Structures

analysis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

1.

Legal Documents: (1 original copy and 2 photocopies)


Certified True Copy of Certificate of
Title/Transfer Certificate of Title (CTC)
 - If the LOT/PROPERTY is not in the name of the applicant (any of the following):
Deed of Absolute Sale, Lease Purchase Agreement, Deed of Assignment,
Memorandum of Agreement, Extrajudicial Settlement, Authority to Construct, Lease
Contract or Certification from the Lessor, Conditional Deed of Sale or Contract of
Sale.
 - If Transfer Certificate of Title (TCT) is in the name of a Corporation: Secretary’s
Certificate or Board Resolution of Authorized Signatory for the application.
 - If a Representative is applying in behalf of the applicant: Notarized Authorization
letter to transact with OBO (with Valid ID of applicant and representative).
 - If a Representative is signing in behalf of the applicant: Notarized Special Power of
Attorney(SPA) with Valid ID of applicant and representative.
 - If NO INDIVIDUAL title: Approved Subdivision plan w/ Lot Boundaries and Technical
description.
 - In the Absence of Approved Subdivision plan: Authority to Construct.
 - For Tower Crane Installation/ Firewall: Neighbor’s consent.

2. Other Clearances (1 original copy and 2 photocopies)


For Towers: CAAP clearance (1 original copy
and 2 photocopies)
 - If telecommunications Tower infrastructure is (1) in excess of 50 meters height and
in the direct flight plan within a 3-kilometer radius of an airport; or (ii) shall be
constructed within the 10-kilometer radius of communication-navigation surveillance
facilities located off-airport.
 - Affidavit of Undertaking, certified by a Geodetic Engineer conformed by the owner
(notarized, 1 original copy and 2 photocopies)attesting that the proposed structure
will be built outside the CAAPcritical areas for towers within 50 meters height.
Affidavit of Undertaking Form (duly filled out
and notarized) Download here
 - For other clearances to be submitted within 30 days after the issuance of the
Building

3. Technical Documents
One (1) photocopy of valid PRC ID & current
PTR with seal and 3 specimen signatures of
the professional.
One (1) original and 2 photocopies of Sketch
Plan (with clear landmarks) and Relocation
Survey report.(Include Structural Survey
Plan if the Structure is existing).
Four (4) copies of system generated and
notarized Unified Application Form for
Building Permit with ancillary/accessory
application forms (if applicable).
THE GENERATED APPLICATION FORMS
SHOULD BE PRINTED BACK TO BACK.
 A. Electrical Permit Forms
 B. Plumbing/Sanitary Permit Forms
 C. Electronics Permit Forms
 D. Mechanical Permit Forms
 E. Fencing Permit Forms (duly notarized)
 F. Demolition Permit Forms (duly notarized) Download here
 G. Excavation Permit Forms
 H. Temporary Sidewalk Enclosure and Occupancy Permit Forms
 I. Sign Permit Forms
 J. Other ancillary/accessory permit forms (Rule III, Section 301, Item 2 of IRR of PD
1096)

Four (4) sets of Building Plans, design plans


and other documents as follows:
 A. Architectural/ Building:

o I. (BP 344 – Accessibility Law compliance for commercial, institutional, industrial &
public assembly buildings). Details, in the form of plans, elevations/sections:

 i. PWD parking (3.70 x 5.00m)


