0% found this document useful (0 votes)
126 views179 pages

BOQ Road Work-Rewa-Tetka Mod

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views179 pages

BOQ Road Work-Rewa-Tetka Mod

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 179

MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD.

Rewa -Beohari-Tetka Mod Road (SH-57)


Two Lane with Paved Shoulder Length= 111.50 Kms.
GENERAL ABSTRACT
Sr. Cost per Km
Sub Head Total Cost (Rs. in Crore)
No. (Cr.)
1 Site-Clearance 1.35
2 Earthwork 29.78
3 Sub-base, Base Courses 57.34
4 Flexible Pavement 99.37
5 Rigid Pavement 31.63
6 Paver Block 2.08
7 Traffic Signs, Marking and Road Appurtenances 15.41
8 RCC Cover Drain & RCC Open Drain 19.99
Protection Work (RCC Toe Wall, Retaining Wall, RCC New Jersy Crush
9 32.71
Barrier & Median Kerb etc.)
10 Junction Improvement 9.98
11 Miscellaneous (Arboriculture Plantation & Rain Water Harvesting) 0.83
12 HPC 9.64
13 RCC Barrel 0.34
14 Slab Culverts 10.71
15 Minor Bridges 12.38
16 Major Bridges 2.60
17 CD Structure Repairing Work 1.18
18 Toll Plaza 28.09
19 Truck Lay Bye 2.10
20 Bus Shelter/Bus Lay Bye 0.43
Total Civil Construction Cost (A) 367.95 3.30
21 Add 2.8% For Contingencies (A) 10.30
22 GST @ 12% of (A) 44.15
23 Agency Charges @ 3% of Civil Construction Cost (A) 11.04
24 Supervision Charges @ 3% of Civil Construction Cost (A) 11.04
25 Maintenance Charges on (A) @ 2.5% 9.20
26 Price of Escalation 5% per Annum of (A) 18.40
Total Provision of GST, Contingencies and Centages (B) 104.13 0.93
Cost to be Bourned by MPRDC
27 Land Acquisition and R&R Cost 2.81
28 Shifting of Electrical Line 7.50
29 Shifting of Water Supply Line 2.65
30 Cost of Forest Clearance 21.03
31 EMP Cost (Tree Plantation 2 times of tree cutting) 0.69
Cost of Preconstruction Activities (C ) 34.67 0.31
Total project Cost (A+B+C) 506.75 4.54
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD.
Rewa -Beohari-Tetka Mod Road (SH-57)
Two Lane with Paved Shoulder Length= 111.50 Kms.
CIVIL WORK COST SUMMARY
Amount
Sr. No. Description Amount (Rs.)
(Cr.)
Part-A: Road Works
1 Site-Clearance 13,498,903.18 1.35
2 Earthwork 297,768,837.15 29.78
3 Sub-base, Base Courses 573,422,055.76 57.34
4 Flexible Pavement 993,685,126.11 99.37
5 Rigid Pavement 316,287,690.46 31.63
6 Paver Block 20,837,920.00 2.08
7 Traffic Signs, Marking and Road Appurtenances 154,140,861.74 15.41
8 RCC Cover Drain & RCC Open Drain 199,890,183.59 19.99
Protection Work (RCC Toe Wall, Retaining Wall, , RCC New Jersy
9 327,090,683.91 32.71
Crush Barrier & Median Kerb etc.)
10 Junction Improvement 99,795,805.00 9.98
11 Miscellaneous (Arboriculture Plantation & Rain Water Harvesting) 8,251,540.00 0.83
Total Cost of Part-A (Road Works) 3,004,669,606.90 300.47
Part-B: Structure Works
Individual Cost
10 Cross-Drainage and Other structures Nos. Total Cost (Rs.)
(Rs.)
i HPC 1 Row 1000 Widening 8 202,589 1,620,712.77 0.16
ii HPC 1 Row 1200 Widening 1 223,692 223,692.10 0.02
iii HPC 2 Row 1000 Widening 1 301,196 301,195.51 0.03
iv HPC 2 Row 1200 Widening 1 342,788 342,788.04 0.03
v HPC 3 Row 1000 Widening 1 385,523 385,522.82 0.04
vi HPC 3 Row 1200 Widening 1 442,376 442,376.00 0.04
HPC 1 Row 1000 (12.50m Wide) For
vii 30 257,127 7,713,819.57 0.77
Junction
HPC 1 Row 1200 (12.50m Wide) Encasing
viii 61 460,856 28,112,215.40 2.81
with Catch Pit
HPC 1 Row 1200 (15.00m Wide) Encasing
ix 13 517,483 6,727,278.38 0.67
with Catch Pit
x HPC 1 Row 1200 (17.50m Wide) 61 351,036 21,413,208.30 2.14
xi HPC 1 Row 1200 (20.00m Wide) 30 369,331 11,079,935.33 1.11
HPC 2 Row 1200 (12.50m Wide) Encasing
xii 5 913,423 4,567,113.38 0.46
with Catch Pit
HPC 2 Row 1200 (15.00m Wide) Encasing
xiii 5 1,058,821 5,294,102.98 0.53
with Catch Pit
xiv HPC 2 Row 1200 (17.50m Wide) 8 520,262 4,162,094.74 0.42
xv HPC 2 Row 1200 (20.00m Wide) 2 564,630 1,129,260.59 0.11
xvi HPC 3 Row 1200 (17.50m Wide) 3 700,215 2,100,645.71 0.21
xvii HPC 3 Row 1200 (20.00m Wide) 1 764,675 764,675.05 0.08
xviii RCC Barrel 1 x 1.20 (12.00m Wide) 3 245,240 735,718.94 0.07
xix RCC Barrel 1 x 1.20 (19.00m Wide) 5 357,478 1,787,390.87 0.18
xx RCC Barrel 1 x 1.50 (12.00m Wide) 1 389,281 389,281.44 0.04
xxi RCC Barrel 1 x 1.50 (19.00m Wide) 1 528,337 528,337.30 0.05
xxii Slab Culvert 1 x 1.20 M Widening 1 776,721 776,720.90 0.08
xxiii Slab Culvert 1 x 2.50 M Widening 4 2,323,450 9,293,799.28 0.93
xxiv Slab Culvert 1 x 2.00 M (12m Wide) 7 2,596,626 18,176,384.37 1.82
xxv Slab Culvert 1 x 3.00 M (12m Wide) 15 4,026,872 60,403,076.73 6.04
xxvi Slab Culvert 1 x 6.00 M (12m Wide) 4 4,623,319 18,493,274.64 1.85
Rev-01
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD.
Rewa -Beohari-Tetka Mod Road (SH-57)
Two Lane with Paved Shoulder Length= 111.50 Kms.
CIVIL WORK COST SUMMARY
Amount
Sr. No. Description Amount (Rs.)
(Cr.)
xxvii Slab Bridge 2 x 6.00 M Widening 2 2,681,046 5,362,092.41 0.54
xxviii Slab Bridge 3 x 5.00 M Widening 1 2,800,132 2,800,131.92 0.28
xxix Slab Bridge 3 x 7.50 M Widening 1 4,741,648 4,741,647.62 0.47
xxx Slab Bridge 3 x 10.50 M Widening 1 6,232,522 6,232,521.70 0.62
xxxi Slab Bridge 3 x 13.50 M Widening 1 6,071,412 6,071,412.29 0.61
xxxii Slab Bridge 4 x 5.50 M Widening 2 3,910,486 7,820,971.51 0.78
xxxiii Slab Bridge 1 x 8.00 M (12m Wide) 1 16,855,466 16,855,466.24 1.69
xxxiv Slab Bridge 1 x 10.00 M (12m Wide) 1 12,428,632 12,428,632.07 1.24
xxxv Slab Bridge 2 x 10.00 M (12m Wide) 2 16,214,282 32,428,563.63 3.24
xxxvi Slab Bridge 3 x 10.00 M (12m Wide) 1 15,124,312 15,124,311.52 1.51
xxxvii T-Beam Bridge 1 x 25.00 M (12m Wide) 1 13,911,467 13,911,466.57 1.39
xxxviii T-Beam Bridge 4 x 20.00 M (12m Wide) 1 26,025,621 26,025,620.95 2.60
xxxix Repairing work in CD Structure 11,819,557 11,819,557.36 1.18
Total Cost of Part-B (Structure Works) 288 368,587,016.90 36.86
Individual Cost
Part-C: Other Works Nos. Total Cost (Rs.)
(Rs.)
11 Toll Plaza 3 93,641,110.60 280,923,331.81 28.09
12 Truck Lay Bye 3 7,009,730.81 21,029,192.42 2.10
13 Bus Shelter/Bus Lay Bye 27 159,953.68 4,318,749.27 0.43
Total Cost of Part-C (Other Works) 306,271,273.50 30.63
Total Cost of Civil Works (Part-A+B+C) 3,679,527,897.30 367.95
Cost per km for Civil Works 33,000,250.20 3.30

Rev-01
Weightage Percentage
Item Stage for Payment
in % of CP weightage
1 2 3 4
A.1- Widening and strengthening of existing road
(Flexible Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
Embankment & Subgrade)
(b) Scarfication
(2) Sub-base course (GSB)
(3) Non bituminous base course (WMM)
(4) Bituminous base course
(5) Wearing Coat
(6) Widening, and repair of culverts
(a) Pipe Culverts 0.14%
(b) Slab/ Box Culverts 0.42%
A.2- Widening and strengthening of existing road
(Rigid Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
0.04%
Embankment & Subgrade)
(b) Scarfication
(2) Sub-base Course (GSB) 0.06%
(3) Non bituminous base course (WMM) 0.13%
(4) Dry Lean Concrete (DLC) Course
(5) Pavement Quality Control (PQC) Course/ White
1.55%
Toppings
B.1 -Reconstruction/ New 2/4-Lane
Realignment/Bypass (Flexible Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
11.73%
Embankment & Subgrade)
(b) Scarfication 0.10%
(2) Sub-base course (GSB) 8.48%
(3) Non bituminous base course (WMM) 13.29%
Road works (4) Hard Shoulder 0.70%
including (5) Bituminous base course 26.82%
culverts, (6) Wearing course 14.09%
64.71%
Widening (7) CC Shoulder 0.82%
and repair of B.2- Reconstruction/ New 2/4- Lane Realignment/
culverts Bypass (Rigid Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
0.33%
Embankment & Subgrade)
(b) Scarfication 0.01%
(2) Sub-base Course (GSB) 1.04%
(3) Non bituminous base course (WMM) 0.36%
(4) Median Filling 0.03%
(4) Dry Lean Concrete (DLC) Course 1.99%
(5) Pavement Quality Control (PQC) Course 9.74%
C.1 - Reconstruction/ New Service Road (Flexible
Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
Embankment & Subgrade)
(b) Earthen Shoulders
(2) Sub-base course (GSB)
(3) Non bituminous base course (WMM)
(4) Bituminous base course
(5) Bituminous wearing Coat
C.2 - Reconstruction/ New Service Road (Rigid
Pavement)
(1) Earthwork up to top of the sub-grade
(a) up to top of the sub-grade (Excavation, Earthwork in
Embankment & Subgrade)
(b) Earthen Shoulders
(2) Sub-base Course (GSB)
(3) Dry Lean Concrete (DLC) Course
(4) Pavement Quality Control (PQC) Course
D- Reconstruction and New Culverts (length<6m) on
existing road, realignments, bypasses
(a) Pipe Culverts 3.91%
(b) Slab/ Box Culverts 4.22%
A.1- Widening and repair of Minor Bridges (length>6
m and < 60 m)
Minor Bridges 29.64%
A.2- New Minor Bridges (length>6 m and < 60 m)
(1) Foundation + Sub-Structure: On completion of the
foundation work including foundations for wing and
52.39%
return walls, abutments, piers upto the abutment/pier
cap.
(2) Super-structure: On completion of the super-
structure in all respects including wearing coat,
16.37%
bearings, expansion joints, hand rails, crash barriers,
road
(3) Approaches: On completion of approaches including
Retaining walls, stone pitching, protection works 1.60%
complete in all respect and fit for use.
(4) Guide Bunds and River Training works: On
completion of Guide Bunds and river Training works
complete in all respects.
Minor B.1- Widening and Repair of underpasses/
Bridges/ overpasses
3.03%
Underpasses Underpass/Overpasses
/Overpasses B.2- New underpasses/ overpasses
(1) Foundation + Sub-Structure: On completion of the
foundation work including foundations for wing and
return walls, abutments, piers upto the abutment/pier
cap.
(2) Super-structure: On completion of the super-
structure in all respects including wearing coat,
bearings, expansion joints, hand rails, crash barriers,
road signs & markings, tests on completion etc.
complete in all respect.
Wearing Coat (a) in case of Overpass wearing coat
including expansion joints complete in all respects as
specified and (b) in case of underpass- rigid pavement
including drainage facility complete in all respects as
specified as specified.

(3) Approaches: On completion of approaches including


Retaining walls/ Reinforced Earth walls, stone pitching,
protection works complete in all respect and fit for use.
A.1- Widening and repairs of Major Bridges
(1) Foundation
(2) Sub-structure
(3) Super-structure (including bearings)
4) wearing coat including expansion joints
(5) Miscellaneous Items like hand rails, crash barriers,
road markings etc.)
(6) Wing walls/return walls
(7) Guide Bunds, River Training works etc.
(8) Approaches (including Retaining walls, stone
pitching and protection works)
A.2- New Major Bridges
(1) Foundation 15.77%
(2) Sub-structure 27.80%
(3) Super-structure (including bearings) 19.82%
4) wearing coat including expansion joints 3.95%
(5) Miscellaneous Items like hand rails, crash barriers,
10.97%
road markings etc.)
(6) Wing walls/return walls 17.94%
(7) Guide Bunds, River Training works etc.
(8) Approaches (including Retaining walls, stone
3.75%
pitching and protection works)
B.1- Widening & repairs ROB/RUB
(1) Foundation
(2) Sub-structure
(3) Super- structure (including bearing)
(4) Wearing coat: (a) in case of ROB- wearing coat
including expansion joint complete in all respect as
specified and (b) in case of RUB- rigid pavement
including drainage facility complete in all respect as
specified as specified.
Major Bridge (5) Miscellaneous Items like hand rails, crash barriers,
(Length>60 road markings etc.
m.) works (6) Wing walls/ return wall
and (7) Approaches (including Retaining walls, stone
ROB/RUB/ pitching and protection works)
elevated 0.71% B.2- New ROB/RUB
section/ (1) Foundation
flyover (2) Sub-structure
including (3) Super- structure (including bearing)
viaducts, if (4) Wearing coat: (a) in case of ROB- wearing coat
any including expansion joint complete in all respect as
specified and (b) in case of RUB- rigid pavement
including drainage facility complete in all respect as
specified as specified.
(5) Miscellaneous Items like hand rails, crash barriers,
road markings etc.
(6) Wing walls/ return wall
(7) Approaches (including Retaining walls, stone
pitching and protection works)
C.1- Widening and Repair of Elevated Section
/Flyover/ Grade Separators
(1) Foundation
(2) Sub-structure
(3) Super- structure (including bearing)
(4) Wearing coat including expansion joints
(5) Miscellaneous Items like hand rails, crash barriers,
road markings etc.

(6) Wing walls/ returning wall


(7) Approaches (including Retaining walls, stone
pitching and protection works)
C.2- New Elevated Section/ Flyovers/ Grade
Separators
(1) Foundation
(2) Sub-structure
(3) Super- structure (including bearing)
(4) Wearing coat including expansion joints
(5) Miscellaneous Items like hand rails, crash barriers,
road markings etc.
(6) Wing walls/ returning wall
(7) Approaches (including Retaining walls, stone
pitching and protection works)
(i) Toll Plaza 24.20%
(ii) Drainage & Protection Works
(a) Road side drains (Pucca & Earthen)
> Earthen Drain 0.61%
> RCC Drain 17.22%
(b) Protection Works (Retaining Wall, Toe Wall, Kerb,
28.17%
median)
(iii) Road signs, safety devices, road furnitures etc. 10.26%
(iv) Project Facilities
(a) Bus Stops 0.37%
(b) Truck lay-byes 1.81%
(c) Rest Areas
(d) Others
> Improvement of Major junctions 3.62%
> Improvement of Minor junctions 4.98%
> Paver Block Floorings 1.79%
Other works 31.55% > Utility Ducts (Cross ducts, Utility chamber) approach
0.86%
to adjoining agricultural fields etc.
> Rain Water Harvesting 0.14%
> Street Lights 2.15%
(v) Road side plantation (Arboriculture) 0.57%
(vi) Repair of Protection Works other than approaches
to the bridges, elevated sections/ flyover/ grade
separators and ROBs/ RUBs
(vii) Safety and traffic management during construction
1.06%
(Temporary Diversion Road at structures)

(viii) Site clearance and dismantling (Tree Cutting,


Clearing and Grubbing, Dismantling of KM/ HM/
0.75%
boundary Stones, barbed wire fencing/ wire mesh
fencing and Dismantling of existing drain, kerb etc. )
(ix) Dismantling of existing CD structures 0.42%
(x) Repair of retained Existing CD Structure 1.02%
100.00%
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
Part-A Road Work
SITE CLEARANCE

Cutting of trees, including cutting of trunks, branches


and removal of stumps, roots, stacking of serviceable
1 2.1 material with all lifts and up to a lead of 1000 mtrs and
earth filling in the depression/pit as per Technical
Specification relevant clauses of Section-200.

(a) Girth from 300 mm to 600 mm Each 2,408.00 193.00 464,744.00


(b) Girth beyond 600 mm to 900 mm Each 1,806.00 348.00 628,488.00
(c) Girth beyond 900 mm to 1800 mm Each 1,204.00 671.00 807,884.00
(d) Girth beyond 1800 mm Each 602.00 1267.00 762,734.00
Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut
earlier and disposal of unserviceable materials and
2 2.2
stacking of serviceable material to be used or auctioned
up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in
thickness.

(a) In area of light jungle Hectare 141.50 39368.00 5,570,375.16

Dismantling of existing structures like culverts, bridges,


retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
3 2.3 sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 metres. as per
relevant clause of Technical Specifications Section 200
including salvage value of dismantelled material.

(a) Lime Concrete, cement concrete grade M-10 and below Cum 118.40 290.00 34,336.00
(b) Cement Concrete Grade M-15 & M-20 Cum 8,660.46 342.00 2,961,877.32
Prestressed / Reinforced cement concrete grade M-20 &
(c) Cum 881.26 886.00 780,797.25
above
(d) Brick Masonary In cement mortar Cum - 239.00 -
(e) Dry rubble stone masonry Cum 2,938.00 176.00 517,088.35
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 125.10 135.00 16,888.50
ii) Diameter beyond 600 mm to 900 mm Meter 2,262.20 183.00 413,982.60
iii) Diameter over 900 mm Meter 314.50 312.00 98,124.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
Dismantling of kilometre stone including cutting of
4 2.9 earth, foundation and disposal of dismantled material
with all lifts and lead upto 1000 m and back filling of pit.

(a) 5th KM stone Each 19.00 277.00 5,263.00


(b) Ordinary KM Stone Each 87.00 167.00 14,529.00
(c) Hectometre Stone Each 440.00 33.00 14,520.00
(d) Boundary Stone Each 434.00 32.00 13,888.00
Dismantling of barbed wire fencing/ wire mesh fencing
including posts, foundation concrete, back filling of pit
by manual means including disposal of dismantled
5 2.10 material with all lifts andup to a lead of 1000 metres, Meter 10,632.00 37.00 393,384.00
stacking serviceable material and unserviceable
materials separately including salvage value of
dismantled material.
TOTAL AMOUNT SITE CLEARANCE 13,498,903.18

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
EARTH WORK
Excavation for roadwork in soil with hydraulic
excavator including cutting and loading in tippers,
trimming bottom and side slopes, in accordance with
6 3.3 requirements of lines, grades and cross sections, and Cum 575,684.06 45.00 25,905,782.48
transporting to the embankment location with all lifts
and lead upto 1000m as per relevent clauses of section-
300 of specification.
Excavation for roadway in ordinary rock with hydraulic
excavator including cutting and loading in tippers,
transporting to embankment site with in all lifts and
7 3.4 lead upto 1000 m, trimming bottom and side slopes in Cum 112,146.24 57.00 6,392,335.94
accordance with requirements of lines, grades and cross
sections as per relevent clauses of section-300 of
specification.
Excavation for roadway in hard rock with rock breakers
i/c breaking rock or by drilling, blasting and breaking,
trimming of bottom and side slopes in accordance with
8 3.5 requirements of lines, grades and cross sections, loading Cum 59,811.33 164.00 9,809,058.19
and disposal of cut road with all lifts and leads upto
1000 metres and as per relevent clauses of section-300
of specification.
Scarification of existing bituminous road surface to a
depth of 50 mm and disposal of scarified material with
9 3.9 Sqm 526,977.00 5.00 2,634,885.00
all lift and lead upto 1000 metres complete as per clause
of 501.8.3.2.
Construction of embankment with approved material
having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
10 3.10 Cum 1,551,956.7 144.00 223,481,769.40
required slope and compacting to meet requirement of
table 300-1, 300-2 and as per relevent clauses of
section-300.
Construction of embankment with approved materials
CBR>7 deposited at site from roadway cutting and
excavation from drain and foundation of other
11 3.11 Cum 345,410.43 65.00 22,451,678.15
structures graded and compacted to meet requirement
of table 300-1, 300-2 and as per relevent clauses of
section-300.
Construction of unlined surface drains of average cross
sectional area 0.40 sqm in soil to specified lines, grades,
levels and dimensions to the requirement of clause 301
12 3.13 Metre 173,008.00 41.00 7,093,328.00
and 309. Excavated material to be used in embankment
within a lead of 50 metres as per relevent clauses of
section-300.
TOTAL AMOUNT EARTHWORK 297,768,837.15

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
SUB-BASE, BASE-COURSE
Construction of granular sub-base by providing well
graded material like natural sand crushed gravel of
crushed stone having CBR>30, spreading in uniform
layers with motor grader on prepared surface, mixing
13 4.1 Cum 298,758.52 764.00 228,251,510.04
by mix in place method with rotavator or plant mix
method at OMC, and compacting with vibratory roller of
80 to 100 kM static weight to achieve the desired
density, complete as per clauses 401 of Specification.

Providing, laying, spreading and compacting graded


stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
14 4.11 tipper to site, laying in uniform layers with paver in sub- Cum 260,068.46 1261.00 327,946,325.54
base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
density in accordance to Table No. 400-12, 400-13 and
as per clause of section 406 of specifications.

Construction of Shoulders with approved


material/selected soil i/c excavation all lifts & leads i/c
grading to required slope & camber of 4% and
15 4.13 Cum
compacting using vibratory roller of 80 to 100 kN static
weight to meet requirement as per relevant clause of
400.
Hard Shoulders (CBR value >12) 91,780.22 181.00 16,612,220.18
Construction of median and Island above road level
with approved material brought from borrow pits,
16 4.15 Cum 4,500.00 136.00 612,000.00
spread, sloped and compacted as per clause 408 of
specification.
TOTAL AMOUNT BASE & SUB BASE 573,422,055.76

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
PAVEMENT
Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base with low
porosity (WMM or WBM) including clearing of road
17 5.1 Sqm. 1,003,733.01 32.00 32,119,456.48
surface and spraying primer at the rate of 0.75 kg/sqm
with pressure distributor and as per relevant clause of
Section-500.
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor on the
18 5.2 prepared bituminous / granular surface cleaned with
mechanical broom and as per relevant clauses of
Section-500.
@ 0.25 kg per sqm (normal bituminous surfaces) Sqm. 972,816.13 12.00 11,673,793.50
@ 0.30 kg per sqm (dry & hungry bituminous
Sqm. 1,003,733.01 14.00 14,052,262.21
surfaces/granular surfaces treated with primer)

Providing and laying dense bituminous macadam using


crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix
of mix and filler, transporting the hot mix to work site,
19 5.5 laying with a hydrostatic paver finisher with sensor Cum
control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per clause
505 of specification complete in all respects.

Using Batch Mix Plant of appropriate capacity and Paver


Finisher Hydraustatic with Sensor control.
(i) for Grading I(40 mm nominal size ) 89,538.64 6617.00 592,477,151.10
Providing and laying bituminous concrete using
crushed aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a
20 5.6 hydrostatic paver finisher with sensor control to the Cum
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per clause 507 of
specification.
Using Batch Mix Plant of appropriate capacity and Paver
a)
Finisher Hydraustatic with Sensor control.
for Grading I (50-65 mm thickness ) with
iii) 13,357.34 7797.00 104,147,211.17
PMB-40/NRMB
for Grading-II ( 30-45 mm thickness ) with
vi) 28,226.77 7785.00 219,745,404.45
PMB-40/NRMB

Construction of dry lean cement concrete Sub- base


over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm aggregate cement ratio
not to exceed 15:1, aggregate gradation after blending
to be as per table 600-1, cement content not to be less
21 6.1 than 150 kg/ cum, optimum moisture content to be Cum 21,597.00 2199.00 47,491,803.00
determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed in a
batching plant, transported to site, laid with a paver
with electronic sensor, compacting with 8- 10 tonnes
vibratory roller, finishing and curing as per clause 601
of specification complete in all respect.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.

Construction of un-reinforced, dowel jointed, plain


cement concrete pavement M-40 grade concrete over a
prepared sub base with cement , coarse and fine
aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a
batching and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form
paver, spread, compacted and finished in a continuous
22 6.3 Cum 40,035.00 5153.00 206,300,355.00
operation including provision of contraction, expansion,
construction and longitudinal joints, joint filler,
separation membrane, sealant primer, joint sealant,
debonding strip, admixtures as approved, curing
compound, finishing to lines and grades as per drawing
as per IRC 15 2011 and as per relevant clauses of
section 602 of specifications complete but excluding
cost of steel in dowel bar and tie rods etc.

Providing and laying Conventional white Topping as per


IRC:SP:76-2015 Over bituminous surface (Existing
bituminous surface prepared if necessary, either by
milling or leveling course to be done with
BM/DBM/DLC to correct surface profile and to be paid
separately) as Cement Concrete Pavement, Construction
of un-reinforced, dowel Jointed, plain cement concrete
pavement M-40 grade concrete over a prepared sub
base, coarse and fine aggregate conforming to IS 383,
maximum size of coarse aggregate not exceeding 31.5
23 6.18 Cum 6,823.70 5006.00 34,159,442.20
mm, mixed in a batching and mixing plant as per
approved mix design, transported to site, laid with a slip
form paver, spread, compacted and finished, in a
continuous operation including provision of expansion
Joint, construction joint, separation membrane,
admixtures as approved, curing compound, finishing to
lines and grades as per drawing as per IRÇ 15 2017 and
as per relevant clauses of MORTH&H Specifications of
section 600 complete but excluding cost of steel in
dowel bar and tie rods etc complete.

Add extra in Item No.6.3, 6.4, 6.6 & 6.10 above for the
cost of steel in dowel bar and tie rod including craddle,
24 6.12 laps etc. Complete required as per design.

i) Mild steel MT 487.38 54837.00 26,726,676.41


ii) Tor steel MT 28.70 56083.00 1,609,413.85

Providing and laying factory made coloured chamfered


edge Cement Concrete paver blocks of required
strength, thickness and size/shape, made by table
vibratory method using PU mould, laid in required
colour and pattern over 50mm thick compacted bed of
stone dust, compacting and proper embedding/laying of
25 6.16 inter locking paver blocks into the bedding layer Sqm.
through vibratory compaction by using plate vibrator,
filling the joints with sand and cutting of paver blocks as
per required size and pattern, finishing and sweeping
extra sand including locking edges with M 15 cement
concrete in footpath, light traffic parking etc. complete
as per direction of Engineer-in-Charge.

80mm thick C.C. paver block of M-35 grade with


(ii) 30,644.00 680.00 20,837,920.00
approved colour, design and pattern.
Plain/Reinforced cement concrete in sub-structure
26 13.6
complete as per drawing and technical specifications
i) PCC Grade M20 Cum 3,608.20 5396.00 19,469,847.20
Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
TOTAL AMOUNT PAVEMENT 1,330,810,736.57

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
TRAFFIC SIGNS, MARKINGS AND ROAD
APPURTENANCES
Construction of cement concrete kerb with channel with
top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M10 grade
foundation 150 mm thick, kerb channel 300 mm wide,
27 8.2 metre 29,794.00 387.00 11,530,278.00
50 mm thick in PCC M20 grade, sloped towards the
kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all
complete as per clause 409

Providing and fixing of retro-reflectorised cautionary,


mandatory and informatory sign board as per IRC 67-
2010 made of high intensity Micro-Prismatic Grade
Sheeting (TypeIV) vide clause 801.3.3 fixed over
Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE)
between two thick skins/sheets of aluminium with
overall thickness of 4mm and aluminium skin of
thickness 0.3 on both side, the ACM shall conform to
Table 800-1 of specification and High Intensity Micro
28 8.3 Prismatck Grade Sheeting shall conform to Table 800-3
of specification. The printing on the high intensity grade
sheeting shall conform to Clause 801.3.7 with water
based latex optimized transparent ink as specified by
the sheeting manufacturer, supported on composite
sign post of size 5mmx 33.55mmx34.99 mm (5mm
thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of
properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the
post with four minimum four number breakaway bolts.

i) 90 cm equilateral triangle Each 758.00 3291.00 2,494,578.00


iii) 60 cm circular Each 152.00 2962.00 450,224.00
iv) 80 cm x 60 cm rectangular Each 120.00 3928.00 471,360.00
v) 60 cm x 45 cm rectangular Each 6,620.00 2899.00 19,191,380.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.

Direction and Place Identification signs upto 0.9


sqm size board.
Providing and erecting direction and place
identification retroreflectorised sign asper IRC:67 made
of high intensity Micro-Prismatic Grade cube corner
Sheeting (Type XI) vide IRC:67:2012 clause 6.7.4.3 &
clause 801.3.4.3 fixed over Aluminium composite
material sheet with thermoplastic core of Low density
polyethylene (LDPE) between two thick skins/sheets of
aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM
shall conform to Table 6.1 of IRC:67:2012 & table 800-1
of specification and High Intensity Micro Prismatck
Grade cube corner Sheeting shall conform to Table 6.9
29 8.6 Sqm 154.80 6479.00 1,002,949.20
of IRC:67:2012 & Table 800-6 of specification. In line
with clause Table 6.8 of IRC:67:2012 and clause 801.3.7
of specification for directinal information, place
identification and other sign boared. The printing on the
high intensity grade sheeting shall conform to Clause
801.3.7 with water based latex optimized transparent
ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium
composite material in accordance to IRC 67-2010 fixed
to ground by means of properly designed foundation
with M15 grade concrete 450x450x600mm The ACM
sheet shall be fixed to the post with minimum two
number breakaway bolts.

Direction and Place Identification signs with size


more than 0.9 sqm size board.
Providing and erecting direction and place
identification retroreflectorised sign asper IRC:67 made
of high intensity Micro-Prismatic Grade cube corner
Sheeting (Type XI) vide IRC:67:2012 clause 6.7.4.3 &
clause 801.3.4.3 fixed over Aluminium composite
material sheet with thermoplastic core of Low density
polyethylene (LDPE) between two thick skins/sheets of
aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM
shall conform to Table 6.1 of IRC:67:2012 & table 800-1
of specification and High Intensity Micro Prismatck
Grade cube corner Sheeting shall conform to Table 6.9
30 8.8 Sqm 15.12 11441.00 172,987.92
of IRC:67:2012 & Table 800-6 of specification. In line
with clause Table 6.8 of IRC:67:2012 and clause 801.3.7
of specification for directinal information, place
identification and other sign boared. The printing on the
high intensity grade sheeting shall conform to Clause
801.3.7 with water based latex optimized transparent
ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium
composite material in accordance to IRC 67-2010 fixed
to ground by means of properly designed foundation
with M15 grade concrete 450x450x600mm The ACM
sheet shall be fixed to the post with minimum two
number breakaway bolts.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
Supply and fixing tubular gantry mounted
Overhead/cantilever signs. All components of signs &
supports, other than the reflective portion shall be
MPRDC thoroughly descaled, cleaned, primed and painted with
Approved two coats of epoxy paints. The sign back side shall be
31
Rate in with grey colour and post shall be in black & white
ADB-V alternate bands. The post below ground shall be
painted with three coats of red lead paint. The sign
shall be made as per IRC-67-2012 and Technical
Specification Section 800.

Erection of overhead gantry/cantilever structure as per


drawing including steel work in trusses, steel tubes
cutting, fixing in position with welding and bolted
i) tonnes 16.11 74636.00 1,202,385.96
complete in all respect and type as per structural design
requirements and approved plans including cost of
excavation, concerte and steel for foundations.

The sign board made out of 2 mm thick alluminium


sheet, face to be fully covered by high intensity grade
white retro reflective sheeting of encapsulated lens
type. The background/border/simples /legend/arrows
shall be made by transparent overlay film of desired
colour as per sign details except those in black which
ii) Sqm 199.10 7679.00 1,528,865.86
shall be of non reflective type. The sign place shall be
fixed with 6 mm dia alluminium rebate on MS angle iron
frame. The angle iron frame shall be made with angle of
size 75 mm x 75 mm x 6 mm with additional bracing at
every 600 mm c/c, if any dimension in more than 1200
mm.
Providing and laying of hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass
beads @ 250 gms per sqm area, thickness of 2.5 mm is
32 8.15 exclusive of surface applied glass beads as per Sqm 46,202.55 516.00 23,840,515.80
IRC:35 .The finished surface to be level, uniform and
free from streaks and holes all complete as per clause
803 of specifications.

Providing reinforced cement concrete M15 grade


kilometre stone of standard design as per IRC:8-1980,
33 8.16
fixing in position including painting and printing etc as
per relevant clauses of Section-800 of specifications.

i) 5th kilometre stone (precast) Each 22.00 2791.00 61,402.00


ii) Ordinary Kilometer stone (Precast) Each 90.00 1681.00 151,290.00
iii) Hectometer stone (Precast) Each 446.00 495.00 220,770.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.

Road Delineators (Supplying and installation of


delineators (road way indicators, hazard markers,
object markers), 80-100 cm high above ground level,
painted black and white in 15 cm wide stripes, fitted
34 8.17 Each 4,849.00 1248.00 6,051,552.00
with 80 x 100 mm rectangular or 75 mm dia circular
reflectorised panels at the top, buried or pressed into
the ground and confirming to IRC-79 and the drawings
as per relevant clauses of section-800 of specifications.

Reinforced cement concrete M15 grade boundary


pillars of standard design as per IRC:25-1967, fixed in
35 8.18 Each 892.00 448.00 399,616.00
position including finishing and lettering but excluding
painting.
36 8.25 Metal Beam Crash Barrier

Type - A, "W" : Metal Beam Crash Barrier (Providing and


erecting a "W" metal beam crash barrier comprising of
3 mm thick corrugated sheet metal beam rail, 70 cm
above road/ground level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm spaced 2 m centre to
(a) centre, 1.8 m high, 1.1 m below ground/road level, all meter 9,755.00 3406.00 33,225,530.00
steel parts and fitments to be galvanised by hot dip
process, all fittings to conform to IS:1367 and IS:1364,
metal beam rail to be fixed on the vertical post with a
spacer of channel Section 150 x 75 x 5 mm, 330 mm
long complete as per clause 810 of specifications.

Providing and laying of a reinforced cement concrete


pipe duct, 300 mm dia, across the road (new
construction), extending from drain to drain in cuts and
toe of slope to toe of slope in fills, constructing head
walls at both ends, providing a minimum fill of granular
material over top and sides of RCC pipe as per IRC:98-
37 8.27 1997, bedded on a 0.3 m thick layer of granular material
free of rock pieces, outer to outer distance of pipe at
least half dia of pipe subject to minimum 450 mm in
case of double and triple row ducts, joints to be made
leak proof, invert level of duct to be above higher than
ground level to prevent entry of water and dirt, all as
per IRC: 98 - 1997 and approved drawings.

