Fire Extiinguisher Inspection Format
Fire Extiinguisher Inspection Format
FOR/ENGG/SFTY/02
FIRE EXTIINGUISHER
Rev No:00
INSPECTION FORMAT
Date:20/02/2021
Project site: THE K.D.M.P.M.A. CO-OP UNIONLTD Month: November-
2022
Date Of Next Status/
S Extinguish Type & inspectio due Remark
No er ID Location Capacity n Date s
09-12-
1 KMU/FE-1 SECURITY ROOM ABC-6 KG 10-11-2022 2022
09-12-
2 KMU/FE-2 CURD TUB WASHER CO2-4.5 KG 10-11-2022 2022
LASSI COLD ROOM ENTRANCE DOOR 09-12-
3 KMU/FE-3 DOCK ABC-4 KG 10-11-2022 2022
09-12-
4 KMU/FE-4 LASSI COLD ROOM ABC-4 KG 10-11-2022 2022
09-12-
5 KMU/FE-5 LASSI PACKING RROM ABC-4 KG 10-11-2022 2022
09-12-
6 KMU/FE-6 CURD CUP PACKING ROOM ABC-4 KG 10-11-2022 2022
09-12-
7 KMU/FE-7 CURD COLD ROOM-5 ABC-4 KG 10-11-2022 2022
CURD COLD ROOM ENTRANCE DOOR 09-12-
8 KMU/FE-8 DOCK ABC-4 KG 10-11-2022 2022
09-12-
9 KMU/FE-9 CURD PROCESS HALL ABC-6 KG 10-11-2022 2022
09-12-
10 KMU/FE-10 CURD CIP CO2-4.5 KG 10-11-2022 2022
09-12-
11 KMU/FE-11 CURD COLD ROOM-10 ABC-6 KG 10-11-2022 2022
NEW BLOCK GROUND FLOOR PANEL 09-12-
12 KMU/FE-12 ROOM CO2-4.5 KG 10-11-2022 2022
NEW BLOCK GROUND FLOOR PANEL 09-12-
13 KMU/FE-13 ROOM ABC-2 KG 10-11-2022 2022
09-12-
14 KMU/FE-14 PANEL OPPOSITE ROOM ABC-4 KG 10-11-2022 2022
09-12-
15 KMU/FE-15 FGS DOCK OFFICE ABC-4 KG 10-11-2022 2022
09-12-
16 KMU/FE-16 NEW BLOCK AIR COMPRESSOR ROOM CO2-4.5 KG 10-11-2022 2022
09-12-
17 KMU/FE-17 1ST FLOOR LAB INSIDE ABC-2 KG 10-11-2022 2022
09-12-
18 KMU/FE-18 LAB OUTSIDE CO2-9 KG 10-11-2022 2022
09-12-
19 KMU/FE-19 1ST FLOOR PANEL ROOM OPPOSITE CO2-9 KG 10-11-2022 2022
09-12-
20 KMU/FE-20 MAIN PANEL ROOM INSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
21 KMU/FE-21 BYPRODUCTS ENTRANCE ABC-4 KG 10-11-2022 2022
09-12-
22 KMU/FE-22 SUGAR ROOM GODOWN CO2-2 KG 10-11-2022 2022
09-12-
23 KMU/FE-23 DOMINO AREA CO2-2 KG 10-11-2022 2022
KHOVA DRYING &SWEETS PACKING 09-12-
24 KMU/FE-24 ROOM ABC-4 KG 10-11-2022 2022
09-12-
25 KMU/FE-25 BASUNDHI PACKING ROOM CO2-2 KG 10-11-2022 2022
09-12-
26 KMU/FE-26 KHOVA PAN--5 AREA CO2-9 KG 10-11-2022 2022
09-12-
27 KMU/FE-27 JUNNU PACKING MACHINE OPPOSITE CO2-2 KG 10-11-2022 2022
PANEER VAT ROOM ENTRANCE OF
JUNNU 09-12-
28 KMU/FE-28 PACKING MACHINE BESIDE ABC-2 KG 10-11-2022 2022
09-12-
29 KMU/FE-29 HSD BUNK AFFF-9 KG 10-11-2022 2022
09-12-
30 KMU/FE-30 CANTEEN ENTRANCE CO2-2 KG 10-11-2022 2022
09-12-
31 KMU/FE-31 CANTEEN KITCHEN CO2-2 KG 10-11-2022 2022
09-12-
32 KMU/FE-32 CANTEEN STORE CO2-2 KG 10-11-2022 2022
COOP OFFICE BUCKETS STORE ROOM 09-12-
33 KMU/FE-33 OUTSIDE DCP-5 KG 10-11-2022 2022
09-12-
34 KMU/FE-34 OLD POWDER GODOWN 1ST SHUTTER AFFF-9 KG 10-11-2022 2022
09-12-
35 KMU/FE-35 OLD POWDER GODOWN 2ND SHUTTER AFFF-9 KG 10-11-2022 2022
09-12-
36 KMU/FE-36 NEW OHC OUTSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
37 KMU/FE-37 GARAGE ABC-6 KG 10-11-2022 2022
GARAGE INSIDE FILM GODOWN 09-12-
