0% found this document useful (0 votes)
66 views13 pages

21LG0077 PLAN Bidbulletin Part3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views13 pages

21LG0077 PLAN Bidbulletin Part3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE XI
DAVAO ORIENTAL SECOND DISTRICT ENGINEERING OFFICE
Matiao, City of Mati, Davao Oriental

C.Y. 2021 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION OF MULTIPURPOSE BUILDINGS
CONSTRUCTION OF BARANGAY HALL
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL

SUBMITTED: RECOMMENDED: APPROVED:

BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS

OFFICE OF THE BUILDING OFFICIAL

LAND USE & ZONING

LINE AND GRADE

ARCHITECTURAL

PERSPECTIVE

TO DON SAN MARIANO


COMVAL PROVINCE

STRUCTURAL
MARAYAG

TO DAVAO CITY r CALAPAGAN


Rive

an
tatag r
Pin Rive
DON MARIANO MARCOS
ba r
ag
PINTATAGAN Rive
Map
MAHAYAG
uti CAUSWAGAN
PUNTALINAO Map
MAPUTI
er MARAGATAS A
Riv TAGBINONGA ON
DON SALVADOR AG
PANIKIAN TARR
ton TAGUIBO TO
MAPAGBA BAY go
May

PISO
o

Pun MAHAYAHAY
SAN ISIDRO
Riv

SAN VICENTE
er

NEW VISAYAS
Bita

CABANGCALAN BUSO
MAYO
SANGHAY TAGABAKID
n-ag
an

CALUBIHAN CULIAN
POBLACION TAGUGPO SAINZ
DON M. MARUNDAN
BANAYBANAY CAGANGANAN Riv
er
DON ENRIQUE LOPEZ
CABADIANGAN LANTAWAN MATIAO
MOGBONGCOGON
TAGBOA
MAGSAYSAY LIBUDON
RANG-AY LANGKA POBLACION
River

THIS SITE DANAO


MAYO, MATI CITY, DAVAO ORIENTAL MATI MAYO BAY
BADAS
River

COCORNON
BAGUMBAYAN
Sumlog

SAN JOSE
DAHICAN
POBLACION
LIMBAHAN o
ua
b
SANITARY
CORPORACION bo C
ua LAPU-LAPU
LUPON MACANGAOC IBA
Tagnaigdaga Pt.
DAWAN
ILANGAY SAN ROQUE Licop Pt.
DUGMANON
BOBON
MANIKLING MAMALI PUJADA BAY
Bobon Pt..
SUDLON
CUABO BAY MAAG TAMISAN
Oanivan Island
BATO BATO
Taganilao Pt. LAWIGAN
SAN MIGUEL
SAN ISIDRO Pujada Island
STO. ROSARIO MACAMBOL

BAON
MAPUTI
River Oak Island

Ivy Island
BITAOGAN
BITAOGAN PT.

Tamadgo Pt.

DAVAO GULF CAMBALEON


TALISAY

LA UNION
La Union River
Macaanan Pt.

MANUEL ROXAS
SERGIO OSMENIA
Bais Pt.
POBLACION CRISPIN DELA CRUZ

GOV. GENEROSO er ANITAP


Riv
TANDANG SORA
SIGABOY ISLAND
TIBANBAN
River
UPPER TIBANBAN
ELECTRICAL
DON CHICOTE

MONTSERAT

TAMBAN OREGON

Magdug River
MAGDUG

KABUAYA Salasa-a Pt.


Padada Pt.

LUZON

River
Luzon

TIBLAWAN

Tiblawan River
NANGAN

NANGAN BAY Surop River


LUBAN Digas Pt.
SUROP

LUBAN ISLAND

Tagabebe River
TAGABEBE BAY
TAGABEBE

Kagangaban Pt.

PUNDAGUITAN

LANGKA
MECHANICAL
LAVIGAN

Lagum Pt.

Lima Pt.

LEGEND:
NATIONAL ROAD SAN AGUSTIN
CAPE
BARANGAY ROAD

RIVER

CITY

MUNICIPALITY

BRIDGE VICINITY MAP


SITE DEVELOPMENT PLAN MUNICIPALITY BOUNDARY LINE NTS
NTS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CARMELO B. FULLO
REGIONAL OFFICE XI CONSTRUCTION OF MULTIPURPOSE BUILDINGS PERSPECTIVE
ARCHITECT II
CONSTRUCTION OF BARANGAY HALL SITE DEVELOPMENT PLAN
DAVAO ORIENTAL VICINITY MAP PREPARED BY: 1
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL

SECOND DISTRICT ENGINEERING OFFICE REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
14.0000

1.9500 2.0250 1.8750 4.0000 4.1500

W W W W
4 3 2 1

G.R.

