0% found this document useful (0 votes)
32 views7 pages

Fire Extiinguisher Inspection Format

Uploaded by

Dasari Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views7 pages

Fire Extiinguisher Inspection Format

Uploaded by

Dasari Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Doc No:

FOR/ENGG/SFTY/02
FIRE EXTIINGUISHER
Rev No:00
INSPECTION FORMAT
Date:20/02/2021
Project site: THE K.D.M.P.M.A. CO-OP UNIONLTD Month: November-
2022
Date Of Next Status/
S Extinguish Type & inspectio due Remark
No er ID Location Capacity n Date s
09-12-
1 KMU/FE-1 SECURITY ROOM ABC-6 KG 10-11-2022 2022
09-12-
2 KMU/FE-2 CURD TUB WASHER CO2-4.5 KG 10-11-2022 2022
LASSI COLD ROOM ENTRANCE DOOR 09-12-
3 KMU/FE-3 DOCK ABC-4 KG 10-11-2022 2022
09-12-
4 KMU/FE-4 LASSI COLD ROOM ABC-4 KG 10-11-2022 2022
09-12-
5 KMU/FE-5 LASSI PACKING RROM ABC-4 KG 10-11-2022 2022
09-12-
6 KMU/FE-6 CURD CUP PACKING ROOM ABC-4 KG 10-11-2022 2022
09-12-
7 KMU/FE-7 CURD COLD ROOM-5 ABC-4 KG 10-11-2022 2022
CURD COLD ROOM ENTRANCE DOOR 09-12-
8 KMU/FE-8 DOCK ABC-4 KG 10-11-2022 2022
09-12-
9 KMU/FE-9 CURD PROCESS HALL ABC-6 KG 10-11-2022 2022
09-12-
10 KMU/FE-10 CURD CIP CO2-4.5 KG 10-11-2022 2022
09-12-
11 KMU/FE-11 CURD COLD ROOM-10 ABC-6 KG 10-11-2022 2022
NEW BLOCK GROUND FLOOR PANEL 09-12-
12 KMU/FE-12 ROOM CO2-4.5 KG 10-11-2022 2022
NEW BLOCK GROUND FLOOR PANEL 09-12-
13 KMU/FE-13 ROOM ABC-2 KG 10-11-2022 2022
09-12-
14 KMU/FE-14 PANEL OPPOSITE ROOM ABC-4 KG 10-11-2022 2022
09-12-
15 KMU/FE-15 FGS DOCK OFFICE ABC-4 KG 10-11-2022 2022
09-12-
16 KMU/FE-16 NEW BLOCK AIR COMPRESSOR ROOM CO2-4.5 KG 10-11-2022 2022
09-12-
17 KMU/FE-17 1ST FLOOR LAB INSIDE ABC-2 KG 10-11-2022 2022
09-12-
18 KMU/FE-18 LAB OUTSIDE CO2-9 KG 10-11-2022 2022
09-12-
19 KMU/FE-19 1ST FLOOR PANEL ROOM OPPOSITE CO2-9 KG 10-11-2022 2022
09-12-
20 KMU/FE-20 MAIN PANEL ROOM INSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
21 KMU/FE-21 BYPRODUCTS ENTRANCE ABC-4 KG 10-11-2022 2022
09-12-
22 KMU/FE-22 SUGAR ROOM GODOWN CO2-2 KG 10-11-2022 2022
09-12-
23 KMU/FE-23 DOMINO AREA CO2-2 KG 10-11-2022 2022
KHOVA DRYING &SWEETS PACKING 09-12-
24 KMU/FE-24 ROOM ABC-4 KG 10-11-2022 2022
09-12-
25 KMU/FE-25 BASUNDHI PACKING ROOM CO2-2 KG 10-11-2022 2022
09-12-
26 KMU/FE-26 KHOVA PAN--5 AREA CO2-9 KG 10-11-2022 2022
09-12-
27 KMU/FE-27 JUNNU PACKING MACHINE OPPOSITE CO2-2 KG 10-11-2022 2022