 ii.PWD ramp (1:12 max. gradient)
 iii.PWD toilet (1.70m x 1.80m clear width – refer to BP 344)
o II. Vicinity Map/Location Plan within a 2.00-kilometer radius for commercial,
industrial, and institutional complex and within a half-kilometer radius for residential
buildings, at any
o III. Perspective drawn at a convenient scale and taken from a vantage point (bird’s
eye view or eye level).
o IV. Floor Plans drawn to scale of not less than 1:100 showing: gridlines, complete
identification of rooms or functional spaces
o V. Elevations, at least four (4), same scale as floor plans showing: gridlines; natural
ground to finish grade elevations; floor to floor heights; door and window marks, type
of material and exterior finishes; adjoining existing structure/s, if any, shown in
single hatched lines.
o VI. Sections, at least two (2), showing: gridlines; natural ground and finish levels;
outline of cut and visible structural parts; doors and windows properly labeled
reflecting the direction of opening; partitions; built-in cabinets, etc.; identification of
rooms and functional spaces cut by section lines.
o VII. Schedule of Doors and Windows showing their types, designations/marks,
dimensions, materials, and number of sets.
o VIII. Reflected ceiling plan showing: design, location, finishes and specifications of
materials, lighting fixtures, diffusers, decorations, air conditioning exhaust and
return grills, sprinkler nozzles, if any, at scale of at least 1:100.
o IX. Layout plan of each floor indicating the fire evacuation route to safe dispersal
areas, standpipes with fire hose, fire extinguishers, first aid kits/cabinets, fire alarm,
fire operations room, emergency lights, signs, etc.
o X. Details of windows, fire exits with grilled windows and ladders
o - For Interior Renovation Projects
o XI. Key Plan
o XII. Front Elevation, same scale as floor plans showing: gridlines;
o XIII. Sections, at least two (2), showing: gridlines;
 B. Structural

o I. Structural Design Analysis

 i. for 2 storeys

 a. One (1) copy of Structural Design Analysis & Computation


 ii. for 3-5 storeys

 a. One (1) copy of Load Test w/ photos


 b. One (1) copy of Structural Design Analysis & Computation
 iii. If 6 storeys and up

 a. One (1) copy Soil exploration w/ photos


 b. One (1) copy of Structural Design Analysis & Computation
o II. Structural Plans

 i. Structural plans coincide with the structural analysis


 ii. Foundation Plans and Details at scale of not less than 1:100.
 iii. Floor/Roof Framing Plans and Details at scale of not less than 1:100 Schedule of
Column, Footings, Wall Footings and Floor Slabs
 iv. Schedule of Beams and Girders/Details
 v. Schedule of Trusses (Truss Details)
 C. Electrical (with Design Analysis, Voltage Drop & Short Circuit Calculations)

o I. Electrical plans coincide with other plans of all sections signed and sealed
o II. Legend or Symbols
o III. General Notes and/or Specifications
o IV. Electrical Layout
o V. Schedule of Loads, Transformers, Generating/UPS Units (Total kVA for each of the
preceding items shall be indicated in the schedule)
o VI. One line diagram
 D. Plumbing/Sanitary

o I. Plumbing plans coincide with other plans of all sections signed and sealed
o II. Plumbing Plans, Layouts and Details, of minimum scale 1:50
o III. Legend and General Notes
o IV. Isometric drawings of the systems (incorporate rain water tank)
o V. Design analysis and technical specifications
o VI. Rainwater tank blow up plans/details
o VII. Water supply / line plan
o VIII. Drainage, waste and vent plan
o IX. Storm water drainage plan (incorporate rainwater tank)
o X. Septic tank, catch basin, grease trap, cistern tank, pressure tank, overhead water
tank, sump pit and pump details (if applicable)
o XI. Sewage Treatment Plant (STP) (if applicable) Planned and designed by only
registered and licensed Sanitary Engineer Design analysis and computation signed
and sealed by SE
 E. Geodetic (with Sketch Plan, Relocation Survey Report except for Subdivisions)

o - If the Building/ Structure is existing, Submit Structural Survey plan


o - If individual title is still for approval, Submit Narrative Survey report

 I. Vicinity Map/Location Plan within a 2.00-kilometer radius for commercial, industrial,


and institutional complex and within a half-kilometer radius for residential buildings,
at any convenient scale showing prominent landmarks or major thoroughfares for
easy reference.
 II. Site Development Plan showing technical description, boundaries, orientation and
position of proposed building/structure in relation to the lot, existing or proposed
access road and driveways and existing public utilities/services. Existing buildings
within and adjoining the lot shall be hatched and distances between the proposed
and existing buildings shall be indicated.
 III. Lot Survey Plans, including but not limited to:
 i. Vicinity Map/ Location Plan
 ii. Lot Plan
 iii. Relocation Survey Plan and Report
 iv. Line and Grade
 v. Detailed Topographic Plan of the site and immediate vicinity