1.8500 FEMALE MALE D


W D D 2
4 CR 2 2 CR
PWD PWD KITCHEN SINK W
1 3.4250
JALOU PLUS JALOU PLUS
STORAGE D D
W 2 2
2.1500 REF. SEE SEC. ELEVATION CONCRETE LEDGE (.10MX.60M) CONCRETE LEDGE (.10MX.60M)
3
LOBBY
C A B I N E T
1.5MMX2"X2" RECTANGULAR TUBE 1.5MMX2"X2" RECTANGULAR TUBE
8.0000 TREASURER OFFICE
8.5000 1.5MMX1"X1" RECTANGULAR TUBE 1.5MMX1"X1" RECTANGULAR TUBE
2.2250
D D
2 2
0.2500 0.0500
TOP OF PARAPET TOP OF PARAPET
W CONFERENCE ROOM
4.0000 1 0.6500 0.6500
D
1 0.1000 0.2500 0.2500
2.2000
D 2.8500 0.1000 1.3000 1.3000 0.1000
W W 2
2ND FLR. CL 2ND FLR. CL
0.2000
1 1 0.1800
1.2000
0.5000 0.6500 0.1000 0.1000
1.7000 1.4000
GARDEN SOIL
1.9750
2.6000 2.6000
1.4000 RAMP 0.4800 1.4000 1.9000 1.9000 1.9000

0.9000 0.9000
GARDEN SOIL 8.6500 8.6500
0.2000 0.2000 2ND FLR.FFL 2ND FLR.FFL 0.2000
0.4000 0.4000
2ND FLR. CL 2ND FLR. CL

PAVING BLOCKS
0.7053
0.9600
1.9000 3.0053 3.0053 1.9000
2.7500 2.7500
1 1
4" THK. CLEAR 4" THK. CLEAR
GLASS GLASS
1.7000

0.5000 3.0000 FFL FFL


0.5000

0.4000 0.4000 1.2000 2.4000


5.8500 4.0000 4.1500 NGL NGL

GROUND FLOOR PLAN


SCALE 1 : 100 MTS.
LEFT SIDE ELEVATION
SCALE 1 : 100 MTS.
RIGHT SIDE ELEVATION
SCALE 1 : 100 MTS.

14.0000

3.8800 2.0450 3.9250 4.1500

W W W
2 1 1
JALOU PLUS

CR CONCRETE LEDGE (.10MX.60M)


1.3500

D 1.5MMX2"X2" RECTANGULAR TUBE


3 W
W D 1
1 2 1.5MMX1"X1" RECTANGULAR TUBE
5.2750
5.6500
SESSION HALL
TOP OF PARAPET
0.2500
BRGY. 0.6500
8.0000
CAPTAIN OFFICE 0.2500 0.1000

1.4000 0.1000 LAWIGAN BRGY. HALL


9.9000 1.0500 BRGY.LAWIGAN, MATI CITY, DAVAO ORIENTAL
W
2 2ND FLR. CL 0.6000
D 0.1000
2
D
W
SECRETARY OFFICE 1
2.7250 1.2000
1 2.2000
D 2.60001.9000
2
W TERRACE
1 0.1800 0.9000
8.6500
0.2000 2ND FLR.FFL
0.5000 0.4000
2ND FLR. CL
2.0500

3.03531.9000
2.7500

5.8500 4.1500 4.0000

FFL
0.5300

14.0000 0.4000
NGL

SECOND FLOOR PLAN


SCALE 1 : 100 MTS.
FRONT ELEVATION
SCALE 1 : 100 MTS.

