0% found this document useful (0 votes)
29 views

3FB Boq

Uploaded by

Win Than
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

3FB Boq

Uploaded by

Win Than
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BOQ SUMMARY

Project Name: 3½STY KO SI THU AUNG

Element : Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C3 (ft3) 498.33 1.00 498
Sub Total 498.33 498

2 Rebar #3 (Fy50) (lbs) 2231.28 1.00 2231


3 Rebar #5 (Fy50) (lbs) 2387.08 1.00 2387
4 Rebar #7 (Fy50) (lbs) 763.30 1.00 763
Sub Total 5381.66 5,381

5 Shuttering (ft2) 1275.46 1.00 1275


Sub Total 1,275

Grand Total 7,155

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 10.80 lbs/ft3
2 Concrete % C3 = 100.00 %
3 Shuttering = 2.56 ft2/ft3