38 KMU/FE-38 SHUTTER OUTSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
39 KMU/FE-39 KHEESARADARSHINI FUNCTION HALL ABC-6 KG 10-11-2022 2022
09-12-
40 KMU/FE-40 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
41 KMU/FE-41 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
42 KMU/FE-42 NEW POWDER GODOWN CO2-9 KG 10-11-2022 2022
09-12-
43 KMU/FE-43 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
44 KMU/FE-44 NEW POWDER GODOWN CO2-6.5 KG 10-11-2022 2022
09-12-
45 KMU/FE-45 NEW BUTTER DEEFREEZE 1ST SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
46 KMU/FE-46 NEW BUTTER DEEFREEZE 2ND SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
47 KMU/FE-47 NEW BUTTER DEEFREEZE 3RD SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
48 KMU/FE-48 POWDER BUILDING DOCK DCP-5 KG 10-11-2022 2022
09-12-
49 KMU/FE-49 POWDER BUILDING TIN GODOWN 10-11-2022 2022
09-12-
50 KMU/FE-50 POWDER BUILDING FILM GODOWN 10-11-2022 2022
POWDER BUILDING 1ST FLOOR BUCKETS 09-12-
51 KMU/FE-51 STORE ENTRANCE 10-11-2022 2022
POWDER BUILDING 1ST FLOOR BUCKETS 09-12-
52 KMU/FE-52 STORE CORNER 10-11-2022 2022
POWDER SECTION PROCESS ENTRANCE 09-12-
53 KMU/FE-53 LEFT 10-11-2022 2022
POWDER SECTION PROCESS HEATER 09-12-
54 KMU/FE-54 PANEL ABC-6 KG 10-11-2022 2022
POWDER SECTION PROCESS AIR 09-12-
55 KMU/FE-55 COMPRESSOR AREA ABC-6 KG 10-11-2022 2022
POWDER SECTION PROCESS HEATER 09-12-
56 KMU/FE-56 OPPOSITE PANEL ABC-4 KG 10-11-2022 2022
POWDER SECTION PROCESS PLC PANEL 09-12-
57 KMU/FE-57 PILLAR 10-11-2022 2022
POWDER SECTION PROCESS PLC PANEL 09-12-
58 KMU/FE-58 SIDE WALL 10-11-2022 2022
POWDER SECTION 25 KG FILLING ROOM 09-12-
59 KMU/FE-59 ENTRANCE SHUTTER 10-11-2022 2022
POWDER SECTION POWDER MIXING 09-12-
60 KMU/FE-60 ROOM 10-11-2022 2022
POWDER SECTION MAIN MCC PANEL 09-12-
61 KMU/FE-61 ROOM 10-11-2022 2022
09-12-
62 KMU/FE-62 APS GENERATOR BACKSIDE 10-11-2022 2022
09-12-
63 KMU/FE-63 APS GROUND FLOOR STEPS 10-11-2022 2022
09-12-
64 KMU/FE-64 APS LAS 10-11-2022 2022
APS 1ST FLOOR STORE ROOM 09-12-
65 KMU/FE-65 ENTRANCE 10-11-2022 2022
09-12-
66 KMU/FE-66 APS 1ST FLOOR STORE ROOM CORNER 10-11-2022 2022
APS 1ST FLOOR STORE ROOM LIFT 09-12-
67 KMU/FE-67 BESIDE 10-11-2022 2022
APS 1ST FLOOR STORE ROOM INSIDE 09-12-
68 KMU/FE-68 STORE ROOM 10-11-2022 2022
APS GROUND FLOOR PACKING ROOM 09-12-
69 KMU/FE-69 ENTRANCE 10-11-2022 2022
09-12-
70 KMU/FE-70 APS AHU ROOM 10-11-2022 2022
APS TETRA PAK MACHINE ROOM 09-12-
71 KMU/FE-71 OUTSIDE 10-11-2022 2022
09-12-
72 KMU/FE-72 APS MAIN PANEL ROOM ENTRANCE 10-11-2022 2022
09-12-
73 KMU/FE-73 APS MAIN PANEL UPS ROOM ENTRANCE 10-11-2022 2022
09-12-
74 KMU/FE-74 APS CIP ROOM OUTSIDE 10-11-2022 2022
09-12-
75 KMU/FE-75 METRAL SCRAP GODOWN ENTRANCE 10-11-2022 2022
09-12-
76 KMU/FE-76 NEW BOILER WOOD CHIPPING MACHINE 10-11-2022 2022
09-12-
77 KMU/FE-77 NEW BOILER ASH SCREW AREA 10-11-2022 2022
09-12-
78 KMU/FE-78 NEW BOILER PANEL ROOM 10-11-2022 2022