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CARMELO B. FULLO
REGIONAL OFFICE XI CONSTRUCTION OF MULTIPURPOSE BUILDINGS GROUND FLOOR PLAN ARCHITECT II
CONSTRUCTION OF BARANGAY HALL FRONT ELEVATION
DAVAO ORIENTAL RIGHT SIDE ELEVATION PREPARED BY: 2
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL
LEFT SIDE ELEVATION REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
SECOND DISTRICT ENGINEERING OFFICE REAR ELEVATION 5
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
0.8000 0.8000

0.1000 0.8000 0.8000

2100 2.1000 2.1000 PARAPET LN

1.4000 SEE TRUSS DETAIL


2ND FLR. CL

1500

2.7000

FFL FFL FFL 2ND FLR. LN

0.4000
D D D 2ND FLR. CL

1 2 3
2.7500
TANGUILE PANEL W/ TANGUILE PANEL W/ TANGUILE PANEL W/
WOODEN JAMB AND COMPLETE ACCESSORIES WOODEN JAMB AND COMPLETE ACCESSORIES WOODEN JAMB AND COMPLETE ACCESSORIES
GROUND FFL

0.4000
NGL

SECTIONAL ELEVATION
SCALE 1 : 100 MTS.

2.4000 2.1000 0.6000 0.6000 0.6000

0.6000 0.6000

1.9000 1.9000

1.7000 1.7000

0.2000 1.2000

FFL

W W W W
1 2 3 4
1 1 1 1
4" THK. BRONZE GLASS AWNING WINDOW 4" THK. BRONZE GLASS AWNING WINDOW 4" THK. BRONZE GLASS AWNING WINDOW 4" THK. BRONZE GLASS AWNING WINDOW
WITH FIXED GLASS WITH FIXED GLASS WITH FIXED GLASS WITH FIXED GLASS

SCHEDULE OF DOORS AND WINDOWS NTS


SCALE

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE XI
CARMELO B. FULLO
CONSTRUCTION OF MULTIPURPOSE BUILDINGS SCHEDULE OF DOORS AND WINDOWS ARCHITECT II
CONSTRUCTION OF BARANGAY HALL SECTIONAL ELEVATION
DAVAO ORIENTAL PREPARED BY: 3
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL

SECOND DISTRICT ENGINEERING OFFICE REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
A B C D E
14.30 A B C D E
3.08 2.93 4.00 4.30 14.30

3.08 2.93 4.00 4.30

3 3
FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400) RG-1 (250X350) RG-1 (250X350) RG-1 (250X350) RG-1 (250X350)
C1/F1 C1/F1 C1/F1 C1/F1 C1/F1
(1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30)

4.15
4.15
RG-1 (250X350)
RG-1 (250X350)
RG-1 (250X350)

FTB-1 (250X400)
FTB-1 (250X400)
FTB-1 (250X400)
FTB-1 (250X400)
FTB-1 (250X400)

8.30
8.30
2 FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400)
2
C1/F1 C1/F1 C1/F1 C1/F1 C1/F1
(1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30)

SC1/F2

4.15
4.15
(0.80X0.80X0.25)

RG-1 (250X350)
RG-1 (250X350)
RG-1 (250X350)

FTB-1 (250X400)
FTB-1 (250X400)
FTB-1 (250X400)
FTB-1 (250X400)
100mm THK. SLAB-ON-GRADE

FTB-1 (250X400)
ON 100mm THK GRAVEL BED ON
WELL COMPACTED SUB-GRADE
C2/F2 @ 95% MAX DRY DENSITY W/
10mmØ TEMP. BARS @ 0.45m O.C. B.W.
(1.00X1.00X0.25)
FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400) FTB-1 (250X400)
TOP OF PARAPET
RG-1 (250X350) RG-1 (250X350) RG-1 (250X350) RG-1 (250X350)

1 C1/F1 C1/F1 C1/F1 1


CHB CHB CHB CHB CHB CHB
(1.40X1.40X0.30) (1.40X1.40X0.30) (1.40X1.40X0.30) CONCRETE GUTTER WITH
C1/F1 CHB CLADDING C1/F1
(1.40X1.40X0.30) (1.40X1.40X0.30) 10MM DIA. RSB SPACED @ .20 O.C, B.W. PROVIDE WATER PROOFING

2CG-1 (250X500)

2CG-1 (250X500)
2B-1 (250X400) 2B-1 (250X400)

2CG-1 (250X500)
CONCRETE CANOPY WITH
LAWIGAN BARANGAY HALL
10MM DIA. RSB SPACED @ .20 O.C, B.W.
LAWIGAN BARANGAY HALL
FOUNDATION PLAN ROOF BEAM LAYOUT PLAN
SCALE 1:50 M SCALE 1:50 M
2CMX2CM DRIFTMOULD

A B C D E
A B C D E
14.30

14.30
3.08 2.93 4.00 4.30
4" DIA. PVC DOWNSPOUT
3.08 2.93 4.00 4.30

3
2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450) 3 CONCRETE GUTTER CONCRETE GUTTER