PANEER VAT ROOM ENTRANCE OF
JUNNU 09-12-
28 KMU/FE-28 PACKING MACHINE BESIDE ABC-2 KG 10-11-2022 2022
09-12-
29 KMU/FE-29 HSD BUNK AFFF-9 KG 10-11-2022 2022
09-12-
30 KMU/FE-30 CANTEEN ENTRANCE CO2-2 KG 10-11-2022 2022
09-12-
31 KMU/FE-31 CANTEEN KITCHEN CO2-2 KG 10-11-2022 2022
09-12-
32 KMU/FE-32 CANTEEN STORE CO2-2 KG 10-11-2022 2022
COOP OFFICE BUCKETS STORE ROOM 09-12-
33 KMU/FE-33 OUTSIDE DCP-5 KG 10-11-2022 2022
09-12-
34 KMU/FE-34 OLD POWDER GODOWN 1ST SHUTTER AFFF-9 KG 10-11-2022 2022
09-12-
35 KMU/FE-35 OLD POWDER GODOWN 2ND SHUTTER AFFF-9 KG 10-11-2022 2022
09-12-
36 KMU/FE-36 NEW OHC OUTSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
37 KMU/FE-37 GARAGE ABC-6 KG 10-11-2022 2022
GARAGE INSIDE FILM GODOWN 09-12-
38 KMU/FE-38 SHUTTER OUTSIDE CO2-4.5 KG 10-11-2022 2022
09-12-
39 KMU/FE-39 KHEESARADARSHINI FUNCTION HALL ABC-6 KG 10-11-2022 2022
09-12-
40 KMU/FE-40 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
41 KMU/FE-41 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
42 KMU/FE-42 NEW POWDER GODOWN CO2-9 KG 10-11-2022 2022
09-12-
43 KMU/FE-43 NEW POWDER GODOWN CO2-4.5 KG 10-11-2022 2022
09-12-
44 KMU/FE-44 NEW POWDER GODOWN CO2-6.5 KG 10-11-2022 2022
09-12-
45 KMU/FE-45 NEW BUTTER DEEFREEZE 1ST SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
46 KMU/FE-46 NEW BUTTER DEEFREEZE 2ND SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
47 KMU/FE-47 NEW BUTTER DEEFREEZE 3RD SHUTTER ABC-6 KG 10-11-2022 2022
09-12-
48 KMU/FE-48 POWDER BUILDING DOCK DCP-5 KG 10-11-2022 2022
09-12-
49 KMU/FE-49 POWDER BUILDING TIN GODOWN 10-11-2022 2022
09-12-
50 KMU/FE-50 POWDER BUILDING FILM GODOWN 10-11-2022 2022
POWDER BUILDING 1ST FLOOR BUCKETS 09-12-
51 KMU/FE-51 STORE ENTRANCE 10-11-2022 2022
POWDER BUILDING 1ST FLOOR BUCKETS 09-12-
52 KMU/FE-52 STORE CORNER 10-11-2022 2022
POWDER SECTION PROCESS ENTRANCE 09-12-
53 KMU/FE-53 LEFT 10-11-2022 2022
POWDER SECTION PROCESS HEATER 09-12-
54 KMU/FE-54 PANEL ABC-6 KG 10-11-2022 2022
POWDER SECTION PROCESS AIR 09-12-
55 KMU/FE-55 COMPRESSOR AREA ABC-6 KG 10-11-2022 2022
POWDER SECTION PROCESS HEATER 09-12-
56 KMU/FE-56 OPPOSITE PANEL ABC-4 KG 10-11-2022 2022
POWDER SECTION PROCESS PLC PANEL 09-12-
57 KMU/FE-57 PILLAR 10-11-2022 2022
POWDER SECTION PROCESS PLC PANEL 09-12-
58 KMU/FE-58 SIDE WALL 10-11-2022 2022
POWDER SECTION 25 KG FILLING ROOM 09-12-