79 KMU/FE-79 NEW BOILER PLC PANEL ROOM 10-11-2022 09-12-
2022
09-12-
80 KMU/FE-80 NEW BOILER CHIMNEY AREA 10-11-2022 2022
09-12-
81 KMU/FE-81 FURNACE OIL TANKS ENTRANCE 10-11-2022 2022
09-12-
82 KMU/FE-82 FURNACE OIL TANKS CORNER 10-11-2022 2022
09-12-
83 KMU/FE-83 OLD BOILER ENTRANCE 10-11-2022 2022
09-12-
84 KMU/FE-84 OLD BOILER PANEL AREA 10-11-2022 2022
09-12-
85 KMU/FE-85 WATER SECTION HFT TANKS 10-11-2022 2022
09-12-
86 KMU/FE-86 WATER ENTRANCE PUMPS AREA 10-11-2022 2022
09-12-
87 KMU/FE-87 IBT-2 ENTRANCE 10-11-2022 2022
09-12-
88 KMU/FE-88 IBT-2 OLD PANEL 10-11-2022 2022
09-12-
89 KMU/FE-89 IBT-2 NEW PANEL 10-11-2022 2022
09-12-
90 KMU/FE-90 OLD DEEFREEZE PLANT 10-11-2022 2022
09-12-
91 KMU/FE-91 ETP 10-11-2022 2022
09-12-
92 KMU/FE-92 GHEE PROCESS PANEL ROOM ENTRANCE 10-11-2022 2022
09-12-
93 KMU/FE-93 GHEE PROCESS PANEL BOILER AREA 10-11-2022 2022
09-12-
94 KMU/FE-94 GHEE PACKING SECTION ENTRANCE 10-11-2022 2022
GHEE PACKING SECTION POUCH 09-12-
95 KMU/FE-95 MACHINE BACKSIDE 10-11-2022 2022
GHEE PACKING SECTION BUTTER 09-12-
96 KMU/FE-96 PACKING AREA 10-11-2022 2022
09-12-
97 KMU/FE-97 OLD LIFT GROUND FLOOR 10-11-2022 2022
09-12-
98 KMU/FE-98 GHEE GRANULATION ROOM ENTRANCE 10-11-2022 2022
09-12-
99 KMU/FE-99 OLD AIR COMPRESSOR ROOM 10-11-2022 2022
10 KMU/FE- 09-12-
0 100 FGS COLD ROOM-1 CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
1 101 PREPAC CAN WASHER BACKSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
2 102 MILK CRATES UNLOADING DOCK 10-11-2022 2022
10 KMU/FE- 09-12-
3 103 PREPAC NICHROME M/C BACKSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
4 104 PREPAC PANEL AREA 10-11-2022 2022
10 KMU/FE- 09-12-
5 105 MILK COLD ROOM-1 OUTSIDE CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
6 106 MILK FILM GODOWN 10-11-2022 2022
10 KMU/FE- 09-12-
7 107 MILK PROCESS PANEL ROOM CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
8 108 BUTTER SECTION ENTRANCE OUTSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
9 109 BUTTER SECTION CHURNER AREA 10-11-2022 2022
11 KMU/FE- 09-12-
0 110 MILK PROCESS ENTRANCE LEFT 10-11-2022 2022
11 KMU/FE- MILK PROCESS ENTRANCE HORIZONTAL 09-12-
1 111 SILOS AREA 10-11-2022 2022
11 KMU/FE- 09-12-
2 112 MILK PROCESS SILO STEPS AREA 10-11-2022 2022
11 KMU/FE- 09-12-
3 113 MILK PROCESS SILOM PANEL AREA 10-11-2022 2022
11 KMU/FE- MILK PROCESS 20KL HOMOGENIZER 09-12-
4 114 PANEL AREA 10-11-2022 2022
11 KMU/FE- 09-12-
5 115 ELECTRICAL SECTION SHUTTER AREA 10-11-2022 2022
11 KMU/FE- 09-12-
6 116 ELECTRICAL SECTION ENTRANCE 10-11-2022 2022
11 KMU/FE- 09-12-
7 117 ELECTRICAL GENEARTOR BACKSIDE 10-11-2022 2022
11 KMU/FE- 09-12-
8 118 TRANSFORMER SHED 10-11-2022 2022
11 KMU/FE- 09-12-
9 119 TRANSFORMER SHED 10-11-2022 2022
12 KMU/FE- 09-12-
0 120 TRANSFORMER SHED 10-11-2022 2022
12 KMU/FE- 09-12-
1 121 OLD REFRIGERATION ENTRANCE 10-11-2022 2022
12 KMU/FE- 09-12-
2 122 OLD REFRIGERATION PANEL AREA 10-11-2022 2022