2S-1 2S-1 2S-2 2S-2 LAWIGAN BARANGAY HALL


t=100mm t=100mm t=100mm t=100mm LC - 100x50x15x1.2mm
INTERMEDIATE PURLINS CONCRETE GUTTER DETAIL
SCALE NTS
2B-1 (250X400) 2B-1 (250X400) 2B-1 (250X400) 2B-1 (250X400)

4.15
4.15

2G-1 (250X450)
2G-1 (250X450)
2G-1 (250X450)
2G-1 (250X450)
2G-1 (250X450)
2S-1 2S-1 2S-2 2S-2
t=100mm t=100mm t=100mm t=100mm

2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450)

8.30
2

8.30
2
2S-1 2S-1 2S-2 2S-2
t=100mm t=100mm t=100mm t=100mm

RAFTER-1 (SEE DETAILS)


RAFTER-1 (SEE DETAILS)
RAFTER-1 (SEE DETAILS)
RAFTER-1 (SEE DETAILS)
RAFTER-1 (SEE DETAILS)

2G-1 (250X450)
2B-1 (250X400) 2B-2 (250X400) 2B-1 (250X400) 2B-1 (250X400)

4.15
4.15

2G-1 (250X450)
2G-1 (250X450)
2G-2 (250X450)
2G-1 (250X450)
2S-1 2S-3 2S-3A 2S-2
t=100mm t=100mm t=100mm t=100mm

2G-2 (250X450)
2G-2 (250X450)
UP
STB-1 (250X300)
2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450) 2G-3 (250X450)

1
2S-4 2S-5 1
t=100mm t=100mm

2CG-1 (250X500)

2CG-1 (250X500)
2B-1 (250X400) 2B-1 (250X400)

2CG-1 (250X500)
LAWIGAN BARANGAY HALL
LAWIGAN BARANGAY HALL ROOF FRAMING PLAN
SCALE 1:50 M
SECOND FLOOR FRAMING PLAN
SCALE 1:50 M

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE XI
CARMELO B. FULLO
CONSTRUCTION OF MULTIPURPOSE BUILDINGS FOUNDATION PLAN ARCHITECT II
CONSTRUCTION OF BARANGAY HALL SECOND FLOOR FRAMING PLAN
DAVAO ORIENTAL ROOF BEAM LAYOUT PLAN PREPARED BY: 4
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL
ROOF FRAMING PLAN REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
SECOND DISTRICT ENGINEERING OFFICE CONCRETE GUTTER DETAIL CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
LC - 150x65x20x2mm
10mm Ø SAG RODS 2L-50x50x5mm TOP & BOTTOM
INTERMEDIATE PURLINS 2L-40x40x4mm
(PLAIN ROUND BAR) CHORD MEMBERS
SPACED @ 1.00m O.C. WEB MEMBERS
(2 LINES PER BAY)

A B
B
5.75
JEMAR 1/50

1.00
5.23
A
JEMAR 1/50

0.49
MAJOR SPACE
A MINOR SPACE
STAIR DIRECTION, MINOR LABEL
COLUMN INDEX

RESIDENCE A
2S-1
RC COLUMN RC COLUMN A FLOOR PLAN t=150mm
SCALE 1:50 M
A- 2
CALL OUTS

TYPE : BLAH
W D LOCATION : BLAH
1 1 SETS : BLAH SINGLE (CALL OUTS)

DOUBLE
(CALL OUTS)