(a) Single Row for one utility service metre 6,884.00 1456.00 10,023,104.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
Road Markers/Road Stud with Lense Reflector
(Providing and fixing of road stud 100x 100 mm, die
cast in aluminium, resistant to corrosive effect of salt
and grit, fitted with lense reflectors, installed in
38 8.28 Each 34,025.00 448.00 15,243,200.00
concrete or asphaltic surface by drilling hole 30 mm
upto a depth of 60 mm and bedded in a suitable
bituminous grout or epoxy mortar, all as per BS 873
part 4:1973).
Providing and fixing guard stones 220x220x1000mm
made of hammer dressed stones and fixed 400mm into
the ground in moorum and broken aggregates block of
39 8.34 Each 6,401.00 298.00 1,907,498.00
size 500x500x500 mm and given two coats of paints
with white and black bands i/c excavation etc.
complete.
Providing and erecting street light mounted on a steel
42.3, 42.14, tubular pole swaged type as per IS:2713-1980 Complete
& 31.9.3 with base plate and top Canopy for street lighting, 10m
40 SOR of highfrom road surface and with 2.0 m overhang. Poles Each 605.00 41275.00 24971375.00
Electrical on both sides spaced at 50 m c/c , fitted with sodium
Work vapour lamp of 250 watts and fixed firmly in concrete
foundation.
TOTAL AMOUNT TRAFFIC SIGNS, MARKINGS AND
154,140,861.74
ROAD APPURTENANCES
RCC COVER DRAIN & RCC OPEN DRAIN
Earth work in excavation of foundation of structures as
per drawing and technical specification, including
setting out, construction of shoring and bracing,
41 12.1 removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with
approved material. as per relevant clauses of section
300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum 31,977.97 52.00 1,662,854.44
Providing Plain cement concrete M-15 nominal mix in
42 12.3 foundation as per relevant clauses of sections 1500, Cum 5,880.75 4299.00 25,281,335.65
1700 and 2100.
Plain/Reinforced cement concrete in sub-structure
43 13.6
complete as per drawing and technical specifications
i) RCC Grade M25 Cum 18,630.70 5972.00 111,262,540.40
Supplying, fitting and placing HYSD bar reinforcement
in substructure complete as per drawing and technical
44 13.7 MT 931.54 66217.00 61,683,453.10
specifications and as per relevant clause of section
1600.
TOTAL AMOUNT RCC COVER DRAIN & RCC OPEN
199,890,183.59
DRAIN

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
RCC TOE WALL & RETAINING WALL
Earth work in excavation of foundation of structures as
per drawing and technical specification, including
setting out, construction of shoring and bracing,
45 12.1 removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with
approved material. as per relevant clauses of section
300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum 47,125.92 52.00 2,450,548.10
Providing Plain cement concrete M-15 nominal mix in
46 12.3 foundation as per relevant clauses of sections 1500, Cum 2,834.93 4299.00 12,187,342.58
1700 and 2100.
Provdiing and laying Plain/Reinforced cement concrete
in open foundation including form work shuttering etc.
47 12.8 complete as per drawing and technical specifications
and as per relevant clauses of sections 1500, 1700 &
2100 with.
i) RCC Grade M25 Cum 1,572.50 5324.00 8,371,990.00
ii) RCC Grade M30 Cum 8,180.13 5337.00 43,657,332.46
Supplying, fitting and placing un-coated HYSD bar
reinforcement in foundation complete as per drawing
48 12.31 MT 733.04 66069.00 48,430,889.42
and technical specifications and as per relevant clauses
of section 1600.
Plain/Reinforced cement concrete in sub-structure
49 13.6
complete as per drawing and technical specifications
i) PCC Grade M20 Cum 1,512.61 5396.00 8,162,065.14
ii) RCC Grade M25 Cum 1,676.40 5972.00 10,011,460.80
iii) RCC Grade M30 Cum 14,232.99 5999.00 85,383,701.01
Supplying, fitting and placing HYSD bar reinforcement
in substructure complete as per drawing and technical
50 13.7 MT 1,222.46 66217.00 80,947,567.60
specifications and as per relevant clause of section
1600.
18 14.16 Filler Joint
Providing & fixing 20 mm thick compressible fibre
ii) board in expansion joint complete as per drawing & meter 651.86 377.00 245,750.14
Technical Specification.
Providing weep holes in Brick masonry/Plain
/Reinforced concrete abutment, wing wall/return wall
with 100 mm dia AC/PVC pipe, extending through the
51 13.9 RM 14,679.85 173.00 2,539,614.05
full width of the structure with slope of 1V :20H
towards drawing foce. Complete as per drawing and
Technical specifications
Providing and laying of Filter media with granular
materials/stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2 of MoRTH
specifications to a thickness of not less than 600 mm
52 13.11 with smaller size towards the soil and bigger size Cum 22,114.97 1117.00 24,702,422.61
towards the wall and provided over the entire surface
behind abutment, wing wall and return wall to the full
height compacted to a firm condition complete as per
drawing and technical specification.

TOTAL AMOUNT RCC TOE WALL & RETAINING WALL 327,090,683.91

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
JUNCTION IMPROVEMENT
Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut
earlier and disposal of unserviceable materials and
53 2.2
stacking of serviceable material to be used or auctioned
up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in
thickness.
(a) In area of light jungle Ha 3.16 39368.00 124,402.88
Excavation for roadwork in soil with hydraulic
excavator including cutting and loading in tippers,
trimming bottom and side slopes, in accordance with
54 3.3 requirements of lines, grades and cross sections, and Cum 12,375.00 45.00 556,875.00
transporting to the embankment location with all lifts
and lead upto 1000m as per relevent clauses of section-
300 of specification.
Scarification of existing bituminous road surface to a
depth of 50 mm and disposal of scarified material with
55 3.9 Sqm 21,682.50 5.00 108,412.50
all lift and lead upto 1000 metres complete as per clause
of 501.8.3.2.
Construction of embankment with approved material
having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
56 3.10 Cum 64,374.0 144.00 9,269,861.76
required slope and compacting to meet requirement of
table 300-1, 300-2 and as per relevent clauses of
section-300.

Construction of granular sub-base by providing well


graded material like natural sand crushed gravel of
crushed stone having CBR>30, spreading in uniform
layers with motor grader on prepared surface, mixing
57 4.1 Cum 15,340.23 764.00 11,719,935.72
by mix in place method with rotavator or plant mix
method at OMC, and compacting with vibratory roller of
80 to 100 kM static weight to achieve the desired
density, complete as per clauses 401 of Specification.

Providing, laying, spreading and compacting graded


stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
58 4.11 tipper to site, laying in uniform layers with paver in sub- Cum 12,498.24 1261.00 15,760,280.64
base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
density in accordance to Table No. 400-12, 400-13 and
as per clause of section 406 of specifications.

Construction of Shoulders with approved


material/selected soil i/c excavation all lifts & leads i/c
grading to required slope & camber of 4% and
59 4.13 Cum
compacting using vibratory roller of 80 to 100 kN static
weight to meet requirement as per relevant clause of
400.
Hard Shoulders (CBR value >12) 5,772.75 181.00 1,044,867.75
Construction of median and Island above road level
with approved material brought from borrow pits,
60 4.15 Cum 1,054.80 136.00 143,452.80
spread, sloped and compacted as per clause 408 of
specification.
Construction of footpath/ separator by providing a 150
mm compacted granular sub base as per clause 401 and
25 mm thick cement concrete grade M15, over laid with
61 4.17 Sqm. 2,109.60 431.00 909,237.60
precast concrete tiles in cement mortar 1:3 including
provision of all drainage arrangements but excluding
kerb channel.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base with low
porosity (WMM or WBM) including clearing of road
62 5.1 Sqm. 69,321.97 32.00 2,218,303.04
surface and spraying primer at the rate of 0.75 kg/sqm
with pressure distributor and as per relevant clause of
Section-500.
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor on the
63 5.2 prepared bituminous / granular surface cleaned with
mechanical broom and as per relevant clauses of
Section-500.
@ 0.25 kg per sqm (normal bituminous surfaces) Sqm. 68,572.09 12.00 822,865.08
@ 0.30 kg per sqm (dry & hungry bituminous
Sqm. 69,321.97 14.00 970,507.58
surfaces/granular surfaces treated with primer)

Providing and laying dense bituminous macadam using


crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix
of mix and filler, transporting the hot mix to work site,
64 5.5 laying with a hydrostatic paver finisher with sensor Cum
control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per clause
505 of specification complete in all respects.

Using Batch Mix Plant of appropriate capacity and Paver


Finisher Hydraustatic with Sensor control.
(i) for Grading II (19 mm nominal size) 3,842.90 6640.00 25,516,856.00
Providing and laying bituminous concrete using
crushed aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a
65 5.6 hydrostatic paver finisher with sensor control to the Cum
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per clause 507 of
specification.
Using Batch Mix Plant of appropriate capacity and Paver
i)
Finisher Hydraustatic with Sensor control.
for Grading-II ( 30-45 mm thickness ) with 60/70
a) 2,264.47 7669.00 17,366,220.43
bitumen(VG-30)
Construction of cement concrete kerb with channel with
top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M10 grade
foundation 150 mm thick, kerb channel 300 mm wide,
66 8.2 metre 2,891.24 387.00 1,118,909.88
50 mm thick in PCC M20 grade, sloped towards the
kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all
complete as per clause 409

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.

Providing and fixing of retro-reflectorised cautionary,


mandatory and informatory sign board as per IRC 67-
2010 made of high intensity Micro-Prismatic Grade
Sheeting (TypeIV) vide clause 801.3.3 fixed over
Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE)
between two thick skins/sheets of aluminium with
overall thickness of 4mm and aluminium skin of
thickness 0.3 on both side, the ACM shall conform to
Table 800-1 of specification and High Intensity Micro
67 8.3 Prismatck Grade Sheeting shall conform to Table 800-3
of specification. The printing on the high intensity grade
sheeting shall conform to Clause 801.3.7 with water
based latex optimized transparent ink as specified by
the sheeting manufacturer, supported on composite
sign post of size 5mmx 33.55mmx34.99 mm (5mm
thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of
properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the
post with four minimum four number breakaway bolts.

i) 90 cm equilateral triangle Each 8.00 3291.00 26,328.00


ii) 60 cm equilateral triangle Each 44.00 2340.00 102,960.00
iii) 60 cm circular Each 24.00 2962.00 71,088.00
iv) 90 cm high octagon Each 69.00 4869.00 335,961.00

Direction and Place Identification signs upto 0.9


sqm size board.
Providing and erecting direction and place
identification retroreflectorised sign asper IRC:67 made
of high intensity Micro-Prismatic Grade cube corner
Sheeting (Type XI) vide IRC:67:2012 clause 6.7.4.3 &
clause 801.3.4.3 fixed over Aluminium composite
material sheet with thermoplastic core of Low density
polyethylene (LDPE) between two thick skins/sheets of
aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM
shall conform to Table 6.1 of IRC:67:2012 & table 800-1
of specification and High Intensity Micro Prismatck
Grade cube corner Sheeting shall conform to Table 6.9
68 8.6 Sqm 98.10 6479.00 635,589.90
of IRC:67:2012 & Table 800-6 of specification. In line
with clause Table 6.8 of IRC:67:2012 and clause 801.3.7
of specification for directinal information, place
identification and other sign boared. The printing on the
high intensity grade sheeting shall conform to Clause
801.3.7 with water based latex optimized transparent
ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium
composite material in accordance to IRC 67-2010 fixed
to ground by means of properly designed foundation
with M15 grade concrete 450x450x600mm The ACM
sheet shall be fixed to the post with minimum two
number breakaway bolts.

Providing and laying of hot applied thermoplastic


compound 2.5 mm thick including reflectorising glass
beads @ 250 gms per sqm area, thickness of 2.5 mm is
69 8.15 exclusive of surface applied glass beads as per Sqm 3,282.84 516.00 1,693,945.44
IRC:35 .The finished surface to be level, uniform and
free from streaks and holes all complete as per clause
803 of specifications.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.

Road Delineators (Supplying and installation of


delineators (road way indicators, hazard markers,
object markers), 80-100 cm high above ground level,
painted black and white in 15 cm wide stripes, fitted
70 8.17 Each 2,560.00 1248.00 3,194,880.00
with 80 x 100 mm rectangular or 75 mm dia circular
reflectorised panels at the top, buried or pressed into
the ground and confirming to IRC-79 and the drawings
as per relevant clauses of section-800 of specifications.

Road Markers/Road Stud with Lense Reflector


(Providing and fixing of road stud 100x 100 mm, die
cast in aluminium, resistant to corrosive effect of salt
and grit, fitted with lense reflectors, installed in
71 8.28 Each 4,360.00 448.00 1,953,280.00
concrete or asphaltic surface by drilling hole 30 mm
upto a depth of 60 mm and bedded in a suitable
bituminous grout or epoxy mortar, all as per BS 873
part 4:1973).
galvanized materials as per BSEN ISO 1461 thickness 3
mm & 4 mm, dia 150mm & 410mm for top and bottom
respectively, stress fitting arrangement on site with
500mm overlap dynamic loading to withstand max
wind pressure as per -IS 875 part III, parameters for
structural & foundation design must be taken from
Wind Tunnel test. Lightning protection of GI single spike
1200mm at top and at base inside compartment having
double thickness 3 mm & 4 mm, dia 150mm & 410mm
for top and bottom respectively, stress fitting
arrangement on site with 500mm overlap dynamic
loading to withstand max wind pressure as per -IS 875
part III, parameters for structural & foundation design
must be taken from Wind Tunnel test. Lightning
protection of GI single spike 1200mm at top and at base
42.92 of
inside compartment having double internal lock with
72 Electrical Nos. 8.00 516348.00 4,130,784.00
adequate size of MCB erected on PVC board complete
SOR 2014
with base plate of 25mm thick 570mm dia. and
foundation bolts having 8 nos. bolts of 30mm dia 850
mm long (EN.8 grade) Anchor plate 490 PCD, including
accessories viz.(1) Lantern carriage of 50 NB ERW class-
B ,MS pipe covered with PVC sleeve suitable to carry
500kg. load and up to 10 fittings symmetrically.(2)
Trailing Copper cable 5x4.0 sq.mm, PVC insulated PVC
Sheathed (3) Double Drum 750Kg Winch having gear
53:1, oil bath (SAE90/140) arrangement (4) 2 nos.
Stainless steel wire ropes 6 mm dia (7/19) breaking
load capacity 2350 kg.x 2,(5) Integral power tool 3-
phase, 1HP 2m/min single speed .torque limiter up to
500 kg adjustable (6) 2 Nos. LED 300 Nos. aviation light
(7) Feeder pillar fabricated out of 14 SWG CRCA sheet
and comprise of incoming MCB 63 A TPN switch, HRC
TOTAL AMOUNT JUNCTION IMPROVEMENT 99,795,805.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Abstract
Item SOR Item
Item Unit Quantity Rate (Rs.) Amount
No. No.
MISCELLANEOUS
73 11.2 Planting of trees by the road side (Avenue trees) in 0.60
m dia holes, 1 m deep dug in the ground, mixing the soil
with decayed farm yard/sludge mannure, planting the
saplings, backfilling the trench, watering, and Each 2,654.00 570.00 1,512,780.00
maintaining the plants for
one year.

74 11.3 Half brick circular tree guard, in 2nd class brick,


internal diametre 1.25 metres, and height 1.2 metres,
above ground and 0.20 metre below ground, bottom
two courses laid dry, and top three courses in cement Each 2,654.00 1940.00 5,148,760.00
mortar 1:6 ( 1 cement 6 sand) and the intermediate
courses being in dry honey comb masonry, as per
design complete.
75 Providing rain water harvesting arrangement as shown
in drawing with all materials etc., with all lifts and leads Each 53.00 30000.00 1,590,000.00
complete as directed by the engineer
TOTAL AMOUNT MISCELLANEOUS 8,251,540.00
TOTAL AMOUNT OF ROAD WORK 2,804,779,423.32
EMP COST
75 11.2 Planting of trees by the road side (Avenue trees) in 0.60
m dia holes, 1 m deep dug in the ground, mixing the soil
with decayed farm yard/sludge mannure, planting the
saplings, backfilling the trench, watering, and Each 12,042.00 570.00 6,863,940.00
maintaining the plants for
one year.
TOTAL AMOUNT EMP COST 6,863,940.00

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
SITE CLEARANCE
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts
1 and up to a lead of 1000 mtrs and earth filling in the depression/pit as per Technical Specification relevant clauses of Section-
200.
(a) Girth from 300 mm to 600 mm Each 2408 2,408.000
(b) Girth beyond 600 mm to 900 mm Each 1806 1,806.000
(c) Girth beyond 900 mm to 1800 mm Each 1204 1,204.000
(d) Girth beyond 1800 mm Each 602 602.000
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be
2
used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in
thickness.
(a) In area of light jungle Hectare
Homogeneous Section-1
TCS-I 2 3,067.00 1.000 0.613
TCS-II-A 1 14,107.00 13.940 19.665
TCS-II-B 1 2,250.00 13.940 3.137
TCS-II-C 1 650.00 13.940 0.906
TCS-II-D 1 1,125.00 13.940 1.568
TCS-II-E 1 795.00 13.940 1.108
TCS-III 1 5,350.00 3.500 1.873
TCS-V-A 1 1,665.00 20.000 3.330
TCS-VI-A 1 1,230.00 6.500 0.800
TCS-VI-B 1 1,080.00 6.500 0.702
TCS-VI-C 1 1,715.00 6.500 1.115
TCS-VI-D 1 560.00 6.500 0.364
TCS-VI-E 1 430.00 6.500 0.280
TCS-VI-F 1 200.00 6.500 0.130
Marging & Diverging Transition 2 67.50 2.250 0.015
Extra Widening 1 8,925.00 1.000 0.893
Homogeneous Section-2
TCS-II-F 1 42,665.00 13.800 58.878
TCS-II-G 1 7,867.00 13.800 10.856
TCS-II-H 1 5,710.00 13.800 7.880
TCS-II-I 1 1,050.00 13.800 1.449
TCS-II-J 1 650.00 13.800 0.897
TCS-V-B 1 7,270.00 20.000 14.540
TCS-V-C 1 700.00 20.000 1.400
TCS-VI-G 1 1,270.00 6.500 0.826
TCS-VI-H 1 230.00 6.500 0.150
TCS-VI-I 1 350.00 6.500 0.228
TCS-VI-J 1 150.00 6.500 0.098
TCS-VI-K 1 350.00 6.500 0.228
TCS-VI-L 1 550.00 6.500 0.358
TCS-VII 2 330.00 3.900 0.257
TCS-IX 2 4,850.00 5.000 4.850
TCS-X 2 1,150.00 1.500 0.345

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 0.158
(from 16.50 to 7.50 m) 2 135.00 4.500 0.061
(from 10.0 to 7.50 m) 2 37.50 1.250 0.005
Extra Widening 1 16,665.00 0.700 1.167
Bus Stop / Lay Bay 27 15.00 3.000 0.122
54 30.00 1.500 0.243
Total 141.495
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
3
unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. as per relevant clause of
Technical Specifications Section 200 including salvage value of dismantelled material.
(a) Lime Concrete, cement concrete grade M-10 and below cum 118.400
(b) Cement Concrete Grade M-15 & M-20 cum 8,660.460
(c) Prestressed / Reinforced cement concrete grade M-20 & above cum 881.261
(d) Brick Masonary In cement mortar cum -
(e) Dry rubble stone masonry cum 2,938.002
(f) Hume pipe of any class
i) Diameter up to 600 mm Meter 125.100
ii) Diameter beyond 600 mm to 900 mm Meter 2,262.200
iii) Diameter over 900 mm Meter 314.500
Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead
4
upto 1000 m and back filling of pit.
(a) 5th KM stone Each 19 19.000
(b) Ordinary KM Stone Each 87 87.000
(c) Hectometre Stone Each 440 440.000
(d) Boundary Stone Each 434 434.000
Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means
5 including disposal of dismantled material with all lifts andup to a lead of 1000 metres, stacking serviceable material and metre 1 10,632.00 10632.000
unserviceable materials separately including salvage value of dismantled material.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
EARTH WORK
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
6 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with cum 575,684.055
all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Excavation for roadway in ordinary rock with hydraulic excavator including cutting and loading in tippers, transporting to
7 embankment site with in all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of cum 112,146.245
lines, grades and cross sections as per relevent clauses of section-300 of specification.
Excavation for roadway in hard rock with rock breakers i/c breaking rock or by drilling, blasting and breaking, trimming of
8 bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road cum 59,811.330
with all lifts and leads upto 1000 metres and as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and lead upto
9 Sqm 1 95,814.00 5.50 526977.000
1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
10 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per
relevent clauses of section-300.
(a) For embankment cum
Fill as per Qty sheet by MX Road 1,474,575.000
Less Qty of Item No. 10 -345,410.433
(b) For sub grade layer cum
Homogeneous Section-1
TCS-II-A 2 14,107.00 3.470 0.500 48951.290
TCS-II-B 1 2,250.00 15.440 0.500 17370.000
TCS-II-D 2 1,125.00 3.470 0.500 3903.750
TCS-II-E 2 795.00 3.470 0.500 2758.650
TCS-III 2 5,350.00 1.75 0.500 9362.500
TCS-V-A 1 1,665.00 15.440 0.500 12853.800
TCS-VI-B 1 1,080.00 4.00 0.500 2160.000
TCS-VI-D 1 560.00 4.00 0.500 1120.000
TCS-VI-F 1 200.00 11.00 0.500 1100.000
Marging & Diverging Transition 4 67.50 2.25 0.500 151.875
Extra Widening 2 8,925.00 1.00 0.500 8925.000

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Homogeneous Section-2
TCS-II-F 2 42,665.00 3.400 0.500 145061.000
TCS-II-G 1 7,867.00 15.300 0.500 60182.550
TCS-II-I 2 1,050.00 3.400 0.500 3570.000
TCS-II-J 2 650.00 3.400 0.500 2210.000
TCS-V-B 1 7,270.00 15.300 0.500 55615.500
TCS-VI-H 1 230.00 4.00 0.500 460.000
TCS-VI-J 1 150.00 4.00 0.500 300.000
TCS-VI-K 1 350.00 11.00 0.500 1925.000
TCS-VII 2 330.00 3.90 0.500 1287.000
TCS-IX 2 4,850.00 5.00 0.500 24250.000
TCS-X 2 1,150.00 1.50 0.500 1725.000
Marging & Diverging Transition
(from 16.50 to 10 m) 20 97.50 3.25 0.500 1584.375
(from 16.50 to 7.50 m) 4 135.00 4.50 0.500 607.500
(from 10.0 to 7.50 m) 4 37.50 1.25 0.500 46.875
Extra Widening 2 16,665.00 0.70 0.500 11665.500
Bus Stop / Lay Bay 54 15.00 3.00 0.500 1215.000
108 30.00 1.50 0.500 2430.000
Total 1,551,956.732
Construction of embankment with approved materials CBR>7 deposited at site from roadway cutting and excavation from drain
11 and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevent clauses cum 345,410.433
of section-300. (Cutting Qty utilised 60%)
Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and
12 dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres Metre
as per relevent clauses of section-300.
2 86,504.00 173008.000
Total 173,008.000

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
SUB-BASE, BASE-COURSE
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone having
CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or
13 cum
plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the desired density,
complete as perSection-1
Homogeneous clauses 401 of Specification.
TCS-I 2 3,067.00 1.000 0.200 1226.800
TCS-II-A 1 14,107.00 14.040 0.200 39612.456
TCS-II-B 1 2,250.00 14.040 0.200 6318.000
TCS-II-C 1 650.00 14.040 0.200 1825.200
TCS-II-D 1 1,125.00 14.040 0.200 3159.000
TCS-II-E 1 795.00 14.040 0.200 2232.360
TCS-III 1 5,350.00 12.00 0.200 12840.000
TCS-V-A 1 1,665.00 14.040 0.200 4675.320
TCS-VI-A 1 1,230.00 11.000 0.200 2706.000
TCS-VI-B 1 1,080.00 11.000 0.200 2376.000
TCS-VI-C 1 1,715.00 11.000 0.200 3773.000
TCS-VI-D 1 560.00 11.000 0.200 1232.000
TCS-VI-E 1 430.00 12.000 0.200 1032.000
TCS-VI-F 1 200.00 11.000 0.200 440.000
Marging & Diverging Transition 2 67.50 2.25 0.200 30.375
Extra Widening 1 8,925.00 1.00 0.200 1785.000
Homogeneous Section-2
TCS-II-F 1 42,665.00 13.900 0.200 118608.700
TCS-II-G 1 7,867.00 13.900 0.200 21870.260
TCS-II-H 1 5,710.00 13.900 0.200 15873.800
TCS-II-I 1 1,050.00 13.900 0.200 2919.000
TCS-II-J 1 650.00 13.900 0.200 1807.000
TCS-V-B 1 7,270.00 13.900 0.200 20210.600
TCS-V-C 1 700.00 13.900 0.200 1946.000
TCS-VI-G 1 1,270.00 11.000 0.200 2794.000
TCS-VI-H 1 230.00 11.000 0.200 506.000
TCS-VI-I 1 350.00 11.000 0.200 770.000
TCS-VI-J 1 150.00 11.000 0.200 330.000
TCS-VI-K 1 350.00 11.000 0.200 770.000
TCS-VI-L 1 550.00 12.000 0.200 1320.000
TCS-VII 2 330.00 8.900 0.200 1174.800
TCS-VIII 1 300.00 7.500 0.200 450.000
TCS-IX 2 4,850.00 9.250 0.200 17945.000
TCS-X 2 1,150.00 1.500 0.200 690.000
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.25 0.200 316.875
(from 16.50 to 7.50 m) 2 135.00 4.50 0.200 121.500
(from 10.0 to 7.50 m) 2 37.50 1.25 0.200 9.375
Extra Widening 1 16,665.00 0.70 0.200 2333.100
Bus Stop / Lay Bay 27 15.00 3.00 0.200 243.000
54 30.00 1.50 0.200 486.000
Total 298,758.521

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with
14
paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in
accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications.
Homogeneous Section-1
TCS-II-A 1 14,107.00 10.320 0.250 36396.060
TCS-II-B 1 2,250.00 10.320 0.250 5805.000
TCS-II-C 1 650.00 10.320 0.250 1677.000
TCS-II-D 1 1,125.00 10.320 0.250 2902.500
TCS-II-E 1 795.00 10.320 0.250 2051.100
TCS-V-A 1 1,665.00 10.320 0.250 4295.700
TCS-VI-A 1 1,230.00 10.160 0.250 3124.200
TCS-VI-B 1 1,080.00 10.160 0.250 2743.200
TCS-VI-C 1 1,715.00 10.160 0.250 4356.100
TCS-VI-D 1 560.00 10.160 0.250 1422.400
TCS-VI-E 1 430.00 10.320 0.250 1109.400
TCS-VI-F 1 200.00 13.360 0.250 668.000
Marging & Diverging Transition 2 67.50 2.250 0.250 37.969
Extra Widening 1 8,925.00 1.000 0.250 2231.250
Homogeneous Section-2
TCS-II-F 1 42,665.00 10.250 0.250 109329.063
TCS-II-G 1 7,867.00 10.250 0.250 20159.188
TCS-II-H 1 5,710.00 10.250 0.250 14631.875
TCS-II-I 1 1,050.00 10.250 0.250 2690.625
TCS-II-J 1 650.00 10.250 0.250 1665.625
TCS-V-B 1 7,270.00 10.250 0.250 18629.375
TCS-V-C 1 700.00 10.250 0.250 1793.750
TCS-VI-G 1 1,270.00 12.625 0.250 4008.438
TCS-VI-H 1 230.00 12.625 0.250 725.938
TCS-VI-I 1 350.00 12.625 0.250 1104.688
TCS-VI-J 1 150.00 12.625 0.250 473.438
TCS-VI-K 1 350.00 12.625 0.250 1104.688
TCS-VI-L 1 550.00 10.250 0.250 1409.375
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 0.250 396.094
(from 16.50 to 7.50 m) 2 135.00 4.500 0.250 151.875
(from 10.0 to 7.50 m) 2 37.50 1.250 0.250 11.719
Extra Widening 1 16,665.00 0.700 0.250 2916.375
Bus Stop / Lay Bay 27 15.00 3.000 0.250 303.750
54 30.00 1.500 0.250 607.500
Below Paver Block
TCS-I 2 3,067.00 1.000 0.250 1533.500
TCS-III 2 5,350.00 1.000 0.320 3424.000
TCS-VII 2 330.00 1.000 0.320 211.200
TCS-IX 2 4,850.00 1.000 0.320 3104.000
TCS-X 2 1,150.00 1.500 0.250 862.500
Total 260,068.46

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope &
15 camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of Cum
400.
Hard Shoulders (CBR value >12)
Homogeneous Section-1
TCS-II-A 2 14,107.00 1.410 0.410 16310.513
TCS-II-B 2 2,250.00 1.410 0.410 2601.450
TCS-II-C 2 650.00 1.410 0.410 751.530
TCS-II-D 2 1,125.00 1.410 0.410 1300.725
TCS-II-E 2 795.00 1.410 0.410 919.179
TCS-V-A 2 1,665.00 1.410 0.410 1925.073
Homogeneous Section-2
TCS-II-F 2 42,665.00 1.375 0.375 43998.281
TCS-II-G 2 7,867.00 1.375 0.375 8112.844
TCS-II-H 2 5,710.00 1.375 0.375 5888.438
TCS-II-I 2 1,050.00 1.375 0.375 1082.813
TCS-II-J 2 650.00 1.375 0.375 670.313
TCS-V-B 2 7,270.00 1.375 0.375 7497.188
TCS-V-C 2 700.00 1.375 0.375 721.875
Total 91,780.22
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and
16 Cum
compacted as per clause 408 of specification.
1 4,850.00 1.5 0.500 3637.500
1 1,150.00 1.5 0.500 862.500
Total 4,500.000

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
PAVEMENT
Providing and applying Primer Coat with bitumen emulsion on prepared surface of granular Base with low porosity (WMM or
17 WBM) including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm with pressure distributor and as per
relevant clause of Section-500.
Homogeneous Section-1
TCS-II-A 1 14,107.00 10.320 145584.240
TCS-II-B 1 2,250.00 10.320 23220.000
TCS-II-C 1 650.00 10.320 6708.000
TCS-II-D 1 1,125.00 10.320 11610.000
TCS-II-E 1 795.00 10.320 8204.400
TCS-V-A 1 1,665.00 10.320 17182.800
TCS-VI-A 1 1,230.00 10.160 12496.800
TCS-VI-B 1 1,080.00 10.160 10972.800
TCS-VI-C 1 1,715.00 10.160 17424.400
TCS-VI-D 1 560.00 10.160 5689.600
TCS-VI-E 1 430.00 10.320 4437.600
TCS-VI-F 1 200.00 13.360 2672.000
Marging & Diverging Transition 2 67.50 2.250 151.875
Extra Widening 1 8,925.00 1.000 8925.000
Homogeneous Section-2
TCS-II-F 1 42,665.00 10.250 437316.250
TCS-II-G 1 7,867.00 10.250 80636.750
TCS-II-H 1 5,710.00 10.250 58527.500
TCS-II-I 1 1,050.00 10.250 10762.500
TCS-II-J 1 650.00 10.250 6662.500
TCS-V-B 1 7,270.00 10.250 74517.500
TCS-V-C 1 700.00 10.250 7175.000
TCS-VI-G 1 1,270.00 12.625 16033.750
TCS-VI-H 1 230.00 12.625 2903.750
TCS-VI-I 1 350.00 12.625 4418.750
TCS-VI-J 1 150.00 12.625 1893.750
TCS-VI-K 1 350.00 12.625 4418.750
TCS-VI-L 1 550.00 10.250 5637.500
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 1584.375
(from 16.50 to 7.50 m) 2 135.00 4.500 607.500
(from 10.0 to 7.50 m) 2 37.50 1.250 46.875
Extra Widening 1 16,665.00 0.700 11665.500
Bus Stop / Lay Bay 27 15.00 3.000 1215.000
54 30.00 1.500 2430.000
Total 1,003,733.015

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor on the prepared bituminous /
18
granular surface cleaned with mechanical broom and as per relevant clauses of Section-500.
(i) @ 0.25 kg per sqm (normal bituminous surfaces)
Homogeneous Section-1
TCS-II-A 1 14,107.00 10.000 141070.000
TCS-II-B 1 2,250.00 10.000 22500.000
TCS-II-C 1 650.00 10.000 6500.000
TCS-II-D 1 1,125.00 10.000 11250.000
TCS-II-E 1 795.00 10.000 7950.000
TCS-V-A 1 1,665.00 10.000 16650.000
TCS-VI-A 1 1,230.00 10.000 12300.000
TCS-VI-B 1 1,080.00 10.000 10800.000
TCS-VI-C 1 1,715.00 10.000 17150.000
TCS-VI-D 1 560.00 10.000 5600.000
TCS-VI-E 1 430.00 10.000 4300.000
TCS-VI-F 1 200.00 10.000 2000.000
Marging & Diverging Transition 2 67.50 2.250 151.875
Extra Widening 1 8,925.00 1.000 8925.000
Homogeneous Section-2
TCS-II-F 1 42,665.00 10.000 426650.000
TCS-II-G 1 7,867.00 10.000 78670.000
TCS-II-H 1 5,710.00 10.000 57100.000
TCS-II-I 1 1,050.00 10.000 10500.000
TCS-II-J 1 650.00 10.000 6500.000
TCS-V-B 1 7,270.00 10.000 72700.000
TCS-V-C 1 700.00 10.000 7000.000
TCS-VI-G 1 1,270.00 10.000 12700.000
TCS-VI-H 1 230.00 10.000 2300.000
TCS-VI-I 1 350.00 10.000 3500.000
TCS-VI-J 1 150.00 10.000 1500.000
TCS-VI-K 1 350.00 10.000 3500.000
TCS-VI-L 1 550.00 10.000 5500.000
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 1584.375
(from 16.50 to 7.50 m) 2 135.00 4.500 607.500
(from 10.0 to 7.50 m) 2 37.50 1.250 46.875
Extra Widening 1 16,665.00 0.700 11665.500
Bus Stop / Lay Bay 27 15.00 3.000 1215.000
54 30.00 1.500 2430.000
Total 972,816.125

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
(ii) @ 0.30 kg per sqm (dry & hungry bituminous surfaces/granular surfaces treated with primer)
Homogeneous Section-1
TCS-II-A 1 14,107.00 10.320 145584.240
TCS-II-B 1 2,250.00 10.320 23220.000
TCS-II-C 1 650.00 10.320 6708.000
TCS-II-D 1 1,125.00 10.320 11610.000
TCS-II-E 1 795.00 10.320 8204.400
TCS-V-A 1 1,665.00 10.320 17182.800
TCS-VI-A 1 1,230.00 10.160 12496.800
TCS-VI-B 1 1,080.00 10.160 10972.800
TCS-VI-C 1 1,715.00 10.160 17424.400
TCS-VI-D 1 560.00 10.160 5689.600
TCS-VI-E 1 430.00 10.320 4437.600
TCS-VI-F 1 200.00 13.360 2672.000
Marging & Diverging Transition 2 67.50 2.250 151.875
Extra Widening 1 8,925.00 1.000 8925.000
Homogeneous Section-2
TCS-II-F 1 42,665.00 10.250 437316.250
TCS-II-G 1 7,867.00 10.250 80636.750
TCS-II-H 1 5,710.00 10.250 58527.500
TCS-II-I 1 1,050.00 10.250 10762.500
TCS-II-J 1 650.00 10.250 6662.500
TCS-V-B 1 7,270.00 10.250 74517.500
TCS-V-C 1 700.00 10.250 7175.000
TCS-VI-G 1 1,270.00 12.625 16033.750
TCS-VI-H 1 230.00 12.625 2903.750
TCS-VI-I 1 350.00 12.625 4418.750
TCS-VI-J 1 150.00 12.625 1893.750
TCS-VI-K 1 350.00 12.625 4418.750
TCS-VI-L 1 550.00 10.250 5637.500
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 1584.375
(from 16.50 to 7.50 m) 2 135.00 4.500 607.500
(from 10.0 to 7.50 m) 2 37.50 1.250 46.875
Extra Widening 1 16,665.00 0.700 11665.500
Bus Stop / Lay Bay 27 15.00 3.000 1215.000
54 30.00 1.500 2430.000
Total 1,003,733.015

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing and laying Dense Bituminous Macadam using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic
19 Cum
paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per clause 505 of specification complete in all respects.
Homogeneous Section-1
TCS-II-A 1 14,107.00 10.000 0.110 15517.700
TCS-II-B 1 2,250.00 10.000 0.110 2475.000
TCS-II-C 1 650.00 10.000 0.110 715.000
TCS-II-D 1 1,125.00 10.000 0.110 1237.500
TCS-II-E 1 795.00 10.000 0.110 874.500
TCS-V-A 1 1,665.00 10.000 0.110 1831.500
TCS-VI-A 1 1,230.00 10.000 0.110 1353.000
TCS-VI-B 1 1,080.00 10.000 0.110 1188.000
TCS-VI-C 1 1,715.00 10.000 0.110 1886.500
TCS-VI-D 1 560.00 10.000 0.110 616.000
TCS-VI-E 1 430.00 10.000 0.110 473.000
TCS-VI-F 1 200.00 10.000 0.110 220.000
Marging & Diverging Transition 2 67.50 2.250 0.110 16.706
Extra Widening 1 8,925.00 1.000 0.110 981.750
Homogeneous Section-2
TCS-II-F 1 42,665.00 10.00 0.085 36265.250
TCS-II-G 1 7,867.00 10.00 0.085 6686.950
TCS-II-H 1 5,710.00 10.00 0.085 4853.500
TCS-II-I 1 1,050.00 10.00 0.085 892.500
TCS-II-J 1 650.00 10.00 0.085 552.500
TCS-V-B 1 7,270.00 10.00 0.085 6179.500
TCS-V-C 1 700.00 10.00 0.085 595.000
TCS-VI-G 1 1,270.00 10.00 0.085 1079.500
TCS-VI-H 1 230.00 10.00 0.085 195.500
TCS-VI-I 1 350.00 10.00 0.085 297.500
TCS-VI-J 1 150.00 10.00 0.085 127.500
TCS-VI-K 1 350.00 10.00 0.085 297.500
TCS-VI-L 1 550.00 10.00 0.085 467.500
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.25 0.085 134.672
(from 16.50 to 7.50 m) 2 135.00 4.50 0.085 51.638
(from 10.0 to 7.50 m) 2 37.50 1.25 0.085 3.984
Extra Widening 1 16,665.00 0.70 0.085 991.568
Bus Stop / Lay Bay 27 15.00 3.00 0.085 103.275
54 30.00 1.50 0.085 206.550
TCS-I 1 3,067.00 5.50 0.050 84.343
TCS-X 2 1,150.00 7.50 0.050 86.250
Total 89,538.636

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing and laying Bituminous Concrete using crushed aggregates of specified grading, premixed with bituminous binder @
5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control
20 Cum
to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction as per clause 507 of specification.
iii) for Grading I (50-65 mm thickness ) with PMB-40/NRMB
Homogeneous Section-1
TCS-II-A 1 14,107.0 10.0 0.050 7053.500
TCS-II-B 1 2,250.0 10.0 0.050 1125.000
TCS-II-C 1 650.0 10.0 0.050 325.000
TCS-II-D 1 1,125.0 10.0 0.050 562.500
TCS-II-E 1 795.0 10.0 0.050 397.500
TCS-V-A 1 1,665.0 10.0 0.050 832.500
TCS-VI-A 1 1,230.0 10.0 0.050 615.000
TCS-VI-B 1 1,080.0 10.0 0.050 540.000
TCS-VI-C 1 1,715.0 10.0 0.050 857.500
TCS-VI-D 1 560.0 10.0 0.050 280.000
TCS-VI-E 1 430.0 10.0 0.050 215.000
TCS-VI-F 1 200.0 10.0 0.050 100.000
Marging & Diverging Transition 2 67.5 2.3 0.050 7.594
Extra Widening 1 8,925.0 1.0 0.050 446.250
Total 13,357.344
vi) for Grading-II ( 30-45 mm thickness ) with PMB-40/NRMB
Homogeneous Section-2
TCS-II-F 1 42,665.0 10.0 0.040 17066.000
TCS-II-G 1 7,867.0 10.0 0.040 3146.800
TCS-II-H 1 5,710.0 10.0 0.040 2284.000
TCS-II-I 1 1,050.0 10.0 0.040 420.000
TCS-II-J 1 650.0 10.0 0.040 260.000
TCS-V-B 1 7,270.0 10.0 0.040 2908.000
TCS-V-C 1 700.0 10.0 0.040 280.000
TCS-VI-G 1 1,270.0 10.0 0.040 508.000
TCS-VI-H 1 230.0 10.0 0.040 92.000
TCS-VI-I 1 350.0 10.0 0.040 140.000
TCS-VI-J 1 150.0 10.0 0.040 60.000
TCS-VI-K 1 350.0 10.0 0.040 140.000
TCS-VI-L 1 550.0 10.0 0.040 220.000
Marging & Diverging Transition
(from 16.50 to 10 m) 10 97.50 3.250 0.040 63.375
(from 16.50 to 7.50 m) 2 135.00 4.500 0.040 24.300
(from 10.0 to 7.50 m) 2 37.50 1.250 0.040 1.875
Extra Widening 1 16,665.00 0.700 0.040 466.620
Bus Stop / Lay Bay 27 15.00 3.000 0.040 48.600
54 30.00 1.500 0.040 97.200
Total 28,226.770

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Construction of Dry Lean Cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to
IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after
blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined
21 Cum
during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to
site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause
601 of specification complete in all respect.
TCS-III 1 5,350.00 11.000 0.150 8827.500
TCS-VII 2 330.00 8.000 0.150 792.000
TCS-VIII 1 300.00 7.500 0.150 337.500
TCS-IX 2 4,850.00 8.000 0.150 11640.000
Total 21,597.000
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base
with cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in
a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread,
compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal
22 Cum
joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing
compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of
specifications complete but excluding cost of steel in dowel bar and tie rods etc.