59 KMU/FE-59 ENTRANCE SHUTTER 10-11-2022 2022
POWDER SECTION POWDER MIXING 09-12-
60 KMU/FE-60 ROOM 10-11-2022 2022
POWDER SECTION MAIN MCC PANEL 09-12-
61 KMU/FE-61 ROOM 10-11-2022 2022
09-12-
62 KMU/FE-62 APS GENERATOR BACKSIDE 10-11-2022 2022
09-12-
63 KMU/FE-63 APS GROUND FLOOR STEPS 10-11-2022 2022
09-12-
64 KMU/FE-64 APS LAS 10-11-2022 2022
APS 1ST FLOOR STORE ROOM 09-12-
65 KMU/FE-65 ENTRANCE 10-11-2022 2022
09-12-
66 KMU/FE-66 APS 1ST FLOOR STORE ROOM CORNER 10-11-2022 2022
APS 1ST FLOOR STORE ROOM LIFT 09-12-
67 KMU/FE-67 BESIDE 10-11-2022 2022
APS 1ST FLOOR STORE ROOM INSIDE 09-12-
68 KMU/FE-68 STORE ROOM 10-11-2022 2022
APS GROUND FLOOR PACKING ROOM 09-12-
69 KMU/FE-69 ENTRANCE 10-11-2022 2022
09-12-
70 KMU/FE-70 APS AHU ROOM 10-11-2022 2022
APS TETRA PAK MACHINE ROOM 09-12-
71 KMU/FE-71 OUTSIDE 10-11-2022 2022
09-12-
72 KMU/FE-72 APS MAIN PANEL ROOM ENTRANCE 10-11-2022 2022
09-12-
73 KMU/FE-73 APS MAIN PANEL UPS ROOM ENTRANCE 10-11-2022 2022
09-12-
74 KMU/FE-74 APS CIP ROOM OUTSIDE 10-11-2022 2022
09-12-
75 KMU/FE-75 METRAL SCRAP GODOWN ENTRANCE 10-11-2022 2022
09-12-
76 KMU/FE-76 NEW BOILER WOOD CHIPPING MACHINE 10-11-2022 2022
09-12-
77 KMU/FE-77 NEW BOILER ASH SCREW AREA 10-11-2022 2022
09-12-
78 KMU/FE-78 NEW BOILER PANEL ROOM 10-11-2022 2022
79 KMU/FE-79 NEW BOILER PLC PANEL ROOM 10-11-2022 09-12-
2022
09-12-
80 KMU/FE-80 NEW BOILER CHIMNEY AREA 10-11-2022 2022
09-12-
81 KMU/FE-81 FURNACE OIL TANKS ENTRANCE 10-11-2022 2022
09-12-
82 KMU/FE-82 FURNACE OIL TANKS CORNER 10-11-2022 2022
09-12-
83 KMU/FE-83 OLD BOILER ENTRANCE 10-11-2022 2022
09-12-
84 KMU/FE-84 OLD BOILER PANEL AREA 10-11-2022 2022
09-12-
85 KMU/FE-85 WATER SECTION HFT TANKS 10-11-2022 2022
09-12-
86 KMU/FE-86 WATER ENTRANCE PUMPS AREA 10-11-2022 2022
09-12-
87 KMU/FE-87 IBT-2 ENTRANCE 10-11-2022 2022
09-12-
88 KMU/FE-88 IBT-2 OLD PANEL 10-11-2022 2022
09-12-
89 KMU/FE-89 IBT-2 NEW PANEL 10-11-2022 2022
09-12-
90 KMU/FE-90 OLD DEEFREEZE PLANT 10-11-2022 2022
09-12-
91 KMU/FE-91 ETP 10-11-2022 2022
09-12-
92 KMU/FE-92 GHEE PROCESS PANEL ROOM ENTRANCE 10-11-2022 2022
09-12-
93 KMU/FE-93 GHEE PROCESS PANEL BOILER AREA 10-11-2022 2022
09-12-
94 KMU/FE-94 GHEE PACKING SECTION ENTRANCE 10-11-2022 2022
GHEE PACKING SECTION POUCH 09-12-
95 KMU/FE-95 MACHINE BACKSIDE 10-11-2022 2022
GHEE PACKING SECTION BUTTER 09-12-
96 KMU/FE-96 PACKING AREA 10-11-2022 2022