W D
1 1

WINDOW/DOOR
LABEL IN PLAN
0.88 0.78 0.90 0.80 0.70 0.70 0.70 0.70 0.70 0.70 0.75 SCALE 1/50

8.30

LAWIGAN BARANGAY HALL


RAFTER - 1 DETAILS
SCALE 1:50 M

SCHEDULE OF REINFORCED CONCRETE COLUMNS


FOUNDATION TO 2ND FLOOR TO
MARK
2ND FLOOR LEVEL ROOF LEVEL

300mm 300mm

300mm 300mm
C1

SIZE 300 mm x 300 mm 300 mm x 300 mm


SCHEDULE OF FOOTINGS SCHEDULE OF FOOTING TIE BEAMS VERT. BARS 8 - 16mm Ø 8 - 16mm Ø
TIES / SPIRAL 2 SETS - 10Ø @ 150mm 2 SETS - 10Ø @ 150mm
FOOTING DIMENSIONS TOP BARS BOTTOM BARS
EMBEDMENT BEAM SECTION CONF. REINF. 2 SETS - 9 PCS 10Ø @ 100mm 2 SETS - 9 PCS 10Ø @ 100mm
MARK DEPTH (m) REMARKS
WIDTH, B LENGTH, L THICKNESS X-DIRECTION Y-DIRECTION X-DIRECTION Y-DIRECTION MARK JOINT REINF. 2 SETS - 10Ø @ 100mm 2 SETS - 10Ø @ 100mm
(m) (m) t (m) BARS BARS BARS BARS LEFT END MIDSPAN RIGHT END
SECTION SECTION SECTION 250mm 250mm
F1 1.40 1.40 0.30 1.50 NONE NONE 7 - 16MM Ø 7 - 16MM Ø ISOLATED FOOTING
250mm 250mm
F2 1.00 1.00 0.25 0.80 NONE NONE 5 - 16MM Ø 5 - 16MM Ø ISOLATED FOOTING
C2
FTB - 1
MATERIAL SPECIFICATIONS:
fc' = 21 MPa (3,000 psi) SIZE 250 mm x 250 mm 250 mm x 250 mm
fy = 276 MPa (40,000 psi) FOR 12MMØ BARS AND BELOW
fy = 414 MPa (60,000 psi) FOR 16MMØ BARS AND ABOVE SIZE (MM) 250x400 250x400 250x400 VERT. BARS 8 - 16mm Ø 8 - 16mm Ø
TOP BARS 3 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø TIES / SPIRAL 2 SETS - 10Ø @ 150mm 2 SETS - 10Ø @ 150mm
BOTTOM BARS 3 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø CONF. REINF. 2 SETS - 9 PCS 10Ø @ 100mm 2 SETS - 9 PCS 10Ø @ 100mm
WEB BARS NONE NONE NONE JOINT REINF. 2 SETS - 10Ø @ 100mm 2 SETS - 10Ø @ 100mm
10MM Ø: 1@50mm, 10@100mm,
STIRRUPS
10@150mm, REST @ 250mm O.C.
300mm 300mm
MATERIALS SPECIFICATION: fc' = 20.7 MPa (3,000 psi) 200mm 200mm
fy = 414 MPa (60,000 psi)
SC1

SIZE 300 mm x 200 mm 300 mm x 200 mm


VERT. BARS 6 - 16mm Ø 6 - 16mm Ø
TIES / SPIRAL 1 SET - 10Ø @ 150mm 1 SET - 10Ø @ 150mm
CONF. REINF. 1 SET - 9 PCS 10Ø @ 100mm 1 SET - 9 PCS 10Ø @ 100mm
JOINT REINF. 1 SET - 10Ø @ 100mm 1 SET - 10Ø @ 100mm

MATERIALS SPECIFICATION: fc' = 20.7 MPa (3,000 psi)


fy = 414 MPa (60,000 psi)

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CARMELO B. FULLO
REGIONAL OFFICE XI CONSTRUCTION OF MULTIPURPOSE BUILDINGS GROUND FLOOR PLAN ARCHITECT II
CONSTRUCTION OF BARANGAY HALL FRONT ELEVATION
DAVAO ORIENTAL RIGHT SIDE ELEVATION PREPARED BY: 5
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL
LEFT SIDE ELEVATION REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
SECOND DISTRICT ENGINEERING OFFICE REAR ELEVATION 5
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
SCHEDULE OF REINFORCED
SCHEDULE OF REINFORCED CONCRETE GIRDERS CONCRETE BEAMS
BEAM SECTION BEAM SECTION BEAM SECTION
MARK MARK MARK
LEFT END SECTION MIDSPAN RIGHT END SECTION LEFT END SECTION MIDSPAN RIGHT END SECTION LEFT END SECTION MIDSPAN RIGHT END SECTION
CONT. END DISCONT. END SECTION CONT. END DISCONT. END CONT. END DISCONT. END SECTION CONT. END DISCONT. END CONT. END DISCONT. END SECTION CONT. END DISCONT. END