TCS-III 1 5,350.00 10.00 0.300 16050.000


TCS-VII 2 330.00 7.50 0.300 1485.000
TCS-VIII 1 300.00 7.50 0.300 675.000
TCS-IX 2 4,850.00 7.50 0.300 21825.000
Total 40,035.000
Providing and laying Conventional white Topping as per IRC:SP:76-2015 Over bituminous surface (Existing bituminous surface
prepared if necessary, either by milling or leveling course to be done with BM/DBM/DLC to correct surface profile and to be
paid separately) as Cement Concrete Pavement, Construction of un-reinforced, dowel Jointed, plain cement concrete pavement
M-40 grade concrete over a prepared sub base, coarse and fine aggregate conforming to IS 383, maximum size of coarse
23 aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid Cum
with a slip form paver, spread, compacted and finished, in a continuous operation including provision of expansion Joint,
construction joint, separation membrane, admixtures as approved, curing compound, finishing to lines and grades as per
drawing as per IRÇ 15 2017 and as per relevant clauses of MORTH&H Specifications of section 600 complete but excluding cost
of steel in dowel bar and tie rods etc complete.
TCS-I 1 3,067.00 5.50 0.200 3373.700
TCS-X 2 1,150.00 7.50 0.200 3450.000
Total 6,823.700

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Add extra in Item No.6.3, 6.4, 6.6 & 6.10 above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete
24
required as per design.
(I) Mild Steel - Dowel Bar MT
38 mm @ 300 mm c/c length 500 mm
TCS-III 39,629 0.50 8.950 177.340
TCS-VII 3,666 0.50 8.950 16.405
TCS-VIII 1,666 0.50 8.950 7.455
TCS-IX 53,888 0.50 8.950 241.149
25 mm @ 300 mm c/c length 450 mm
TCS-I 16,065 0.36 3.850 22.266
TCS-X 16,428 0.36 3.850 22.769
Total 487.384
(II) Tor steel - Tie Bar - 12 mm Dia 640 mm long & 600 mm c/c MT
TCS-III 26,754 0.64 0.888 15.205
TCS-VII 1,102 0.64 0.888 0.626
TCS-VIII 501 0.64 0.888 0.285
TCS-IX 16,170 0.64 0.888 9.190
TCS-I 3,409 0.64 0.888 1.937
TCS-X 2,558 0.64 0.888 1.454
Total 28.697
Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness and
size/shape, made by table vibratory method using PU mould, laid in required colour and pattern over 50mm thick compacted
bed of stone dust, compacting and proper embedding/laying of inter locking paver blocks into the bedding layer through
25 Sqm
vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and
pattern, finishing and sweeping extra sand including locking edges with M 15 cement concrete in footpath, light traffic parking
etc. complete as per direction of Engineer-in-Charge.
80mm thick C.C. paver block of M-35 grade with approved colour, design and pattern.
TCS-I 2 3,067.00 1.000 6134.000
TCS-III 2 5,350.00 1.000 10700.000
TCS-VII 2 330.00 1.000 660.000
TCS-IX 2 4,850.00 1.000 9700.000
TCS-X 2 1,150.00 1.500 3450.000
Total 30,644.000

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
26 Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
i) PCC Grade M20 Cum
For Rigid Shoulder
Homogeneous Section-1
TCS-VI-A 1 1,230.00 1.000 0.410 504.300
TCS-VI-B 1 1,080.00 1.000 0.410 442.800
TCS-VI-C 1 1,715.00 1.000 0.410 703.150
TCS-VI-D 1 560.00 1.000 0.410 229.600
TCS-VI-E 2 430.00 1.000 0.410 352.600
TCS-VI-F 1 200.00 1.000 0.410 82.000
Homogeneous Section-2
TCS-VI-G 1 1,270.00 1.000 0.375 476.250
TCS-VI-H 1 230.00 1.000 0.375 86.250
TCS-VI-I 1 350.00 1.000 0.375 131.250
TCS-VI-J 1 150.00 1.000 0.375 56.250
TCS-VI-K 1 350.00 1.000 0.375 131.250
TCS-VI-L 2 550.00 1.000 0.375 412.500
Total 3,608.200

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
TRAFFIC SIGNS, MARKINGS AND ROAD APPURTENANCES
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped
27 metre
towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per
clause 409
TCS-I 2 3,067.000 6134.000
TCS-III 2 5,350.000 10700.000
TCS-VII 2 330.000 660.000
TCS-VIII 1 300.000 300.000
TCS-IX 2 4,850.000 9700.000
TCS-X 2 1,150.000 2300.000
Total 29,794.000

Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high
intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of
4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity
28 Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting
shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.

90 cm equilateral triangle
i) each 758 758.000
Cautionary/Warning Sign
60 cm circular
ii) each 152 152.000
Mandatory/Regulatory Signs
80 cm x 60 cm rectangular
iii) each 120 120.000
Informatory Signs
60 cm x 45 cm rectangular
iv) each 6620 6,620.000
Informatory Signs/Cheveron Sign/Hazard Marker/Rout Marker
Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity Micro-
Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core
of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and aluminium
skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro Prismatck
29 sqm 172 1.00 0.900 154.800
Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall conform to
Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer, supported on
composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to
IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM
sheet shall be fixed to the post with minimum two number breakaway bolts.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Direction and Place Identification signs with size more than 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity Micro-
Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core
of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and aluminium
skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro Prismatck
30 sqm 4 1.80 2.100 15.120
Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall conform to
Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer, supported on
composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to
IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM
sheet shall be fixed to the post with minimum two number breakaway bolts.
Supply and fixing tubular gantry mounted Overhead/cantilever signs. All components of signs & supports, other than the
reflective portion shall be thoroughly descaled, cleaned, primed and painted with two coats of epoxy paints. The sign back side
31
shall be with grey colour and post shall be in black & white alternate bands. The post below ground shall be painted with three
coats of red lead paint. The sign shall be made as per IRC-67-2001 and Technical Specification Section 800.
Erection of overhead gantry/cantilever structure as per drawing including steel work in trusses, steel tubes cutting, fixing in
i) position with welding and bolted complete in all respect and type as per structural design requirements and approved plans tonnes
including cost of excavation, concerte and steel for foundations.
Overhead 2 2.14 4.280
Cantiliver 13 0.91 11.830
Total 16.110

The sign board made out of 2 mm thick alluminium sheet, face to be fully covered by high intensity grade white retro reflective
sheeting of encapsulated lens type. The background/border/ simples/legend/arrows shall be made by transparent overlay film
ii) of desired colour as per sign details except those in black which shall be of non reflective type. The sign place shall be fixed with sqm
6 mm dia alluminium rebate on MS angle iron frame. The angle iron frame shall be made with angle of size 75 mm x 75 mm x 6
mm with additional bracing at every 600 mm c/c, if any dimension in more than 1200 mm.

Overhead 4 15.00 1.310 78.600


Cantiliver 26 3.57 1.300 120.497
Total 199.097

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per
32 sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform
and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 3 Mtrs. Long @ 6.0 Mtrs. Interval at Road Centre 17529 3.00 0.150 7888.050
2110 3.00 0.150 949.500
Continuous White Strips of 0.15m wide at Road Edges 2 105,170.00 0.150 31551.000
4 6,330.00 0.150 3798.000
Tranverse Bar Marking 672 10.00 0.300 2016.000
Total 46,202.550
Providing reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position
33
including painting and printing etc as per relevant clauses of Section-800 of specifications.
i) 5th kilometre stone (precast) each 22 22.000
ii) Ordinary Kilometer stone (Precast) each 90 90.000
iii) Hectometer stone (Precast) each 446 446.000
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground
level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised
34 each 4849 4,849.000
panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings as per relevant clauses of
section-800 of specifications.
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including
35 each 892 892.000
finishing and lettering but excluding painting.
36 Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm
(a) spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip meter 1 9,755.00 9755.000
process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel
Section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 of specifications.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from
drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of
granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of
37
rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row
ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt,
all as per IRC: 98 - 1997 and approved drawings.
a) Single Row for one utility service metre
TCS-II 156 20.00 3120.000
TCS-III 107 12.00 1284.000
TCS-V 20 20.00 400.000
TCS-VII & IX 104 20.00 2080.000
Total 6,884.000
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant
38 to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm each 34025 34,025.000
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973).

Providing and fixing guard stones 220x220x1000mm made of hammer dressed stones and fixed 400mm into the ground in
39 moorum and broken aggregates block of size 500x500x500 mm and given two coats of paints with white and black bands i/c each 6401 6,401.000
excavation etc. complete.

Providing and erecting street light mounted on a steel tubular pole swaged type as per IS:2713-1980 Complete with base plate
40 and top Canopy for street lighting, 10m highfrom road surface and with 2.0 m overhang. Poles on both sides spaced at 25m c/c Each 605 605.000
in four lane and Staggerd in Two Lane, fitted with sodium vapour lamp of 250 watts and fixed firmly in concrete foundation.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
RCC COVER DRAIN & RCC OPEN DRAIN
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,
41 construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material. as per relevant clauses of section 300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum
RCC Cover Drain 2 15,047.00 1.100 0.800 26482.720
RCC Open Drain 1 9,095.00 1.000 0.600 5457.000
Overhead Sign 17 1.50 1.500 1.000 38.250
Total 31,977.970
42 Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500, 1700 and 2100. Cum
RCC Cover Drain 2 15,047.00 1.100 0.150 4965.510
RCC Open Drain 1 9,095.00 1.000 0.100 909.500
Overhead Sign 17 1.50 1.500 0.150 5.738
Total 5,880.748
43 Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
i) RCC Grade M25 Cum
RCC Cover Drain 2 15,047.00 0.900 0.150 4062.690
4 15,047.00 0.150 0.850 7673.970
2 15,047.00 0.900 0.150 4062.690
RCC Open Drain 1 9,095.00 0.800 0.100 727.600
1 9,095.00 0.150 0.500 682.125
1 9,095.00 0.150 1.000 1364.250
Overhead Sign 17 1.50 1.500 1.500 57.375
Total 18,630.700
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical
44 MT
specifications and as per relevant clauses of section 1600.
for Drain @ 50 kg/Cum 18,630.70 0.050 931.535
Total 931.535

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
RCC TOE WALL & RETAINING WALL
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,
45 construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material. as per relevant clauses of section 300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum
RCC Toe Wall
Average Height 0.8 M Above GL 1 1,000.00 1.450 0.700 1015.000
Average Height 1.0 M Above GL 1 215.00 1.750 0.700 263.375
Average Height 1.2 M Above GL 1 1,035.00 1.750 0.700 1267.875
Average Height 1.5 M Above GL 1 2,750.00 1.900 0.700 3657.500
RCC Retaining Wall
Average Height 2.0 M Above GL 1 740.00 2.350 2.100 3651.900
Average Height 2.5 M Above GL 1 820.00 2.725 2.100 4692.450
Average Height 3.0 M Above GL 1 1,100.00 3.100 2.100 7161.000
Average Height 3.5 M Above GL 1 930.00 3.400 2.100 6640.200
Average Height 4.0 M Above GL 1 920.00 3.700 2.100 7148.400
Average Height 4.5 M Above GL 1 1,095.00 4.050 2.100 9312.975
Average Height 5.5 M Above GL 1 225.00 4.900 2.100 2315.250
Total 47,125.925
46 Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500, 1700 and 2100. Cum
RCC Toe Wall
Average Height 0.8 M Above GL 1 1,000.00 1.450 0.100 145.000
Average Height 1.0 M Above GL 1 215.00 1.750 0.100 37.625
Average Height 1.2 M Above GL 1 1,035.00 1.750 0.100 181.125
Average Height 1.5 M Above GL 1 2,750.00 1.900 0.100 522.500
RCC Retaining Wall
Average Height 2.0 M Above GL 1 740.00 2.350 0.100 173.900
Average Height 2.5 M Above GL 1 820.00 2.725 0.100 223.450
Average Height 3.0 M Above GL 1 1,100.00 3.100 0.100 341.000
Average Height 3.5 M Above GL 1 930.00 3.400 0.100 316.200
Average Height 4.0 M Above GL 1 920.00 3.700 0.100 340.400
Average Height 4.5 M Above GL 1 1,095.00 4.050 0.100 443.475
Average Height 5.5 M Above GL 1 225.00 4.900 0.100 110.250
Total 2,834.925

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per
47
drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with.
i) RCC Grade M25
RCC Toe Wall
Average Height 0.8 M Above GL 1 1,000.00 1.250 0.200 250.000
Average Height 1.0 M Above GL 1 215.00 1.550 0.200 66.650
Average Height 1.2 M Above GL 1 1,035.00 1.550 0.200 320.850
Average Height 1.5 M Above GL 1 2,750.00 1.700 0.200 935.000
Total 1,572.500
ii) RCC Grade M30
RCC Retaining Wall
Average Height 2.0 M Above GL 1 740.00 2.150 0.250 397.750
1 740.00 1.100 0.200 81.400
1 740.00 0.450 0.200 66.600
1 740.00 0.600 0.200 44.400

Average Height 2.5 M Above GL 1 820.00 2.525 0.250 517.625


1 820.00 1.375 0.200 112.750
1 820.00 0.450 0.200 73.800
1 820.00 0.700 0.200 57.400

Average Height 3.0 M Above GL 1 1,100.00 2.900 0.250 797.500


1 1,100.00 1.650 0.200 181.500
1 1,100.00 0.450 0.200 99.000
1 1,100.00 0.800 0.200 88.000

Average Height 3.5 M Above GL 1 930.00 3.200 0.250 744.000


1 930.00 1.825 0.200 169.725
1 930.00 0.475 0.200 88.350
1 930.00 0.900 0.200 83.700

Average Height 4.0 M Above GL 1 920.00 3.500 0.350 1127.000


1 920.00 2.000 0.300 276.000
1 920.00 0.500 0.300 138.000
1 920.00 1.000 0.300 138.000

Average Height 4.5 M Above GL 1 1,095.00 3.850 0.350 1475.513


1 1,095.00 2.200 0.300 361.350
1 1,095.00 0.500 0.300 164.250
1 1,095.00 1.150 0.300 188.888

Average Height 5.5 M Above GL 1 225.00 4.700 0.500 528.750


1 225.00 2.600 0.300 87.750
1 225.00 0.600 0.300 40.500
1 225.00 1.500 0.300 50.625
Total 8,180.126

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical
48 MT
specifications and as per relevant clauses of section 1600.
Toe Wall @ 50 kg/Cum 1,572.50 0.050 78.625
Retaining Wall @ 80 kg/Cum 8,180.13 0.080 654.410
Total 733.035
49 Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
i) PCC Grade M20 Cum
Median Kerb 2 4,850.00 0.350 0.100 339.500
2 4,850.00 0.150 0.750 1091.250
Wheel Guard 3032 0.30 0.300 0.300 81.864
Total 1,512.614
ii) RCC Grade M25 Cum
RCC Toe Wall
Average Height 0.8 M Above GL 1 1,000.00 0.200 1.200 240.000
Average Height 1.0 M Above GL 1 215.00 0.200 1.400 60.200
Average Height 1.2 M Above GL 1 1,035.00 0.200 1.600 331.200
Average Height 1.5 M Above GL 1 2,750.00 0.200 1.900 1045.000
Total 1,676.400
iii) RCC Grade M30
RCC Retaining Wall
Average Height 2.0 M Above GL 1 740.00 0.450 3.550 1182.150
1 740.00 - 3.550 0.000
1 740.00 0.200 0.600 88.800

Average Height 2.5 M Above GL 1 820.00 0.450 4.050 1494.450


1 820.00 - 4.050 0.000
1 820.00 0.200 0.600 98.400

Average Height 3.0 M Above GL 1 1,100.00 0.450 4.550 2252.250


1 1,100.00 - 4.550 0.000
1 1,100.00 0.200 0.600 132.000

Average Height 3.5 M Above GL 1 930.00 0.450 5.050 2113.425


1 930.00 0.025 5.050 58.706
1 930.00 0.200 0.600 111.600

Average Height 4.0 M Above GL 1 920.00 0.450 5.350 2214.900


1 920.00 0.050 5.350 123.050
1 920.00 0.200 0.600 110.400

Average Height 4.5 M Above GL 1 1,095.00 0.450 5.850 2882.588


1 1,095.00 0.050 5.850 160.144
1 1,095.00 0.200 0.600 131.400

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
Average Height 5.5 M Above GL 1 225.00 0.450 6.700 678.375
1 225.00 0.150 6.700 113.063
1 225.00 0.200 0.600 27.000
New Jersy Crush Barrier
1 330.00 0.800 0.600 158.400
1 330.00 0.550 0.250 22.688
1 330.00 0.300 0.800 79.200
Total 14,232.989
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical
50 MT
specifications and as per relevant clauses of section 1600.
for Toe Wall @ 50 kg/Cum 1,676.40 0.050 83.820
Retaining Wall & New Jersy Crush Barrier @ 80 kg/Cum 14,232.99 0.080 1138.639
Total 1,222.459
51 Filler Joint RM
ii) Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. meter 130.00 5.014 651.857
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC
52 pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and RM
Technical specifications
RCC Toe Wall 7,625.0 0.20 1525.000
RCC Retaining Wall 29,233.0 0.45 13154.850
Total 14,679.850
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in
clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger
53 Cum
size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height
compacted to a firm condition complete as per drawing and technical specification.
RCC Toe Wall 1 5,000.00 0.6 1.525 4575.000
RCC Retaining Wall 1 5,830.00 0.6 5.014 17539.971
Total 22,114.971

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Road Work
Sr.
Item Unit Nos. Length Width Height Quantity
No.
MISCELLANEOUS
Each
Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed
54
farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, and maintaining the plants for one year.
Avanue Tree Plantation (As per IRC:21) In Single row @ 20m interval both side in sttagerad way in along open area 2 1327.00 2654.000
Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 Each 2654.00 2654.00
55 metre below ground, bottom two courses laid dry, and top three courses in cement mortar 1:6 (1 cement 6 sand) and the
intermediate courses being in dry honey comb masonry, as per design complete.
Providing rain water harvesting arrangement as shown in drawing with all materials etc., with all lifts and leads complete as Each 53 53.00
56
directed by the engineer
EMP
Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed Each
57 farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, and maintaining the plants for one year.

Compensatory Afforestation (2 time of tree cuting) 12042 12042.00

Rev-01
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be Hectar
1 2 120.00 3.50 0.08 0.34
used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in e
thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
2 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with cum 2 120.00 2.50 0.50 300.00 1200.00
all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and lead
3 Sqm 1 120.00 7.00 840.00 3360.00
upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per
relevent clauses of section-300.
(a) For embankment cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 9.49 0.50 308.43
25 m long straight portion ; W=2x7.0 m 2 25.00 2.62 0.50 65.50
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 0.50 165.00
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 11.12 0.50 523.75
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 3.12 0.50 374.40
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 9.49 0.50 616.85
(b) For sub grade layer
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 17.49 0.50 568.43
25 m long straight portion ; W=2x7.0 m 2 25.00 11.62 0.50 290.50
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 0.50 165.00
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 10.12 0.50 476.65
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 12.12 0.50 1454.40
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 16.24 0.50 -974.40
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 17.49 0.50 1136.85
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 16.24 0.50 -1055.60
Total 4115.75 16463.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone having
CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or
5 cum
plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the desired density,
complete as per clauses 401 of Specification.
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 16.09 0.20 209.17
25 m long straight portion ; W=2x7.0 m 2 25.00 10.92 0.20 109.20
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 0.20 66.00
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 9.42 0.20 177.47
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 11.42 0.20 548.16
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 14.84 0.20 -356.16
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 16.09 0.20 418.34
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 14.84 0.20 -385.84
Total 786.34 3145.36
6 Wet Mix Macadam (WMM) cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 0.250 186.39
25 m long straight portion ; W=2x7.0 m 2 25.00 7.11 0.250 88.88
30 m long straight portion ; W=2x5.5 m 2 30.00 5.61 0.250 84.15
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.61 0.250 132.12
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.61 0.250 456.60
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.22 0.250 -306.60
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 0.250 372.78
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 0.250 -332.15
Total 682.15 2728.60
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope &
7 camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of Cum
400.
Hard Shoulders (CBR value >12)
For Improvement of Side Road 2 137.10 1.86 0.36 183.60
Total 183.60 734.42
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and
8 cum
compacted as per clause 408 of specification.
For Improvement of Side Road
filling in Median 1 52.00 1.20 0.50 31.20
filling in island 2 42.00 Area 0.50 42.00
For Improvement of Main Highway
filling in Median 1 100.00 1.20 0.50 60.00
Total 133.20 532.80
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Construction of footpath/ separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick
9 cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all drainage Sqm
arrangements but excluding kerb channel.
For Improvement of Side Road
For median 1 52.00 1.20 62.40
For island 2 42.00 Area 84.00
For Improvement of Main Highway
For median 1 100.00 1.20 120.00
Total 266.40 1065.60
10 Prime coat on prepared Granular base Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 745.55
25 m long straight portion ; W=2x7.0 m 2 25.00 7.11 355.50
30 m long straight portion ; W=2x5.5 m 2 30.00 5.61 336.60
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.61 528.46
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.61 1826.40
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.22 -1226.40
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 2728.61 10914.44
11 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 731.25
25 m long straight portion ; W=2x7.0 m 2 25.00 7.00 350.00
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 330.00
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.50 518.10
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.50 1800.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.00 -1200.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 1462.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 -1300.00
Total 2691.85 10767.40
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
12 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 745.55
25 m long straight portion ; W=2x7.0 m 2 25.00 7.11 355.50
30 m long straight portion ; W=2x5.5 m 2 30.00 5.61 336.60
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.61 528.46
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.61 1826.40
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.22 -1226.40
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 2728.61 10914.44
13 Dense Bituminous Macadam (DBM) Cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 0.070 51.19
25 m long straight portion ; W=2x7.0 m 2 25.00 7.00 0.070 24.50
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 0.070 23.10
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.50 0.070 36.27
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.50 0.070 126.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.00 0.070 -84.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.070 102.38
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.070 -91.00
Total 188.43 753.72
14 Bituminous Concrete (BC) Cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 0.04 29.25
25 m long straight portion ; W=2x7.0 m 2 25.00 7.00 0.04 14.00
30 m long straight portion ; W=2x5.5 m 2 30.00 5.50 0.04 13.20
Curvature portion (R=30.0m), W=2x5.5 m 2 47.10 5.50 0.04 20.72
For Improvement of Main Highway
120 m long straight portion ; W=2x7.5 m 2 120.00 7.50 0.04 72.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 120.00 10.00 0.04 -48.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.04 58.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.04 -52.00
Total 107.67 430.68
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped
15 metre
towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per
clause 409
For Improvement of Side Road
For median 2 52.00 104.00
For island 2 32.89 65.78
For Improvement of Main Highway
For median 2 100.0 200.00
Total 369.78 1479.12

Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high
intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of
4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity
16 Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting
shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.

i) 90 cm equilateral triangle each 1 1.00 4.00


ii) 60 cm equilateral triangle each 6 6.00 24.00
iii) 60 cm circular each 3 3.00 12.00
iv) 90 cm high octagon each 1 1.00 4.00

Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity Micro-
Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core
of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro
17 sqm 6 1.00 0.90 5.40 21.60
Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall
conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with minimum two number breakaway bolts.
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Major Junction Improvement (As per Dwg. No. 23 of MoST Std. Dwg. for Intersections)
Total No of T Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per
18 sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform
and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 3 Mtrs. Long @ 6.0 Mtrs. Interval at Road Centre 1 89.73 0.10 8.97
White Strips of 0.15 Mtrs. Wide Continuous at road edge 2 269.20 0.15 80.76
Digonal Marking 6 50.00 0.15 45.00
75 0.80 0.60 36.00
Stop Line 1 5.50 0.20 1.10
Giveway Line 30 0.60 0.20 3.60
Words- STOP 1 0.880 Area 0.88
Arrows -
Arrow Type (AM-11 & 12) 4 1.425 Area 5.70
Arrow Type (AM-09 & 10) 1 1.215 Area 1.22
Arrow Type (AM-08) 8 1.100 Area 8.80
Total 192.03 768.11
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia
19 each
circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings as per
relevant clauses of section-800 of specifications.
At Every 10m C/C bothsides 70 70.00
Total 70.00 280.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant
20 to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm each
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973).
At Every 5m C/C bothsides 140 140.00
Total 140.00 560.00
High Mast Lights
21 Providing and erecting 30mt High Mast Lighting system suitable to install upto 10 No. 2 x 250/ 400 w M.H / S.V flood light and each 1 1.00 4.00
control gear with integral Power tool, weight 450 kg
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be Hectar
1 2 120.00 3.50 0.08 0.34
used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in e
thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
2 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with cum 2 120.00 2.50 0.50 300.00 1200.00
all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and lead
3 Sqm 1 120.00 7.00 840.00 3360.00
upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per
relevent clauses of section-300.
(a) For embankment cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 9.49 0.50 308.43
30 m long straight portion ; W=2x7.0 m 2 30.00 2.62 0.50 78.60
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 0.50 137.50
Curvature portion (R=20.0m), W=5.5 m 1 31.40 11.12 0.50 174.58
Triangular Portion 1 102.00 Area 0.50 51.00
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 3.12 0.50 390.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 9.49 0.50 616.85
(b) For sub grade layer
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 17.49 0.50 568.43
30 m long straight portion ; W=2x7.0 m 2 30.00 11.62 0.50 348.60
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 0.50 137.50
Curvature portion (R=20.0m), W=5.5 m 1 31.40 10.12 0.50 158.88
Triangular Portion 1 102.00 Area 0.50 51.00
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 12.12 0.50 1515.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 16.24 0.50 -1015.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 17.49 0.50 1136.85
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 16.24 0.50 -1055.60
Total 3602.62 14410.48
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone having
CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or
5 cum
plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the desired density,
complete as per clauses 401 of Specification.
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 16.09 0.20 209.17
30 m long straight portion ; W=2x7.0 m 2 30.00 10.92 0.20 131.04
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 0.20 55.00
Curvature portion (R=20.0m), W=5.5 m 1 31.40 9.42 0.20 59.16
Triangular Portion 1 102.00 Area 0.20 20.40
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 11.42 0.20 571.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 14.84 0.20 -371.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 16.09 0.20 418.34
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 14.84 0.20 -385.84
Total 707.27 2829.08
6 Wet Mix Macadam (WMM) cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 0.250 186.39
30 m long straight portion ; W=2x7.0 m 2 30.00 7.11 0.250 106.65
25 m long straight portion ; W=2x5.5 m 2 25.00 5.61 0.250 70.13
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.72 0.250 44.90
Triangular Portion 1 102.00 Area 0.250 25.50
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 7.61 0.250 475.63
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.22 0.250 -319.38
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 0.250 372.78
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 0.250 -332.15
Total 630.44 2521.76
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope &
7 camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of Cum
400.
Hard Shoulders (CBR value >12)
For Improvement of Side Road 2 126.40 1.86 0.36 169.27
Total 169.27 677.10
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and
8 cum
compacted as per clause 408 of specification.
For Improvement of Side Road
filling in Median 1 55.00 1.20 0.50 33.00
filling in island 1 75.00 Area 0.50 37.50
For Improvement of Main Highway
filling in Median 1 100.00 1.20 0.50 60.00
Total 130.50 522.00
Construction of footpath/ separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick
9 cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all drainage Sqm
arrangements but excluding kerb channel.
For Improvement of Side Road
For median 1 55.00 1.20 66.00
For island 1 75.00 Area 75.00
For Improvement of Main Highway
For median 1 100.00 1.20 120.00
Total 261.00 1044.00
10 Prime coat on prepared Granular base Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 745.55
30 m long straight portion ; W=2x7.0 m 2 30.00 7.11 426.60
25 m long straight portion ; W=2x5.5 m 2 25.00 5.61 280.50
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.72 179.61
Triangular Portion 1 102.00 Area 102.00
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 7.61 1902.50
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.22 -1277.50
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 2521.76 10087.04
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
11 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 731.25
30 m long straight portion ; W=2x7.0 m 2 30.00 7.00 420.00
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 275.00
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.50 172.70
Triangular Portion 1 102.00 Area 102.00
For Improvement of Main Highway 0 0.00 0.00 0.00
125 m long straight portion ; W=2x7.5 m 2 125.00 7.50 1875.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.00 -1250.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 1462.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 -1300.00
Total 2488.45 9953.80
12 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.47 745.55
30 m long straight portion ; W=2x7.0 m 2 30.00 7.11 426.60
25 m long straight portion ; W=2x5.5 m 2 25.00 5.61 280.50
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.72 179.61
Triangular Portion 1 102.00 Area 102.00
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 7.61 1902.50
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.22 -1277.50
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 2521.76 10087.04
13 Dense Bituminous Macadam (DBM) Cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 0.070 51.19
30 m long straight portion ; W=2x7.0 m 2 30.00 7.00 0.070 29.40
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 0.070 19.25
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.50 0.070 12.09
Triangular Portion 1 102.00 Area 0.070 7.14
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 7.50 0.070 131.25
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.00 0.070 -87.50
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.070 102.38
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.070 -91.00
Total 174.19 696.76
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
14 Bituminous Concrete (BC) Cum
For Improvement of Side Road
65 m long tapered portion ; W= from 15.5m to 7.0m 1 65.00 11.25 0.04 29.25
30 m long straight portion ; W=2x7.0 m 2 30.00 7.00 0.04 16.80
25 m long straight portion ; W=2x5.5 m 2 25.00 5.50 0.04 11.00
Curvature portion (R=20.0m), W=5.5 m 1 31.40 5.50 0.04 6.91
Triangular Portion 1 102.00 Area 0.04 4.08
For Improvement of Main Highway
125 m long straight portion ; W=2x7.5 m 2 125.00 7.50 0.04 75.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 125.00 10.00 0.04 -50.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.04 58.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.04 -52.00
Total 99.54 398.16
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped
15 metre
towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per
clause 409
For Improvement of Side Road
For median 2 55.00 110.00
For island 1 43.03 43.03
For Improvement of Main Highway
For median 2 100.0 200.00
Total 353.03 1412.12

Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high
intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of
4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity
16 Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting
shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.

