TEMPLATE

DEVIATION REQUEST FORM

PUBLICATION DATE 11.04.2021


Version 5.0

A. To be completed by Gold Standard

1| Decision

1.1 | Date – 14/06/2023

1.2 | Decision

The applied deviation request is approved.

The project is granted a deviation from para 4.1.49.(b) of the Principles &
Requirements considering the COVID situation. The project may proceed for listing
and design certification provided that the project is in compliance with other
applicable requirements.
Additionally, the project developer shall successfully demonstrate, along with relevant
evidence, to demonstrate prior consideration of carbon revenues.

The project developer shall document the deviation request, its implications, and GS’
decision in the appropriate section of the GS PoA-DD.

Climate Security and Sustainable Development


TEMPLATE - DEVIATION REQUEST FORM V4.0

The validating VVB shall, through appropriate means at its disposal, evaluate the
Project’s compliance with the above-mentioned conditions and provides its opinion in
the Validation Report.

Certification body shall review both the PD’s submission and the VVB’s opinion of the
same and take appropriate steps.

1.3 | Is this decision applicable to other project activities under similar


circumstances?

No

Climate Security and Sustainable Development 2


TEMPLATE - DEVIATION REQUEST FORM V4.0

B. To be completed by the Project Developer/Coordinating and


Managing Entity and/or VVB requesting deviation (Submit deviation
request form in Microsoft Word format)

2| Background information
Deviation Reference Number DEV_401
Date of decision 14/06/2023
Precedent (YES/NO) No
Precedent details NA
Date of submission 26/04/2023
Project/PoA/VPA Project ID – GSXXXX
☒ PoA ID – GS12030
☒ VPA ID – GS12031
Project/PoA/VPA title PoA Title –

GS POA SAFE WATER PROGRAMME BY WATER MI


SSION IN TANZANIA

VPA Title-

GS 12030 VPA 1 SAFE WATER PROJECT IN KIGOM


A AND DODOMA (TANZANIA)
Date of listing Not listed yet
GS Standard version applicable GS4GG
Date of transition to GS4GG (if N/A
applicable)
Date of transition to Gold N/A
Standard from another standard
(e.g. CDM) (if applicable)
Date of design N/A
certification/inclusion (if
applicable)
Location of project/PoA/VPA TANZANIA
Scale of the project/PoA/VPA ☐ Microscale
☒ Small scale
☐ Large scale
Gold Standard Impact Registry Not available yet
link of the project/PoA/VPA
Status of the project/PoA/VPA ☒ New
☐ Listed
☐ Certified design
☐ Certified project

Climate Security and Sustainable Development 3


TEMPLATE - DEVIATION REQUEST FORM V4.0

Title/subject of deviation Prior consideration_Deviation


Specify applicable As per P & R requirement clause 4.1.49
rule/requirements/methodology,
with exact paragraph reference
Retroactive projects shall submit the required
and version number
documents for preliminary review (time of first
submission) within one year of the project start
date.
Specify the monitoring period Start date End date
for which the request is valid (if
applicable) N/A

Submitted by Contact person name: David Inman

Email ID: [email protected]


Organization: WATER MISSION TANZANIA
Project participant: Yes ☒ No ☐
Validation and Verification body Yes ☐ No ☒
(VVB opinion shall be included,
where required by the
If yes;
applicable rules/requirements or
VVB name:
request is submitted by the
VVB).
VVB Staff name(s):
Any previous deviations Yes ☐ No ☒
approved for the same project
activity/PoA/VPA(s)?

3| Deviation detail

3.1 | Description of the deviation:

*Guidance* Use the space below to describe the deviation and substantiate the
reason for requesting deviation from applicable rules/requirements. Please include
all relevant information in support of the request. You are requested to follow the
principles for requesting deviations, given in the Deviation Approval Procedure/
Design Change Requirements.

3.1.1 | Deviation detail (to be completed by Project developer):

The project developer through this submission would like to request an extension on
the prior consideration rule in GS4GG.