2G - 1 2B - 1

IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
SIZE (MM) 250x450 250x450 250x450 250x450 250x450 SIZE (MM) SIZE (MM) 250x400 250x400 250x400 250x400 250x400
TOP BARS 3 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø TOP BARS TOP BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø
BOTTOM BARS 2 - 16mm Ø 2 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø BOTTOM BARS BOTTOM BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø
WEB BARS NONE NONE NONE NONE NONE WEB BARS WEB BARS NONE NONE NONE NONE NONE
STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L. STIRRUPS STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L.
SCHEDULE OF FLOOR SLABS
SPACING OF REINFORCING BARS (mm)
2G - 2 2B - 2 MARK THICKNESS BAR SHORT DIRECTION BARS LONG DIRECTION BARS
REMARKS
(mm) LOCATION
@ CONTINUOUS @ DISCONT. @ CONTINUOUS @ DISCONT.
@ MIDSPAN @ MIDSPAN
EDGE EDGE EDGE EDGE
SIZE (MM) 250x450 250x450 250x450 SIZE (MM) SIZE (MM) 250x400 250x400 250x400
TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
TOP BARS 5 - 16mm Ø 2 - 16mm Ø 3 - 16mm Ø TOP BARS TOP BARS 3 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø 2S - 1 100 TWO WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300
BOTTOM BARS 3 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø BOTTOM BARS BOTTOM BARS 2 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø
TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
WEB BARS NONE NONE NONE WEB BARS WEB BARS NONE NONE NONE 2S - 2 100 ONE WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300
STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L. STIRRUPS STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L.
TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
2S - 3 100 TWO WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300
2G - 3 TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
2S - 3A 100 TWO WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300

IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
SIZE (MM) 250x450 250x450 250x450 250x450 250x450 SIZE (MM) SIZE (MM) 2S - 4 100 TWO WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300
TOP BARS 3 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø TOP BARS TOP BARS
TOP BARS 10Ø @ 300 NONE 10Ø @ 300 10Ø @ 300 NONE 10Ø @ 300
BOTTOM BARS 2 - 16mm Ø 2 - 16mm Ø 3 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø BOTTOM BARS BOTTOM BARS 2S - 5 100 ONE WAY
BOTTOM BARS 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300 10Ø @ 300
WEB BARS NONE NONE NONE NONE NONE WEB BARS WEB BARS
MATERIAL SPECIFICATIONS: NOTES:
STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L. STIRRUPS STIRRUPS
fc' = 20.7 MPa (3,000 psi) IF TOP BARS OF ADJACENT SLABS DIFFER AT THEIR
fy = 276 MPa (40,000 psi) COMMON SUPPORT THE SMALLER SPACING SHALL GOVERN.

2CG - 1

SIZE (MM) 250x500 250x500 250x500 SIZE (MM) SIZE (MM)


TOP BARS 5 - 16mm Ø 5 - 16mm Ø 5 - 16mm Ø TOP BARS TOP BARS
BOTTOM BARS 3 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø BOTTOM BARS BOTTOM BARS
WEB BARS NONE NONE NONE WEB BARS WEB BARS
STIRRUPS 10MM Ø: 1@50mm, REST @ 100mmO.C. TO FREE END STIRRUPS STIRRUPS

RG - 2

IF APPLICABE
IF APPLICABE
IF APPLICABE
IF APPLICABE
SIZE (MM) 250x350 250x350 250x350 250x350 250x350 SIZE (MM) SIZE (MM)
TOP BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø TOP BARS TOP BARS
BOTTOM BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø BOTTOM BARS BOTTOM BARS
WEB BARS NONE NONE NONE NONE NONE WEB BARS WEB BARS
STIRRUPS 10MM Ø: 1@50mm, 10@100mm, 5@150mm, REST @ 300mm O.C. TO C.L. STIRRUPS STIRRUPS

MATERIALS SPECIFICATION: fc' = 20.7 MPa (3,000 psi) MATERIALS SPECIFICATION: fc' = 20.7 MPa (3,000 psi) MATERIALS SPECIFICATION: fc' = 20.7 MPa (3,000 psi)
fy = 414 MPa (60,000 psi) fy = 414 MPa (60,000 psi) fy = 414 MPa (60,000 psi)

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CARMELO B. FULLO
REGIONAL OFFICE XI CONSTRUCTION OF MULTIPURPOSE BUILDINGS GROUND FLOOR PLAN ARCHITECT II
CONSTRUCTION OF BARANGAY HALL FRONT ELEVATION
DAVAO ORIENTAL RIGHT SIDE ELEVATION PREPARED BY: 5
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL
LEFT SIDE ELEVATION REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
SECOND DISTRICT ENGINEERING OFFICE REAR ELEVATION 5
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:
PLUMBING NOTES :
1. GRADES OF HORIZONTAL PIPINGS : LEGEND :
RUN ALL HORIZONTAL PIPINGS IN FERFECT ALIGNMENT A FORM GRADE OF NOT LESS THAN TWO PERCENT ( 2 % )