i) 90 cm equilateral triangle each 1 1.00 4.00


ii) 60 cm equilateral triangle each 5 5.00 20.00
iii) 60 cm circular each 3 3.00 12.00
iv) 90 cm high octagon each 1 1.00 4.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Major Junction Improvement (As per Dwg. No. 24 of MoST Std. Dwg. for Intersections)
Total No of Y Major Jn = 4 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity Micro-
Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core
of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro
17 sqm 6 1.00 0.90 5.40 21.60
Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall
conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with minimum two number breakaway bolts.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per
18 sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform
and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 3 Mtrs. Long @ 6.0 Mtrs. Interval at Road Centre 1 68.80 0.10 6.88
White Strips of 0.15 Mtrs. Wide Continuous at road edge 2 206.40 0.15 61.92
Digonal Marking 6 50.00 0.15 45.00
75 0.80 0.60 36.00
Stop Line 1 5.50 0.20 1.10
Giveway Line 30 0.60 0.20 3.60
Words- STOP 1 0.880 Area 0.88
Arrows -
Arrow Type (AM-11 & 12) 4 1.425 Area 5.70
Arrow Type (AM-09 & 10) 1 1.215 Area 1.22
Arrow Type (AM-08) 8 1.100 Area 8.80
Total 171.10 684.38
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia
19 each
circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings as per
relevant clauses of section-800 of specifications.
At Every 10m C/C bothsides 68 68.00
Total 68.00 272.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant
20 to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm each
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973).
At Every 5m C/C bothsides 136 136.00
Total 136.00 544.00
High Mast Lights
21 Providing and erecting 30mt High Mast Lighting system suitable to install upto 10 No. 2 x 250/ 400 w M.H / S.V flood light and each 1 1.00 4.00
control gear with integral Power tool, weight 450 kg
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Qty Calculation of Cross-Major Junction Improvement (As per Dwg. No. 22 of MoST Std. Dwg. for Intersections)
Total No of Cross Major Jn = 0 Nos.
Qty for 1 Total Qty for
Sr. No. Item Unit Nos. Length Width Height
Junction all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be Hectar
1 2 115.00 3.50 0.08 0.00
used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in e
thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
2 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with cum 2 115.00 2.50 0.50 287.50 0.00
all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and lead
3 Sqm 1 115.00 7.00 805.00 0.00
upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per
relevent clauses of section-300.
(a) For embankment cum
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 9.49 0.50 616.85
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 2.62 0.50 131.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 0.50 275.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 11.12 0.50 1047.50
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 3.12 0.50 349.44
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 9.49 0.50 616.85
(b) For sub grade layer
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 17.49 0.50 1136.85
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 11.62 0.50 581.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 0.50 275.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 10.12 0.50 953.30
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 12.12 0.50 1357.44
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 16.24 0.50 -909.44
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 17.49 0.50 1136.85
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 16.24 0.50 -1055.60
Total 6512.05 0.00
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone having
CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or
5 cum
plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the desired density,
complete as per clauses 401 of Specification.
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 16.09 0.20 418.34
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 10.92 0.20 218.40
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 0.20 110.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 9.42 0.20 354.95
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 11.42 0.20 511.62
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 14.84 0.20 -332.42
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 16.09 0.20 418.34
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 14.84 0.20 -385.84
Total 1313.39 0.00
6 Wet Mix Macadam (WMM) cum
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 0.250 372.78
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.11 0.250 177.75
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.61 0.250 140.25
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.61 0.250 264.23
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.61 0.250 426.16
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.22 0.250 -286.16
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 0.250 372.78
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 0.250 -332.15
Total 1135.63 0.00
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope &
7 camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of Cum
400.
Hard Shoulders (CBR value >12)
For Improvement of Side Road 4 137.10 1.86 0.36 367.21
Total 367.21 0.00
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and
8 cum
compacted as per clause 408 of specification.
(c) For filling in island, median, separator
For Improvement of Side Road
filling in Median 2 45.00 1.20 0.50 54.00
filling in island 4 42.00 Area 0.50 84.00
For Improvement of Main Highway
filling in Median 2 45.00 1.20 0.50 54.00
Total 192.00 0.00
Construction of footpath/ separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick
9 cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all drainage Sqm
arrangements but excluding kerb channel.
For Improvement of Side Road
For median 2 45.00 1.20 108.00
For island 4 42.00 Area 168.00
For Improvement of Main Highway
For median 2 45.00 1.20 108.00
Total 384.00 0.00
10 Prime coat on prepared Granular base Sqm
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.11 711.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.61 561.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.61 1056.92
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.61 1704.64
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.22 -1144.64
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 4542.52 0.00
11 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 1462.50
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.00 700.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 550.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.50 1036.20
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.50 1680.00
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.00 -1120.00
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 1462.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 -1300.00
Total 4471.20 0.00
12 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.11 711.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.61 561.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.61 1056.92
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.61 1704.64
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.22 -1144.64
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.47 1491.10
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.22 -1328.60
Total 4542.52 0.00
13 Dense Bituminous Macadam (DBM) Cum
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.07 102.38
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.00 0.07 49.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 0.07 38.50
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.50 0.07 72.53
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.50 0.07 117.60
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.00 0.07 -78.40
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.07 102.38
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.07 -91.00
Total 312.98 0.00
14 Bituminous Concrete (BC) Cum
For Improvement of Side Road
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.04 58.50
25 m long straight portion (bothsides); W=2x7.0 m 4 25.00 7.00 0.04 28.00
25 m long straight portion (bothsides); W=2x5.5 m 4 25.00 5.50 0.04 22.00
Curvature portion (R=30.0m) (bothsides), W=2x5.5 m 4 47.10 5.50 0.04 41.45
For Improvement of Main Highway
112 m long straight portion ; W=2x7.5 m 2 112.00 7.50 0.04 67.20
Deduct proposed carriageway portion already taken in the estimates of main highway -1 112.00 10.00 0.04 -44.80
65 m long tapered portion (bothsides); W= from 15.5m to 7.0m 2 65.00 11.25 0.04 58.50
Deduct proposed carriageway portion already taken in the estimates of main highway -2 65.00 10.00 0.04 -52.00
Total 178.85 0.00
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped
15 metre
towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per
clause 409
For Improvement of Side Road
For median 4 45.00 180.00
For island 4 32.89 131.57
For Improvement of Main Highway
For median 4 45.0 180.00
Total 491.57 0.00
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high
intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of
4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity
16 Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting
shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.

i) 90 cm equilateral triangle each 2 2.00 0.00


ii) 60 cm equilateral triangle each 10 10.00 0.00
iii) 60 cm circular each 4 4.00 0.00
iv) 90 cm high octagon each 2 2.00 0.00

Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity Micro-
Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core
of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and
aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro
17 sqm 8 1.00 0.90 7.20 0.00
Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall
conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete
450x450x600mm The ACM sheet shall be fixed to the post with minimum two number breakaway bolts.

Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per
18 sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform
and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 3 Mtrs. Long @ 6.0 Mtrs. Interval at Road Centre 1 172.80 0.10 17.28
White Strips of 0.15 Mtrs. Wide Continuous at road edge 2 518.40 0.15 155.52
Digonal Marking 12 50.00 0.15 90.00
150 0.80 0.60 72.00
Stop Line 2 5.50 0.20 2.20
Giveway Line 60 0.60 0.20 7.20
Words- STOP 2 0.880 Area 1.76
Arrows -
Arrow Type (AM-11 & 12) 8 1.425 Area 11.40
Arrow Type (AM-09 & 10) 2 1.215 Area 2.43
Arrow Type (AM-08) 16 1.100 Area 17.60
Total 377.39 0.00
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia
19 each
circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings as per
relevant clauses of section-800 of specifications.
At Every 10m C/C bothsides 124 124.00
Total 124.00 0.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant
20 to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm each
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973).
At Every 5m C/C bothsides 252 252.00
Total 252.00 0.00
High Mast Lights
21 Providing and erecting 30mt High Mast Lighting system suitable to install upto 10 No. 2 x 250/ 400 w M.H / S.V flood light and each 1 1.00 0.00
control gear with integral Power tool, weight 450 kg
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Minor Junction Improvement (As per Dwg. No. 35 of MoST Std. Dwg. for Intersections)
Total No of T Minor Jn = 39 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth
up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of
1 Hectare 2 79.00 2.50 0.04 1.54
serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic
soil not exceeding 150 mm in thickness.

Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom
2 and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the cum 1 175.00 Vol. 175.00 6825.00
embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and
3 Sqm 1 70.00 3.75 262.50 10237.50
lead upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 cum
and as per relevent clauses of section-300.
(a) For embankment
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 6.945 0.30 114.59
Flared Portion 2 Area 82.50 0.30 49.50
2 Area 112.50 0.30 67.50
(b) For sub grade layer
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 13.245 0.30 218.54
Flared Portion 2 Area 82.50 0.30 49.50
2 Area 112.50 0.30 67.50
Total 567.14 22118.46
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed
stone having CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place
5 cum
method with rotavator or plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static
weight to achieve the desired density, complete as per clauses 401 of Specification.
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 12.345 0.15 101.85
Flared Portion 2 Area 82.50 0.15 24.75
2 Area 112.50 0.15 33.75
Total 160.35 6253.65
6 Wet Mix Macadam (WMM) Cum
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.535 0.150 62.16
Flared Portion 2 Area 82.50 0.150 24.75
2 Area 112.50 0.150 33.75
Total 120.66 4705.7
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required
7 slope & camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per Cum
relevant clause of 400.
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Minor Junction Improvement (As per Dwg. No. 35 of MoST Std. Dwg. for Intersections)
Total No of T Minor Jn = 39 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Hard Shoulders (CBR value >12)
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 2.11 0.23 53.26
Flared Portion 2 24.00 2.11 0.23 23.24
Total 76.50 2983.33
8 Prime coat on prepared Granular base Sqm
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.535 414.43
Flared Portion 2 Area 82.50 165.00
2 Area 112.50 225.00
Total 804.43 31372.8
9 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.375 405.63
Flared Portion 2 Area 82.50 165.00
2 Area 112.50 225.00
Total 795.63 31029.6
10 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.535 414.43
Flared Portion 2 Area 82.50 165.00
2 Area 112.50 225.00
Total 804.43 31372.8
11 Dense Bituminous Macadam (DBM) Cum
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.375 0.050 20.28
Flared Portion 2 Area 82.50 0.050 8.25
2 Area 112.50 0.050 11.25
Total 39.78 1551.4
12 Bituminous Concrete (BC) Cum
55m tapered section (width transition 3.75 m to 11.0m) 1 55.00 7.375 0.030 12.17
Flared Portion 2 Area 82.5 0.030 4.95
2 Area 112.5 0.030 6.75
Total 23.87 930.9
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Minor Junction Improvement (As per Dwg. No. 35 of MoST Std. Dwg. for Intersections)
Total No of T Minor Jn = 39 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn

Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010
made of high intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite
material sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of
aluminium with overall thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to
Table 800-1 of specification and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of
13
specification. The printing on the high intensity grade sheeting shall conform to Clause 801.3.7 with water based latex
optimized transparent ink as specified by the sheeting manufacturer, supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to IRC 67-2010 fixed to
ground by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM sheet shall be
fixed to the post with four minimum four number breakaway bolts.

i) 90 cm high octagon each 1 1.00 39.00


Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity
Micro-Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall
thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of
14 specification and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The sqm 1 1.00 0.90 0.90 35.10
printing on the high intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized
transparent ink as specified by the sheeting manufacturer, supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to IRC 67-2010 fixed to
ground by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM sheet shall be
fixed to the post with minimum two number breakaway bolts.
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of T-Minor Junction Improvement (As per Dwg. No. 35 of MoST Std. Dwg. for Intersections)
Total No of T Minor Jn = 39 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250
15 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface
to be level, uniform and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 6 Mtrs. Long @ 3.0 Mtrs. Interval at Road Centre 1 20.00 0.10 2.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous at Centre line 1 30.00 0.10 3.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous edge line 2 79.00 0.10 15.80
Digonal Marking 0 50.00 0.15 -
0 0.80 0.60 -
Stop Line 1 20.50 0.20 4.10
Words- STOP 1 0.88 Area 0.88
Arrows -
Arrow Type (AM-11 & 12) 2 1.425 Area 2.85
Arrow Type (AM-09 & 10) 1 1.215 Area 1.22
Total 29.85 1163.96
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers),
80-100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm
16 each
rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming to
IRC-79 and the drawings as per relevant clauses of section-800 of specifications.
At Every 5m C/C 2 16.00 32.00
Total 32.00 1248.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by
17 each
drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS
873 part 4:1973).
At Every 3m C/C 2 26.00 52.00
Total 52.00 2028.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Minor Junction Improvement (As per Dwg. No. 36-C of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 14 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable
1 Hectare 2 88.00 2.50 0.04 0.62
material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not
exceeding 150 mm in thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and
2 side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment cum 1 125.00 Vol. 125.00 1750.00
location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and
3 Sqm 1 50.00 3.75 187.50 2625.00
lead upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and
as per relevent clauses of section-300.
(a) For embankment cum
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 4.945 0.30 37.09
Flared Portion 1 Area 175.00 0.30 52.50
1 Area 312.50 0.30 93.75
1 Area 125.00 0.30 37.50
(b) For sub grade layer cum
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 11.245 0.30 84.34
Flared Portion 1 Area 175.00 0.30 52.50
1 Area 312.50 0.30 93.75
1 Area 125.00 0.30 37.50
Total 488.93 6845.02
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone
having CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with
5 cum
rotavator or plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the
desired density, complete as per clauses 401 of Specification.
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 10.345 0.15 38.79
Flared Portion 1 Area 175.00 0.15 26.25
1 Area 312.50 0.15 46.88
1 Area 125.00 0.15 18.75
Total 130.67 1829.38
6 Wet Mix Macadam (WMM) Cum
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.535 0.150 20.76
Flared Portion 1 Area 175.00 0.150 26.25
1 Area 312.50 0.150 46.88
1 Area 125.00 0.150 18.75
Total 112.63 1576.8
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Minor Junction Improvement (As per Dwg. No. 36-C of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 14 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required
7 slope & camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per Cum
relevant clause of 400.
Hard Shoulders (CBR value >12)
25m tapered section (width transition 3.75 m to 7.0m) 2 25.00 2.11 0.23 24.21
Flared Portion 1 39.00 2.11 0.23 18.88
1 24.00 2.11 0.23 11.62
Total 54.71 765.93
8 Prime coat on prepared Granular base Sqm
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.535 138.38
Flared Portion 1 Area 175.00 175.00
1 Area 312.50 312.50
1 Area 125.00 125.00
Total 750.88 10512.3
9 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.375 134.38
Flared Portion 1 Area 175.00 175.00
1 Area 312.50 312.50
1 Area 125.00 125.00
Total 746.88 10456.3
10 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.535 138.38
Flared Portion 1 Area 175.00 175.00
1 Area 312.50 312.50
1 Area 125.00 125.00
Total 750.88 10512.3
11 Dense Bituminous Macadam (DBM) Cum
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.375 0.05 6.72
Flared Portion 1 Area 175.00 0.05 8.75
1 Area 312.50 0.05 15.63
1 Area 125.00 0.05 6.25
Total 37.34 522.76
12 Bituminous Concrete (BC) Cum
25m tapered section (width transition 3.75 m to 7.0m) 1 25.00 5.375 0.03 4.03
Flared Portion 1 Area 175.00 0.03 5.25
1 Area 312.50 0.03 9.38
1 Area 125.00 0.03 3.75
Total 22.41 313.74
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Minor Junction Improvement (As per Dwg. No. 36-C of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 14 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of
high intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material
sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with
overall thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of
specification and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The
13
printing on the high intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized
transparent ink as specified by the sheeting manufacturer, supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to IRC 67-2010 fixed to ground
by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM sheet shall be fixed to
the post with four minimum four number breakaway bolts.
i) 90 cm high octagon each 1 1.00 14.00
Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity
Micro-Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall
thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification
14 and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high sqm 1 1.00 0.90 0.90 12.60
intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by
the sheeting manufacturer, supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of
Aluminium composite material in accordance to IRC 67-2010 fixed to ground by means of properly designed foundation
with M15 grade concrete 450x450x600mm The ACM sheet shall be fixed to the post with minimum two number
breakaway bolts.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms
15 per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 6 Mtrs. Long @ 3.0 Mtrs. Interval at Road Centre 1 20.00 0.10 2.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous at Centre line 1 30.00 0.10 3.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous edge line 2 88.00 0.10 17.60
Digonal Marking 0 50.00 0.15 -
0 0.80 0.60 -
Stop Line 1 15.00 0.20 3.00
Words- STOP 1 0.88 Area 0.88
Arrows -
Arrow Type (AM-11 & 12) 2 1.425 Area 2.85
Arrow Type (AM-09 & 10) 1 1.215 Area 1.22
Total 30.55 427.63
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-
100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or
16 each
75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the
drawings as per relevant clauses of section-800 of specifications.
At Every 5m C/C 2 18.00 36.00
Total 36.00 504.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Y-Minor Junction Improvement (As per Dwg. No. 36-C of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 14 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by
17 each
drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873
part 4:1973).
At Every 3m C/C 2 29.00 58.00
Total 58.00 812.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Cross-Minor Junction Improvement (As per Dwg. No. 34 of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 4 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable
1 Hectare 4 79.00 2.50 0.08 0.32
material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not
exceeding 150 mm in thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and
2 side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment cum 2 175.00 Vol. 350.00 1400.00
location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Scarification of existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lift and
3 Sqm 2 70.00 3.75 525.00 2100.00
lead upto 1000 metres complete as per clause of 501.8.3.2.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
4 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and
as per relevent clauses of section-300.
(a) For embankment cum
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 6.945 0.30 229.18
Flared Portion 4 Area 82.50 0.30 99.00
4 Area 112.50 0.30 135.00
(b) For sub grade layer cum
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 13.245 0.30 437.08
Flared Portion 4 Area 82.50 0.30 99.00
4 Area 112.50 0.30 135.00
Total 1134.27 4537.08
Construction of Granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone
having CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with
5 cum
rotavator or plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the
desired density, complete as per clauses 401 of Specification.
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 12.345 0.15 203.69
Flared Portion 4 Area 82.50 0.15 49.50
4 Area 112.50 0.15 67.50
Total 320.69 1282.76
6 Wet Mix Macadam (WMM) Cum
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.535 0.150 124.33
Flared Portion 4 Area 82.50 0.150 49.50
4 Area 112.50 0.150 67.50
Total 241.33 965.3
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Cross-Minor Junction Improvement (As per Dwg. No. 34 of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 4 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required
7 slope & camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per Cum
relevant clause of 400.
Hard Shoulders (CBR value >12)
55m tapered section (width transition 3.75 m to 11.0m) 4 55.00 2.11 0.23 106.51
Flared Portion 4 24.00 2.11 0.23 46.48
Total 152.99 611.97
8 Prime coat on prepared Granular base Sqm
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.535 828.85
Flared Portion 4 Area 82.50 330.00
4 Area 112.50 450.00
Total 1608.85 6435.4
9 Tack coat on the prepared bituminous surface @ 0.25 kg per Sq.M. Sqm
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.375 811.25
Flared Portion 4 Area 82.50 330.00
4 Area 112.50 450.00
Total 1591.25 6365.0
10 Tack coat on Granular surface treated with primer @ 0.30 kg per sq.m Sqm
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.535 828.85
Flared Portion 4 Area 82.50 330.00
4 Area 112.50 450.00
Total 1608.85 6435.4
11 Dense Bituminous Macadam (DBM) Cum
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.375 0.050 40.56
Flared Portion 4 Area 82.50 0.050 16.50
4 Area 112.50 0.050 22.50
Total 79.56 318.24
12 Bituminous Concrete (BC) Cum
55m tapered section (width transition 3.75 m to 11.0m) 2 55.00 7.375 0.030 24.34
Flared Portion 4 Area 82.50 0.030 9.90
4 Area 112.50 0.030 13.50
Total 47.74 190.96
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Cross-Minor Junction Improvement (As per Dwg. No. 34 of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 4 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of
high intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material
sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with
overall thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of
specification and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The
13
printing on the high intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized
transparent ink as specified by the sheeting manufacturer, supported on composite sign post of size 5mmx
33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in accordance to IRC 67-2010 fixed to ground
by means of properly designed foundation with M15 grade concrete 450x450x600mm The ACM sheet shall be fixed to
the post with four minimum four number breakaway bolts.
i) 90 cm high octagon each 2 2.00 8.00
Direction and Place Identification signs upto 0.9 sqm size board.
Providing and erecting direction and place identification retroreflectorised sign asper IRC:67 made of high intensity
Micro-Prismatic Grade Sheeting (Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall
thickness of 4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification
14 and High Intensity Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high sqm 2 1.00 0.90 1.80 7.20
intensity grade sheeting shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by
the sheeting manufacturer, supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of
Aluminium composite material in accordance to IRC 67-2010 fixed to ground by means of properly designed foundation
with M15 grade concrete 450x450x600mm The ACM sheet shall be fixed to the post with minimum two number
breakaway bolts.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms
15 per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
White Strips of 0.10 Mtrs. Wide and 6 Mtrs. Long @ 3.0 Mtrs. Interval at Road Centre 2 20.00 0.10 4.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous at Centre line 2 30.00 0.10 6.00
White Strips of 0.10 Mtrs. Wide and 30 Mtrs. Long Contineous edge line 4 79.00 0.10 31.60
Digonal Marking 0 50.00 0.15 -
0 0.80 0.60 -
Stop Line 2 20.50 0.20 8.20
Words- STOP 2 0.88 Area 1.76
Arrows -
Arrow Type (AM-11 & 12) 4 1.425 Area 5.70
Arrow Type (AM-09 & 10) 2 1.215 Area 2.43
Total 59.69 238.76
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-
100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or
16 each
75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming to IRC-79 and the
drawings as per relevant clauses of section-800 of specifications.
At Every 5m C/C 4 16.00 64.00
Total 64.00 256.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Cross-Minor Junction Improvement (As per Dwg. No. 34 of MoST Std. Dwg. for Intersections)
Total No of Cross Minor Jn = 4 Nos
Sr. Qty for 1 Total Qty
Item Unit Nos. Length Width Height
No. Junction for all Jn
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by
17 each
drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873
part 4:1973).
At Every 3m C/C 4 26.00 104.00
Total 104.00 416.00
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
Part-C Toll Plaza , Truck Lay Bay

TOLL PLAZA

Clearing and Grubbing Road Land


(Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut
1 2.2 earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned
up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in
thickness.)
A In area of light jungle hectare 2.28 39368.00 89,735.42
Excavation for roadwork in soil with hydraulic
excavator including cutting and loading in tippers,
trimming bottom and side slopes, in accordance with
2 3.3 requirements of lines, grades and cross sections, and Cum 16,822.50 45.00 757,012.50
transporting to the embankment location with all lifts
and lead upto 1000m as per relevent clauses of section-
300 of specification.

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
3 3.10 Cum 7,736.25 144.00 1,114,020.00
required slope and compacting to meet requirement of
table 300-1, 300-2 and as per relevent clauses of
section-300.

Granular Sub-base with Well Graded Material


(CBR>30 or more) (Table:- 400-1 & Table 400-2)
Construction of granular sub-base by providing well
graded material like natural sand crushed gravel or
crushed stone having CBR >30, spreading in uniform
4 4.1 Cum 3,334.50 764.00 2,547,558.00
layers with motor grader on prepared surface, mixing
by mix in place method with rotavator or plant mix
method at OMC, and compacting with vibratory rollers
of 80 to 100 kN static weight to achieve the desired
density, complete as per Clause 401 of Specification.

Dry Lean Cement Concrete Sub- base


Construction of dry lean cement concrete Sub- base
over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm aggregate cement ratio
not to exceed 15:1, aggregate gradation after blending
to be as per table 600-1, cement content not to be less
5 6.1 Cum 2,138.63 2199.00 4,702,836.38
than 150 kg/ cum, optimum moisture content to be
determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed in a
batching plant, transported to site, laid with a paver
with electronic sensor, compacting with 8- 10 tonnes
vibratory roller, finishing and curing as per clause 601
of specification complete in all respect.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.

Cement Concrete Pavement (Construction of un-


reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with 43 grade
cement @ 400 kg per cum, coarse and fine aggregate
conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mix design,
6 6.3 transported to site, laid with a fixed form or slip form Cum 4,142.25 5153.00 21,345,014.25
paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion,
construction and longitudinal joints, joint filler,
separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per drawing )

Excavation for Structures


Earth work in excavation of foundation of structures as
per drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter,
7 12.1 dressing of sides and bottom and backfilling with Cum 540.00 52.00 28,080.00
approved material. as per relevant clauses of section
300 & 2100 in.
I- Ordinary soil
B- Mechanical Means
upto 3 m depth

Providing Plain cement concrete M-15 nominal mix in


8 12.3 foundation as per relevant clauses of sections 1500, Cum 108.00 4299.00 464,292.00
1700 and 2100.
Provdiing and laying Plain/Reinforced cement concrete
in open foundation including form work shuttering etc.
9 12.8 complete as per drawing and technical specifications Cum
and as per relevant clauses of sections 1500, 1700 &
2100 with.
i) RCC Grade M25 472.50 5324.00 2,515,590.00
Supplying, fitting and placing un-coated HYSD bar
reinforcement in foundation complete as per drawing
10 12.31 MT 28.35 66069.00 1,873,056.15
and technical specifications and as per relevant clauses
of section 1600.
Providing weep holes in Brick
masonry/Plain/Reinforced concrete abutment, wing
wall/return wall with 100 mm dia AC/PVC pipe,
11 13.9 Each 900.00 173.00 155,700.00
extending through the full width of the structure with
slope of 1V :20H towards drawing foce. Complete as per
drawing and Technical specifications
Plain/Reinforced cement concrete in sub-structure
12 13.6 Cum
complete as per drawing and technical specifications
i) RCC Grade M25 444.94 5972.00 2,657,193.62
Supplying, fitting and placing HYSD bar reinforcement
in substructure complete as per drawing and technical
13 13.7 MT 35.60 66217.00 2,357,017.95
specifications and as per relevant clause of section
1600.
Construction of Underground Tunnel between toll office
and toll booth of each toll lane, including Excavation,
Concreting, Electrification, necessary ventilation, fire
fighting system, stair case at each toll lane for easy
14 movement etc. as per IRC:SP:84-2014,Cl.10.4.5, -
Pg.115 (Future Expansion Consider while calculating
Length)
(RCC Box of minimum 2.7m Lateral Clearance and
3.0m vertical clearance)

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
Excavation for Structures
Earth work in excavation of foundation of structures as
per drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter,
12.1 dressing of sides and bottom and backfilling with Cum 546.84 52.00 28,435.68
approved material. as per relevant clauses of section
300 & 2100 in.
I- Ordinary soil
B- Mechanical Means
upto 3 m depth
Back filling behind abutment, wing wall and return wall
complete as per drawing and Technical specification
13.10 and as per relevant clauses 305 of specifications and as Cum 39.06 880.00 34,372.80
per appendix 6 of IRC-78.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
Providing Plain cement concrete M-15 nominal mix in
12.3 foundation as per relevant clauses of sections 1500, Cum 29.30 4299.00 125,939.21
1700 and 2100.
Provdiing and laying Plain/Reinforced cement concrete
in open foundation including form work shuttering etc.
12.8 complete as per drawing and technical specifications Cum
and as per relevant clauses of sections 1500, 1700 &
2100 with.
i) RCC Grade M35 271.62 5424.00 1,473,266.88
Supplying, fitting and placing un-coated HYSD bar
reinforcement in foundation complete as per drawing
12.31 MT 24.45 66069.00 1,615,109.56
and technical specifications and as per relevant clauses
of section 1600.
Electric Motor for Drain out Water from Tunnel Nos 2.00 150,000 300,000.00
Supply and installation of toll booths of size 2.50 x
1.80m and 2.50 x 3.70mwith porta cabin / container as
15 Sqm 31.50 8,000 252,000.00
per drg. & technical specifications directed by the
engineer.
Steel work in built up tubular trusses including cutting,
hoisting fixing in position and applying a priming coat of
16 14.24 approved steel primer, welded and bolted including tonne 2.51 65,592 164,500.92
special shaped washers etc.
complete.
Provision of Canopy at Toll Plaza. The Structure of
Canopy will be pre-fabricated steel structure including
17 Sqm 1,627.50 10,000 16,275,000.00
facia,drainage system. (vertical clearance will be
minimum 6.0m.), internal electrification etc.
Semi Automatic Toll Lane, i.e. Automatic vehicle
18 identification but manual fee transaction, should be Lane 4.00 1,000,000 4,000,000.00
provided
Two Toll Lanes in each direction of travel shall be
provided with the system of payment through
Electronic Toll Collection (ETC) out of which one Lane
shall be dedicated for ETC exclusively and the second
19 Lane 2.00 3,200,000 6,400,000.00
lane shall be standly ETC lane. The standly ETC lane
may be converted to dedicated ETC lane in case of
failure/ maintenance of first ETC Lan. (DEDICATED
ETC)

Two Toll Lanes in each direction of travel shall be


provided with the system of payment through
Electronic Toll Collection (ETC) out of which one Lane
20 shall be dedicated for ETC exclusively and the second Lane 2.00 1,500,000 3,000,000.00
lane shall be standly ETC lane. The standly ETC lane
may be converted to dedicated ETC lane in case of
failure/ maintenance of first ETC Lan. (STANDBY ETC)

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
identification retro-reflectorized sign as per
IRC:67:2012 made of high intensity Micro- Prismatic
Grade cube corner sheeting (Type XI) vide IRC:67:2012
clause 6.7.4.3 & clause 801.3.4.3 of MORTH fixed over
Aluminum composite material sheet with thermoplastic
core of Low density polyethylene (LDPE) between two
thick skins/sheets of aluminum with overall thickness
of 4mm and aluminum skin of thickness 0.3 on both
side, the ACM shall conform to Table 6.1 of IRC:67:2012
& table 800-1 of MORT&H specifications and High
Intensity Micro Prismatic Grade cube corner sheeting
shall conform to shall conform to Table 6.9 of
IRC:67:2012 & table 800-6 of MORT&H specifications.
In line with clause 6.8 of IRC:67:2012 & clause 801.3.7
of MORT&H. for the directional, informatory, place
identification and other sign boards, the messages
21 8.8 Sqm 186.45 11441.00 2,133,226.25
(legends, letters, numerals etc.) and borders shall be
cut-out from durable transparent overlay film or cut-out
from the same reflective sheeting only. Cut-outs shall be
from durable transparent overlay materials as specified
by the sheeting manufacturer and shall be bonded with
the sheeting in the manner specified by the
manufacturer and should be supported on MS sign post
of size 75mmx75mmx6mm fixed to ground by means of
properly designed foundation of dimension
450x450x600mm with M15 grade concrete. The ACM
sheet shall be fixed to the post with four minimum four
number breakaway bolts & supported with a back
support frame of 25mmx25mmx3mm angle. 10 years
Warranty for Retro Reflective Sheeting from the original
sheeting manufacturer as per clause 6.9 of IRC:67:2012
& a certified copy of three years outdoor exposure
Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on
Bituminous Surface
Providing and laying of hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass
22 8.15 Sqm 1681.00 516.00 867,397.03
beads @ 250 gms per sqm area, thickness of 2.5 mm is
exclusive of surface applied glass beads as per
IRC:35 .The finished surface to be level, uniform and
free from streaks and holes all complete as per clause
803 of specifications.

Road Markers/Road Stud with Lense Reflector


Providing and fixing single mould twin shanked molded
Road Markers/Road Stud made of poly carbonate or
ABS body and shall support a load of 13635 Kg tested in
accrodance to ASTM D 4280 and complying to
specifications of Section-5 of IRC:35-2015, and clause
804 of MORT&H. As per clause 804.2.2 of MORT&H and
section-5 of IRC:35-2015, the reflecting panels shall
consist of number of lenses containing single or dual
prismatic cubes capable of providing total internal
23 8.28 reflection of the light enterring surface should be 35+/- Each 920.00 448.00 412,160.00
5 deghree to base. The reflective marker shall be fixed
to the road surface using the epoxy/ adhesive and the
procedure recommanded by the manufacturer. No nails
shall be used to affix the markers so that they do not
pose saftey hazard on the road. The contractor shall
submit a two year replacement warranty for
satisfactory filed performance including stipulated field
performance including stipulated retro-reflectance of
the reflecting panel.

Construction of Administrative Block including


24 Sqm 750.00 12,000 9,000,000.00
Traffic Aid Post & Emergency Medical Aid Post
Construction of Generator and Electric & Generator
25 Sqm 50.00 9,000 450,000.00
Room
Lawn Development at Toll Plaza including tree
26 Sqm 3,920.00 200 784,000.00
plantation and with outer kerb

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
Construction of 2 Nos. Toielet Blocks (1 on Both Side)
for Public users (As per Letter no
27 Sqm 100.00 8,000 800,000.00
NHAI/GM/CMII/SBM/Misc/2016/96855 dated
20.03.17
28 Standardised static weighing maching at toll plaza No 2.00 500,000 1,000,000.00
29 Standardised Weigh in motion in each toll lane Lane 8.00 175,000 1,400,000.00

Providing and erecting street light mounted on a steel


42.3, 42.14, tubular pole swaged type as per IS:2713-1980 Complete
42.20 & with base plate and top Canopy for street lighting, 10m
30 31.9.3 SOR highfrom road surface and with 2.0 m overhang. Poles Nos. 36.00 41275.00 1,485,900.00
of Electrical on both sides spaced at 25 m c/c , fitted with sodium
Work vapour lamp of 250 watts and fixed firmly in concrete
foundation.

galvanized materials as per BSEN ISO 1461 thickness 3


mm & 4 mm, dia 150mm & 410mm for top and bottom
respectively, stress fitting arrangement on site with
500mm overlap dynamic loading to withstand max
wind pressure as per -IS 875 part III, parameters for
structural & foundation design must be taken from
Wind Tunnel test. Lightning protection of GI single spike
1200mm at top and at base inside compartment having
double thickness 3 mm & 4 mm, dia 150mm & 410mm
for top and bottom respectively, stress fitting
arrangement on site with 500mm overlap dynamic
loading to withstand max wind pressure as per -IS 875
part III, parameters for structural & foundation design
must be taken from Wind Tunnel test. Lightning
protection of GI single spike 1200mm at top and at base
42.92 of
inside compartment having double internal lock with
31 Electrical Nos. 2.00 516348.00 1,032,696.00
adequate size of MCB erected on PVC board complete
SOR 2014
with base plate of 25mm thick 570mm dia. and
foundation bolts having 8 nos. bolts of 30mm dia 850
mm long (EN.8 grade) Anchor plate 490 PCD, including
accessories viz.(1) Lantern carriage of 50 NB ERW class-
B ,MS pipe covered with PVC sleeve suitable to carry
500kg. load and up to 10 fittings symmetrically.(2)
Trailing Copper cable 5x4.0 sq.mm, PVC insulated PVC
Sheathed (3) Double Drum 750Kg Winch having gear
53:1, oil bath (SAE90/140) arrangement (4) 2 nos.
Stainless steel wire ropes 6 mm dia (7/19) breaking
load capacity 2350 kg.x 2,(5) Integral power tool 3-
phase, 1HP 2m/min single speed .torque limiter up to
500 kg adjustable (6) 2 Nos. LED 300 Nos. aviation light
(7) Feeder pillar fabricated out of 14 SWG CRCA sheet
and comprise of incoming MCB 63 A TPN switch, HRC
TOTAL AMOUNT TOLL PLAZA 93,641,110.60

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
TRUCK LAY BAY
Clearing and Grubbing Road Land
(Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of stumps of trees cut
1 2.2 earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned
up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in
thickness.)
A In area of light jungle hectare 0.43 39368.00 17,006.98

Construction of embankment with approved material


having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
2 3.10 Cum 3,867.60 144.00 556,934.40
required slope and compacting to meet requirement of
table 300-1, 300-2 and as per relevent clauses of
section-300.

Construction of granular sub-base by providing well


graded material like natural sand crushed gravel of
crushed stone having CBR>30, spreading in uniform
layers with motor grader on prepared surface, mixing
3 4.1 Cum 599.12 764.00 457,727.68
by mix in place method with rotavator or plant mix
method at OMC, and compacting with vibratory roller of
80 to 100 kM static weight to achieve the desired
density, complete as per clauses 401 of Specification.

Providing, laying, spreading and compacting graded


stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
4 4.11 tipper to site, laying in uniform layers with paver in sub- Cum 621.40 1261.00 783,585.40
base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
density in accordance to Table No. 400-12, 400-13 and
as per clause of section 406 of specifications.

Construction of Median and Island above road level


with approved material obtained from borrow pits
5 4.15 including excavation & Transportation through all lead Cum 38.10 136.00 5,181.60
& lift and Spreading, Grading, Compacting as per
relavent clauses of section - 400.

Providing and applying primer coat with bitumen


emulsion on prepared surface of granular Base with low
porosity (WMM or WBM) including clearing of road
6 5.1 Sqm. 2,485.60 32.00 79,539.20
surface and spraying primer at the rate of 0.75 kg/sqm
with pressure distributor and as per relevant clause of
Section-500.