12 KMU/FE- 09-12-
3 123 OLD REFRIGERATION PANEL OPPOSITE 10-11-2022 2022
12 KMU/FE- 09-12-
4 124 MILK DOCK STARTING 10-11-2022 2022
12 KMU/FE- 09-12-
5 125 MILK DOCK CENTER AREA 10-11-2022 2022
12 KMU/FE- 09-12-
6 126 MILK DOCK ENDING AREA 10-11-2022 2022
12 KMU/FE- 09-12-
7 127 ECC ROOM OUTSIDE 10-11-2022 2022
12 KMU/FE- 09-12-
8 128 STEPS PANEL ROOM OUTSIDE 10-11-2022 2022
12 KMU/FE- 09-12-
9 129 MECHANICAL STORE ENTRANCE 10-11-2022 2022
13 KMU/FE- 09-12-
0 130 MECHANICAL STORE INSIDE 10-11-2022 2022
13 KMU/FE- 09-12-
1 131 RMRD 10-11-2022 2022
13 KMU/FE- RMRD CHENMICAL ROOM OUTSIDE 09-12-
2 132 (CAUSTIC SODA) 10-11-2022 2022
13 KMU/FE- 09-12-
3 133 DGM PLANT OFFICE OUTSIDE 10-11-2022 2022
13 KMU/FE- PRODUCTION OFFICE ROOM 10-11-2022 09-12-
4 134 2022
13 KMU/FE- 09-12-
5 135 ESTATE OFFICER ROOM STEPS AREA 10-11-2022 2022
13 KMU/FE- 09-12-
6 136 SFM ENTRANCE 10-11-2022 2022
13 KMU/FE- 09-12-
7 137 SFM PACKING ROOM 10-11-2022 2022
13 KMU/FE- 09-12-
8 138 CURD BUCKET GODOWN ROOM 10-11-2022 2022
13 KMU/FE- 09-12-
9 139 QC LAB ENTRANCE CORRIDOR 10-11-2022 2022
14 KMU/FE- GHEE TINS STORE ROOM OPPOSITE WAY 09-12-
0 140 TO LAB 10-11-2022 2022
14 KMU/FE- 09-12-
1 141 QC LAB TESTING ROOM-1 10-11-2022 2022
14 KMU/FE- 09-12-
2 142 QC LAB MICROBILOGY ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
3 143 QC LAB TESTING ROOM-2 10-11-2022 2022
14 KMU/FE- 09-12-
4 144 STORE SCRAP STORAGE ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
5 145 SFM BOTTLES ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
6 146 1ST FLOOR LIFT ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
7 147 OLD KHOVA SCETION ENTRANCE 10-11-2022 2022
14 KMU/FE- 09-12-
8 148 STORE ENTRANCE 10-11-2022 2022
14 KMU/FE- 09-12-
9 149 STORE ENTRANCE LEFT PILLAR 10-11-2022 2022
15 KMU/FE- 09-12-
0 150 STORE ENTRANCE LEFT INSIDE PILLAR 10-11-2022 2022
15 KMU/FE- 09-12-
1 151 STORE MANGER ROOM FRONT 10-11-2022 2022
15 KMU/FE- 09-12-
2 152 STORE MANGER ROOM OPPOSITE INSIDE 10-11-2022 2022
15 KMU/FE- 09-12-
3 153 ADMIN GROUND FLOOR STEPS AREA 10-11-2022 2022
15 KMU/FE- ADMIN GROUND FLOOR SALES ROOM 09-12-
4 154 CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- ADMIN GROUND FLOOR BOARD ROOM 09-12-
5 155 CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- 09-12-
6 156 ADMIN 1ST FLOOR STEPS AREA 10-11-2022 2022
15 KMU/FE- ADMIN 1ST FLOOR ACCOUNTS FILES 09-12-
7 157 ROOM CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- ADMIN 1ST FLOOR PURCAHSE OFFICE 09-12-
8 158 ROOM CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- 09-12-
9 159 ECC ROOM 10-11-2022 2022
16 KMU/FE- 09-12-
0 160 ECC ROOM 10-11-2022 2022
Check Point:
Fire Extinguishers Body condition
Handle Condition
Pressure Gauge Condition
Pressure Gauge in Green Zone
Discharge Hose/Home Condition
Extinguishers Hanging? Stand Condition
Checked By Revived By
HOD
(Name & Signature) (Name & Signature)
(Name & Signature)