2. CHANGES IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES ( 45 DEG. ) WYES, LONG SWEEP QUARTER BEND, SIXTH EIGHT OF SIXTEENTH BENDS. S.V. SEPTIC VAULT
WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 81 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE C.O.. CLEAN OUT
USED ON WASTE LINE, TEE AND CROSSES MAYBE USED IN VENT PIPES.
3. PROHIBITED FITTINGS :
W.C. WATER CLOSET
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL OR WASTE LINES, THE DRILLING AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USE OF VTR VENT THRU ROOF
SADDLE HUB AND BEND ARE PROHIBITED
VTC VENT THRU CEILING
4. PIPE CLEAN - OUTS
CLEAN - OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS F.D. FLOOR DRAIN
A) EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO AND ONE HALF DEGREES (22 21 )
B) ONE AND ONE HALF METERS (1.50m) INSIDE THE PROPERTY LINE BEFORE THE HOUSE DRAINAGE CONNECTION.
F FAUCET
C) AT THE END OF ANY HORIZONTAL LINES. LAV. LAVATORY
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB. WATER LINE
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
8. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER AND A LICENSE PLUMBING CONTRACTOR. SANITARY LINE

SV SV
OUTLET

TO WATER SOURCE C.O CO


CO

G.R. G.R. FD
LAV FD FD
LAV
FEMALE D D
MALE WC FEMALE MALE
D D WC
CR 2 2 CR CR 2 2 CR
PWD PWD KITCHEN SINK KITCHEN SINK
PWD PWD

STORAGE D D
2 STORAGE 2
REF. REF.
LOBBY SESSION HALL SESSION HALL
LOBBY
BRGY. BRGY.
TREASURER OFFICE CAPTAIN OFFICE CAPTAIN OFFICE
TREASURER OFFICE

CONFERENCE ROOM CONFERENCE ROOM


SECRETARY OFFICE SECRETARY OFFICE

TERRACE 0.1800 TERRACE 0.1800


0.5000
0.5000
1.7000

GROUND FLOOR SECOND FLOOR GROUND FLOOR SECOND FLOOR


WATER LINE LAY OUT PLAN
SCALE 1 : 1000 mm SEWERAGE LAY OUT PLAN
SCALE 1 : 1000 mm
2.5000 1.5000 1.0000
1.5000 1.0000 100 mm THK. CONC. SLAB W/ 10 mm Ø RSB
8-10mm Ø RSB SP. 100 mm THK. CONC. SLAB W/ 10 mm Ø RSB SP. @ 200 mm O.C.B.W.
0.1000 AS SHOWN SP. @ 200 mm O.C.B.W.
C.O. C.O.

AIRSPACE
300 AIRSPACE TO PUBLIC SEWER
INLET
WATER LEVEL
WATER LEVEL

100 mm THK CHB w/ 10 mm Ø .50X.50 M.


RSB SP. @ 0.60 m O.C. B.W. MANHOLE
1.5000
1200 LEACHING CHAMBER
DIGESTIVE CHAMBER 8-10mm Ø RSB SP.
AS SHOWN C.O.

C.O.
GRAVEL

200 PLAN DETAIL OF SEPTIC VAULT


SECTION SCALE 1 : 250 mm

0.3000 0.3000 0.3000


TO TOILET

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE XI
CARMELO B. FULLO
CONSTRUCTION OF MULTIPURPOSE BUILDINGS SEWERAGE LAY OUT PLAN ARCHITECT II
CONSTRUCTION OF BARANGAY HALL WATER LINE LAY OUT PLAN
DAVAO ORIENTAL PREPARED BY: 5
BRGY. MAYO, MATI CITY, DAVAO ORIENTAL PLUMBING NOTES :
SECOND DISTRICT ENGINEERING OFFICE LEGEND :
REYNAN C. COSTELO BEVERLY M. MAGLANGIT FIDELA M. BISEN JANE D. CAINGHOG
CHRISTIAN MARC C. TAJORE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
5
Matiao, City of Mati, Davao Oriental
ENGINEER II DATE: DATE: DATE: DATE:

You might also like