Residensi Adelia 2, B-22-15, Jalan Persiaran Bangi Avenue 2, Taman Bangi Avenue, 43000 Kajang Selangor .XLSX - Compressed

Uploaded by

Amir Aizudin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 53

HOUSE DEFECTS

INSPECTION REPORTS

Project : Residensi Adelia, Kajang

Owner : Amir Aizudin bin Abdul Khalid


Address : Residensi Adelia 2, B-22-15, Jalan Persiaran Bangi Avenue 2,
Taman Bangi Avenue, 43000 Kajang Selangor
Contact No : 60176811392
Email : [email protected]

Inspector Incharge : MSHQ


Inspection Date : 30/11/2023 Report Date : 02/12/2023
Time : 09.30AM Report Ref.No.(RRN) : HIER/02122023/NNY/7395

1 HIER SDN BHD


LOCATION:
FOYER (F)

Defect 1
AREA W - Wall
CODE F-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 2
AREA W - Wall
CODE F-W-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)

2 HIER SDN BHD


LOCATION:
FOYER (F)

VIEW PICTURES

3 HIER SDN BHD


LOCATION:
FOYER (F)

VIEW PICTURES

4 HIER SDN BHD


LOCATION:
HALL (H)

Defect 1
AREA W - Wall
CODE H-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 2
AREA D - Door
CODE H-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA DF - Door frame
CODE H-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)

5 HIER SDN BHD


LOCATION:
HALL (H)

Defect 4
AREA FT - Floor tiles
CODE H-FT-6
DEFECTS HT - Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)
Defect 5
AREA FT - Floor tiles
CODE H-FT-CP
DEFECTS CP -Chipped
CORRECTIVE CP - The chipped tiles need to
change with the new one
ACTION

DONE / REMARKS
(By Contractor)
Defect 6
AREA W - Wall
CODE H-W-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)

6 HIER SDN BHD


LOCATION:
HALL (H)

Defect 7
AREA FT - Floor tiles
CODE H-FT-F
DEFECTS F - Uneven filler
CORRECTIVE F - Need to apply the filler back
and make sure good finishing
ACTION

DONE / REMARKS
(By Contractor)
Defect 8
AREA C - Ceiling
CODE H-C-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)

7 HIER SDN BHD


LOCATION:
HALL (H)

VIEW PICTURES

8 HIER SDN BHD


LOCATION:
HALL (H)

VIEW PICTURES

9 HIER SDN BHD


LOCATION:
BALCONY (B)

Defect 1
AREA SD - Sliding door
CODE B-SD-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)
Defect 2
AREA FT - Floor tiles
CODE B-FT-CP
DEFECTS CP -Chipped
CORRECTIVE CP - The chipped tiles need to
change with the new one
ACTION

DONE / REMARKS
(By Contractor)
Defect 3
AREA GL - Grille
CODE B-GL-D
DEFECTS D - Dented
CORRECTIVE D - Need to fix the dented part

ACTION

DONE / REMARKS
(By Contractor)

10 HIER SDN BHD


LOCATION:
BALCONY (B)

Defect 4
AREA W - Wall
CODE B-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 5
AREA GL - Grille
CODE B-G-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)

11 HIER SDN BHD


LOCATION:
BALCONY (B)

VIEW PICTURES

12 HIER SDN BHD


LOCATION:
BALCONY (B)

VIEW PICTURES

13 HIER SDN BHD


LOCATION:
KITCHEN (K)

Defect 1
AREA KC - Kitchen cabinet
CODE K-KC-NA
DEFECTS NA - Not alligned
CORRECTIVE NA - Re-install and make sure it is
allign
ACTION

DONE / REMARKS
(By Contractor)
Defect 2
AREA W T - Wall tiles
CODE K-WT-CP
DEFECTS CP -Chipped
CORRECTIVE CP - The chipped tiles need to
change with the new one
ACTION

DONE / REMARKS
(By Contractor)
Defect 3
AREA WF - Window frame
CODE K-WF-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)

14 HIER SDN BHD


LOCATION:
KITCHEN (K)

Defect 4
AREA W T - Wall tiles
CODE K-WT-F
DEFECTS F - Uneven filler
CORRECTIVE F - Need to apply the filler back
and make sure good finishing
ACTION

DONE / REMARKS
(By Contractor)
Defect 5
AREA C - Ceiling
CODE K-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 6
AREA FT - Floor tiles
CODE K-FT-1
DEFECTS HT - Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)

15 HIER SDN BHD


LOCATION:
KITCHEN (K)

VIEW PICTURES

16 HIER SDN BHD


LOCATION:
KITCHEN (K)

VIEW PICTURES

17 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

Defect 1
AREA D - Door
CODE MB-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA DF - Door frame
CODE MB-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA FT - Floor tiles
CODE MB-FT-F
DEFECTS F - Uneven filler
CORRECTIVE F - Need to apply the filler back
and make sure good finishing
ACTION

DONE / REMARKS
(By Contractor)