09-12-
97 KMU/FE-97 OLD LIFT GROUND FLOOR 10-11-2022 2022
09-12-
98 KMU/FE-98 GHEE GRANULATION ROOM ENTRANCE 10-11-2022 2022
09-12-
99 KMU/FE-99 OLD AIR COMPRESSOR ROOM 10-11-2022 2022
10 KMU/FE- 09-12-
0 100 FGS COLD ROOM-1 CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
1 101 PREPAC CAN WASHER BACKSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
2 102 MILK CRATES UNLOADING DOCK 10-11-2022 2022
10 KMU/FE- 09-12-
3 103 PREPAC NICHROME M/C BACKSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
4 104 PREPAC PANEL AREA 10-11-2022 2022
10 KMU/FE- 09-12-
5 105 MILK COLD ROOM-1 OUTSIDE CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
6 106 MILK FILM GODOWN 10-11-2022 2022
10 KMU/FE- 09-12-
7 107 MILK PROCESS PANEL ROOM CORRIDOR 10-11-2022 2022
10 KMU/FE- 09-12-
8 108 BUTTER SECTION ENTRANCE OUTSIDE 10-11-2022 2022
10 KMU/FE- 09-12-
9 109 BUTTER SECTION CHURNER AREA 10-11-2022 2022
11 KMU/FE- 09-12-
0 110 MILK PROCESS ENTRANCE LEFT 10-11-2022 2022
11 KMU/FE- MILK PROCESS ENTRANCE HORIZONTAL 09-12-
1 111 SILOS AREA 10-11-2022 2022
11 KMU/FE- 09-12-
2 112 MILK PROCESS SILO STEPS AREA 10-11-2022 2022
11 KMU/FE- 09-12-
3 113 MILK PROCESS SILOM PANEL AREA 10-11-2022 2022
11 KMU/FE- MILK PROCESS 20KL HOMOGENIZER 09-12-
4 114 PANEL AREA 10-11-2022 2022
11 KMU/FE- 09-12-
5 115 ELECTRICAL SECTION SHUTTER AREA 10-11-2022 2022
11 KMU/FE- 09-12-
6 116 ELECTRICAL SECTION ENTRANCE 10-11-2022 2022
11 KMU/FE- 09-12-
7 117 ELECTRICAL GENEARTOR BACKSIDE 10-11-2022 2022
11 KMU/FE- 09-12-
8 118 TRANSFORMER SHED 10-11-2022 2022
11 KMU/FE- 09-12-
9 119 TRANSFORMER SHED 10-11-2022 2022
12 KMU/FE- 09-12-
0 120 TRANSFORMER SHED 10-11-2022 2022
12 KMU/FE- 09-12-
1 121 OLD REFRIGERATION ENTRANCE 10-11-2022 2022
12 KMU/FE- 09-12-
2 122 OLD REFRIGERATION PANEL AREA 10-11-2022 2022
12 KMU/FE- 09-12-
3 123 OLD REFRIGERATION PANEL OPPOSITE 10-11-2022 2022
12 KMU/FE- 09-12-
4 124 MILK DOCK STARTING 10-11-2022 2022
12 KMU/FE- 09-12-
5 125 MILK DOCK CENTER AREA 10-11-2022 2022
12 KMU/FE- 09-12-
6 126 MILK DOCK ENDING AREA 10-11-2022 2022
12 KMU/FE- 09-12-
7 127 ECC ROOM OUTSIDE 10-11-2022 2022
12 KMU/FE- 09-12-
8 128 STEPS PANEL ROOM OUTSIDE 10-11-2022 2022
12 KMU/FE- 09-12-
9 129 MECHANICAL STORE ENTRANCE 10-11-2022 2022
13 KMU/FE- 09-12-
0 130 MECHANICAL STORE INSIDE 10-11-2022 2022
13 KMU/FE- 09-12-
