name:-Veternary Clinic type"C" Construction.
Client:-L/Assabi Woreda Agriculture Office.
Contractor:-Lati,Bonsa and their friends
Location:-L/Assabi Woreda Dongor Town Kebele.01