Providing and applying tack coat with bitumen


emulsion using emulsion pressure distributor on the
7 5.2 prepared bituminous / granular surface cleaned with
mechanical broom and as per relevant clauses of
Section-500.
( i) @ 0.25 kg per sqm (normal bituminous surfaces) Sqm. 2,380.00 12.00 28,560.00
@ 0.30 kg per sqm (dry & hungry bituminous
(ii) Sqm. 2,485.60 14.00 34,798.40
surfaces/granular surfaces treated with primer)

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.

Providing and laying dense bituminous macadam using


crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix
of mix and filler, transporting the hot mix to work site,
8 5.5 laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per clause
505 of specification complete in all respects.

Using Batch Mix Plant of appropriate capacity and Paver


a)
Finisher Hydraustatic with Sensor control.
( i) for Grading II (19 mm nominal size) Cum 166.60 6640.00 1,106,224.00

Providing and laying bituminous concrete using


crushed aggregates of specified grading, premixed with
bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a
9 5.6 hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per clause 507 of
specification.

Using Batch Mix Plant of appropriate capacity and Paver


a)
Finisher Hydraustatic with Sensor control.
for Grading II ( 30-45 mm thickness ) with 60/70
( i) Cum 95.20 7669.00 730,088.80
bitumen

Providing and laying half round reinforced cement


concrete pipe Np2 type conforming to IS 458-2003 for
drains in single row including joint filling with cement
10 6.14 metre 480.00 230.00 110,400.00
mortar 1:2 but excluding excavation, bedding,
protection works, backfilling etc. complete. (NP2 Pipes
300 mm dia)

Construction of cement concrete kerb with channel with


top and bottom width 115 and 165 mm respectively,
250 mm high in M 20 grade PCC on M10 grade
foundation 150 mm thick, kerb channel 300 mm wide,
11 8.2 50 mm thick in PCC M20 grade, sloped towards the metre 406.00 387.00 157,122.00
kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all
complete as per clause 409.
Using Concrete Batching and Mixing Plant

Rev-01
Providing and fixing of retro-reflectorized cautionary,
mandatory and informatory sign board as per IRC: 67-
2012 made of high intensity Micro- Prismatic Grade COST ESTIMATE
Sheeting (type IV) Rewa -Beohari-Tetka
vide IRC:67-2012 Mod Road
clause 6.7.3.2 & (SH-57)
SOR Item clause 801.3.3 of MORT&H fixed over Aluminum
Sr. No. composite material sheetItem with thermoplastic (LDPE) Unit Quantity Rate (Rs.) Amount
No.
between two thick skins/sheets of aluminum with
overall thickness of 4mm and aluminum skin of
thickness 0.3 on both side, the ACM shall conform to
Table 6.1 of IRC:67-2012 & Table 800-1 of MORT&H
specifications and High Intensity Micro Prismatic Garde
Sheeting shall confom to Table 6.6 of IRC:67-2012 &
Table 800-3 of MORT&H specification. In the bline with
clause 6.8 of MORT&H the messages ( legends,
numerals, letters etc.) & bordes shall be screen printed
12 8.3
or of cut out from the sa,me type of refletive sheeting for
cautionary/ mandatory signs. Screen printing shall be
processed & finished with materials and in a manner
specified by the sheeting manufacturer supported on
MS sign post of size 75mmx75mmx6mm fixed to
ground by means of properly designed foundation of
dimension 4560x450x600mm with M15 grade concrete.
The ACM sheet shall be fixed to the post with four
minimum four number breackaway bolts & supported
i) 60 cma circular
with back support frame of 25mmx25mmx3mm angle. Each 2.00 2962.00 5,924.00
ii) 60 cm x 45 cm
7 years Warranty
identification rectangular
for Retro Reflective
retro-reflectorized sign Sheeting
as per Each 2.00 2899.00 5,798.00
manufacturer as per clause 6.9 of IRC:67-2012
IRC:67:2012 made of high intensity Micro- Prismatic & a
cerifiedcube
Grade copy of three
'corner years(Type
sheeting outdoor exposure
XI) vide report
IRC:67:2012
fromn 6.7.4.3
clause an independent test lan as
& clause 801.3.4.3 perover
fixed caluse 6.7 of
Aluminum
IRC:67-2012material
composite for the product offered
sheet with shall be submitted
thermoplastic core of
by thedensity
Low contractor.
polyethylene (LDPE) between two thick
skins /sheets of aluminum with overall thickness of
4mm and aluminum skin of thickness 0.3 on both side,
the ACM shall to 6.1 conform Table of & IRC:67:2012
table 800-1 of specifications and MORT&H High
Intensity Micro Prismatic Grade cube corner sheeting
shall conform to Table 6.9 of IRC:67:2012 & table 800-6
of MORT&H specifications. In line with clause clause 6.8
of IRC:67:2012 & 801.3.7 of MORT&H, for the
directional, and informatory, place identification other
sign boards, the messages (legends, letters, numerals
13 8.6 etc.) and borders shall be cut-out from durable Each 1.80 6479.00 5,218.20
transparent overlay film or cut-out from the same
reflective sheeting only. Cut-outs shall be from durable
transparent overlay materials as specified by the
sheeting manufacturer and shall be bonded with the
sheeting in the manner specified by the manufacturer
and should be supported on MS sign post of size
75mmx75mmx6mm fixed to ground by means of
properly designed foundation of dimension
450x450x600mm with M15 grade concrete. The ACM
sheet shall be fixed to the post with four minimum four
number breakaway bolts & supported with a back
support frame of 25mmx25mmx3mm angle. 10 years
Warranty for Retro Reflective Sheeting from the original
sheeting manufacturer as per clause 6.9 of IRC:67:2012
& a certified copy of three years outdoor exposure
report from an independent test lab as per clause 6.7 of

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
identification retro-reflectorized sign as per
IRC:67:2012 made of high intensity Micro- Prismatic
Grade cube corner sheeting (Type XI) vide IRC:67:2012
clause 6.7.4.3 & clause 801.3.4.3 of MORTH fixed over
Aluminum composite material sheet with thermoplastic
core of Low density polyethylene (LDPE) between two
thick skins/sheets of aluminum with overall thickness
of 4mm and aluminum skin of thickness 0.3 on both
side, the ACM shall conform to Table 6.1 of IRC:67:2012
& table 800-1 of MORT&H specifications and High
Intensity Micro Prismatic Grade cube corner sheeting
shall conform to shall conform to Table 6.9 of
IRC:67:2012 & table 800-6 of MORT&H specifications.
In line with clause 6.8 of IRC:67:2012 & clause 801.3.7
of MORT&H. for the directional, informatory, place
identification and other sign boards, the messages
14 8.8 Sqm 14.47 11441.00 93,775.75
(legends, letters, numerals etc.) and borders shall be
cut-out from durable transparent overlay film or cut-out
from the same reflective sheeting only. Cut-outs shall be
from durable transparent overlay materials as specified
by the sheeting manufacturer and shall be bonded with
the sheeting in the manner specified by the
manufacturer and should be supported on MS sign post
of size 75mmx75mmx6mm fixed to ground by means of
properly designed foundation of dimension
450x450x600mm with M15 grade concrete. The ACM
sheet shall be fixed to the post with four minimum four
number breakaway bolts & supported with a back
support frame of 25mmx25mmx3mm angle. 10 years
Warranty for Retro Reflective Sheeting from the original
sheeting manufacturer as per clause 6.9 of IRC:67:2012
& a certified copy of three years outdoor exposure

Providing and laying of hot applied thermoplastic


compound 2.5 mm thick including reflectorising glass
beads @ 250 gms per sqm area, thickness of 2.5 mm is
15 8.15 exclusive of surface applied glass beads as per
Rond Delineators Sqm 251.40 516.00 129,722.40
IRC:35 .The
Supplying andfinished surface
installation roadto delineators
be level, uniform and
(road way
free from streaks
indicators), as perandMORT&Hholes all complete
Clause as per
806. The clause
structure
803
shallofbespecifications.
made in roll forming process having height of
80-100 cm above the ground level, width not less than
100 mm and shall extend not more than 300mm below
the ground while being installed, buried or pressed in to
the ground in confirmation with IRC:79: 1981, are as
directed by the by the Engineer painted black with
powder coat of minimum 40 microns thickness for
16 8.17 protection against corrosion, on top of which Type XI Each 48.00 1248.00 59,904.00
Road Markers/Road
retro reflective sheetingStud with
shall beLense
pastedReflector
on both sides
Providing
complyingand to fixing single mould
IRC:79:1981. Thetwin shanked molded
delineator should
Road
consistMarkers/Road
of minimum retro Studreflective
made ofunit poly carbonate
exposed area or
of
ABS
330 body and shall
cm2 white support
color, a load
full cube of 13635
corner microKgprismatic
tested in
accrodance
non-metallic to ASTM
retro D 4280
reflective and complying
sheeting on each side to
specifications
conforming with of Section-5 of IRC:35-2015,
IRC 67:2012 and clause
and meeting the
804 of MORT&H.
coefficient of retroAs per clause 804.2.2
reflection values asof MORT&H
per ASTMand D
section-5
4956 TypeofXIIRC:35-2015, the reflecting
table specification. panels shall
The delineator shall
consist of number
have grooves acrossofthe
lenses containing
length to makesingle or dual
the reflective
prismatic cubes capable of providing total internal
sheets vandal-proof.
17 8.28 reflection of the light enterring surface should be 35+/- Each 640.00 448.00 286,720.00
5 deghree to base. The reflective marker shall be fixed
to the road surface using the epoxy/ adhesive and the
procedure recommanded by the manufacturer. No nails
shall be used to affix the markers so that they do not
pose saftey hazard on the road. The contractor shall
submit a two year replacement warranty for
Providing
satisfactoryand erecting
filed street light
performance mounted
including on a steel
stipulated field
42.3, 42.14, tubular pole swaged
performance includingtypestipulated
as per IS:2713-1980 Complete
retro-reflectance of
& 31.9.3 with base plate
the reflecting and top Canopy for street lighting, 10m
panel.
18 SOR of highfrom road surface and with 2.0 m overhang. Poles Each 20.00 41275.00 825500.00
Electrical on both sides spaced at 25 m c/c , fitted with sodium
Work vapour lamp of 250 watts and fixed firmly in concrete
foundation.

19 Rest Area with Toilet 180.00 8000.00 1440000.00


20 Telephone Booth 2.00 45000.00 90000.00
Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
TOTAL AMOUNT TRUCK LAY BAY 7,009,730.81

Rev-01
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity
Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
1 and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top Hectare
organic soil not exceeding 150 mm in thickness.
A) In area of light jungle
Straight Portion (41.40+(2.175*4)+1=51.20m) 1 120.00 51.20 0.61
Administration Building area 1 162.00 25.00 0.41
Parking Area 2 140.00 45.00 1.26
Total 2.28
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
2 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with Cum
all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Straight Portion (41.40+((1.175+2.175)/2)*4=48.20m) 1 120.00 48.20 1.00 5784.00
Tapered Portion (26.75+((1.175+2.175)/2)*4=33.45m) 2 165.00 33.45 1.00 11038.50
Total 16822.50
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads,
3 transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as Cum
per relevent clauses of section-300.
Straight Portion (41.40+((0.675+1.175)/2)*4=45.20m) 1 120.00 45.20 0.50 2712.00
Tapered Portion (26.75+((0.675+1.175)/2)*4=30.45m) 2 165.00 30.45 0.50 5024.25
Total 7736.25
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse
4 graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Cum
rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
GSB cum Drainage Layer (Grading III)
Straight Portion (41.40+((0.450+0.675)/2)*4=43.75m) 1 120.00 43.75 0.225 1181.25
Tapered Portion (26.75+((0.45+0.675)/2)*4=29.00m) 2 165.00 29.00 0.225 2153.25
Total 3334.50
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity

Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with
coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not
to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum,
5 Cum
optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7
days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes
vibratory roller, finishing and curing.)

Straight Portion 1 120.00 42.50 0.15 765.00


Tapered Portion 2 165.00 27.75 0.15 1373.63
Total 2138.63

Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared
sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid
6 Cum
with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of
contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )

Straight Portion (6*3.2+2*4.5+7*1.9=41.50m) 1 120.00 41.50 0.30 1494.00


Tapered Portion (43.40+12)/2 = 26.75 2 165.00 26.75 0.30 2648.25
Total 4142.25
RCC Road Side Covered Drain
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,
construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
7 backfilling with approved material. as per relevant clauses of section 300 & 2100 in Cum 2 450.00 1.20 0.50 540.00
(B) Mechanical Means
(i) Depth upto 3 m

8 Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500,1700 and 2100. Cum 2 450.00 1.20 0.10 108.00
9 Providing RCC M-25 nominal mix in foundation as per relevant clauses of sections 1500,1700 and 2100. Cum
BOTTOM 2 450.00 1.00 0.15 135.00
SIDE WALL 4 450.00 0.15 0.75 202.50
Cover 2 450.00 1.00 0.15 135.00
Total 472.50
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
10
and as per relevant specifications and as per relevant clause of section 1600
STEEL @ 60 KG/Cum Tonne 472.50 0.06 28.35
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC/
PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per
11 Each 900 900.00
drawing and Technical specifications

Toll Plaza Island


Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as
12 Cum
per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with .
(C) RCC Grade M25
for Other Island 6 73.80 1.00 0.15 66.42
For Central Island 1 77.60 1.00 0.15 11.64
6 73.80 0.85 0.25 94.09
1 77.60 0.85 0.25 16.49
6 73.80 0.85 0.25 94.09
1 77.60 0.85 0.25 16.49
6 73.80 0.70 0.40 123.98
1 77.60 0.70 0.40 21.73
Total 444.94
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical
13 specifications and as per relevant clauses of section 1600.

STEEL @ 80 KG/Cum Tonne 444.94 0.08 35.60


Construction of Underground Tunnel between toll office and toll booth of each toll lane, including Excavation, Concreting, stair
14 case at each toll lane for easy movement etc.
(RCC Box of minimum 2.5m Lateral Clearance and 3.0m vertical clearance)

Excavation for Structures


Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,
construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
(i) backfilling with approved material. as per relevant clauses of section 300 & 2100 in. Cum 1 46.50 4.20 2.80 546.84
I- Ordinary soil
B- Mechanical Means
upto 3 m depth

Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as per
(ii) relevant clauses 305 of specifications and as per appendix 6 of IRC-78. Cum 1 46.50 0.30 2.80 39.06

Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as
(iii) per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . Cum 1 46.50 4.20 0.15 29.30
PCC Grade M-15
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as
(iv) per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . Cum
RCC Grade M35
Slab 1 46.50 3.90 0.45 81.61
SIDE WALL 2 46.50 0.45 2.50 104.63
Raft 1 46.50 3.90 0.45 81.61
Stair Ways 8 3.50 0.90 0.15 3.78
Total 271.62
(v) Steel MT 271.62 0.09 24.45
(vi) Electric Motor for Drain out Water from Tunnel Nos. 2 2.00
Toll Booth
15
Supply and installation of toll booths of size 2.50 x 1.80m and 2.50 x 3.70mwith porta cabin / container as per drg. & technical
i) Sqm
specifications directed by the engineer.
On Other Island 6 2.50 1.80 27.00
On Central Island 1 2.50 1.80 4.50
Total 31.50
Steel work in built up tubular trusses including cutting, hoisting fixing in position and applying a priming coat of approved
16
steel primer, welded and bolted including special shaped washers etc. complete.
Toll booth Protection work
(1) For MS Pipe 110 mm 56.80 meter @ 15.86 Kg/Rmt Rmt 56.80
(2) For Toll Both Protection - (7 Nos. x 2.8 x 0.9 x 1.2 @ 15.86 Kg/Rmt) Rmt 93.80
tonne 150.60 15.86 2.389
Westage 5 % tonne 0.12
Total 2.51
Provision of Canopy at Toll Plaza. The Structure of Canopy will be pre-fabricated steel structure including facia,drainage
17 Sqm 1 46.50 35.00 1627.50
system. (vertical clearance will be minimum 6.0m.),internal electrification etc.
18 Semi Automatic Toll Lane, i.e. Automatic vehicle identification but manual fee transaction, should be provided Lane 4 4
Two Toll Lanes in each direction of travel shall be provided with the system of payment through Electronic Toll
Collection (ETC) out of which one Lane shall be dedicated for ETC exclusively and the second lane shall be standly ETC lane.
19 Lane 2 2
The standly ETC lane may be converted to dedicated ETC lane in case of failure/ maintenance of first ETC Lan. (DEDICATED
ETC)
Two Toll Lanes in each direction of travel shall be provided with the system of payment through Electronic Toll
Collection (ETC) out of which one Lane shall be dedicated for ETC exclusively and the second lane shall be standly ETC lane.
20 Lane 2 2
The standly ETC lane may be converted to dedicated ETC lane in case of failure/ maintenance of first ETC Lan. (STANDBY
ETC)
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity

Direction and Place Identification signs with size more than 0.9 sqm size board. Providing and fixing of retro-reflectorised
cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high intensity Micro-Prismatic Grade Sheeting
(Type XI) vide clause 801.3.3 fixed over Aluminium composite material sheet with thermoplastic core of Low density
polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of 4mm and aluminium skin of
thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity Micro Prismatck Grade Sqm
Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting shall conform to
Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer, supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to ground by means of properly designed foundation with M15
grade concrete 450x450x600mm. The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.
21
(T1) Cantilever gantry sign for Toll Gate 1.0 Km 2 1.52 0.63 1.92
(T2) Cantilever gantry sign for Toll Gate 500 m 2 1.72 0.63 2.17
(T3) Kerb sign for exempt vehicles 2 3.40 1.70 11.56
(T4) Kerb sign for pictorial depiction of toll rates 2 4.12 4.43 36.47
(T5) Kerb sign for pictorial depiction of toll rates 2 2.47 2.66 13.14
(T6) Providing Recto Reflective Canopy Signage at toll plaza Facia made of High Intensity Presmatic material, GR-9 sheeting
2 46.50 1.20 111.60
vide clause 801.3,
(T7) Sign near the tollbooths displaying toll rates and complaint telephone number & address 8 1.00 1.20 9.60
Total 186.45
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing
and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area,
22 thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free Sqm
from streaks and holes all complete as per clause 803 of specifications.)

Bar Marking 2x35 7.50 0.30 1260.00


Diagonal Marking (12.0 Sqm) 8x2 12.00 192.00
White Stip 2x4 30.00 0.10 84.00
Centre Line Marking 1 33.34 3.00 0.10 10.002
Edge Line 2 450.00 0.15 135.00
Total 1681.002
Road Markers/Road Stud with Lense Reflector Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant
23 to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm Each
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973
At every 30 meter c/c 2 10.00 20.00
At Every 2.00 meter interval 6 150.00 900.00
Total 920.00
24 Construction of Administrative Block including Traffic Aid Post & Emergency Medical Aid Post Sqm 1 50.00 15.00 750.00
25 Construction of Generator and Electric & Generator Room Sqm 1 10.00 5.00 50.00
26 Lawn Development at Toll Plaza including tree plantation and with outer kerb Sqm 1 112.00 35.00 3920.00
Construction of 2 Nos. Toielet Blocks (1 on Both Side) for Public users (As per Letter no
27 Sqm 2 10.00 5.00 100.00
NHAI/GM/CMII/SBM/Misc/2016/96855 dated 20.03.17
28 Standardised static weighing maching at toll plaza No 2 2.00
29 Standardised Weigh in motion in each toll lane Lane 8 8.00
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Toll Plaza
Sr. No. Item Unit Nos. Length Width Height Quantity
Providing and erecting street light mounted on a steel tubular pole swaged type as per IS:2713-1980 Complete with base
30 plate and top Canopy for street lighting, 10m highfrom road surface and with 2.0 m overhang. Poles on both sides spaced at 25 No. 36 36.00
m c/c , fitted with sodium vapour lamp of 250 watts and fixed firmly in concrete foundation.

High Mast Lights


Providing and erecting 30mt High Mast Lighting system suitable to install upto 10 No. 2 x 250/ 400 w M.H / S.V flood light and
control gear with integral Power tool, weight 450 kg. comprising of 2 sections of hot dipped galvanized materials as per BSEN
ISO 1461 thickness 3 mm & 4 mm, dia 150mm & 410mm for top and bottom respectively, stress fitting arrangement on site
with 500mm overlap dynamic loading to withstand max wind pressure as per -IS 875 part III, parameters for structural &
foundation design must be taken from Wind Tunnel test. Lightning protection of GI single spike 1200mm at top and at base
inside compartment having double thickness 3 mm & 4 mm, dia 150mm & 410mm for top and bottom respectively, stress
fitting arrangement on site with 500mm overlap dynamic loading to withstand max wind pressure as per -IS 875 part III,
parameters for structural & foundation design must be taken from Wind Tunnel test. Lightning protection of GI single spike
31 1200mm at top and at base inside compartment having double internal lock with adequate size of MCB erected on PVC board Nos. 2 2.00
complete with base plate of 25mm thick 570mm dia. and foundation bolts having 8 nos. bolts of 30mm dia 850 mm long (EN.8
grade) Anchor plate 490 PCD, including accessories viz.(1) Lantern carriage of 50 NB ERW class-B ,MS pipe covered with PVC
sleeve suitable to carry 500kg. load and up to 10 fittings symmetrically.(2) Trailing Copper cable 5x4.0 sq.mm, PVC insulated
PVC Sheathed (3) Double Drum 750Kg Winch having gear 53:1, oil bath (SAE90/140) arrangement (4) 2 nos. Stainless steel
wire ropes 6 mm dia (7/19) breaking load capacity 2350 kg.x 2,(5) Integral power tool 3-phase, 1HP 2m/min single
speed .torque limiter up to 500 kg adjustable (6) 2 Nos. LED 300 Nos. aviation light (7) Feeder pillar fabricated out of 14 SWG
CRCA sheet and comprise of incoming MCB 63 A TPN switch, HRC fuses, single dial timer, suitable size of contactors for
lighting and power tool, 2 nos. outgoing, reversing switch for motor. (7) Foundation drawing, test certificate and guarantee
certificate shall be provided by manufacturer. (Without fixture and lamp)
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Truck Lay Bay
Sr. No. Item Unit Nos. Length Width Height Quantity
TRUCK LAY BAY
Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking
1 of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not Hectare
exceeding 150 mm in thickness.
A) In area of light jungle
2 240.00 9.00 0.432
Construction of embankment / sub grade with approved material obtained from borrow pits with all lifts & leads including
2 excavation, transporting to site, spreading, grading to required level & Camber and compacting using viabratory roller to meet
requirement of table No. 300-1, 300-2 and as per relevant clauses of Section 300 & 400.
(a) For embankment cum
Straight Portion 2 100.00 8.72 1.000 1744
Tapered Portion 4 70.00 4.47 1.000 1251.6
(b) For sub grade layer cum
Straight Portion 2 100.00 8.72 0.500 872
Tapered Portion 4 70.00 4.47 0.500 625.8
Total 3,867.60
Construction of granular sub-base by providing well graded material like natural sand crushed gravel of crushed stone having
CBR>30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or
3 cum
plant mix method at OMC, and compacting with vibratory roller of 80 to 100 kM static weight to achieve the desired density,
complete as per clauses 401 of Specification.
Straight Portion 2 100.00 8.72 0.200 348.8
Tapered Portion 4 70.00 4.47 0.200 250.32
Total 599.12
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with
4 cum
paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in
accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications.
Straight Portion 2 100.00 7.22 0.25 361
Tapered Portion 4 70.00 3.72 0.25 260.4
Total 621.40
Construction of Median and Island above road level with approved material obtained from borrow pits including excavation &
5 cum 2 100.00 1.27 0.15 38.1
Transportation through all lead & lift and Spreading, Grading, Compacting as per relavent clauses of section - 400.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Truck Lay Bay
Sr. No. Item Unit Nos. Length Width Height Quantity
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base with low porosity (WMM or
6 WBM) including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm with pressure distributor and as per Sqm
relevant clause of Section-500.
Straight Portion 2 100.00 7.22 1444
Tapered Portion 4 70.00 3.72 1041.6
Total 2485.60
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor on the prepared bituminous /
7
granular surface cleaned with mechanical broom and as per relevant clauses of Section-500.
( i) @ 0.25 kg per sqm (normal bituminous surfaces) Sqm
Straight Portion 2 100.00 7.00 1400
Tapered Portion 4 70.00 3.50 980
Total 2380.00
(ii) @ 0.30 kg per sqm (dry & hungry bituminous surfaces/granular surfaces treated with primer) Sqm
Straight Portion 2 100.00 7.22 1444
Tapered Portion 4 70.00 3.72 1041.6
Total 2485.60

Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder
@ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver
8 Cum
finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction as per clause 505 of specification complete in all respects.

Straight Portion 2 100.00 7.00 0.070 98


Tapered Portion 4 70.00 3.50 0.070 68.6
Total 166.60
Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4
to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the
9 Cum
required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction
as per clause 507 of specification.
Straight Portion 2 100.00 7.00 0.040 56
Tapered Portion 4 70.00 3.50 0.040 39.2
Total 95.20
Providing and laying half round reinforced cement concrete pipe Np2 type conforming to IS 458-2003 for drains in single row
10 including joint filling with cement mortar 1:2 but excluding excavation, bedding, protection works, backfilling etc. complete. (NP2 metre 2 240.00 480.00
Pipes 300 mm dia)
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards
11 metre 2 203.00 406.00
the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause
409.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Truck Lay Bay
Sr. No. Item Unit Nos. Length Width Height Quantity

Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign board as per IRC 67-2010 made of high
intensity Micro-Prismatic Grade Sheeting (TypeIV) vide clause 801.3.3 fixed over Aluminium composite material sheet with
thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets of aluminium with overall thickness of
4mm and aluminium skin of thickness 0.3 on both side, the ACM shall conform to Table 800-1 of specification and High Intensity
12 Micro Prismatck Grade Sheeting shall conform to Table 800-3 of specification. The printing on the high intensity grade sheeting
shall conform to Clause 801.3.7 with water based latex optimized transparent ink as specified by the sheeting manufacturer,
supported on composite sign post of size 5mmx 33.55mmx34.99 mm (5mm thick) made of Aluminium composite material in
accordance to IRC 67-2010 fixed to ground by means of properly designed foundation with M15 grade concrete 450x450x600mm
The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts.

i) 60 cm circular 'Mandatory/Regulatory Signs each 2 2.00


60 cm x 45 cm rectangular
ii) each 2 2.00
Informatory Signs/Cheveron Sign

Direction and Place Identification signs upto 0.9 sqm size board.
Providing and fixing directional, informatory and place identification retro-reflectorized sign as per IRC:67:2012 made of high
intensity Micro- Prismatic Grade cube 'corner sheeting (Type XI) vide IRC:67:2012 clause 6.7.4.3 & clause 801.3.4.3 fixed over
Aluminum composite material sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick skins/sheets
of aluminum with overall thickness of 4mm and aluminum skin of thickness 0.3 on both side, the ACM shall to 6.1 conform Table
of & IRC:67:2012 table 800-1 of specifications and MORT&H High Intensity Micro Prismatic Grade cube corner sheeting shall
conform to Table 6.9 of IRC:67:2012 & table 800-6 of MORT&H specifications. In line with clause clause 6.8 of IRC:67:2012 &
801.3.7 of MORT&H, for the directional, and informatory, place identification other sign boards, the messages (legends, letters,
13 numerals etc.) and borders shall be cut-out from durable transparent overlay film or cut-out from the same reflective sheeting Sqm 2 1.00 0.90 1.80
only. Cut-outs shall be from durable transparent overlay materials as specified by the sheeting manufacturer and shall be bonded
with the sheeting in the manner specified by the manufacturer and should be supported on MS sign post of size
75mmx75mmx6mm fixed to ground by means of properly designed foundation of dimension 450x450x600mm with M15 grade
concrete. The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts & supported with a back
support frame of 25mmx25mmx3mm angle. 10 years Warranty for Retro Reflective Sheeting from the original sheeting
manufacturer as per clause 6.9 of IRC:67:2012 & a certified copy of three years outdoor exposure report from an independent test
lab as per clause 6.7 of IRC:67:2012 for the product offered shall be submitted by the contractor..

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Truck Lay Bay
Sr. No. Item Unit Nos. Length Width Height Quantity

Direction and Place Identification signs with size more than 0.9 sqm size board.
Providing and fixing directional, informatory and place identification retro-reflectorized sign as per IRC:67:2012 made of high
intensity Micro- Prismatic Grade cube corner sheeting (Type XI) vide IRC:67:2012 clause 6.7.4.3 & clause 801.3.4.3 of MORTH
fixed over Aluminum composite material sheet with thermoplastic core of Low density polyethylene (LDPE) between two thick
skins/sheets of aluminum with overall thickness of 4mm and aluminum skin of thickness 0.3 on both side, the ACM shall conform
to Table 6.1 of IRC:67:2012 & table 800-1 of MORT&H specifications and High Intensity Micro Prismatic Grade cube corner
sheeting shall conform to shall conform to Table 6.9 of IRC:67:2012 & table 800-6 of MORT&H specifications. In line with clause
6.8 of IRC:67:2012 & clause 801.3.7 of MORT&H. for the directional, informatory, place identification and other sign boards, the
14 Sqm 4 1.29 2.81 14.47
messages (legends, letters, numerals etc.) and borders shall be cut-out from durable transparent overlay film or cut-out from the
same reflective sheeting only. Cut-outs shall be from durable transparent overlay materials as specified by the sheeting
manufacturer and shall be bonded with the sheeting in the manner specified by the manufacturer and should be supported on MS
sign post of size 75mmx75mmx6mm fixed to ground by means of properly designed foundation of dimension 450x450x600mm
with M15 grade concrete. The ACM sheet shall be fixed to the post with four minimum four number breakaway bolts & supported
with a back support frame of 25mmx25mmx3mm angle. 10 years Warranty for Retro Reflective Sheeting from the original
sheeting manufacturer as per clause 6.9 of IRC:67:2012 & a certified copy of three years outdoor exposure report from an
independent test lab as per clause 6.7 of IRC:67:2012 for the product offered shall be submitted by the contractor.

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Truck Lay Bay
Sr. No. Item Unit Nos. Length Width Height Quantity
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm
15 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and
free from streaks and holes all complete as per clause 803 of specifications.
Lane/centreline/edge marking/transverse and any other marking sqm
54 3.00 0.10 16.20
4 240.00 0.15 144.00
Digonal Marking 2 100.00 0.15 30.00
100 0.80 0.60 48.00
Arrow Type (AM-08) 12 1.100 Area 13.20
Total 251.40
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground
level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised
16 each 48 48.00
panels at the top, buried or pressed into the ground and confirming to IRC-79 and the drawings as per relevant clauses of section-
800 of specifications.

Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to
16 corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a each 640 640.00
depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973).

Providing and erecting street light mounted on a steel tubular pole swaged type as per IS:2713-1980 Complete with base plate
17 and top Canopy for street lighting, 10m highfrom road surface and with 2.0 m overhang. Poles on both sides spaced at 25 m c/c , each 20 20.00
fitted with sodium vapour lamp of 250 watts and fixed firmly in concrete foundation.
18 Rest Area with Toilet Sqm 2 15.00 6.00 180.00
19 Telephone Booth each 2 2.00

Rev-01
COST ESTIMATE

Rewa -Beohari-Tetka Mod Road (SH-57)


Abstract of Bus Shelter
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.
Earth work in excavation of foundation of structures as
per drawing and technical specification, including
setting out, construction of shoring and bracing,
1 12.1 removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with
approved material. as per relevant clauses of section
300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum 7.13 52.00 370.66
Providing Plain cement concrete M-15 nominal mix in
2 12.3 foundation as per relevant clauses of sections 1500, Cum 0.97 4299.00 4,178.63
1700 and 2100.

Provdiing and laying Plain/Reinforced cement concrete


in open foundation including form work shuttering etc.
3 12.8 complete as per drawing and technical specifications
and as per relevant clauses of sections 1500, 1700 &
2100 with.

i) RCC Grade M25 Cum 1.92 5324.00 10,206.11


Supplying, fitting and placing un-coated HYSD bar
reinforcement in foundation complete as per drawing
4 12.31 MT 0.17 66069.00 11,398.88
and technical specifications and as per relevant clauses
of section 1600.

Structural steel work riveted, bolted or welded in built


10.2 of
up sections, trusses and framed work, including
5 Building Kg 262.70 68.70 18,047.49
cutting,hoisting, fixing in position and applying a
SOR
priming coat of approved steel primer all complete.

Providing and fixing UV stabilised fibreglass reinforced


plastic sheet roofing upto any pitch including fixing with
polymer coated 'J' or 'L' hooks, bolts and nuts 8mm dia.
G.I plain/bitumen washers complete but excluding the
cost of purlins, rafters, trusses etc. The sheets shall be
manufactured out of 2400 TEX panel rovigs
12.17 of
incorporating minimum 0.3% Ultra-violet stabiliser in
6 Building Sqm
resin system under approximately 2400 psi and hot
SOR
cured. They shall be of uniform pigmentation and
thickness without air pockets and shall conform to IS
10192 and IS 12866.The sheets shall be opaque or
translucent, clear or pigmented, textured or smooth as
specified.

2mm thick corrugated (2.5" or 4.2" or 6") or step-down


12.17.1 28.06 1031.00 28,929.86
(2"or 3"or 6") as specified.
12.17.2 2mm thick flat. 16.47 955.00 15,728.85
Construction of embankment with approved material
having CBR>7 obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
7 3.10 Cum 22.10 144.00 3,182.40
required slope and compacting to meet requirement of
table 300-1, 300-2 and as per relevent clauses of
section-300.

Rev-01
COST ESTIMATE

Rewa -Beohari-Tetka Mod Road (SH-57)


Abstract of Bus Shelter
SOR Item
Sr. No. Item Unit Quantity Rate (Rs.) Amount
No.

52 mm thick cement concrete flooring with concrete


hardener topping, under layer 40 mm thick cement
concrete 1:2:4 (1 cement : 2 sand : 4 graded stone
aggregate 20 mm nominal size) and top layer 12 mm
11.2 of
thick cement hardener consisting of mix 1:2 (1 cement
8 Building Sqm 44.20 399.00 17,635.80
hardener mix : 2 graded stone aggregate 6 mm nominal
SOR
size) by volume, hardening compound mixed @ 2 litre
per 50kg of cement or as per manufacturers
specifications. This includes cost of cement slurry, but
excluding the cost of nosing of steps etc. complete.

Providing and erecting street light mounted on a steel


42.3, 42.14,
tubular pole swaged type as per IS:2713-1980 Complete
42.20 &
with base plate and top Canopy for street lighting, 10m
9 31.9.3 SOR Nos. 1.00 41275.00 41,275.00
highfrom road surface and with 2.0 m overhang. with
of Electrical
sodium vapour lamp of 250 watts and fixed firmly in
Work
concrete foundation.

As per
10 Dust Bin Nos. 2.00 1000.00 2,000.00
Market Rate

As per
11 Precast RCC Park Chair Nos. 2.00 3500.00 7,000.00
Market Rate
TOTAL AMOUNT BUS Shelter 159,953.68

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Bus Shelter
Sr. No. Item Unit Nos. Length Width Height Quantity
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring
1 and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per
relevant clauses of section 300 & 2100 in
i) Ordinary soil (Mechanical Means-Depth upto 3 m) Cum 3 2.70 0.80 1.10 7.13
2 Providing Plain cement concrete M-15 nominal mix in foundation as per relevant clauses of sections 1500, 1700 and 2100. Cum 3 2.70 0.80 0.15 0.97
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and
3
technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with.
i) RCC M25 3 2.50 0.60 0.300 1.35
9 0.30 0.30 0.700 0.57
Total 1.92
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as
4 Cum
per relevant clauses of section 1600.
@. 90 kg/Cum 1.92 0.09 0.17
Total 0.17
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting,hoisting, fixing in position and
5 Kg
applying a priming coat of approved steel primer all complete.
50mm dia MS Pipe 111.00
40mm dia MS Pipe 114.00
MS Plate 200x200x12mm 8.50
Fountation Bolt 16mm dia 19.20
J-Hook & washer 10.00
Total 262.70
Providing and fixing UV stabilised fibreglass reinforced plastic sheet roofing upto any pitch including fixing with polymer coated 'J' or 'L'
hooks, bolts and nuts 8mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be
manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% Ultra-violet stabiliser in resin system under approximately 2400
6
psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The
sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified.

i) 2mm thick corrugated (2.5" or 4.2" or 6") or step-down (2"or 3"or 6") as specified. 1 6.10 3.60 21.96
1 6.10 1.00 6.10
Total 28.06

Rev-01
COST ESTIMATE
Rewa -Beohari-Tetka Mod Road (SH-57)
Details of Quantity Calculation of Bus Shelter
Sr. No. Item Unit Nos. Length Width Height Quantity
ii) 2mm thick flat. 1 6.10 2.70 16.47
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site,
7 Cum 2 6.80 3.25 0.500 22.10
spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.