18 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

Defect 4
AREA WF - Window frame
CODE MB-WF-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)
Defect 5
AREA FT - Floor tiles
CODE MB-FT-2
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)
Defect 6
AREA WW - Window
CODE MB-WW-ST
DEFECTS ST - Stuck
CORRECTIVE ST - Check what has caused it and
fix it
ACTION

DONE / REMARKS
(By Contractor)

19 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

Defect 7
AREA W - Wall
CODE MB-W-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 8
AREA W - Wall
CODE MB-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 9
AREA C - Ceiling
CODE MB-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

20 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

Defect 10
AREA C - Ceiling
CODE MB-C-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 11
AREA C - Ceiling
CODE MB-C-WM
DEFECTS WM - Watermark
CORRECTIVE WM - Check the source of leakage
and fix it. For water mark area
ACTION need to sand down and repaint
with the same coded colour

DONE / REMARKS
(By Contractor)
Defect 12
AREA AC - Air conditioner
CODE MB-AC-LABEL
DEFECTS LABEL - NOT COLD
CORRECTIVE Label - Recheck and fix the faulty
problems and ensure it is well
ACTION function.

DONE / REMARKS
(By Contractor)

21 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

VIEW PICTURES

22 HIER SDN BHD


LOCATION:
MASTER BEDROOM (MB)

VIEW PICTURES

23 HIER SDN BHD


LOCATION:
TOILET MASTER (TM)

Defect 1
AREA D - Door
CODE TM-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA D - Door
CODE TM-D-CP
DEFECTS CP -Chipped
CORRECTIVE CP - Wood: Fill the chipped area
with wood filler sand down and
ACTION repaint with th coded colour or
change new

DONE / REMARKS
(By Contractor)
Defect 3
AREA DF - Door frame
CODE TM-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)

24 HIER SDN BHD


LOCATION:
TOILET MASTER (TM)

Defect 4
AREA W T - Wall tiles
CODE TM-WT-8
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)
Defect 5
AREA W T - Wall tiles
CODE TM-WT-CP
DEFECTS CP -Chipped
CORRECTIVE CP - The chipped tiles need to
change with the new one
ACTION

DONE / REMARKS
(By Contractor)
Defect 6
AREA STC - Stop cock
CODE TM-STC-L
DEFECTS L - Leaking
CORRECTIVE L - Check the source of leakage. If
the part is broken then need to
ACTION change and double test check.

DONE / REMARKS
(By Contractor)

25 HIER SDN BHD


LOCATION:
TOILET MASTER (TM)

Defect 7
AREA FTK - Flush tank
CODE TM-FTK-L
DEFECTS L - Leaking
CORRECTIVE L - Check the source of leakage. If
the part is broken then need to
ACTION change and double test check.

DONE / REMARKS
(By Contractor)
Defect 8
AREA C - Ceiling
CODE TM-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

26 HIER SDN BHD


LOCATION:
TOILET MASTER (TM)

VIEW PICTURES

27 HIER SDN BHD


LOCATION:
TOILET MASTER (TM)

VIEW PICTURES

28 HIER SDN BHD


LOCATION:
BEDROOM 2 (B2)

Defect 1
AREA D - Door
CODE B2-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA DF - Door frame
CODE B2-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA FT - Floor tiles
CODE B2-FT-8
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)

29 HIER SDN BHD


LOCATION:
BEDROOM 2 (B2)

Defect 4
AREA W - Wall
CODE B2-W-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 5
AREA W - Wall
CODE B2-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 6
AREA WF - Window frame
CODE B2-WF-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)

30 HIER SDN BHD


LOCATION:
BEDROOM 2 (B2)

Defect 7
AREA C - Ceiling
CODE B2-C-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 8
AREA C - Ceiling
CODE B2-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

31 HIER SDN BHD


LOCATION:
BEDROOM 2 (B2)

VIEW PICTURES

32 HIER SDN BHD


LOCATION:
BEDROOM 2 (B2)

VIEW PICTURES

33 HIER SDN BHD


LOCATION:
TOILET 2 (T2)

Defect 1
AREA DF - Door frame
CODE T2-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA D - Door
CODE T2-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA FTK - Flush tank
CODE T2-FTK-SK
DEFECTS SK - Shaky
CORRECTIVE SK - Shaky – Reinstall the fitting
and install back. Make sure its
ACTION tightened and firm

DONE / REMARKS
(By Contractor)

34 HIER SDN BHD


LOCATION:
TOILET 2 (T2)

Defect 4
AREA WF - Window frame
CODE T2-WF-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)
Defect 5
AREA W T - Wall tiles
CODE T2-WT-12
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)
Defect 6
AREA C - Ceiling
CODE T2-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

35 HIER SDN BHD


LOCATION:
TOILET 2 (T2)

Defect 7
AREA STC - Stop cock
CODE T2-STC-ST
DEFECTS ST - Stuck
CORRECTIVE ST - Check what has caused it and
fix it
ACTION

DONE / REMARKS
(By Contractor)

36 HIER SDN BHD


LOCATION:
TOILET 2 (T2)

VIEW PICTURES

37 HIER SDN BHD


LOCATION:
TOILET 2 (T2)

