India: Attid Trent (
India: Attid Trent (
283/54/2018-GRID SOLAR-Part(2)
aTTId TRenT{ / Government of India
,Tad 3IT Haq,PRT 3, d #merv/ Ministry of New & Renewable Energy
fOg d( 3,off qaiNT / Grid Solar POWer Division
Atal Akshay Urja Bhawan,
Lodhi Road, New Delhi - 110003
Dated: 14th October, 2024
OFFICE MEMORANDUM
sub: Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirement for
Compulsory Registration) Order, 2019: Clarification
With reference to the Approved Models and Manufacturers of Solar Photovoltaic Modules
(Requirements for Compulsory k8gistration) Order1 2019 and subsequent amenflments & clarification
bargtc; ;nd’(iLidelines +or entistmg’nt under'the said Order, the undersigned is directed to convey that
UNRE Jidb itg O.M. .,. 283/54/2018-GRID SOLAR-Part(5) dated 07.10.2022 (copy enclosed) had
inter-alia clarified that:
“The amendments of even no. dated 13.01.2022 and 28.03.2022, shall not be applicable for
open access and net-metering renewable energY projects where the First Application J for grant
of .
• In-principle approval; or
• No Objection Certificate (NOC); or
• Government Order; or
+ Any other such approvals as may be required for open access and net-metering of
the renewable energy projects I
as per the provisions of respective State/UT policY or as per the rules and regulations of
respective Electricity Regulatory Commission, has been made befOFe Ol.10.2022, to.anY.
rel;vant entities viz. Distribution licensee(s)/ State Transmission UtilitY (STU)/ State Load
Despatch Centre (SLDC)/ State Nodal AgencY for Renewable EnergY/ (Power/EnergY/
Renewable Energy Department of the State/UT).”
2. In this regard, it is once again reiterated and clarified that ALMM Order shall not be applicable for
open access and net-metering renewable energy projects where the First Applicationl for grant of:
e
In-principle approval; or
e No Objection Certificate (NOC); or
e Government Order; or
•
Any other such approvals as may be required for open access and net-metering of
the renewable energy projects;
as per the provisions of respective Central / State / UT policy or as per the rules and regulations
of ;espective Electricity Regulatory Commission (CERC/ SERC/ JERC)I has been made b.efF?.[e
01.10:20221 to any r8levant entities viz. Distribution licensee(s)/ State Transmission UtilitY
(STU)/ Central Transmission Utility of India Limited (CTUIL)/ State Load Despatch Cent[e
eSLD6)/ National Load Despatch Centre (NLDC) / Regional Load Despatch Centre / GHg
Controiter of India Limited / State Nodal Agency for Renewable EnergY/ (Power/EnergY/
Renewable Energy Department of the State/UT).
(Sanjay G i’;ndhar)
Scientist-E
E-mail: [email protected]
Enel; as above