52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 sand : 4
graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2
8 sqm 2 6.80 3.25 44.20
graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50kg of cement or as per manufacturers
specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
Providing and erecting street light mounted on a steel tubular pole swaged type as per IS:2713-1980 Complete with base plate and top
9 Canopy for street lighting, 10m highfrom road surface and with 2.0 m overhang. with sodium vapour lamp of 250 watts and fixed firmly in Nos. 1 1.00
concrete foundation.
10 Dust Bin Nos. 2 37.00 2.00
11 Precast RCC Park Chair Nos. 2 2.00

Rev-01
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)

1750 4.922 0 0 0
1760 4.848 0.025 127.918 0.822
1780 5.13 5.772 97.482 0.471
1800 4.475 5.035 92.5 1.982
1820 7.633 8.587 101.971 3.106
1840 2.845 3.2 98.622 2.24
1860 2.15 2.418 47.926 11.415
1880 0 0 29.365 39.17
1900 0 0 0 381.332
1920 0 0 0 129.825
1940 4.969 5.59 36.089 7.424
1960 4.856 5.463 90.218 1.892
1980 4.782 5.379 88.177 1.465
2000 5.253 5.909 93.386 1.084
2020 6.319 7.109 107.54 0.189
2040 7.36 8.28 128.864 0.004
2060 7.643 8.599 141.111 0.177
2080 7.168 8.064 140.594 5.173
2100 6.218 6.996 115.788 37.215
2120 3.922 4.413 104.622 0.628
2140 2.045 2.3 42.448 4.931
2160 1.921 2.161 35.466 1.785
2180 2.157 2.426 39.365 5.236
2200 0.112 0.126 30.407 10.502
2220 2.754 3.099 23.362 16.453
2240 3.954 4.449 67.045 5.432
2260 3.158 3.552 71.633 5.057
2280 1.091 1.228 46.16 6.331
2300 0.748 0.842 16.783 17.271
2320 0.387 0.436 9.324 13.593
2340 3.197 3.596 37.983 15.331
2360 2.33 2.621 46.967 16.265
2380 3.618 4.071 65.301 6.944
2400 6.274 7.058 75.689 4.694
2420 1.538 1.731 55.924 27.649
2440 6.066 6.824 94.099 17.972
2460 3.457 3.889 98.657 5.638
2480 1.806 2.031 45.329 14.861
2500 1.151 1.295 17.907 14.411
2520 2.481 2.791 43.865 17.491
2540 2.639 2.969 44.61 12.155
2560 3.225 3.628 55.372 10.97
2580 3.723 4.189 65.44 10.951
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
2600 3.474 3.909 63.391 16.225
2620 1.403 1.579 47.602 6.073
2640 0.333 0.374 14.094 14.575
2660 0 0 3.798 10.337
2680 0 0 0 15.527
2700 1.149 1.292 1.266 29.231
2720 2.546 2.865 41.789 5.731
2740 2.452 2.759 54.021 1.646
2760 2.996 3.371 66.198 6.202
2780 0.43 0.483 39.265 13.676
2800 0 0 0 28.597
2820 0 0 0 101.159
2840 4.726 5.316 45.209 24.4
2860 6.629 7.457 113.923 0.667
2880 4.514 5.079 103.733 4.599
2900 2.897 3.259 59.655 9.195
2920 4.162 4.682 66.338 1.629
2940 5.37 6.042 90.51 6.623
2960 4.227 4.756 95.298 7.553
2980 4.372 4.919 79.681 25.157
3000 6.411 7.213 101.75 12.53
3020 6.779 7.627 130.258 3.385
3040 8.342 9.384 152.076 13.531
3060 9.791 11.015 176.174 0
3080 9.174 10.32 178.223 0
3100 8.851 9.958 168.648 0.283
3120 9.022 10.15 168.752 0.243
3140 7.728 8.694 150.079 0
3160 7.348 8.267 142.27 0.213
3180 7.213 8.114 137.396 0.484
3200 7.292 8.204 136.973 0.271
3220 6.847 7.703 134.402 0.736
3240 6.339 7.132 123.342 1.079
3260 6.182 6.954 118.613 1.376
3280 3.343 3.761 54.986 0.898
3300 6.147 6.916 116.046 0.615
3320 5.97 6.716 114.289 0.729
3340 5.896 6.633 112.015 1.459
3360 5.855 6.587 110.942 0.894
3380 6.426 7.229 114.49 0.134
3400 7.434 8.364 132.338 0.044
3420 7.242 8.147 148.47 0.1
3440 3.184 3.582 99.39 3.068
3460 4.43 4.984 74.794 1.883
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
3480 3.284 3.695 72.762 2.688
3500 3.992 4.491 69.118 3.314
3520 4.259 4.792 77.788 3.814
3540 4.753 5.347 82.325 3.698
3560 6.171 6.943 102.457 1.982
3580 6.801 7.651 122.635 3.109
3600 8.19 9.214 139.93 2.297
3620 8.764 9.86 157.902 0.295
3640 7.138 8.03 151.37 0.58
3660 4.586 5.159 107.894 3.417
3680 3.262 3.669 69.711 2.73
3700 2.502 2.814 55.893 3.366
3720 1.984 2.232 37.749 5.316
3740 3.037 3.416 42.353 3.692
3760 2.963 3.334 59.005 1.969
3780 4.15 4.668 68.686 3.153
3800 4.003 4.504 77.854 1.617
3820 4.351 4.895 76.822 3.967
3840 3.445 3.875 72.102 5.735
3860 4.767 5.363 75.574 3.578
3880 5.614 6.315 99.308 1.118
3900 3.767 4.238 97.383 0.771
3920 0 0 52.234 9.03
3940 2.125 2.39 26.131 71.349
3960 4.678 5.262 78.178 4.066
3980 5.17 5.817 97.408 2.334
4000 6.077 6.836 105.038 8.725
4020 8.11 9.124 151.842 14.215
4040 8.028 9.032 148.985 12.664
4060 5.986 6.734 133.366 10.196
4080 5.902 6.64 126.422 5.708
4100 6.845 7.7 119.677 2.09
4120 6.732 7.574 128.403 2.866
4140 6.108 6.872 123.174 4.034
4160 7.778 8.751 110.39 4.841
4180 7.926 8.916 156.449 4.498
4200 6.455 7.262 132.04 4.793
4220 4.033 4.537 88.951 6.848
4240 2.799 3.149 63.342 4.187
4260 4.526 5.091 90.696 5.368
4280 4.018 4.52 89.062 5.878
4300 4.927 5.543 86.22 6.543
4320 5.092 5.729 90.48 11.657
4340 4.425 4.978 88.998 21.134
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
4360 4.137 4.654 86.597 36.231
4380 2.935 3.302 68.139 35.734
4400 2.042 2.297 41.151 25.853
4420 1.065 1.198 29.836 34.229
4440 0 0 17.022 79.564
4460 0.167 0.188 16.079 84.324
4480 1.977 2.224 29.394 97.052
4500 2.878 3.237 44.596 98.694
4520 1.992 2.241 55.126 98.404
4540 2.817 3.169 48.543 63.842
4560 1.482 1.667 21.779 42.517
4580 1.837 2.066 35.96 26.161
4600 2.522 2.837 43.39 31.67
4620 1.735 1.952 26.77 28.135
4640 1.438 1.618 33.824 25.799
4660 4.314 4.853 44.688 21.304
4680 0 0 37.156 13.433
4700 1.89 2.127 30.635 13.428
4720 3.81 4.287 58.374 5.007
4740 3.629 4.082 63.664 1.774
4760 3.451 3.883 64.471 1.198
4780 5.858 6.59 80.514 0.778
4800 5.242 5.898 122.043 0.325
4820 4.237 4.766 81.878 1.104
4840 5.774 6.496 99.636 1.21
4860 4.286 4.821 91.847 3.837
4880 5.239 5.894 89.947 1.75
4900 4.215 4.742 96.181 0.189
4920 5.534 6.226 89.781 1.812
4940 4.293 4.829 94.843 4.136
4960 2.841 3.196 72.566 8.606
4980 1.286 1.447 37.995 24.497
5000 0.782 0.879 18.27 22.607
5020 1.075 1.21 37.039 70.288
5040 0 0 0 138.048
5060 1.658 1.866 31.141 81.841
5080 2.076 2.336 34.203 28.723
5100 5.115 5.755 66.344 12.337
5120 2.758 3.103 54.766 12.071
5140 2.596 2.921 48.446 17.474
5160 2.2 2.475 26.488 17.569
5180 3.51 3.949 57.739 10.717
5200 4.311 4.85 73.338 2.327
5220 5.581 6.278 94.186 0.306
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
5240 6.49 7.301 111.245 0.003
5260 3.686 4.147 96.407 0.982
5280 3.428 3.857 65.994 5.916
5300 3.296 3.708 61.948 9.292
5320 3.831 4.31 67.739 7.289
5340 4.758 5.352 80.047 5.069
5360 4.008 4.509 88.494 2.826
5380 3.103 3.491 63.179 3.726
5400 2.7 3.038 70.133 4.266
5420 2.586 2.91 47.598 10.688
5440 5.154 5.799 103.826 5.157
5460 3.888 4.374 87.061 3.354
5480 0 0 30.378 13.138
5500 0 0 0 118.252
5520 1.624 1.827 0 227.509
5540 0 0 0 390.101
5560 2.093 2.354 0 559.525
5580 2.107 2.371 46.875 45.966
5600 1.02 1.148 24.029 17.71
5620 0 0 30.635 23.885
5640 0 0 0 35.568
5660 0 0 0 58.259
5680 0 0 0 131.646
5700 0.422 0.333 7.81 171.759
5720 0 0 1.244 266.158
5740 0 0 0 152.603
5760 0.106 0.083 0.568 242.29
5780 0.675 0.532 6.646 181.344
5800 1.436 1.131 19.174 96.348
5820 3.374 2.657 39.778 23.249
5840 4.822 3.797 72.741 13.483
5860 6.007 4.731 101.987 8.36
5880 6.847 5.392 119.722 5.389
5900 7.329 5.772 135.853 3.644
5920 7.866 6.195 143.822 4.919
5940 7.196 5.667 144.922 2.377
5960 5.277 5.936 119.431 4.356
5980 3.491 3.928 82.725 10.056
6000 1.47 1.653 45.244 17.674
6020 0.59 0.664 21.053 46.737
6040 0.069 0.077 4.527 83.591
6060 0.11 0.123 1.68 132.473
6080 0 0 0 102.277
6100 0.11 0.123 2.137 201.304
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
6120 0.983 1.106 8.518 132.615
6140 4.898 5.51 47.109 65.766
6160 5.062 5.694 83.731 17.112
6180 4.526 5.092 93.076 17.969
6200 3.688 4.149 81.383 16.997
6220 2.648 2.979 60.072 33.065
6240 1.848 2.079 38.727 57.066
6260 1.148 1.292 23.993 94.36
6280 0.078 0.087 7.051 335.113
6300 0 0 0 220.443
6320 1.043 1.174 39.218 128.61
6340 2.636 2.966 31.942 36.219
6360 4.752 5.346 70.469 30.217
6380 5.238 5.892 87.904 19.8
6400 5.61 6.312 99.505 6.761
6420 7.568 5.96 149.075 1.032
6440 9.136 7.195 153.544 0.179
6460 9.135 7.194 185.017 0
6480 7.803 6.145 159.458 0.093
6500 6.166 4.856 132.625 8.781
6520 3.369 2.653 93.424 35.614
6540 1.914 1.508 48.91 87.526
6560 2.888 2.274 45.435 75.119
6580 2.3 1.812 50.062 27.737
6600 1.532 1.207 15.174 27.07
6620 2.103 1.656 27.738 26.454
6640 0 0 8.612 29.111
6660 0 0 0 63.136
6680 0 0 0 72.87
6700 1.139 1.282 0.255 91.65
6720 0 0 0 87.89
6740 0 0 0 111.742
6760 0 0 0 55.513
6780 0 0 0 45.682
6800 1.225 1.378 0 48.75
6820 0 0 0 31.136
6840 0 0 0 13.434
6860 1.17 1.317 0 12.429
6880 0 0 16.706 25.728
6900 2.135 2.402 12.218 35.367
6920 2.799 3.149 40.254 23.172
6940 4.322 4.862 70.536 4.534
6960 5.347 6.016 90.826 2.988
6980 6.331 7.123 108.926 2.241
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
7000 7.371 8.293 134.551 7.841
7020 9.265 10.423 143.722 4.817
7040 4.098 4.611 156.853 11.329
7060 10.778 12.125 106.871 84.994
7080 5.836 6.566 167.615 1.577
7100 7.414 8.34 126.511 0.527
7120 7.557 8.501 142.817 0.23
7140 6.923 7.789 144.661 0.701
7160 6.412 7.214 125.24 0.836
7180 5.322 5.988 110.474 1.166
7200 5.16 5.805 99.982 1.731
7220 5.102 5.74 95.982 1.123
7240 4.439 4.994 88.802 1.294
7260 5.253 5.909 87.09 1.758
7280 4.678 5.262 96.036 0.33
7300 6.102 6.865 97.395 1.097
7320 5.076 5.711 103.042 0.783
7340 4.95 5.568 94.008 0.776
7360 2.641 2.971 60.586 6.537
7380 2.235 1.761 59.49 11.022
7400 0 0 15.547 0
7420 0 0 0 0
7440 0 0 0.44 0
7460 0 0 0 0
7480 0 0 0 0
7500 0 0 0 0
7520 0 0 0 0
7540 0 0 0 0
7560 0 0 0 0
7580 0 0 0 0
7600 0 0 0 342.388
7620 0 0 0 259.559
7640 0 0 0 266.001
7660 0 0 0 290.51
7680 0 0 0 254.616
7700 0 0 0 136.584
7720 0 0 0 111.097
7740 0.203 0.229 0 155.475
7760 0 0 0 70.673
7780 0 0 0 31.644
7800 3.685 4.145 7.759 52.318
7820 4.506 5.069 75.886 8.195
7840 5.742 6.459 96.27 1.477
7860 6.947 7.816 114.467 0.999
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
7880 6.409 7.21 126.424 1.67
7900 5.426 6.105 115.842 3.249
7920 4.029 4.532 86.834 7.791
7940 5.138 5.781 67.005 6.391
7945 7.386 8.309 37.892 0.056
7945 7.089 7.975 0 0
7960 3.066 3.45 71.961 7.427
7980 0 0 16.8 101.504
8000 0.139 0.157 1.748 400.941
8020 0.414 0.466 5.918 335.84
8040 1.638 1.842 11.122 542.297
8060 3.582 4.03 48.709 274.672
8080 1.563 1.759 53.029 162.37
8100 5.386 6.059 76.77 153.339
8120 4.032 4.536 98.869 39.855
8140 7.701 8.663 115.935 15.884
8160 8.014 9.016 174.751 6.079
8180 4.848 5.454 115.01 29.032
8200 5.483 6.169 84.417 16.156
8220 2.026 2.279 59.419 85.921
8240 4.074 4.583 70.718 26.891
8260 0.265 0.298 16.169 39.636
8280 0.776 0.873 1.816 71.192
8300 0.843 0.949 19.156 24.868
8320 0.88 0.99 16.118 58.584
8340 0 0 2.042 75.588
8360 0 0 0 88.157
8380 2.33 2.622 0.874 84.446
8400 1.754 1.974 37.246 49.079
8420 0.753 0.847 24.509 116.491
8440 1.422 1.6 17.565 118.853
8460 1.966 2.212 35.526 39.808
8480 2.057 2.314 33.322 25.865
8500 0 0 11.298 3.264
8520 0 0 0 19.694
8540 0 0 0.808 30.754
8560 0 0 9.547 0
8580 0 0 0 0
8600 0 0 0 0
8620 0 0 0 0
8640 0 0 0 0
8660 0 0 0 0
8680 0 0 0 0
8700 0 0 0 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
8720 0 0 0 0
8740 0 0 0 0
8760 0 0 0 350.103
8780 0 0 0 361.28
8800 0 0 0 255.058
8820 0 0 0 189.207
8840 0 0 0 86.948
8860 0 0 0 49.577
8880 0 0 35.414 346.336
8900 10.23 11.509 26.405 941.278
8920 0 0 32.801 1132.852
8940 0 0 0 1123.443
8960 0 0 39.326 908.725
8980 0 0 44.17 1202.135
9000 0 0 0 1201.556
9020 9.695 10.907 91.371 1155.805
9040 0 0 61.834 1149.114
9060 0 0 0 1181.403
9080 0 0 0 1140.48
9100 5.284 5.945 3.831 954.226
9120 9.97 11.216 65.995 357.693
9140 4.369 4.915 130.812 467.821
9160 9.946 11.19 58.377 424.114
9180 3.809 4.285 40.03 349.931
9200 1.688 1.899 49.177 256.512
9220 0 0 6.022 278.758
9240 0 0 0 276.761
9260 0 0 0 331.992
9280 0 0 0 0
9300 0 0 0 0
9320 0 0 0 0
9340 0 0 0 0
9360 0.074 0.058 0.353 99.059
9380 0.94 0.741 8.768 44.362
9400 1.73 1.362 24.486 19.881
9420 0.607 0.478 2.869 13.863
9440 1.743 1.373 22.736 20.921
9460 0.56 0.63 4.506 20.891
9480 0.406 0.456 8.15 43.012
9500 1.519 1.709 9.029 58.377
9520 2.096 2.358 36.428 46.701
9540 0 0 16.522 21.141
9560 2.687 3.023 26.422 14.682
9580 2.546 2.865 59.967 26.897
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
9600 1.956 2.201 42.536 17.641
9620 2.275 2.56 39.903 19.678
9640 2.482 2.792 45.613 20.772
9660 2.382 2.68 45.466 25.072
9680 3.64 4.095 55.509 27.292
9700 4.166 4.686 74.848 13.614
9720 4.629 5.207 81.181 14.439
9740 1.708 1.922 69.77 26.725
9760 0 0 2.094 85.339
9780 2.345 2.638 20.403 61.228
9800 2.566 2.886 43.563 17.812
9820 2.229 2.507 47.997 15.608
9840 2.706 3.044 46.235 21.832
9860 2.459 2.767 48.722 20.474
9880 2.319 2.609 45.381 24.228
9900 1.958 2.203 40.298 23.553
9920 1.946 2.19 36.814 25.465
9940 1.844 2.075 36.743 26.254
9960 1.669 1.877 33.098 25.387
9980 1.403 1.579 30.034 26.571
10000 1.31 1.474 25.938 40.465
10020 1.185 1.333 23.675 42.602
10040 1.619 1.822 25.428 36.728
10060 1.586 1.784 31.139 19.987
10080 0.688 0.774 22.898 33.065
10100 1.71 1.924 21.21 34.485
10120 1.855 2.087 31.551 29.724
10140 1.16 1.305 29.417 29.083
10160 2.322 2.613 32.242 29.522
10180 2.727 3.068 50.24 12.591
10200 2.268 2.552 49.671 4.238
10220 1.476 1.661 28.88 16.071
10240 1.644 1.85 24.618 17.981
10260 2.008 2.259 34.226 10.245
10280 0 0 25.819 25.955
10300 2.495 2.807 28.268 13.415
10320 2.374 2.671 40.753 23.827
10340 2.068 2.327 48.679 12.313
10360 0 0 16.423 18.006
10380 0 0 2.527 22.666
10400 0 0 0 38.841
10420 0.002 0.002 12.104 39.956
10440 0 0 0 68.78
10460 0 0 0 106.952
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
10480 0 0 0 168.388
10500 0 0 0 173.16
10520 0 0 0 186.533
10540 0 0 0 271.744
10560 0 0 0 372.735
10580 0 0 0 218.083
10600 0 0 0 519.603
10620 0 0 0 580.065
10640 0 0 0 517.719
10660 0 0 0 484.046
10680 0 0 0 335.421
10700 0 0 0 368.602
10720 0 0 0 303.953
10740 0 0 0 118.47
10760 0 0 0 93.996
10780 0 0 0 47.076
10800 0 0 0 45.571
10820 0.227 0.256 0 34.225
10840 1.422 1.6 13.412 33.778
10860 1.719 1.934 35.218 41.865
10880 0 0 9.829 42.048
10900 1.287 1.448 7.679 11.772
10920 1.346 1.515 24.591 7.904
10940 0.606 0.681 19.061 7.249
10960 0.7 0.788 13.466 30.151
10980 0.973 1.094 22.906 33.209
11000 0.78 0.878 15.783 34.869
11020 0.838 0.943 18.913 19.168
11040 0.464 0.522 12.188 13.248
11060 0.376 0.423 14.151 22.326
11080 0.345 0.388 5.11 21.975
11100 0.742 0.834 10.174 18.2
11120 1.31 1.474 17.686 23.046
11140 0.731 0.823 14.418 23.881
11160 1.465 1.648 19.144 20.143
11180 0 0 10.963 20.633
11200 0.45 0.506 0 22.334
11220 0.574 0.645 8.599 32.428
11240 0 0 0 25.93
11260 0 0 0 29.376
11280 0 0 0 28.322
11300 0 0 0 29.495
11320 0 0 0 39.69
11340 0.39 0.439 0 31.534
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
11360 0.916 1.031 10.913 23.717
11380 1.312 1.476 22.223 20.677
11400 1.813 2.039 29.992 18.476
11420 1.838 2.067 36.566 22.336
11440 2.125 2.39 35.825 21.789
11460 2.264 2.547 42.206 24.126
11480 1.303 1.466 31.51 23.92
11500 2.72 3.06 28.615 27.95
11520 3.465 3.898 57.748 23.13
11540 3.458 3.891 65.646 9.469
11560 3.002 3.377 64.174 12.401
11580 2.538 2.856 41.936 15.389
11600 2.185 2.458 50.375 13.452
11620 2.247 2.528 40.814 13.793
11640 2.715 3.055 46.494 20.7
11660 2.779 3.127 53.454 16.078
11680 0 0 5.076 20.91
11700 1.186 1.335 0 36.528
11720 1.499 1.181 48.843 9.577
11740 0 0 0 17.526
11760 0.4 0.315 0 24.371
11780 2.957 2.328 44.102 28.65
11800 3.768 2.967 67.484 20.143
11820 4.481 3.529 75.574 16.669
11840 4.742 3.734 87.402 1.885
11860 5.329 4.197 92.061 1.289
11880 5.694 4.484 108.993 6.828
11900 7.586 5.975 125.58 14.76
11920 8.365 6.587 150.262 10.783
11940 10.55 8.308 173.538 29.516
11960 7.762 6.113 186.914 67.741
11980 14.178 11.166 133.578 332.03
12000 0.03 0.024 99.425 640.906
12020 0 0 107.507 0
12040 0 0 0.944 0
12060 4.003 3.153 18.521 500.956
12080 1.514 1.193 30.222 617.935
12100 3.718 2.928 104.991 448.102
12120 133.582 105.195 103.385 226.171
12140 0 0 104.433 491.845
12160 0 0 0.814 578.795
12180 0.426 0.336 14.047 267.701
12200 0 0 0 0
12220 0 0 0 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
12240 0 0 0 0
12260 0 0 0 209.619
12280 0 0 0 120.709
12300 3.396 3.821 32.018 28.201
12320 4.135 4.652 74.206 6.219
12340 4.789 5.387 78.502 6.244
12360 3.427 3.856 84.175 10.38
12380 4.468 5.027 73.067 12.351
12400 5.074 5.709 86.967 8.473
12420 4.835 5.44 94.663 7.708
12440 3.574 4.021 82.999 8.968
12460 2.197 2.471 54.638 13.329
12480 0 0 5.016 15.039
12500 0.886 0.996 8.318 17.758
12520 0 0 13.03 24.259
12540 1.802 2.027 33.282 50.371
12560 0 0 19.716 33.485
12580 0.16 0.18 0 34.873
12600 2.468 2.777 28.457 15.117
12620 3.336 3.753 54.859 21.263
12640 2.234 2.514 52.312 14.739
12660 0.144 0.162 28.517 17.63
12680 0 0 0 35.653
12700 1.988 2.237 0 34.73
12720 0 0 22.705 25.447
12740 0 0 0 33.021
12760 0 0 0 0
12780 0 0 0 0
12800 0 0 0 0
12820 0 0 0 0
12840 0 0 0 0
12860 0 0 0 0
12880 0 0 0 0
12900 0 0 0 0
12920 0 0 0 0
12940 0 0 0 0
12960 0 0 0 0
12980 0 0 0 0
13000 0 0 0 0
13020 0 0 0 0
13040 0 0 0 0
13060 0 0 0 0
13080 0 0 0 0
13100 0 0 0 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
13120 0 0 0 0
13140 0 0 0 0
13160 0 0 0 0
13180 0 0 0 0
13200 0 0 0 0
13220 0 0 0 0
13240 0 0 0 0
13260 0 0 0 0
13280 0 0 0 0
13300 0 0 0 0
13320 0.022 0.024 0.018 148.782
13340 0 0 0 0
13360 0 0 0 0
13380 0 0 0 0
13400 0 0 0 561.572
13420 0 0 0 445.606
13440 0 0 0 383.078
13460 0 0 0 137.971
13480 0 0 0 121.395
13500 0.023 0.026 0 100.982
13520 0 0 0 55.039
13540 2.774 3.12 23.108 23.643
13560 0 0 48.767 19.975
13580 0 0 0 54.097
13600 0.09 0.102 0 33.349
13620 0.322 0.362 0.652 19.575
13640 0.562 0.632 4.705 22.63
13660 0 0 1.761 26.839
13680 1.218 1.371 18.077 24.659
13700 2.139 2.407 32.959 43.373
13720 3.057 3.439 46.798 24.627
13740 5.114 5.753 77.65 8.962
13760 4.717 5.306 98.021 3.318
13780 2.262 2.545 66.321 2.806
13800 1.977 2.224 38.834 24.258
13820 1.055 1.187 29.256 25.073
13840 0.281 0.316 11.998 18.596
13860 0.428 0.482 12.729 19.478
13880 1.993 2.242 28.336 9.844
13900 4.585 5.158 67.673 7.283
13920 6.362 7.157 118.352 4.767
13940 8.375 9.422 142.822 0.96
13960 7.17 8.066 147.272 0.002
13980 5.57 6.267 122.756 0.532
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
14000 2.654 2.986 75.003 1.927
14020 2.734 3.075 55.72 6.812
14040 1.101 1.238 35.532 15.775
14060 0.184 0.207 15.754 20.424
14080 0 0 0 194.4
14100 0 0 0 1209.332
14120 0 0 0 1111.688
14140 2.512 2.826 10.028 1105.927
14160 5.224 5.877 44.462 296.28
14180 0 0 13.063 46.474
14200 1.502 1.689 0 105.395
14220 4.357 4.901 66.139 18.569
14240 1.536 1.728 50.39 22.171
14260 0 0 8.994 420.544
14280 0 0 0 1188.593
14300 0 0 0 1153.8
14320 0 0 0 382.976
14340 0 0 0 136.616
14360 0 0 0 87.538
14380 0 0 0 75.967
14400 0 0 0 95.117
14420 0 0 0 190.933
14440 0 0 0 222.534
14460 0 0 0 166.603
14480 0 0 0 1032.32
14500 0 0 0 1329.49
14520 0 0 0 1226.468
14540 0 0 0 1318.2
14560 0 0 0 1293.085
14580 0 0 0 1480.929
14600 0 0 0 1481.145
14620 0 0 0 1532.057
14640 0 0 0 1366.993
14660 0 0 0 1661.32
14680 0 0 0 1520.905
14700 0 0 0 1269.853
14720 0 0 0 1206.05
14740 0 0 0 865.183
14760 0 0 0 892.785
14780 0 0 0 877.802
14800 0 0 0 1506.211
14820 0 0 0 898.372
14840 0.017 0.019 0 704.549
14860 0.864 0.972 1.433 767.064
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
14880 2.991 3.365 29.45 210.353
14900 7.045 7.925 88.402 142.051
14920 7.226 8.129 134.702 4.723
14940 4.642 5.223 109.04 5.803
14960 2.609 2.935 57.166 13.147
14980 1.747 1.966 41.675 20.77
15000 1.672 1.881 29.495 29.112
15020 0.218 0.246 11.094 31.912
15040 1.238 1.393 8.182 30.531
15060 0.035 0.04 3.334 24.769
15080 1.113 1.252 15.182 30.339
15100 1.374 1.545 23.408 25.874
15120 2.726 3.067 37.89 23.606
15140 3.29 3.701 55.327 19.265
15160 3.211 3.613 60.623 13.515
15180 3.346 3.764 62.117 11.542
15200 4.075 4.585 69.687 27.304
15220 5.036 5.666 77.332 31.543
15240 4.484 5.045 96.921 21.514
15260 5.635 6.34 102.731 14.903
15280 6.21 6.987 108.998 14.709
15300 4.945 5.563 112.926 19.403
15320 2.406 2.706 64.703 23.755
15340 5.867 6.601 80.006 18.266
15360 4.935 5.552 109.615 14.948
15380 5.254 5.91 90.723 47.083
15400 10.297 11.584 116.913 68.155
15420 7.047 7.928 160.135 33.015
15440 6.469 7.277 128.11 136.012
15460 5.37 6.041 110.971 286.123
15480 1.228 1.382 70.614 531.12
15500 0 0 0 991.174
15520 15.052 16.934 76.876 1386.897
15540 0 0 78.422 1350.324
15560 0 0 0 1195.979
15580 0 0 0 1094.57
15600 0 0 0 700.053
15620 0 0 0 820.084
15640 0 0 0 1032.319
15660 0 0 0 908.986
15680 0 0 0 488.778
15700 0 0 0 274.113
15720 3.078 3.463 23.562 67.601
15740 4.051 4.558 67.193 11.446
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
15760 3.826 4.304 74.449 16.225
15780 3.702 4.165 70.306 29.666
15800 2.509 2.822 47.895 28.952
15820 3.426 3.855 56.502 27.782
15840 3.546 3.99 65.06 23.729
15860 4.387 4.936 72.161 10.797
15880 7.733 8.699 121.398 4.211
15900 8.206 9.231 147.447 0.034
15920 6.499 7.312 146.483 0
15940 8.757 9.851 165.036 0
15960 7.802 8.778 160.901 0
15980 7.989 8.987 156.126 0
16000 9.652 10.859 178.004 0.05
16020 4.216 4.743 87.89 10.564
16040 6.069 6.827 136.89 4.859
16060 8.334 9.375 134.763 1.819
16080 7.928 8.919 156.506 2.771
16100 7.482 8.418 146.505 5.678
16120 6.766 7.612 131.915 8.551
16140 5.571 6.268 117.887 17.106
16160 4.234 4.764 90.809 24.105
16180 4.13 4.646 78.826 31.473
16200 2.796 3.146 62.204 36.722
16220 3.028 3.407 57.118 37.877
16240 1.963 2.209 26.874 33.384
16260 2.016 2.268 37.517 23.363
16280 4.3 4.838 54.409 38.093
16300 3.807 4.283 63.37 11.835
16320 4.182 4.705 75.374 4.927
16340 4.277 4.811 80.409 3.229
16360 4.394 4.943 83.826 6.94
16380 5.424 6.102 92.886 3.78
16400 5.651 6.358 103.844 1.726
16420 5.894 6.631 107.737 2.584
16440 5.512 6.201 105.976 43.438
16460 5.141 5.783 102.266 150.33
16480 5.109 5.747 97.43 37.314
16500 4.394 4.944 90.102 12.17
16520 4.412 4.964 84.667 12.76
16540 3.812 4.289 78.448 11.495
16560 2.797 3.146 65.979 6.937
16580 1.747 1.966 27.101 13.454
16600 2.956 3.326 49.545 12.386
16620 2.985 3.358 55.71 14.685
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
16640 3.33 3.746 63.166 10.038
16660 2.394 2.693 57.898 8.503
16680 2.736 3.078 41.134 9.352
16700 2.756 3.101 53.362 12.379
16720 2.659 2.992 51.434 16.76
16740 2.773 3.119 51.757 23.702
16760 2.862 3.219 55.23 18.248
16780 2.798 3.148 55.087 14.577
16800 2.82 3.173 53.246 17.281
16820 2.927 3.293 56.8 12.929
16840 2.255 2.537 53.462 20.511
16860 2.622 2.95 35.918 11.336
16880 2.9 3.263 51.745 12.073
16900 2.742 3.084 51.434 15.673
16920 1.524 1.715 40.44 22.007
16940 0.564 0.635 32.055 49.631
16960 0 0 0 87.557
16980 0 0 0 165.057
17000 0 0 0 286.705
17020 0 0 0 359.296
17040 0 0 0 331
17060 0 0 0 400.8
17080 0 0 0 371.547
17100 0 0 0 348.795
17120 0 0 0 444.738
17140 0 0 0 306.807
17160 0 0 0 322.85
17180 0 0 0 245.568
17200 0 0 0 120.695
17220 0.587 0.661 0 92.989
17240 1.052 1.184 27.11 55.722
17260 0.31 0.348 12.587 58.773
17280 0 0 4.833 68.019
17300 0 0 0 50.42
17320 0 0 0 97.742
17340 0 0 0 73.948
17360 0 0 0 37.485
17380 0 0 0 52.85
17400 0 0 0 79.787
17420 0 0 0 74.526
17440 0 0 0 48.145
17460 0 0 0 43.054
17480 0 0 0 46.088
17500 0 0 0 38.116
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
17520 0 0 0 34.08
17540 0 0 0 27.804
17560 0.432 0.486 0 34.386
17580 1.062 1.195 16.299 35.468
17600 1.45 1.632 24.914 17.301
17620 1.686 1.897 29.407 15.168
17640 0 0 0 24.827
17660 1.673 1.882 0 29.109
17680 2.341 2.633 38.917 20.666
17700 0.379 0.427 18.749 32.783
17720 1.138 1.28 24.607 23.458
17740 0.691 0.778 21.047 26.074
17760 1.386 1.56 22.842 26.261
17780 2.115 2.38 32.567 22.981
17800 1.085 1.22 23.417 25.825
17820 1.885 2.12 27.197 18.592
17840 2.639 2.969 43.778 11.455
17860 2.684 3.02 52.02 9.073
17880 1.816 2.043 40.234 12.521
17900 1.667 1.876 33.609 19.856
17920 0.602 0.677 25.477 31.891
17940 0.315 0.355 4.159 54.539
17960 2.287 2.573 24.35 133.511
17980 0 0 0 0
18000 0 0 3.922 106.802
18020 0 0 0 76.267
18040 3.726 4.191 35.53 17.906
18060 4.618 5.195 79.833 12.23
18080 5.352 6.021 90.949 21.643
18100 5.262 5.919 100.764 25.519
18120 5.188 5.837 105.954 19.4
18140 6.01 6.761 99.306 19.304
18160 6.222 6.999 116.297 5.679
18180 2.001 2.251 54.745 5.82
18200 2.188 2.462 40.549 2.236
18220 2.211 2.488 41.532 1.481
18240 1.854 2.086 35.666 8.301
18260 2.812 3.164 48.114 12.863
18280 2.79 3.138 56.519 3.827
18300 2.413 2.714 47.456 8.119
18320 2.682 3.018 45.462 15.123
18340 2.914 3.278 48.741 9.159
18360 1.65 1.856 43.544 10.019
18380 2.946 3.314 35.82 12.213
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
18400 4.527 5.093 60.848 8.965
18420 2.092 2.354 55.032 14.836
18440 2.529 2.845 43.373 19.276
18460 2.697 3.034 35.788 27.235
18480 2.134 2.4 32.624 30.025
18500 0 0 0.351 26.047
18520 0 0 0 37.419
18540 2.479 2.789 30.766 62.802
18560 4.425 4.978 65.145 83.208
18580 0 0 0 87.992
18600 0 0 0 157.654
18620 0 0 0 174.182
18640 0 0 0 159.236
18660 0 0 0 69.887
18680 1.382 1.555 19.072 49.201
18700 0 0 8.622 41.033
18720 0.074 0.083 0 37.038
18740 0 0 5.869 33.381
18760 2.09 2.352 20.343 10.468
18780 2.659 2.992 54.88 30.278
18800 2.733 3.074 50.703 19.337
18820 3.384 3.807 57.702 10.039
18840 3.3 3.713 67.777 9.026
18860 2.434 2.739 54.267 9.318
18880 2.038 2.293 41.94 6.356
18900 1.178 1.325 31.722 5.073
18920 0.441 0.496 0 16.1
18940 1.196 1.346 15.736 32.81
18960 0.03 0.034 6.518 28.031
18980 0.589 0.662 22.022 27.889
19000 0 0 0.989 24.312
19020 1.21 1.361 9.798 11.983
19040 0.321 0.361 0 27.072
19060 0 0 0 32.549
19080 0 0 0 32.852
19100 0 0 0 33.076
19120 0 0 0 36.763
19140 0 0 0 47.387
19160 0.213 0.239 0 53.012
19180 0 0 0 38.293
19200 0 0 1.853 31.177
19220 1.47 1.653 8.957 18.091
19240 0.66 0.743 20.391 14.839
19260 0 0 0 24.514
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
19280 0 0 0 18.772
19300 0 0 0 25.49
19320 0.846 0.952 0 21.267
19340 0 0 0 44.652
19360 0 0 0 53.14
19380 0 0 0 58.374
19400 0 0 0 77.212
19420 0 0 0 114.016
19440 0 0 0 85.956
19460 0 0 0 75.033
19480 0 0 0 80.179
19500 0 0 0 114.461
19520 0 0 0 122.924
19540 0 0 0 87.493
19560 0 0 0 52.589
19580 0 0 0 29.446
19600 0 0 0 18.979
19620 2.258 2.54 0 30.032
19640 2.738 3.081 40.549 26.657
19660 3.457 3.889 61.342 22.734
19680 3.438 3.867 65.686 19.639
19700 2.269 2.552 58.96 19.336
19720 4.092 4.604 58.102 13.951
19740 3.568 4.014 70.319 13.833
19760 3.191 3.59 60.655 12.151
19780 3.933 4.424 65.124 9.858
19800 4.763 5.359 80.676 6.853
19820 3.289 3.7 75.532 8.533
19840 2.567 2.888 58.849 8.723
19860 2.377 2.674 37.183 19.748
19880 1.511 1.7 39.624 20.837
19900 0.947 1.066 24.788 27.639
19920 1.248 1.404 18.982 26.728
19940 2.491 2.803 26.433 28.542
19960 3.942 4.434 58.906 28.724
19980 2.938 3.306 77.028 20.565
20000 4.878 5.487 78.493 16.265
20020 5.755 6.475 102.466 10.72
20040 4.344 4.887 93.474 11.584
20060 4.298 4.836 75.934 8.877
20080 0.226 0.254 32.343 14.631
20100 4.258 4.79 47.595 26.483
20120 2.391 2.69 64.303 21.129
20140 2.931 3.298 44.244 17.146
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
