0% found this document useful (0 votes)
7 views5 pages

Rendelle Concept Paper

Uploaded by

rendellemante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views5 pages

Rendelle Concept Paper

Uploaded by

rendellemante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

School Fence Renovation

“Improving School Safety: A Plan For Fence Renovation”

Rendelle Joy A. Mante

Dangcagan National High School

[email protected]/ 09073413593

OCTOBER 2024
Introduction

Dangcagan National High School is a public school in Dangcagan, Bukidnon, with

approximately 2,001 students. It provides a range of academic programs, including STEM,

HUMSS, and ABM, along with two vocational courses: SMAW and EIM, all aimed at preparing

students for various career paths.

The reason for seeking support from your agency for this project is to enhance the

security of the students through the renovation of the school fences. It would prevent

unauthorized access and discourage cutting classes by limiting entry points to the main gate.

Additionally, new fences would improve the overall appearance of the school, creating a safer

and more attractive environment for students.

Rationale/Background

The problem at Dangcagan National High School involves poorly maintained fences,

with some areas, particularly at the back, lacking fences entirely and others in disrepair.

Renovating these fences is crucial for enhancing student security, as it would prevent

unauthorized access and discourage cutting classes by limiting entry points to the main gate.

Additionally, new fences would improve the overall appearance of the school, creating a safer

and more attractive environment for students.


Project Description

ACTION PLAN

OBJECTIVES ACTION RESPONSIBILITY TIMELINE


Assessment and Conduct site Project Team Week 1-2
Planning evaluation; gather
input from
stakeholders
Budgeting Estimate costs; Finance Team Week 3-4
explore funding
options
Approval Process Present plan to Project Lead Weeks 5
administration and
local authorities;
address concerns
Implementation Schedule renovation; Project Manager Week 6-7
hire contractors or
organize volunteers
Communication Communication Keep Communications Throughout Project
school community Team
informed; share
updates
Final Review Inspect completed Project Team Week 9
work; gather feedback
Maintenance Plan Establish maintenance Maintenance Team Ongoing
schedule for longevity

Project needs and cost


Budget Item Description Price No. of Total amount
items
1. Concrete posts Durable concrete ₱850 50 posts ₱42,500
posts to support the
fence structure.
2. Hollow blocks Hollow blocks ₱15 2,000 pcs. ₱30,000
fencing for security
and hollow blocks
on the top of the
fence.
3. Gates Secure metal gates ₱10,000 2 gates ₱20,000
for controlled
access.
4. Tie bar To connect and ₱25 2,000 pcs. 50,000
support the hollow
blocks.
5. Cement mix For securing posts ₱250 70 bags 17,500
in the ground and
for hollow blocks.
6. Labor costs Payment for skilled ₱400 6 laborers ₱24,000
workers to install for 10 days
the fence.
Total Budget ₱183,500

Equipment Needed Description


1. Power drill For fastening material
2. Concrete mixer For mixing cement on-site.
Personnel
1. Foreman To oversee the project.
2. 5 Skilled laborers For installation and construction tasks.

You might also like