1| Decision
1.2 | Decision
The project is granted a deviation from para 4.1.49.(b) of the Principles &
Requirements considering the COVID situation. The project may proceed for listing
and design certification provided that the project is in compliance with other
applicable requirements.
Additionally, the project developer shall successfully demonstrate, along with relevant
evidence, to demonstrate prior consideration of carbon revenues.
The project developer shall document the deviation request, its implications, and GS’
decision in the appropriate section of the GS PoA-DD.
The validating VVB shall, through appropriate means at its disposal, evaluate the
Project’s compliance with the above-mentioned conditions and provides its opinion in
the Validation Report.
Certification body shall review both the PD’s submission and the VVB’s opinion of the
same and take appropriate steps.
No
2| Background information
Deviation Reference Number DEV_401
Date of decision 14/06/2023
Precedent (YES/NO) No
Precedent details NA
Date of submission 26/04/2023
Project/PoA/VPA Project ID – GSXXXX
☒ PoA ID – GS12030
☒ VPA ID – GS12031
Project/PoA/VPA title PoA Title –
VPA Title-
3| Deviation detail
*Guidance* Use the space below to describe the deviation and substantiate the
reason for requesting deviation from applicable rules/requirements. Please include
all relevant information in support of the request. You are requested to follow the
principles for requesting deviations, given in the Deviation Approval Procedure/
Design Change Requirements.
The project developer through this submission would like to request an extension on
the prior consideration rule in GS4GG.
In line with clause, 4.1.49 of the P & R requirements, Retroactive projects shall submit
the required documents for preliminary review (time of first submission) within one year
of the project start date. Retroactive Project submitted at a date later than one year
from the project start date will not be eligible for Gold Standard certification.
The project has a start date of 16 Aug 2021 and the project documentation was
submitted to Sustaincert on 08 Dec 2022 which is slightly more than one year
from the start date.
The PD would like to inform that they were aware of the above rule and
accordingly they shared an email to GS (screenshot below) within one year of
the project start date (on 31 May 2022) and conducted the local stakeholder
consultation (July 2022) in accordance with GS rules within one year of the
project start date, thus demonstrating strong intent to achieve certification
under GS4GG programme.
Within one year of the project start date, it is true that organizational employee
restrictions were in place surrounding the global COVID pandemic, which
factored into reasons that prohibited them from carrying out stakeholder
engagement meetings in a timelier manner in 2021. Specifically, employee
restrictions included the prohibition of holding community meetings and
regulation limited gathering sizes. In Tanzania specifically, there was uncertainty
around shifts in government policy due to the change in political leadership.
……
*Guidance* Use the space below to describe how the deviation complies with the
requirements, and, where applicable, the accuracy, completeness and
conservativeness is ensured. Please include all relevant information in support of the
request.
………
*Guidance* Use the space below to describe the impact of the deviation on project
design, safeguarding principles assessment, SDG assessment, emissions reductions,
monitoring frequency, data quality, potential risk or any other relevant aspect of the
project. Please substantiate the impact assessment with relevant and verifiable
data/information.
The deviation shall have no impact on the project design, safeguarding principles
assessment, SDG assessment, emissions reductions, monitoring frequency, data
quality, potential risk, or any other relevant aspect of the project since the
deviation pertains to only extension required to submission of the project
documentation. The project developer would comply with all GS4GG related
rules and guidelines in future during the project cycle.
………
3.4 | Documents:
*Guidance* List of documents provided (note that once a decision has been made
by Gold Standard, this deviation form along with supporting documents will be
made public on the Gold Standard website. If any of the supporting documents are
confidential, please indicate here to ensure they are omitted.)
GS12030_PoA_PriorConsideration_DeviationRequest_April2023
Version
Release date Description
number
4 14.01.2021
3 16.07.2020
2 03.05.2018