20160 2.486 2.797 58.127 16.647
20180 2.194 2.469 44.71 26.106
20200 0.796 0.896 30.711 18.647
20220 0 0 5.526 24.38
20240 0.795 0.895 0 18.176
20260 3.038 3.418 47.612 13.151
20280 2.576 2.898 54.788 15.546
20300 0.362 0.407 44.777 20.109
20320 0.633 0.712 5.442 21.283
20340 1.711 1.925 18.626 17.214
20360 1.108 1.247 18.7 18.267
20380 2.244 2.525 32.06 26.985
20400 2.374 2.67 43.342 25.57
20420 4.098 4.611 61.671 16.315
20440 4.577 5.149 81.615 9.426
20460 5.112 5.751 91.746 10.779
20480 3.878 4.362 85.452 9.028
20500 0.702 0.789 33.463 106.939
20520 2.89 3.252 45.669 69.471
20540 1.023 1.151 46.585 28.06
20560 9.573 10.769 0 35.324
20580 1.346 1.515 97.906 16.936
20600 1.058 1.19 24.327 7.215
20620 6.981 7.853 55.504 4.939
20640 0 0 95.592 14.666
20660 0.048 0.054 0 128.961
20680 0 0 0 0
20700 0 0 0 0
20720 0 0 0 0
20740 0 0 0 0
20760 0 0 0 0
20780 0 0 0 0
20800 0 0 0 0
20820 0 0 0 0
20840 0 0 0 0
20860 1.819 2.047 16.261 38.53
20880 0.864 0.972 11.923 33.143
20900 0 0 3.994 21.993
20920 1.877 2.111 15.132 31.593
20940 2.512 2.826 41.304 24.38
20960 3.725 4.19 58.804 16.359
20980 4.488 5.049 76.364 9.026
21000 4.65 5.231 87.981 3.114
21020 5.754 6.473 94.648 2.558
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
21040 4.986 5.61 103.888 1.158
21060 5.718 6.433 110.552 0.471
21080 4.434 4.989 95.823 8.175
21100 4.372 4.919 75.781 18.164
21120 2.394 2.693 70.527 15.806
21140 0 0 18.943 19.664
21160 0 0 15.794 20.051
21180 0 0 0 0
21200 0 0 0 0
21220 0 0 0 0
21240 0 0 0 0
21260 0 0 0 0
21280 0 0 0 0
21300 0 0 0 0
21320 0 0 0 0
21340 0 0 0 0
21360 0 0 0 0
21380 0 0 0 0
21400 0 0 0 0
21420 0 0 0 0
21440 0 0 0 0
21460 0 0 0 0
21480 0 0 0 0
21500 0 0 0 0
21520 0 0 0 0
21540 0 0 0 0
21560 0 0 0 0
21580 0 0 0 0
21600 0 0 0 0
21620 0 0 0 0
21640 0 0 0 0
21660 0 0 0 0
21680 0 0 0 0
21700 0 0 0 0
21720 0 0 0 0
21740 0 0 0 0
21760 0 0 0 0
21780 0 0 0 0
21800 0 0 0 106.26
21820 0 0 0 171.808
21840 0 0 0 185.687
21860 0 0 0 174.496
21880 0 0 0 88.391
21900 0 0 0 51.613
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
21920 0 0 0 28.722
21940 6.136 6.903 72.993 19.803
21960 3.532 3.974 81.123 15.696
21980 1.845 2.075 49.074 15.993
22000 0.895 1.007 22.668 37.663
22020 0.749 0.842 20.843 60.22
22040 0.227 0.256 12.062 51.226
22060 1.674 1.884 11.278 21.46
22080 0 0 9.481 55.58
22100 0 0 0 143.404
22120 0 0 0 212.509
22140 0.852 0.959 0 118.696
22160 0 0 0 25.761
22180 1.662 1.87 0 36.37
22200 0 0 0 49.539
22220 0 0 0 111.987
22240 0 0 0 51.537
22260 1.331 1.498 7.425 36.991
22280 2.416 2.718 35.69 17.424
22300 2.858 3.215 40.993 10.226
22320 3.333 3.749 62.372 11.009
22340 2.893 3.254 64.349 6.966
22360 0 0 0 27.08
22380 3.379 3.802 21.295 29.296
22400 0 0 0 97.104
22420 2.574 2.896 22.209 48.676
22440 2.058 2.315 45.202 13.934
22460 1.54 1.733 31.36 8.808
22480 1.454 1.636 28.612 20.228
22500 0.596 0.671 20.19 28.602
22520 0.314 0.353 29.202 25.33
22540 1.706 1.919 34.555 52.369
22560 3.086 3.471 45.625 56.553
22580 0 0 0 62.849
22600 0 0 0 31.279
22620 0.501 0.563 0 23.851
22640 1.29 1.452 16.122 16.772
22660 2.294 2.58 40.44 11.092
22680 3.037 3.416 48.515 5.863
22700 3.219 3.622 58.213 3.262
22720 3.376 3.798 62.465 5.099
22740 3.054 3.436 63.68 7.596
22760 2.738 3.081 57.114 9.961
22780 2.73 3.072 49.398 18.093
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
22800 2.677 3.011 51.002 19.408
22820 2.193 2.467 48.346 17.917
22840 2.401 2.701 44.885 20.777
22860 2.621 2.948 46.486 22.509
22880 2.529 2.845 44.825 19.336
22900 2.514 2.829 47.625 9.648
22920 2.567 2.888 47.579 17.593
22940 2.787 3.136 50.74 27.138
22960 3.406 3.832 58.792 28.08
22980 3.258 3.665 62.134 27.767
23000 3.601 4.051 64.288 22.349
23020 3.252 3.659 60.742 21.816
23040 3.934 4.426 67.004 18.328
23060 4.498 5.061 84.818 12.049
23080 2.299 2.587 72.404 7.294
23100 3.139 3.532 17.947 27.027
23120 3.295 3.707 61.99 43.854
23140 3.525 3.965 64.546 25.062
23160 2.805 3.155 60.745 21.937
23180 1.938 2.18 45.118 26.332
23200 1.681 1.891 31.431 24.802
23220 1.43 1.608 29.381 10.815
23240 0.876 0.986 19.891 6.712
23260 10.005 11.255 12.125 14.499
23280 3.204 3.605 93.124 21.577
23300 5.466 6.149 75.526 18.17
23320 5.448 6.129 107.487 3.372
23340 5.382 6.055 98.249 1.531
23360 6.742 7.584 116.495 1.366
23380 6.191 6.965 124.897 0.922
23400 5.219 5.872 100.01 0.694
23420 5.574 6.27 100.074 0.806
23440 6.758 7.602 132.77 0.162
23460 8.406 9.457 144.542 0.328
23480 10.3 11.588 182.261 0.028
23500 13.943 15.686 220.933 0.01
23520 13.255 14.912 261.08 0
23540 10.919 12.284 234.994 0
23560 1.779 2.002 125.33 4.16
23580 0 0 47.488 26.645
23600 0 0 0 65.979
23620 0 0 0 506.748
23640 0 0 0 864.762
23660 0 0 0 792.524
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
23680 0 0 0 808.665
23700 0 0 0 604.96
23720 0 0 0 569.663
23740 0 0 0 292.3
23760 0.628 0.707 3.425 65.425
23780 1.122 1.263 0.314 38.22
23800 2.11 2.373 37.103 27.762
23820 1.079 1.214 5.316 17.955
23840 3.201 3.601 38.781 10.808
23860 5.101 5.738 81.632 4.865
23880 4.302 4.84 88.458 3.815
23900 4.809 5.41 84.301 11.669
23920 1.421 1.598 43.686 15.268
23940 2.848 3.204 53.689 8.296
23960 0 0 15.121 23.295
23980 0 0 0 406.248
24000 0 0 0 988.402
24020 0 0 0 950.234
24040 0 0 0 950.59
24060 0 0 0 901.085
24080 0 0 0 1227.719
24100 0 0 0 1613.2
24120 0 0 0 1412.709
24140 0 0 0 1226.955
24160 0 0 0 1278.781
24180 0 0 0 1195.789
24200 0 0 0 1121.052
24220 0 0 0 1161.991
24240 0 0 0 482.141
24260 0 0 0 417.075
24280 0 0 0 368.929
24300 0.996 1.121 9.462 43.636
24320 1.693 1.904 28.945 51.18
24340 4.561 5.131 67.794 16.718
24360 4.996 5.621 90.899 5.537
24380 4.808 5.409 93.458 5.937
24400 4.382 4.93 90.41 10.643
24420 5.482 6.168 93.37 7.644
24440 6.511 7.325 114.418 0.002
24460 6.022 6.774 109.906 8.493
24480 5.591 6.29 108.554 2.979
24500 3.138 3.531 56.338 0
24520 6.52 7.335 122.43 0
24540 7.55 8.493 132.006 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
24560 5.562 6.258 125 0.117
24580 4.682 5.268 72.812 3.231
24600 8.842 9.947 126.171 9.36
24620 10.019 11.272 178.947 14.189
24640 10.062 11.32 196.606 13.321
24660 6.601 7.426 160.21 8.263
24680 5.486 6.171 116.097 3.105
24700 3.607 4.058 84.479 7.274
24720 4.214 4.741 73.798 15.281
24740 4.272 4.806 81.498 17.367
24760 0.717 0.806 65.768 15.912
24780 2.751 3.095 33.202 19.509
24800 4.07 4.578 48.391 10.695
24820 2.347 2.641 55.789 19.064
24840 0.634 0.713 41.413 14.609
24860 0.284 0.32 15.287 12.621
24880 0 0 0 35.393
24900 0 0 0 44.859
24920 0 0 0 51.932
24940 0 0 0 31.425
24960 0 0 0 17.458
24980 0 0 0 37.643
25000 0.538 0.606 0 37.228
25020 0 0 0 23.639
25040 1.204 1.355 0.462 31.092
25060 0.612 0.689 3.044 23.536
25080 2.383 2.681 37.175 17.942
25100 3.486 3.922 53.285 12.135
25120 3.672 4.131 60.408 5.606
25140 8.149 9.167 108.105 1.212
25160 11.318 12.732 187.89 0
25180 14.71 16.549 246.85 0
25200 17.87 20.103 302.81 0
25220 16.495 18.557 289.569 0
25240 18.709 21.047 336.766 0
25260 22.707 25.546 396.939 0
25280 26.317 29.606 462.79 0
25300 29.465 33.148 520.898 0
25320 31.11 34.999 573.329 0
25340 34.583 38.906 646.47 0
25360 34.094 38.355 651.425 0
25380 25.366 28.536 589.921 0
25400 28.58 32.153 522.729 0
25420 21.602 24.302 475.157 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
25440 26.526 29.842 456.293 0
25460 32.503 36.566 554.574 0
25480 30.994 34.869 599.253 0
25500 32.404 36.455 598.208 0
25520 29.97 33.717 592.854 0
25540 20.068 22.577 473.777 138.148
25560 4.997 5.621 258.393 476.686
25580 2.556 2.876 47.252 646.103
25600 0.237 0.266 13.326 889.129
25620 0 0 0 998.102
25640 0 0 0 1070.795
25660 0 0 0 476.104
25680 0 0 0 162.973
25700 0 0 0 125.521
25720 0 0 0 146
25740 0 0 0 235.49
25760 0 0 0 525.603
25780 0 0 0 747.065
25800 0 0 0 578.905
25820 0 0 0 599.073
25840 0 0 0 702.69
25860 0 0 0 614.556
25880 0 0 0 477.697
25900 0 0 0 343.859
25920 0 0 0 249.945
25940 0 0 0 183.85
25960 0 0 0 224.93
25980 0 0 0 70.598
26000 0 0 0 149.446
26020 0 0 0 116.767
26040 0 0 0 68.138
26060 1.642 1.847 19.449 55.139
26080 3.07 3.453 44.49 20.67
26100 2.595 2.92 58.659 3.849
26120 3.11 3.498 65.919 4.252
26140 5.474 6.159 59.228 16.903
26160 0 0 0 7.927
26180 0 0 0 16.729
26200 0 0 0 91.389
26220 0 0 0 255.648
26240 0 0 0 441.503
26260 0 0 0 551.882
26280 0 0 0 759.161
26300 0 0 0 503.677
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
26320 0 0 0 971.388
26340 0 0 0 744.795
26360 0 0 0 620.516
26380 0 0 0 551.254
26400 0 0 0 387.91
26420 0 0 0 267.748
26440 0 0 0 357.65
26460 0 0 0 380.404
26480 0.545 0.613 1.786 496.274
26500 1.395 1.57 9.164 644.954
26520 2.156 2.426 25.695 533.742
26540 0 0 0 530.234
26560 0 0 0 744.945
26580 0 0 0 1201.598
26600 0 0 0 1006.951
26620 0 0 0 918.051
26640 7.578 8.525 53.147 442.526
26660 7.05 7.931 84.426 120.555
26680 6.092 6.854 122.353 18.063
26700 5.247 5.903 107.692 16.717
26720 4.853 5.459 95.283 24.349
26740 2.63 2.959 74.197 38.154
26760 2.301 2.588 57.968 29.365
26780 1.251 1.408 30.284 12.726
26800 0 0 9.502 0
26820 0 0 0 0
26840 0 0 0 0
26860 0 0 0 0
26880 0 0 0 0
26900 0 0 0 0
26920 0 0 0 0
26940 0 0 0 0
26960 0 0 0 0
26980 1.146 1.289 0 102.163
27000 1.334 1.5 6.636 29.743
27020 0 0 13.167 24.603
27040 0.911 1.025 0 39.41
27060 2.373 2.669 40.51 31.791
27080 2.906 3.269 55.462 21.759
27100 6.094 6.856 87.986 6.663
27120 6.194 6.968 147.918 6.016
27140 2.97 3.342 83.86 9.571
27160 1.447 1.628 45.234 11.85
27180 0 0 0 38.047
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
27200 0 0 0 61.38
27220 0 0 0 92.708
27240 0 0 0 110.376
27260 0 0 0 103.81
27280 0 0 0 125.358
27300 0 0 0 115.83
27320 0 0 0 87.648
27340 0 0 0 86.274
27360 0 0 2.671 97.658
27380 0 0 0 121.73
27400 0 0 0 73.151
27420 0.706 0.795 0 91.194
27440 1.431 1.61 20.644 82.037
27460 0 0 5.587 84.337
27480 0 0 0 0
27500 0 0 0 201.213
27520 2.199 2.474 53.355 19.473
27540 0 0 29.235 0
27560 0 0 17.395 0
27580 0 0 4.788 0
27600 0 0 0 0
27620 0 0 0 0
27640 0 0 0 0
27660 0 0 0 0
27680 0 0 0 0
27700 0 0 0 0
27720 0 0 0 0
27740 0 0 0 0
27760 0 0 0 0
27780 0 0 0 0
27800 0 0 0 0
27820 0 0 0 0
27840 0 0 0 0
27860 0 0 0 0
27880 0.142 0.159 4.272 108.733
27900 1.113 1.252 14.133 91.499
27920 0 0 0 0
27940 0 0 0 0
27960 0 0 0 0
27980 0 0 0 0
28000 0 0 0 62.886
28020 0 0 0 24.297
28040 5.364 6.035 36.631 11.194
28060 5.229 5.882 114.06 9.12
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
28080 1.729 1.945 65.169 19.848
28100 5.718 6.432 58.134 30.767
28120 5.362 6.032 101.718 10.544
28140 6.086 6.847 107.674 19.377
28160 7.57 8.516 130.626 18.139
28180 6.433 7.237 131.458 7.697
28200 6.15 6.918 119.778 12.909
28220 5.385 6.058 107.774 11.374
28240 4.932 5.549 96.992 37.052
28260 4.826 5.43 88.374 13.834
28280 5.717 6.431 104.101 11.158
28300 5.248 5.904 105.531 33.242
28320 6.426 7.23 110.537 14.372
28340 6.836 7.691 129.378 9.26
28360 6.136 6.903 126.466 17.614
28380 0 0 0 0
28400 0 0 0 0
28420 0 0 0 0
28440 0 0 0 0
28460 0 0 0 0
28480 0 0 0 0
28500 0 0 0 0
28520 0 0 0 0
28540 0 0 0 0
28560 0 0 0 0
28580 0 0 0 0
28600 0 0 0 0
28620 0 0 0 0
28640 0 0 0 0
28660 0 0 0 0
28680 0 0 0 0
28700 0 0 0 0
28720 0 0 0 0
28740 0 0 0 0
28760 0 0 0 0
28780 0 0 0 0
28800 0 0 0 0
28820 0 0 0 0
28840 0 0 0 0
28860 0 0 0 0
28880 0 0 0 0
28900 0 0 0 0
28920 0 0 0 0
28940 0 0 0 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
28960 0 0 0 15.993
28980 0 0 0 0
29000 0 0 0 0
29020 0 0 0 0
29040 0 0 0 1.033
29060 0 0 0 1.033
29080 0 0 0 0
29100 0 0 0 0.122
29120 0 0 0 0.122
29140 0 0 0 0
29160 0 0 0 0.428
29180 0 0 0 0.171
29200 0 0 0 3.003
29220 0 0 0 1.56
29240 0 0 0 0.487
29260 0 0 0 1.283
29280 0 0 0 0
29300 0 0 0 9.121
29320 0 0 0 41.275
29340 0 0 0 157.494
29360 0 0 0 106.967
29380 0 0 0 48.126
29400 0 0 0 61.041
29420 0 0 24.249 81.325
29440 0 0 0 63.154
29460 0 0 0 38.156
29480 0 0 0 22.201
29500 0 0 0 14.585
29520 0 0 0 19.018
29540 0 0 0 31.059
29560 0 0 0 43.935
29580 0 0 0 39.903
29600 0 0 0 59.653
29620 0.709 0.797 0 82.609
29640 1.263 1.421 29.406 101.532
29660 4.02 4.523 57.212 117.627
29680 5.239 5.894 87.473 120.908
29700 6.104 6.867 107.54 109.87
29720 4.729 5.32 101.256 98.074
29740 0 0 25.172 191.309
29760 0 0 0 265.156
29780 0 0 0 341.535
29800 0 0 0 379.116
29820 0 0 0 575.315
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
29840 0 0 0 773.638
29860 0 0 0 420.589
29880 0 0 0 803.075
29900 0 0 0 726.761
29920 0 0 0 490.571
29940 0 0 0 561.096
29960 0 0 0 597.453
29980 0 0 0 389.695
30000 0 0 0 333.496
30020 0 0 0 122.481
30040 0 0 0 103.814
30060 0.913 1.027 0 68.749
30080 2.718 3.057 31.279 16.696
30100 0 0 28.942 34.84
30120 0.206 0.231 5.633 46.753
30140 2.218 2.495 21.082 30.084
30160 0.793 0.892 22.303 50.915
30180 0 0 0 177.301
30200 2.27 2.554 0 95.379
30220 3.874 4.359 63.083 8.334
30240 3.305 3.718 64.063 9.145
30260 1.644 1.85 56.668 18.58
30280 0.641 0.721 20.822 293.649
30300 0.766 0.861 15.814 112.141
30320 0.129 0.145 7.433 34.485
30340 0.185 0.208 0 278.146
30360 0 0 0 352.373
30380 0 0 0 326.413
30400 0 0 0 148.638
30420 0 0 0 66.6
30440 0 0 0 30.399
30460 0 0 0 29.399
30480 0 0 0 39.243
30500 0 0 0 32.761
30520 0 0 0 32.214
30540 1.07 1.204 0 26.4
30560 1.38 1.553 7.882 24.818
30580 2.714 3.053 36.99 18.008
30600 1.166 1.311 47.569 14.472
30620 0.971 1.093 20.746 23.038
30640 2.545 2.863 29.802 24.65
30660 4.269 4.802 63.989 22.433
30680 3.781 4.253 83.376 27.038
30700 1.771 1.993 51.878 34.679
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
30720 0.324 0.365 19.456 43.482
30740 1.886 2.121 8.827 29.256
30760 2.642 2.972 41.884 26.085
30780 2.739 3.082 51.722 18.576
30800 2.934 3.301 57.474 12.753
30820 3.742 4.21 62.771 8.667
30840 3.762 4.233 71.8 8.495
30860 4.149 4.667 74.62 8.154
30880 4.593 5.167 83.631 6.005
30900 4.72 5.31 88.794 6.625
30920 4.262 4.794 82.876 10.608
30940 5.07 5.704 84.237 20.042
30960 4.742 5.334 95.578 12.76
30980 5.753 6.472 102.526 6.535
31000 5.519 6.209 105.438 5.885
31020 6.352 7.146 100.448 3.952
31040 5.782 6.504 109.374 5.843
31060 6.606 7.431 121.981 1.909
31080 5.943 6.686 119.16 1.841
31100 5.385 6.058 101.03 3.04
31120 5.041 5.671 99.713 2.495
31140 4.538 5.106 90.61 3.644
31160 4.854 5.461 86.476 5.377
31180 4.583 5.156 86.602 6.981
31200 4.453 5.009 85.494 6.229
31220 3.916 4.406 74.938 12.672
31240 3.014 3.39 72.59 15.947
31260 1.019 1.147 39.497 18.341
31280 1.232 1.386 9.998 18.05
31300 0.206 0.232 5.99 19.9
31320 1.918 2.157 23.056 37.487
31340 2.151 2.42 40.818 34.148
31360 0.313 0.352 23.563 36.201
31380 1.024 1.152 12.816 31.777
31400 3.305 3.718 53.882 19.67
31420 2.994 3.368 59.204 18.198
31440 3.187 3.586 56.926 19.553
31460 2.884 3.245 58.65 13.702
31480 3.049 3.43 55.44 16.364
31500 3.502 3.94 61.231 16.231
31520 3.268 3.677 64.758 13.145
31540 4.267 4.801 70.484 12.025
31560 3.282 3.692 79.354 13.665
31580 3.774 4.245 65.792 15.745
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
31600 4.085 4.595 74.978 8.885
31620 3.928 4.419 74.378 5.278
31640 2.83 3.184 64.487 10.003
31660 2.329 2.62 48.835 27.179
31680 2.896 3.258 67.372 17.498
31700 1.522 1.712 40.12 66.7
31720 2.198 2.472 22.429 94.372
31740 10.034 11.289 117.828 38.599
31760 14.683 16.519 252.164 45.196
31780 9.442 10.622 202.758 48.826
31800 12.731 14.323 188.831 15.132
31820 13.926 15.667 273.277 13.16
31840 16.326 18.366 280.303 10.203
31860 19.437 21.866 357.743 6.061
31880 22.587 25.411 420.446 0.871
31900 24.986 28.109 447.864 0
31920 15.961 0 309.47 0
31940 15.913 0 280.188 0
31960 15.307 0 316.034 0
31980 15.361 17.281 298.878 0.252
32000 20.771 0 346.625 0
32020 12.806 14.407 344.694 29.485
32040 22.902 25.765 358.962 30.689
32060 16.498 18.56 382.274 1.175
32080 23.995 26.995 379.413 1.117
32100 24.175 0 446.969 0
32120 18.283 0 375.749 0
32140 23.282 0 405.185 0
32160 17.264 0 332.388 0
32180 19.859 0 341.472 0
32200 13.866 0 347.53 0
32220 18.815 0 276.139 0
32240 17.142 0 338.446 0
32260 15.17 17.066 285.909 20.294
32280 13.49 15.177 289.775 43.203
32300 15.618 0 285.693 0
32320 13.061 0 263.146 0
32340 15.633 0 271.267 0
32360 15.201 17.101 258.99 1.145
32380 14.004 15.754 281.91 1.683
32400 13.484 15.17 260.681 5.364
32420 10.602 11.928 211.215 28.839
32440 10.718 12.058 201.518 13.906
32460 8.866 9.974 198.938 18.165
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
32480 4.474 5.033 105.992 18.819
32500 11.123 12.514 182.034 23.98
32520 11.814 13.291 219.873 2.157
32540 11.085 12.47 206.599 12.986
32560 13.788 15.512 242.658 1.096
32580 11.272 12.681 236.491 5.258
32600 17.888 20.124 275.635 9.546
32620 19.53 21.971 345.034 4.21
32640 20.044 22.55 379.245 1.014
32660 15.585 17.533 316.876 0.493
32680 16.186 18.21 313.351 8.539
32700 10.948 12.317 260.697 23.136
32720 12.374 13.92 232.344 20.165
32740 13.253 14.909 238.424 4.377
32760 12.736 14.328 245.2 1.912
32780 11.444 12.875 231.408 0.48
32800 10.645 11.975 205.075 0.13
32820 9.589 10.787 195.617 3.365
32840 12.648 14.229 225.975 4.474
32860 11.489 12.925 222.492 5.667
32880 10.381 11.678 206.562 10.585
32900 9.012 10.139 179.93 19.799
32920 8.112 9.126 161.751 26.615
32940 6.937 7.804 143.841 17.569
32960 5.598 6.297 117.102 24.925
32980 2.83 3.184 80.538 44.205
33000 3.953 4.447 40.918 77.263
33020 4.324 3.406 86.13 35.874
33040 1.248 0.983 62.573 44.932
33060 1.091 0.86 0 78.369
33080 1.355 1.068 38.644 101.111
33100 1.355 1.068 42.426 181.559
33120 1.405 1.106 20.023 189.872
33140 0.702 0.553 20.407 216.503
33160 0.963 0.759 15.98 212.03
33180 0.906 0.713 17.039 228.668
33200 0.818 0.645 19.396 156.787
33220 1.422 1.12 19.342 97.368
33240 2.309 1.818 33.096 48.875
33260 3.002 2.364 34.903 28.464
33280 2.959 2.33 57.338 17.592
33300 2.856 2.249 39.234 33.866
33320 4.23 3.331 66.982 23.084
33340 4.942 3.891 84.11 19.373
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
33360 5.292 4.168 97.222 10.011
33380 4.714 3.713 100.035 14.583
33400 5.856 4.612 82.278 57.873
33420 4.437 3.494 80.422 23.846
33440 5.089 4.008 87.774 9.217
33460 4.87 3.835 93.498 5.811
33480 5.559 4.378 98.33 4.633
33500 5.953 6.697 108.054 3.983
33520 6.699 7.537 118.962 1.902
33540 5.991 6.74 120.857 2.043
33560 6.441 7.246 111.918 4.595
33580 8.13 9.146 134.579 2.944
33600 9.83 11.058 173.971 1.793
33620 8.658 9.74 181.523 2.514
33640 9.026 10.154 169.462 2.978
33660 8.818 9.921 167.926 1.11
33680 8.893 10.004 166.765 0.18
33700 8.959 10.079 168.675 0
33720 9.012 10.139 168.988 0
33740 9.139 10.282 171.33 0
33760 9.225 10.378 173.392 0
33780 9.133 10.274 173.806 0
33800 9.275 10.435 173.365 0
33820 9.718 10.933 179.823 0
33840 11.238 12.643 194.311 0.001
33860 11.098 12.485 215.44 0.002
33880 9.666 10.874 191.788 0
33900 10.524 11.84 188.918 0.031
33920 10.438 11.742 198.623 0.186
33940 11.359 12.779 203.89 0.737
33960 12.086 13.597 220.446 1.124
33980 14.555 16.375 259.641 0.602
34000 14.116 15.881 266.91 0.892
34020 13.595 15.295 277.477 0.036
34040 12.756 14.351 242.131 0.084
34060 11.803 13.279 237.754 2.747
34080 10.458 11.765 204.435 11.756
34100 9.931 11.173 194.282 6.57
34120 8.599 9.674 176.586 15.426
34140 7.622 8.574 155.602 25.255
34160 7.369 8.29 137.762 13.889
34180 7.162 8.058 137.622 17.109
34200 6.55 7.368 130.117 11.485
34220 6.14 6.908 119.232 17.144
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
34240 6.06 6.818 107.048 26.596
34260 5.605 6.305 110.447 19.214
34280 5.622 6.324 104.047 22.2
34300 5.672 6.381 106.944 19.159
34320 6.338 7.13 113.498 15.657
34340 6.845 7.7 123.174 11.517
34360 6.794 7.644 132.49 9.384
34380 7.125 8.015 140.482 9.404
34400 6.602 7.428 127.414 8.773
34420 2.974 3.345 63.122 15.126
34440 3.455 3.887 60.066 12.055
34460 3.711 4.175 68.374 11.409
34480 3.798 4.273 71.738 12.087
34500 2.959 3.329 66.081 13.402
34520 3.69 4.152 64.081 9.291
34540 3.764 4.235 71.63 5.702
34560 4.086 4.597 75.147 8.153
34580 4.212 4.739 78.839 4.137
34600 5.206 5.857 89.75 2.599
34620 6.357 7.151 109.353 5.456
34640 9.323 10.489 154.315 6.179
34660 7.195 8.095 163.422 20.165
34680 9.878 11.113 153.568 21.349
34700 10.604 11.93 197.834 1.707
34720 10.586 11.909 174.008 18.283
34740 10.816 12.168 208.566 0.472
34760 8.954 10.073 201.275 0.245
34780 10.32 11.61 186.813 0.117
34800 7.494 8.431 174.54 2.694
34820 9.482 10.667 148.373 24.486
34840 12.073 13.582 210.607 2.972
34860 12.448 14.004 220.118 4.593
34880 10.991 12.365 244.124 1.249
34900 14.865 16.723 217.202 0.075
34920 5.703 6.416 159.109 9.811
34940 3.217 3.619 87.565 19.259
34960 2.012 2.264 47.786 65.701
34980 8.982 10.105 93.242 52.59
35000 16.27 18.303 242.906 9.148
35020 12.239 13.769 266.84 3.681
35040 14.829 16.682 288.188 3.808
35060 12.208 13.734 303.018 1.411
35080 14.861 16.718 254.698 0.168
35100 15.477 17.411 273.535 0
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
35120 10.41 11.711 231.381 27.844
35140 12.192 13.716 216.304 30.951
35160 13.171 14.818 229.606 0
35180 14.457 16.264 258.268 0.19
35200 16.328 18.369 291.89 0.968
35220 16.249 18.28 312.73 4.136
35240 14.634 16.463 250.385 14.546
35260 13.658 15.366 273.609 4.721
35280 13.851 15.583 284.296 4.268
35300 0 0 0 5.343
35320 0 0 0 9.644
35340 0 0 0 21.263
35360 0 0 0 15.007
35380 0 0 0 80.098
35400 0 0 0 147.088
35420 0 0 0 381.961
35440 0 0 0 462.754
35460 0 0 0 322.332
35480 0 0 0 206.104
35500 0 0 0 358.579
35520 0 0 0 306.151
35540 0 0 0 0
35560 0 0 0 132.982
35580 0 0 0 80.814
35600 0 0 0 92.582
35620 0 0 0 42.831
35640 0 0 0 27.346
35660 0 0 0 9.787
35680 0 0 0 2.29
35700 0 0 0 4.558
35720 11.252 12.659 210.145 15.951
35740 11.705 13.168 220.947 13.432
35760 13.238 14.892 235.156 9.369
35780 13.772 15.494 259.617 7.466
35800 13.866 15.599 235.942 5.576
35820 12.471 14.03 257.065 4.114
35840 14.677 16.511 242.432 2.955
35860 16.163 18.184 288.462 1.274
35880 15.336 17.253 309.4 1.405
35900 16.636 18.716 301.605 5.646
35920 17.019 19.147 299.294 7.324
35940 18.054 20.311 306.142 5.926
35960 18.321 20.611 339.551 0
35980 9.975 11.222 288.453 1.758
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
36000 2.332 2.624 101.198 43.083
36020 4.353 4.897 69.235 69.104
36040 5.116 5.756 92.482 25.369
36060 5.243 5.899 96.694 23.33
36080 5.649 6.355 104.949 25.598
36100 6.928 7.794 118.688 18.374
36120 0 0 0 22.692
36140 0 0 0 56.317
36160 0 0 0 39.906
36180 0 0 0 44.45
36200 0 0 0 52.707
36220 0 0 0 20.811
36240 0 0 0 32.067
36260 0 0 0 13.906
36280 0 0 0 14.185
36300 0 0 0 17.604
36320 0 0 0 0
36340 0 0 0 347.453
36360 0 0 0 83.258
36380 0 0 0 22.782
36400 0 0 0 16.378
36420 0 0 0 5.942
36440 0 0 0 11.196
36460 0 0 0 2.38
36480 0 0 0 6.041
36500 3.734 4.2 78.104 27.456
36520 5.319 5.984 78.586 17.134
36540 4.686 5.272 89.969 15.287
36560 4.398 4.948 86.929 11.897
36580 3.778 4.251 78.61 18.275
36600 4.001 4.501 74.523 27.699
36620 3.67 4.128 72.28 29.382
36640 3.146 3.539 67.398 23.282
36660 3.942 4.435 62.854 22.827
36680 3.158 3.553 67.694 22.882
36700 3.621 4.073 61.913 32.919
36720 3.566 4.011 71.554 23.989
36740 3.998 4.497 68.848 19.36
36760 3.806 4.282 73.774 12.147
36780 3.662 4.12 69.464 12.867
36800 3.46 3.893 66.325 20.204
36820 0 0 1.718 18.125
36840 0 0 0 38.748
36860 0 0 0 23.142
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
36880 0.672 0.756 0.062 19.916
36900 1.742 1.959 23.351 33.553
36920 0.911 1.025 27.372 25.411
36940 1.562 1.758 17.59 40.305
36960 1.202 1.353 25.729 41.741
36980 0.542 0.609 17.898 35.871
37000 1.51 1.699 13.973 30.438
37020 1.24 1.395 24.678 29.207
37040 1.222 1.374 22.497 27.017
37060 1.911 2.15 28.911 13.643
37080 2.526 2.842 41.844 21.098
37100 1.854 2.086 39.65 36.149
37120 2.034 2.288 32.534 35.443
37140 2.381 2.678 42.601 33.578
37160 2.398 2.698 48.274 30.285
37180 2.636 2.966 45.106 34.122
37200 2.251 2.533 40.059 22.684
37220 2.294 2.581 52.239 13.697
37240 0 0 7.312 29.443
37260 3.83 4.309 40.539 4.976
37280 3.874 4.358 73.181 6.917
37300 4.182 4.704 78.798 5.973
37320 4.079 4.589 78.326 2.089
37340 3.323 3.739 76.934 16.206
37360 2.519 2.834 54.239 18.864
37380 1.594 1.794 33.596 44.711
37400 3.061 3.443 27.865 25.124
37420 3.066 3.449 55.807 11.176
37440 3.64 4.095 64.344 10.093
37460 3.554 3.998 69.526 6.183
37480 2.538 2.856 57.686 11.958
37500 2.395 2.695 43.003 23.268
37520 2.954 3.324 48.404 8.785
37540 3.688 4.149 63.432 11.756
37560 3.491 3.928 72.299 6.919
37580 3.495 3.932 65.708 4.082
37600 5.456 6.138 91.508 4.646
37620 4.727 5.318 104.85 8.83
37640 4.422 4.974 93.53 16.634
37660 3.222 3.624 61.435 23.514
37680 6.529 7.345 91.681 9.627
37700 5.282 5.942 112.047 4.895
37720 4.09 4.601 86.79 7.766
37740 3.225 3.628 68.419 23.598
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
37760 2.022 2.275 53.589 44.051
37780 1.438 1.618 33.427 55.546
37800 0.847 0.953 21.611 61.126
37820 0 0 0 97.325
37840 0 0 0 166.098
37860 0 0 0 171.992
37880 11.903 13.391 84.362 16.815
37900 12.59 14.163 101.662 10.668
37920 0.295 0.332 67.807 20.56
37940 0 0 0 21.973
37960 0 0 0 18.495
37980 0 0 0 23.184
38000 0 0 0 26.305
38020 0 0 0 26.346
38040 0 0 0 35.703
38060 0 0 0 41.507
38080 0 0 0 41.559
38100 1.205 1.355 10.061 26.514
38120 0.606 0.681 12.229 29.291
38140 0.606 0.682 15.529 25.247
38160 1.574 1.77 19.78 24.525
38180 2.336 2.628 32.352 28.656
38200 2.576 2.898 49.498 26.687
38220 2.579 2.902 44.321 31.689
38240 3.948 4.442 64.751 23.94
38260 5.972 6.719 101.737 11.18
38280 5.195 5.845 107.365 9.305
38300 1.208 1.359 63.344 12.115
38320 5.207 5.858 45.363 17.624
38340 5.703 6.416 104.251 10.754
38360 5.166 5.812 102.686 18.692
38380 4.662 5.245 92.286 57.563
38400 5.395 6.07 93.782 36.341
38420 5.781 6.503 104.832 18.896
38440 5.858 6.59 112.506 23.678
38460 5.707 6.421 109.338 9.365
38480 5.739 6.457 107.863 13.53
38500 6.094 6.856 111.353 7.566
38520 5.818 6.546 113.313 3.622
38540 9.07 10.203 133.569 3.544
38560 5.86 6.593 153.369 3.746
38580 5.338 6.006 103.366 4.259
38600 4.616 5.193 100.053 4.917
38620 3.642 4.097 83.855 8.153
Earth Work Quantity Sheet
Chainage Area Cut (m2)Area Fill (m2)Volume Cut (m3)Volume Fill (m3)
38640 3.43 3.858 56.198 37.49
38660 5.1 5.738 83.673 18.9
38680 5.206 5.856 97.461 18.564
38700 4.862 5.47 98.213 21.064
38720 4.913 5.527 90.121 18.935
38740 6.794 7.643 113.359 7.852
38760 6.57 7.391 126.546 2.914
38780 5.222 5.874 110.803 3.136
38800 4.744 5.337 90.934 5.667
38820 4.826 5.43 90.292 9.756
38840 4.441 4.996 87.283 12.975
38860 5.206 5.857 91.186 11.256
38880 6.448 7.254 108.219 12.488
38900 7.232 8.136 128.526 9.414
38920 7.316 8.231 140.646 1.564
38940 7.827 8.806 139.367 1.004
38960 7.372 8.294 148.454 1.928
38980 7.166 8.061 144.812 2.538
39000 7.63 8.584 133.273 3.616
39020 8.153 9.172 138.124 1.873
39040 8.431 9.485 154.792 0.515
39060 9.252 10.409 167.447 0.23
39080 10.498 11.81 214.86 0.648
39100 8.36 9.405 172.426 0.036
39120 11.13 12.522 200.069 0.738
39140 12.978 14.601 231.769 0.004
39160 12.427 13.981 239.61 3.313
39165 11.161 12.556 34.95 0.008
Total Quantity 116425.266 174733.685
Madhya Pradesh Vidyut Vitaran Company Limited (MPPKVVCL)

Description Amount (Rs.)