In line with clause, 4.1.49 of the P & R requirements, Retroactive projects shall submit
the required documents for preliminary review (time of first submission) within one year

Climate Security and Sustainable Development 4


TEMPLATE - DEVIATION REQUEST FORM V4.0

of the project start date. Retroactive Project submitted at a date later than one year
from the project start date will not be eligible for Gold Standard certification.

The project has a start date of 16 Aug 2021 and the project documentation was
submitted to Sustaincert on 08 Dec 2022 which is slightly more than one year
from the start date.

The PD would like to inform that they were aware of the above rule and
accordingly they shared an email to GS (screenshot below) within one year of
the project start date (on 31 May 2022) and conducted the local stakeholder
consultation (July 2022) in accordance with GS rules within one year of the
project start date, thus demonstrating strong intent to achieve certification
under GS4GG programme.

Within one year of the project start date, it is true that organizational employee
restrictions were in place surrounding the global COVID pandemic, which
factored into reasons that prohibited them from carrying out stakeholder
engagement meetings in a timelier manner in 2021. Specifically, employee
restrictions included the prohibition of holding community meetings and
regulation limited gathering sizes. In Tanzania specifically, there was uncertainty
around shifts in government policy due to the change in political leadership.

The delay in preparation of project documentation is attributed to project start-


up finance was required to launch this project, the starting sums of which arrived
at the end of 2021. Once funding was received, organizational board approval
was required and obtained on 28 January 2022. A contract was then signed with
the Consultants in Jan 2022. At this point, the PD began working with the
consultant on the preparation of the project documentation.

3.1.2 | VVB opinion (to be completed by VVB, if applicable):

*Guidance* If required by SustainCERT or Gold Standard for this particular


deviation, please add here the VVB’s opinion.

Climate Security and Sustainable Development 5


TEMPLATE - DEVIATION REQUEST FORM V4.0

……

3.2 | Assessment of the deviation:

*Guidance* Use the space below to describe how the deviation complies with the
requirements, and, where applicable, the accuracy, completeness and
conservativeness is ensured. Please include all relevant information in support of the
request.

3.2.1 | Deviation assessment (to be completed by Project developer):

As explained earlier, the PD has demonstrated relevant intent to achieve


certification in GS4GG by submitting a notification email to GS within one year
of the project start date and by achieving an important milestone of conducting
the stakeholder’s consultation within one year of the project start date. Hence,
this deviation does not in any way undermines the PD’s serious intent to achieve
certification under GS4GG.

3.2.2 | VVB opinion (to be completed by VVB, if applicable):

*Guidance* If required by SustainCERT or Gold Standard for this particular


deviation, please add here the VVB’s opinion.

………

3.3 | Impact of the deviation:

*Guidance* Use the space below to describe the impact of the deviation on project
design, safeguarding principles assessment, SDG assessment, emissions reductions,
monitoring frequency, data quality, potential risk or any other relevant aspect of the
project. Please substantiate the impact assessment with relevant and verifiable
data/information.

3.3.1 | Impact assessment (to be completed by Project developer):

Climate Security and Sustainable Development 6


TEMPLATE - DEVIATION REQUEST FORM V4.0

The deviation shall have no impact on the project design, safeguarding principles
assessment, SDG assessment, emissions reductions, monitoring frequency, data
quality, potential risk, or any other relevant aspect of the project since the
deviation pertains to only extension required to submission of the project
documentation. The project developer would comply with all GS4GG related
rules and guidelines in future during the project cycle.

3.3.2 | VVB opinion (to be completed by VVB, if applicable ):

*Guidance* If required by SustainCERT or Gold Standard for this particular


deviation, please add here the VVB’s opinion.

………

3.4 | Documents:

*Guidance* List of documents provided (note that once a decision has been made
by Gold Standard, this deviation form along with supporting documents will be
made public on the Gold Standard website. If any of the supporting documents are
confidential, please indicate here to ensure they are omitted.)

GS12030_PoA_PriorConsideration_DeviationRequest_April2023

Version
Release date Description
number

Additional information added:


- date of listing, design certification, transition
- standard version
5 11.04.2022 - specific reference to a requirement deviated from
- any previous deviations/design changes
approved
Guidance on VVB opinion

4 14.01.2021
3 16.07.2020

2 03.05.2018

1 01.07.2017 Initial adoption