1 131 RMRD 10-11-2022 2022
13 KMU/FE- RMRD CHENMICAL ROOM OUTSIDE 09-12-
2 132 (CAUSTIC SODA) 10-11-2022 2022
13 KMU/FE- 09-12-
3 133 DGM PLANT OFFICE OUTSIDE 10-11-2022 2022
13 KMU/FE- PRODUCTION OFFICE ROOM 10-11-2022 09-12-
4 134 2022
13 KMU/FE- 09-12-
5 135 ESTATE OFFICER ROOM STEPS AREA 10-11-2022 2022
13 KMU/FE- 09-12-
6 136 SFM ENTRANCE 10-11-2022 2022
13 KMU/FE- 09-12-
7 137 SFM PACKING ROOM 10-11-2022 2022
13 KMU/FE- 09-12-
8 138 CURD BUCKET GODOWN ROOM 10-11-2022 2022
13 KMU/FE- 09-12-
9 139 QC LAB ENTRANCE CORRIDOR 10-11-2022 2022
14 KMU/FE- GHEE TINS STORE ROOM OPPOSITE WAY 09-12-
0 140 TO LAB 10-11-2022 2022
14 KMU/FE- 09-12-
1 141 QC LAB TESTING ROOM-1 10-11-2022 2022
14 KMU/FE- 09-12-
2 142 QC LAB MICROBILOGY ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
3 143 QC LAB TESTING ROOM-2 10-11-2022 2022
14 KMU/FE- 09-12-
4 144 STORE SCRAP STORAGE ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
5 145 SFM BOTTLES ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
6 146 1ST FLOOR LIFT ROOM 10-11-2022 2022
14 KMU/FE- 09-12-
7 147 OLD KHOVA SCETION ENTRANCE 10-11-2022 2022
14 KMU/FE- 09-12-
8 148 STORE ENTRANCE 10-11-2022 2022
14 KMU/FE- 09-12-
9 149 STORE ENTRANCE LEFT PILLAR 10-11-2022 2022
15 KMU/FE- 09-12-
0 150 STORE ENTRANCE LEFT INSIDE PILLAR 10-11-2022 2022
15 KMU/FE- 09-12-
1 151 STORE MANGER ROOM FRONT 10-11-2022 2022
15 KMU/FE- 09-12-
2 152 STORE MANGER ROOM OPPOSITE INSIDE 10-11-2022 2022
15 KMU/FE- 09-12-
3 153 ADMIN GROUND FLOOR STEPS AREA 10-11-2022 2022
15 KMU/FE- ADMIN GROUND FLOOR SALES ROOM 09-12-
4 154 CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- ADMIN GROUND FLOOR BOARD ROOM 09-12-
5 155 CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- 09-12-
6 156 ADMIN 1ST FLOOR STEPS AREA 10-11-2022 2022
15 KMU/FE- ADMIN 1ST FLOOR ACCOUNTS FILES 09-12-
7 157 ROOM CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- ADMIN 1ST FLOOR PURCAHSE OFFICE 09-12-
8 158 ROOM CORRIDOR AREA 10-11-2022 2022
15 KMU/FE- 09-12-
9 159 ECC ROOM 10-11-2022 2022
16 KMU/FE- 09-12-
0 160 ECC ROOM 10-11-2022 2022

Check Point:
Fire Extinguishers Body condition
Handle Condition
Pressure Gauge Condition
Pressure Gauge in Green Zone
Discharge Hose/Home Condition
Extinguishers Hanging? Stand Condition

Checked By Revived By
HOD
(Name & Signature) (Name & Signature)
(Name & Signature)

You might also like