India: Attid Trent (

mnre

Uploaded by

eprcompliances
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

F. N,.

283/54/2018-GRID SOLAR-Part(2)
aTTId TRenT{ / Government of India
,Tad 3IT Haq,PRT 3, d #merv/ Ministry of New & Renewable Energy
fOg d( 3,off qaiNT / Grid Solar POWer Division
Atal Akshay Urja Bhawan,
Lodhi Road, New Delhi - 110003
Dated: 14th October, 2024
OFFICE MEMORANDUM

sub: Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirement for
Compulsory Registration) Order, 2019: Clarification

With reference to the Approved Models and Manufacturers of Solar Photovoltaic Modules
(Requirements for Compulsory k8gistration) Order1 2019 and subsequent amenflments & clarification
bargtc; ;nd’(iLidelines +or entistmg’nt under'the said Order, the undersigned is directed to convey that
UNRE Jidb itg O.M. .,. 283/54/2018-GRID SOLAR-Part(5) dated 07.10.2022 (copy enclosed) had
inter-alia clarified that:

“The amendments of even no. dated 13.01.2022 and 28.03.2022, shall not be applicable for
open access and net-metering renewable energY projects where the First Application J for grant
of .
• In-principle approval; or
• No Objection Certificate (NOC); or
• Government Order; or
+ Any other such approvals as may be required for open access and net-metering of
the renewable energy projects I

as per the provisions of respective State/UT policY or as per the rules and regulations of
respective Electricity Regulatory Commission, has been made befOFe Ol.10.2022, to.anY.
rel;vant entities viz. Distribution licensee(s)/ State Transmission UtilitY (STU)/ State Load
Despatch Centre (SLDC)/ State Nodal AgencY for Renewable EnergY/ (Power/EnergY/
Renewable Energy Department of the State/UT).”

2. In this regard, it is once again reiterated and clarified that ALMM Order shall not be applicable for
open access and net-metering renewable energy projects where the First Applicationl for grant of:
e
In-principle approval; or
e No Objection Certificate (NOC); or
e Government Order; or

Any other such approvals as may be required for open access and net-metering of
the renewable energy projects;

as per the provisions of respective Central / State / UT policy or as per the rules and regulations
of ;espective Electricity Regulatory Commission (CERC/ SERC/ JERC)I has been made b.efF?.[e
01.10:20221 to any r8levant entities viz. Distribution licensee(s)/ State Transmission UtilitY
(STU)/ Central Transmission Utility of India Limited (CTUIL)/ State Load Despatch Cent[e
eSLD6)/ National Load Despatch Centre (NLDC) / Regional Load Despatch Centre / GHg
Controiter of India Limited / State Nodal Agency for Renewable EnergY/ (Power/EnergY/
Renewable Energy Department of the State/UT).

3. This issue with the approval of competent authority.


yours fi

(Sanjay G i’;ndhar)
Scientist-E
E-mail: [email protected]
Enel; as above

To: All Concerned

Copy to: Director, NIC, MNRE, for uploading on MNRE website

Copy for internal circulation: PPS to Secretary / PSO to JS (AY)