VIEW PICTURES

38 HIER SDN BHD


LOCATION:
BEDROOM 3 (B3)

Defect 1
AREA D - Door
CODE B3-D-CP
DEFECTS CP -Chipped
CORRECTIVE CP - Wood: Fill the chipped area
with wood filler
ACTION

DONE / REMARKS
(By Contractor)
Defect 2
AREA D - Door
CODE B3-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA DF - Door frame
CODE B3-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)

39 HIER SDN BHD


LOCATION:
BEDROOM 3 (B3)

Defect 4
AREA FT - Floor tiles
CODE B3-FT-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 5
AREA W - Wall
CODE B3-W-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 6
AREA WF - Window frame
CODE B3-WF-T
DEFECTS T - Stain
CORRECTIVE T - Remove the stain and clean the
affected area
ACTION

DONE / REMARKS
(By Contractor)

40 HIER SDN BHD


LOCATION:
BEDROOM 3 (B3)

Defect 7
AREA C - Ceiling
CODE B3-C-C
DEFECTS C - Crack
CORRECTIVE C - Wall: Cut along the hairline
crack. Install fibre/wire mesh and
ACTION fill the area with skim filler. Sand
down the surface and repaint with
same colour code.

DONE / REMARKS
(By Contractor)
Defect 8
AREA C - Ceiling
CODE B3-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

41 HIER SDN BHD


LOCATION:
BEDROOM 3 (B3)

VIEW PICTURES

42 HIER SDN BHD


LOCATION:
BEDROOM 3 (B3)

VIEW PICTURES

43 HIER SDN BHD


LOCATION:
TOILET 3 (T3)

Defect 1
AREA DF - Door frame
CODE T3-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA D - Door
CODE T3-D-CP
DEFECTS CP -Chipped
CORRECTIVE CP - Wood: Fill the chipped area
with wood filler
ACTION

DONE / REMARKS
(By Contractor)
Defect 3
AREA D - Door
CODE T3-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)

44 HIER SDN BHD


LOCATION:
TOILET 3 (T3)

Defect 4
AREA W T - Wall tiles
CODE T3-WT-CP
DEFECTS CP -Chipped
CORRECTIVE CP - The chipped tiles need to
change with the new one
ACTION

DONE / REMARKS
(By Contractor)
Defect 5
AREA FT - Floor tiles
CODE T3-FT-2
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)
Defect 6
AREA W T - Wall tiles
CODE T3-WT-13
DEFECTS Hollow tiles
CORRECTIVE HT - Refer no. on label for
quantity tiles defect. For hollow
ACTION tiles need to replace with a new
tile with same code. Make sure the
tile alignment is consistent and
tile adhesive is fully spread. Test
for tile hollowness.

DONE / REMARKS
(By Contractor)

45 HIER SDN BHD


LOCATION:
TOILET 3 (T3)

Defect 7
AREA C - Ceiling
CODE T3-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)
Defect 8
AREA FTK - Flush tank
CODE T3-FTK-L
DEFECTS L - Leaking
CORRECTIVE L - Check the source of leakage. If
the part is broken then need to
ACTION change and double test check.

DONE / REMARKS
(By Contractor)

46 HIER SDN BHD


LOCATION:
TOILET 3 (T3)

VIEW PICTURES

47 HIER SDN BHD


LOCATION:
TOILET 3 (T3)

VIEW PICTURES

48 HIER SDN BHD


LOCATION:
YARD (Y)

Defect 1
AREA D - Door
CODE Y-D-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 2
AREA DF - Door frame
CODE Y-DF-P
DEFECTS P - Uneven painted
CORRECTIVE P - For uneven painted. Need to
re-paint with the same coded
ACTION colour and make sure the same
tone

DONE / REMARKS
(By Contractor)
Defect 3
AREA W - Wall
CODE Y-W-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

49 HIER SDN BHD


LOCATION:
YARD (Y)

Defect 4
AREA C - Ceiling
CODE Y-C-S
DEFECTS S - Uneven skim/plaster
CORRECTIVE S - Apply skim coat and sand the
affected area. Repaint with the
ACTION same colour code. Make sure
surface is smooth and even

DONE / REMARKS
(By Contractor)

50 HIER SDN BHD


LOCATION:
YARD (Y)

VIEW PICTURES

51 HIER SDN BHD


LOCATION:
YARD (Y)

VIEW PICTURES

52 HIER SDN BHD


I/We hereby confirm that the above are the defects observed by me/us for your onward action in
rectifying the same. The report complies with the requirements of the Standards of Practice of
Qlassic CIDB and has been prepared for the exclusive use of our client. No use by third parties is
intended. We will not be responsible to any parties for the contents of the report other than the
party named herein. The report is effectively a snapshot of the house, recording the conditions
on a given date. Our inspectors cannot predict future behaviour and as such we cannot be
responsible for thing that occurs after the inspection. The report itself is copyrighted and may not
be used in whole or in part without our express written permission.

Complaint received by (BSAA/PMR) Acknowledge by (BE/PE):

MUHAMMAD ASRI BIN JAMALUDDIN


HIER SDN.BHD

53 HIER SDN BHD