1st Floor Periodical Maintenance Check List

Uploaded by

ammaralam342
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

AL-KARAM TOWEL INDUSTRIES (PVT.) LTD.

DATE :
Forth Floor LV Panel Monthly Inspaction Check List MDB 2

S.No Items To Check Yes No N/A Remarks

1 Clear & permanent identification marking provided


2 Clear & permanent capacity information level provided
3 1 meter distance provided in front of DB
4 Insulating rubber mats are provided in front of DB
5 DB installed at compliant location
6 Artificial respiration board installed beside DB
7 DB installed 2.5 meters away from any washing plant
8 Combustible material are not stored near DB
9 Voltmeter,Ampmeter and indicating lamp are installed and functional
10 DB having operable Panel door
11 Phase separator installed between terminal of MCCB
12 Earthing cables sizes are appropriate
13 DB door is connected with earthing
14 No circuit is drawn without incorporating CB
15 No higher rated CB provided withlower rated cables
16 Each circuit is provided with dedicated neutral
17 Indicator lamps and meters are with protection devices
18 DB provided with dead front construction
19 DB is properly concealed, dust proof
20 Color coading maintained for cable & bus bar
21 Multi-looping of cable is not observed
22 No over heating, Over loading & sign of burning
23 Cable marking, taging
24 Conductor is provided with cable lugs
25 No unterminated wire found
26 Mats

Prepared By Reviewed By

_______________ _______________
Electrical Incharge Electrical Manager
AL-KARAM TOWEL INDUSTRIES (PVT.) LTD.
Third Floor LV Panel Monthly Inspaction Check List FDB Date:

S.No Items To Check Yes No N/A Remarks

1 Clear & permanent identification marking provided


2 Clear & permanent capacity information level provided
3 1 meter distance provided in front of DB
4 Insulating rubber mats are provided in front of DB
5 DB installed at compliant location
6 Artificial respiration board installed beside DB
7 DB installed 2.5 meters away from any washing plant
8 Combustible material are not stored near DB
9 Voltmeter,Ampmeter and indicating lamp are installed and functional
10 DB having operable Panel door
11 Phase separator installed between terminal of MCCB
12 Earthing cables sizes are appropriate
13 DB door is connected with earthing
14 No circuit is drawn without incorporating CB
15 No higher rated CB provided withlower rated cables
16 Each circuit is provided with dedicated neutral
17 Indicator lamps and meters are with protection devices
18 DB provided with dead front construction
19 DB is properly concealed, dust proof
20 Color coading maintained for cable & bus bar
21 Multi-looping of cable is not observed
22 No over heating, Over loading & sign of burning
23 Cable marking, taging
24 Conductor is provided with cable lugs
25 No unterminated wire found
26 Mats

Prepared By Reviewed By

_______________ _______________
Electrical Incharge Electrical Manager
AL-KARAM TOWEL INDUSTRIES (PVT.) LTD.
Date:
THIRD FLOOR LV Panel Monthly Inspaction Check List OTHER DB: EXHAUST FAN DB

S.No Items To Check Yes No N/A Remarks

1 Clear & permanent identification marking provided


2 Clear & permanent capacity information level provided
3 1 meter distance provided in front of DB
4 Insulating rubber mats are provided in front of DB
5 DB installed at compliant location
6 Artificial respiration board installed beside DB
7 DB installed 2.5 meters away from any washing plant
8 Combustible material are not stored near DB
9 Voltmeter,Ampmeter and indicating lamp are installed and functional
10 DB having operable Panel door
11 Phase separator installed between terminal of MCCB
12 Earthing cables sizes are appropriate
13 DB door is connected with earthing
14 No circuit is drawn without incorporating CB
15 No higher rated CB provided withlower rated cables
16 Each circuit is provided with dedicated neutral
17 Indicator lamps and meters are with protection devices
18 DB provided with dead front construction
19 DB is properly concealed, dust proof
20 Color coading maintained for cable & bus bar
21 Multi-looping of cable is not observed
22 No over heating, Over loading & sign of burning
23 Cable marking, taging
24 Conductor is provided with cable lugs
25 No unterminated wire found
26 Mats

Prepared By Reviewed By

_____________ _____________
Electrical Incharge Electrical Manager
AL-KARAM TOWEL INDUSTRIES (PVT.) LTD.
DATE:
LV Panel Monthly Inspaction Check List DB

S.No Items To Check Yes No N/A Remarks

1 Clear & permanent identification marking provided


2 Clear & permanent capacity information level provided
3 One meter distance provided in front of DB
4 Insulating rubber mats are provided in front of DB
5 DB installed at compliant location
6 Artificial respiration board installed beside DB
7 DB installed 2.5 meters away from any washing plant
8 Combustible material are not stored near DB
9 Voltmeter,Ampmeter and indicating lamp are installed and functional
10 DB having operable Panel door
11 Phase separator installed between terminal of MCCB
12 Earthing cables sizes are appropriate
13 DB door is connected with earthing
14 No circuit is drawn without incorporating CB
15 No higher rated CB provided with lower rated cables
16 Each circuit is provided with dedicated neutral
17 Indicator lamps and meters are with protection devices
18 DB provided with dead front construction
19 DB is properly concealed, dust proof
20 Color coading maintained for cable & bus bar
21 Multi-looping of cable is not observed
22 No over heating, Over loading & sign of burning
23 Cable marking, taging
24 Conductor is provided with cable lugs
25 No unterminated wire found
No visible damage to impair safety.
26

Prepared By Reviewed By

_______________ _______________
Electrical Incharge Electrical Manager