No. of Single Poles to be shifted 698 Nos

@ 75000 Per Pole 52350000

No. of Double PolesWith Transformer to be


79 Nos
shifted

@ 200000 Per Pole 15800000

Total Rs 68,150,000

Add 10% Extra Charges 6,815,000

74,965,000

Say Rs (in Crores) 7.5


ESTIMATE FOR HDPE PIPE DISTRIBUTION NETWORK
UADD Water Supply, Sewerage and Tube Well Works SOR wef 10 May 2012
S.No. Ref. Particulars Qty Unit Rate Amount

Earth work in Excavation for pipe trench in all kinds of


soil and WBM in areas including dressing, watering and
Item No. 15.1 pg.
1 ramming and disposal of Excavated earth lead upto 50 9035.07 Cum 129.1 1166428.18
151
meters and lift upto 1.5m, disposal earth to be leveled,
neatly dressed.

Earth work in excavation for pipe trench in all kinds of


Item No. 15.3 pg. rocks in areas including dressing, stacking of useful
2
151 material and disposal of unserviceable one upto 50 m
lead and lift upto 1.5 m.
Soft rock with or without blasting or bituminous
1594.43 Cum 206 328451.55
pavement.
Item No. 15.9 pg. Filling with moorum for pipe bedding or over the pipe
3 1062.95 Cum 625 664343.75
151 including supply of moorum.

Providing, laying, Jointing & field testing of High Density


Polyethylene pipes, (HDPE) confirming to IS 4984/
14151/ 12786/ 13488 with necessary jointing material
like Mechanical connector or jointing pipes by heating to
the ends of pipes with the help of Teflon coated electric
mirror/ heater to the required temperature and then
Item No. 8.1 pg.
4 pressing the ends together against each other, to form a
96
monolithic & leak proof joint by thermosetting process. It
may be required to be done with Jacks/Hydraulic Jacks/
But fusion machine. (50mm & above fusion jointed &
below 50mm mechanical jointed)
8 Kg/Sq.cm

110mm Dia 7435 RM 400 2974000


125mm Dia 1710 RM 514 878940
140mm Dia 340 RM 638 216920
180mm Dia 850 RM 1045 888250
200mm Dia 4850 RM 1293 6271050
(a) Filling available excavated earth in trenches, plinth
sides of foundation in layers not exceeding 20cm. in depth
Item No. 15.8 pg.
5 including consolidation of each layer by ramming 6815.93 Cum 29 197662.06
151
watering, lead up to 50m and lift up to 1.5m in all kinds of
soils

Cutting of Water bound macadam road and making good


Item No. 15.15
6 the same including supply of extra quantities of materials 2642.5 Cum 693 1831252.5
pg. 152
i.e. aggregate, moorum screening and labour required.

Providing and installing of valves and specials etc


7 2245832.00
completed of various sizes @ 20% of the Item No. 4
Sub Total 17663130.04
Add Escalation 5% per year 8831565.02
Sub Total 26494695.06
LA
Village Area in Sqm Area in Hect. Chainage Length Rate Amount (Rs.) Amount (Rs.) Remarks
Amlia 13500 1.350 40.850 41.300 0.450 1078400 1455840 4476708 Realignment
Shahargarh 9000 0.900 60.850 61.150 0.300 428400 385560 1185597 Curve Improvemetn
Shahargarh 12000 1.200 63.850 64.250 0.400 428400 514080 1580796 Realignment
Dheka 12000 1.200 67.700 68.100 0.400 353600 424320 1304784 Realignment
Dheka 12000 1.200 67.700 68.100 0.400 353600 424320 1304784 Realignment
Tanghar 54400 5.440 71.150 71.550 0.400 340000 1849600 5687520 Realignment
Malauti 13500 1.350 88.500 88.950 0.450 329100 444285 1366176.375 Realignment
Tikhi 6300 0.630 89.650 89.860 0.210 476000 299880 922131 Curve Improvemetn
Tikhi 4500 0.450 91.300 91.450 0.150 476000 214200 658665 Curve Improvemetn
Tikhi 1500 0.150 91.700 91.750 0.050 476000 71400 219555 Curve Improvemetn
Deolihan Tola 5100 0.510 91.750 91.920 0.170 340000 173400 533205 Curve Improvemetn
Deolihan Tola 21000 2.100 92.050 92.750 0.700 340000 714000 2195550 Realignment
Jora 3000 0.300 93.350 93.450 0.100 510000 153000 470475 Curve Improvemetn
Kanadi Kalan 24500 2.450 108.350 108.500 0.150 326400 799680 2459016 Curve Improvemetn
Kanadi Khurd 25500 2.550 110.080 110.930 0.850 476000 1213800 3732435 Realignment
Total 217800 21.787 5.180 9140162.5 28105999.687

Page 152
Forest
District/ Division Range Compartment Area in Sqm Area in Hect. Chainage Length Rate Amount (Rs.) Remarks
REWA REWA 9 5921 0.593 18.450 18.750 0.300 2500000 1482500
REWA REWA 10p 16796 1.680 18.750 19.600 0.850 2500000 4200000
REWA REWA 11 22230 2.223 19.600 20.600 1.000 2500000 5557500
REWA REWA 12p 51320 5.132 20.600 21.150 0.550 2500000 12830000
REWA REWA XX 3575 0.358 21.150 21.550 0.200 2500000 895000 LHS
REWA REWA XX 6324 0.633 21.150 21.800 0.325 2500000 1582500 RHS
REWA REWA 14 3795 0.380 21.550 21.850 0.150 2500000 950000 LHS
REWA REWA 14 553 0.056 21.800 21.850 0.025 2500000 140000 RHS
REWA REWA 15A 4634 0.464 21.850 22.100 0.250 2500000 1160000
REWA REWA XX 5224 0.523 22.100 22.350 0.250 2500000 1307500
REWA REWA 15A 5653 0.566 22.350 22.650 0.300 2500000 1415000
REWA REWA XX 6247 0.625 22.650 22.950 0.300 2500000 1562500
REWA REWA 15A 11074 1.108 22.950 23.500 0.550 2500000 2770000
REWA REWA XX 5337 0.534 23.500 23.800 0.300 2500000 1335000
REWA REWA 15A 9109 0.911 23.800 24.200 0.400 2500000 2277500
REWA REWA XX 4417 0.442 24.200 24.425 0.225 2500000 1105000
REWA REWA 15C 5757 0.576 24.425 24.630 0.205 2500000 1440000
REWA REWA 13B 1920 0.192 24.630 24.750 0.120 2500000 480000
REWA REWA 15C 10940 1.094 24.750 25.325 0.575 2500000 2735000
REWA REWA 15D 5154 0.516 25.325 25.900 0.287 2500000 1290000 RHS
REWA REWA 15D 14158 1.416 25.325 26.400 0.537 2500000 3540000 LHS
REWA REWA 13C 759 0.076 25.900 26.000 0.050 2500000 190000 RHS
REWA REWA 15D 1614 0.162 26.000 26.400 0.200 2500000 405000 RHS
REWA REWA 13C 5980 0.598 26.400 26.700 0.300 2500000 1495000
REWA REWA 13D 10606 1.061 26.700 27.230 0.530 2500000 2652500
REWA REWA 15D 3700 0.370 27.230 27.400 0.170 2500000 925000
CHURHAT CHURHAT 1119 38846 3.885 27.400 32.050 4.650 2500000 9712500
CHURHAT CHURHAT 1120 54026 5.403 27.400 32.050 4.650 2500000 13507500
CHURHAT CHURHAT 1122 11687 1.169 38.150 38.750 0.600 2500000 2922500
CHURHAT CHURHAT 1127 503 0.051 40.510 40.565 0.055 2500000 127500
CHURHAT CHURHAT 1128 73275 7.328 42.250 45.900 3.650 2500000 18320000
Page 153
Forest
REWA REWA 9 5921 0.593 18.450 18.750 0.300 2500000 1482500
CHURHAT CHURHAT Rev. Forest 33732 3.374 45.900 47.550 1.650 2500000 8435000 Kubari
SATNA MUKUNDPUR 756 89965 8.997 47.550 56.550 4.500 2500000 22492500 RHS
NORTH SHAHDOL WEST BEOHARI 78 22514 2.252 61.575 62.700 1.125 2500000 5630000
NORTH SHAHDOL WEST BEOHARI 79 24985 2.499 62.700 63.850 1.150 2500000 6247500
NORTH SHAHDOL EAST BEOHARI 11 5380 0.538 64.475 65.025 0.275 2500000 1345000 RHS
NORTH SHAHDOL EAST BEOHARI 13 6870 0.687 65.200 65.500 0.300 2500000 1717500
NORTH SHAHDOL EAST BEOHARI 13 7114 0.712 66.300 66.900 0.300 2500000 1780000 LHS
NORTH SHAHDOL EAST BEOHARI 12 5186 0.519 66.300 66.900 0.300 2500000 1297500 RHS
NORTH SHAHDOL EAST BEOHARI 32 1536 0.154 69.440 69.600 0.080 2500000 385000 RHS
NORTH SHAHDOL EAST BEOHARI 163 38762 3.877 82.325 84.250 1.925 2500000 9692500
NORTH SHAHDOL GODAWAL 211 1836 0.184 84.250 84.450 0.100 2500000 460000 RHS
NORTH SHAHDOL GODAWAL 211 1113 0.112 84.250 84.350 0.050 2500000 280000 LHS
NORTH SHAHDOL EAST BEOHARI 163 5767 0.577 84.350 84.900 0.275 2500000 1442500 LHS
NORTH SHAHDOL EAST BEOHARI 163 1219 0.122 84.450 84.550 0.050 2500000 305000 RHS
NORTH SHAHDOL GODAWAL 211 8985 0.899 84.550 85.475 0.462 2500000 2247500 RHS
NORTH SHAHDOL GODAWAL 211 4993 0.500 84.900 85.475 0.287 2500000 1250000 LHS
NORTH SHAHDOL GODAWAL 215 1287 0.129 85.475 85.535 0.060 2500000 322500
NORTH SHAHDOL GODAWAL 213 21100 2.110 85.535 86.550 1.015 2500000 5275000
NORTH SHAHDOL GODAWAL 214 20069 2.007 86.550 87.550 1.000 2500000 5017500
NORTH SHAHDOL JAISINGHNAGAR 334 1649 0.165 95.300 95.450 0.075 2500000 412500 RHS
NORTH SHAHDOL JAISINGHNAGAR 334 2506 0.251 95.600 95.850 0.125 2500000 627500 RHS
NORTH SHAHDOL JAISINGHNAGAR 333 19230 1.923 96.700 97.700 1.000 2500000 4807500
NORTH SHAHDOL JAISINGHNAGAR 354 11925 1.193 98.250 98.825 0.575 2500000 2982500
NORTH SHAHDOL JAISINGHNAGAR 328 29201 2.921 99.500 100.960 1.460 2500000 7302500
NORTH SHAHDOL JAISINGHNAGAR 327 13352 1.336 102.875 103.540 0.665 2500000 3340000
NORTH SHAHDOL JAISINGHNAGAR 362 50884 5.089 106.750 108.175 1.425 2500000 12722500
NORTH SHAHDOL JAISINGHNAGAR 395 4789 0.479 111.100 111.959 0.430 2500000 1197500 RHS
NORTH SHAHDOL JAISINGHNAGAR 395 3707 0.371 111.235 111.959 0.362 2500000 927500 LHS
Total 840790 84.102 43.577 210255000.0

Page 154
TCS-I: STRENGTHENING OF EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT
WITH CONVENTIONAL WHITE TOPPINGS INCLUDING PAVER BLOCK FLOORINGS
AND RCC DRAIN IN BUILT-UPS

Design Ch. Design Length Bridge Net Length


Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
Rewa/Bichhiya/
1 0.000 3.150 3.150 0.083 3.067 TCS-I
Kuthuliya
Total 3.150 0.083 3.067

TCS-II-A: RECONSTRUCTION & WIDENING OF EXISTING INTERMEDIATE LANE


FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
3.150 9.650 6.500 0.023 6.477 TCS-II-A

10.200 11.750 1.550 0.021 1.529 TCS-II-A

12.100 12.900 0.800 0.800 TCS-II-A


13.550 13.615 0.065 0.065 TCS-II-A
14.250 16.100 1.850 1.850 TCS-II-A
18.700 20.400 1.700 0.012 1.688 TCS-II-A
21.100 21.500 0.400 0.012 0.388 TCS-II-A
25.400 25.600 0.200 0.200 TCS-II-A
32.000 33.150 1.150 0.040 1.110 TCS-II-A
Total 14.215 0.108 14.107

TCS-II-B: RECONSTRUCTION & WIDENING (WITH PROFILE RAISING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
9.650 10.200 0.550 0.550 TCS-II-B
20.400 20.900 0.500 0.500 TCS-II-B
21.500 21.800 0.300 0.300 TCS-II-B
23.250 23.550 0.300 0.300 TCS-II-B
24.700 24.900 0.200 0.200 TCS-II-B
25.250 25.400 0.150 0.150 TCS-II-B
25.750 26.000 0.250 0.250 TCS-II-B
Total 2.250 0.000 2.250
TCS-II-C: RECONSTRUCTION & WIDENING (IN CUTTING) OF EXISTING
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
18.550 18.700 0.150 0.150 TCS-II-C
20.900 21.050 0.150 0.150 TCS-II-C
21.950 22.150 0.200 0.200 TCS-II-C
25.600 25.750 0.150 0.150 TCS-II-C
Total 0.650 0.000 0.650

TCS-II-D: RECONSTRUCTION & ECCENTRIC WIDENING (RHS) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
21.050 21.100 0.050 0.050 TCS-II-D
22.150 22.450 0.300 0.300 TCS-II-D
22.750 23.000 0.250 0.250 TCS-II-D
23.100 23.250 0.150 0.150 TCS-II-D
23.550 23.825 0.275 0.275 TCS-II-D
26.000 26.100 0.100 0.100 TCS-II-D
Total 1.125 0.000 1.125

TCS-II-E: RECONSTRUCTION & ECCENTRIC WIDENING (LHS) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
21.800 21.950 0.150 0.150 TCS-II-E
22.450 22.750 0.300 0.300 TCS-II-E
23.000 23.100 0.100 0.100 TCS-II-E
23.825 23.900 0.075 0.075 TCS-II-E
25.080 25.250 0.170 0.170 TCS-II-E
Total 0.795 0.000 0.795

TCS-II-F: RECONSTRUCTION & WIDENING OF EXISTING INTERMEDIATE LANE


FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
33.150 33.200 0.050 0.050 TCS-II-F
33.400 34.400 1.000 1.000 TCS-II-F
36.800 37.100 0.300 0.300 TCS-II-F
37.250 37.900 0.650 0.650 TCS-II-F
38.500 40.300 1.800 0.032 1.768 TCS-II-F
40.550 40.800 0.250 0.250 TCS-II-F
41.350 41.900 0.550 0.550 TCS-II-F
42.600 43.100 0.500 0.500 TCS-II-F
47.700 47.850 0.150 0.150 TCS-II-F
48.250 48.750 0.500 0.500 TCS-II-F
48.950 49.650 0.700 0.700 TCS-II-F
49.950 53.750 3.800 3.800 TCS-II-F
53.900 56.750 2.850 2.850 TCS-II-F
57.000 58.270 1.270 0.660 0.610 TCS-II-F
59.500 60.600 1.100 1.100 TCS-II-F
61.150 61.250 0.100 0.100 TCS-II-F
64.250 64.400 0.150 0.150 TCS-II-F
65.450 66.200 0.750 0.750 TCS-II-F
66.800 67.500 0.700 0.700 TCS-II-F
68.700 69.200 0.500 0.500 TCS-II-F
69.550 69.600 0.050 0.050 TCS-II-F
69.650 69.800 0.150 0.150 TCS-II-F
69.900 70.550 0.650 0.650 TCS-II-F
70.650 71.000 0.350 0.350 TCS-II-F
71.750 71.900 0.150 0.150 TCS-II-F
74.050 75.450 1.400 1.400 TCS-II-F
75.550 77.000 1.450 1.450 TCS-II-F
81.750 82.350 0.600 0.011 0.589 TCS-II-F
82.650 84.300 1.650 1.650 TCS-II-F
84.450 84.800 0.350 0.350 TCS-II-F
85.250 85.600 0.350 0.350 TCS-II-F
86.750 87.850 1.100 1.100 TCS-II-F
88.350 88.550 0.200 0.200 TCS-II-F
88.950 89.250 0.300 0.300 TCS-II-F
89.400 89.650 0.250 0.030 0.220 TCS-II-F
89.850 90.500 0.650 0.650 TCS-II-F
90.600 90.700 0.100 0.100 TCS-II-F
91.050 91.300 0.250 0.250 TCS-II-F
91.500 91.700 0.200 0.022 0.178 TCS-II-F
92.750 93.350 0.600 0.600 TCS-II-F
94.250 100.900 6.650 6.650 TCS-II-F
101.100 103.600 2.500 0.028 2.472 TCS-II-F
103.800 104.650 0.850 0.850 TCS-II-F
105.050 108.350 3.300 3.300 TCS-II-F
108.500 109.100 0.600 0.600 TCS-II-F
109.250 109.450 0.200 0.022 0.178 TCS-II-F
109.750 110.100 0.350 0.350 TCS-II-F
110.950 111.500 0.550 0.550 TCS-II-F
Total 43.470 0.805 42.665
TCS-II-G: RECONSTRUCTION & WIDENING (WITH PROFILE RAISING) OF EXISTING
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
33.200 33.400 0.200 0.200 TCS-II-G
34.400 36.150 1.750 1.750 TCS-II-G
37.900 38.500 0.600 0.600 TCS-II-G
45.900 46.400 0.500 0.500 TCS-II-G
47.850 48.250 0.400 0.400 TCS-II-G
48.750 48.950 0.200 0.200 TCS-II-G
49.650 49.950 0.300 0.300 TCS-II-G
60.700 60.850 0.150 0.150 TCS-II-G
61.400 61.650 0.250 0.250 TCS-II-G
64.400 64.700 0.300 0.300 TCS-II-G
64.850 65.150 0.300 0.300 TCS-II-G
67.500 67.700 0.200 0.200 TCS-II-G
68.100 68.350 0.250 0.250 TCS-II-G
68.500 68.700 0.200 0.200 TCS-II-G
69.200 69.350 0.150 0.150 TCS-II-G
72.200 72.800 0.600 0.025 0.575 TCS-II-G
85.050 85.250 0.200 0.200 TCS-II-G
86.450 86.750 0.300 0.300 TCS-II-G
87.850 88.100 0.250 0.008 0.242 TCS-II-G
93.500 93.650 0.150 0.150 TCS-II-G
93.950 94.250 0.300 0.300 TCS-II-G
103.600 103.800 0.200 0.200 TCS-II-G
109.100 109.250 0.150 0.150 TCS-II-G
Total 7.900 0.033 7.867

TCS-II-H: RECONSTRUCTION & WIDENING (IN CUTTING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
1 36.150 36.800 0.650 0.022 0.628 TCS-II-H
2 37.100 37.250 0.150 0.150 TCS-II-H
3 40.450 40.550 0.100 0.100 TCS-II-H
4 40.800 40.850 0.050 0.050 TCS-II-H
5 42.300 42.500 0.200 0.200 TCS-II-H
6 46.400 47.150 0.750 0.018 0.732 TCS-II-H
7 53.750 53.900 0.150 0.150 TCS-II-H
8 60.600 60.700 0.100 0.100 TCS-II-H
9 61.250 61.400 0.150 0.150 TCS-II-H
10 61.800 61.950 0.150 0.150 TCS-II-H
11 62.750 63.150 0.400 0.400 TCS-II-H
12 64.700 64.850 0.150 0.150 TCS-II-H
13 65.150 65.200 0.050 0.050 TCS-II-H
14 66.350 66.600 0.250 0.250 TCS-II-H
15 68.350 68.500 0.150 0.150 TCS-II-H
16 69.350 69.550 0.200 0.200 TCS-II-H
17 71.550 71.750 0.200 0.200 TCS-II-H
18 71.900 72.200 0.300 0.300 TCS-II-H
19 82.350 82.650 0.300 0.300 TCS-II-H
20 84.300 84.450 0.150 0.150 TCS-II-H
21 84.800 85.050 0.250 0.250 TCS-II-H
22 88.100 88.350 0.250 0.250 TCS-II-H
23 91.900 92.050 0.150 0.150 TCS-II-H
24 93.650 93.950 0.300 0.300 TCS-II-H
25 100.900 101.100 0.200 0.200 TCS-II-H
Total 5.750 0.040 5.710

TCS-II-I: RECONSTRUCTION & ECCENTRIC WIDENING (RHS) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
40.300 40.450 0.150 0.150 TCS-II-I
41.900 42.200 0.300 0.300 TCS-II-I
62.450 62.550 0.100 0.100 TCS-II-I
66.200 66.350 0.150 0.150 TCS-II-I
69.800 69.900 0.100 0.100 TCS-II-I
85.600 85.700 0.100 0.100 TCS-II-I
89.250 89.400 0.150 0.150 TCS-II-I
Total 1.050 0.000 1.050

TCS-II-J: RECONSTRUCTION & ECCENTRIC WIDENING (LHS) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH
PAVED SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
42.200 42.300 0.100 0.100 TCS-II-J
62.550 62.750 0.200 0.200 TCS-II-J
69.600 69.650 0.050 0.050 TCS-II-J
70.550 70.650 0.100 0.100 TCS-II-J
75.450 75.550 0.100 0.100 TCS-II-J
90.500 90.600 0.100 0.100 TCS-II-J
Total 0.650 0.000 0.650
TCS-III: RECONSTRUCTION & WIDENING OF EXISTING INTERMEDIATE LANE
FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS RIGID PAVEMENT
INCLUDING PAVER BLOCK FLOORINGS AND RCC DRAIN IN BUILT-UPS
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
11.750 12.100 0.350 0.350 TCS-III Amikhi
12.900 13.550 0.650 0.650 TCS-III Amikhi
16.100 18.550 2.450 2.450 TCS-III Govindgarh
56.750 57.000 0.250 0.250 TCS-III Kaithaha
58.900 59.500 0.600 0.600 TCS-III Deolond
90.700 91.050 0.350 0.350 TCS-III Thiki
104.650 105.050 0.400 0.400 TCS-III Karki
109.450 109.750 0.300 0.300 TCS-III Tetka
Total 5.350 0.000 5.350

TCS-IV: RETAINING OF APPROACHES OF UNDER CONSTRUCTION 2-LANE ROB WITH


SLIP ROADS IN OPEN COUNTRY
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
13.615 14.250 0.635 0.140 0.495 TCS-IV RoB Retained
Total 0.635 0.140 0.495

TCS-V-A: NEW CONSTRUCTION OF 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS


FLEXIBLE PAVEMENT ON REALIGNMENTS IN OPEN COUNTRY (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
23.900 24.700 0.800 0.800 TCS-V-A
24.900 25.080 0.180 0.180 TCS-V-A
26.100 26.300 0.200 0.200 TCS-V-A
26.950 27.050 0.100 0.100 TCS-V-A
27.300 27.360 0.060 0.060 TCS-V-A
27.490 27.565 0.075 0.075 TCS-V-A
30.500 30.600 0.100 0.100 TCS-V-A
31.700 31.850 0.150 0.150 TCS-V-A
Total 1.665 0.000 1.665

TCS-V-B: NEW CONSTRUCTION OF 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS


FLEXIBLE PAVEMENT ON REALIGNMENTS IN OPEN COUNTRY (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
1 41.050 41.350 0.300 0.300 TCS-V-B
2 42.500 42.600 0.100 0.100 TCS-V-B
3 43.100 43.300 0.200 0.200 TCS-V-B
4 44.000 44.250 0.250 0.250 TCS-V-B
5 60.850 61.150 0.300 0.010 0.290 TCS-V-B
6 61.650 61.800 0.150 0.150 TCS-V-B
7 61.950 62.250 0.300 0.300 TCS-V-B
8 63.150 64.250 1.100 0.080 1.020 TCS-V-B
9 65.200 65.450 0.250 0.250 TCS-V-B
10 66.600 66.800 0.200 0.200 TCS-V-B
11 67.700 67.750 0.050 0.050 TCS-V-B
12 68.050 68.100 0.050 0.050 TCS-V-B
13 71.000 71.550 0.550 0.550 TCS-V-B
14 85.700 86.450 0.750 0.750 TCS-V-B
15 88.550 88.950 0.400 0.400 TCS-V-B
16 89.650 89.850 0.200 0.200 TCS-V-B
17 91.300 91.500 0.200 0.200 TCS-V-B
18 91.700 91.900 0.200 0.200 TCS-V-B
19 92.050 92.750 0.700 0.020 0.680 TCS-V-B
20 93.350 93.500 0.150 0.150 TCS-V-B
21 108.350 108.500 0.150 0.150 TCS-V-B
22 110.100 110.950 0.850 0.020 0.830 TCS-V-B
Total 7.400 0.130 7.270

TCS-V-C: NEW CONSTRUCTION (IN CUTTING) OF 2-LANE CARRIAGEWAY WITH


PAVED SHOULDERS FLEXIBLE PAVEMENT ON REALIGNMENTS IN OPEN COUNTRY
(FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
40.850 41.050 0.200 0.200 TCS-V-C
62.250 62.450 0.200 0.200 TCS-V-C
67.750 68.050 0.300 0.300 TCS-V-C
Total 0.700 0.000 0.700

TCS-VI-A: RECONSTRUCTION & ECCENTRIC WIDENING (LHS, HILL SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
26.300 26.550 0.250 0.250 TCS-VI-A
26.800 26.950 0.150 0.150 TCS-VI-A
27.360 27.490 0.130 0.130 TCS-VI-A
28.250 28.350 0.100 0.100 TCS-VI-A
29.050 29.200 0.150 0.150 TCS-VI-A
30.750 30.900 0.150 0.150 TCS-VI-A
31.000 31.300 0.300 0.300 TCS-VI-A
Total 1.230 0.000 1.230
TCS-VI-B: RECONSTRUCTION & ECCENTRIC WIDENING (RHS, VALLEY SIDE) OF
EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
26.550 26.800 0.250 0.250 TCS-VI-B
27.050 27.150 0.100 0.100 TCS-VI-B
28.040 28.250 0.210 0.210 TCS-VI-B
28.930 29.050 0.120 0.120 TCS-VI-B
30.600 30.750 0.150 0.150 TCS-VI-B
30.900 31.000 0.100 0.100 TCS-VI-B
31.850 32.000 0.150 0.150 TCS-VI-B
Total 1.080 0.000 1.080

TCS-VI-C: RECONSTRUCTION & ECCENTRIC WIDENING (RHS, HILL SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
27.565 27.820 0.255 0.255 TCS-VI-C
27.930 28.040 0.110 0.110 TCS-VI-C
28.450 28.930 0.480 0.480 TCS-VI-C
29.450 30.200 0.750 0.750 TCS-VI-C
30.380 30.500 0.120 0.120 TCS-VI-C
Total 1.715 0.000 1.715

TCS-VI-D: RECONSTRUCTION & ECCENTRIC WIDENING (LHS, VALLEY SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
27.820 27.930 0.110 0.110 TCS-VI-D
28.350 28.450 0.100 0.100 TCS-VI-D
29.330 29.450 0.120 0.120 TCS-VI-D
30.350 30.380 0.030 0.030 TCS-VI-D
31.300 31.500 0.200 0.200 TCS-VI-D
Total 0.560 0.000 0.560

TCS-VI-E: RECONSTRUCTION & WIDENING (IN CUTTING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ALONG GHAT SECTIONS (FOR
70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
27.150 27.300 0.150 0.150 TCS-VI-E
29.200 29.330 0.130 0.130 TCS-VI-E
30.200 30.350 0.150 0.150 TCS-VI-E
Total 0.430 0.000 0.430

TCS-VI-F: RECONSTRUCTION & WIDENING (WITH PROFILE RAISING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG GHAT
SECTIONS (FOR 70 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
31.500 31.700 0.200 0.200 TCS-VI-F
Total 0.200 0.000 0.200

TCS-VI-G: RECONSTRUCTION & ECCENTRIC WIDENING (RHS, HILL SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
43.300 43.500 0.200 0.200 TCS-VI-G
43.700 44.000 0.300 0.300 TCS-VI-G
44.500 44.720 0.220 0.220 TCS-VI-G
47.150 47.700 0.550 0.550 TCS-VI-G
Total 1.270 0.000 1.270

TCS-VI-H: RECONSTRUCTION & ECCENTRIC WIDENING (RHS, VALLEY SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
44.720 44.950 0.230 0.230 TCS-VI-H
Total 0.230 0.000 0.230

TCS-VI-I: RECONSTRUCTION & ECCENTRIC WIDENING (LHS, HILL SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
45.250 45.600 0.350 0.350 TCS-VI-I
Total 0.350 0.000 0.350
TCS-VI-J: RECONSTRUCTION & ECCENTRIC WIDENING (LHS, VALLEY SIDE) OF
EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE
ALONG GHAT SECTIONS (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
45.600 45.750 0.150 0.150 TCS-VI-J
Total 0.150 0.000 0.150

TCS-VI-K: RECONSTRUCTION & WIDENING (WITH PROFILE RAISING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG GHAT
SECTIONS (FOR 30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
43.500 43.700 0.200 0.200 TCS-VI-K
45.750 45.900 0.150 0.150 TCS-VI-K
Total 0.350 0.000 0.350

TCS-VI-L: RECONSTRUCTION & WIDENING (IN CUTTING) OF EXISTING


INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ALONG GHAT SECTIONS (FOR
30.0 MSA)
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
44.250 44.500 0.250 0.250 TCS-VI-L
44.950 45.250 0.300 0.300 TCS-VI-L
Total 0.550 0.000 0.550

TCS-VII: RECONSTRUCTION AND WIDENING OF EXISTING 2 X SINGLE LANE DIVIDED


FLEXIBLE PAVEMENT TO 4-LANE DIVIDED CARRIAGEWAY WITH RIGID PAVEMENT
INCLUDING PAVER BLOCK FLOORINGS AND RCC DRAIN IN BUILT-UPS
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
58.270 58.600 0.330 0.330 TCS-VII
Total 0.330 0.000 0.330

TCS-VIII: RECONSTRUCTION OF EXISTING 2-LANE FLEXIBLE PAVEMENT WITH


RIGID PAVEMENT IN CONGESTED BUILT-UPS
Design Ch. Design Length Bridge Net Length
Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
58.600 58.900 0.300 0.300 TCS-VIII Deolond
Total 0.300 0.000 0.300

TCS-IX: RECONSTRUCTION AND WIDENING OF EXISTING INTERMEDIATE LANE


FLEXIBLE PAVEMENT TO 4-LANE DIVIDED CARRIAGEWAY WITH RIGID PAVEMENT
INCLUDING PAVER BLOCK FLOORINGS AND RCC DRAIN IN BUILT-UPS

Design Ch. Design Length Bridge Net Length


Sl No Ref. TCS Remarks
(From) Ch. (To) (Km) Length (Km) (Km)
58.600 58.900 0.300 0.300 TCS-VIII Deolond
Total 0.300 0.000 0.300
TCS-I: STRENGTHENING OF EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT
WITH CONVENTIONAL WHITE TOPPINGS INCLUDING PAVER BLOCK FLOORINGS AND
RCC DRAIN IN BUILT-UPS
TCS-II-A: RECONSTRUCTION & WIDENING OF EXISTING INTERMEDIATE LANE
FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS FLEXIBLE
PAVEMENT &
TCS-II-B: RECONSTRUCTION INWIDENING
OPEN COUNTRY
(WITH(FOR 70.0 RAISING)
PROFILE MSA) OF EXISTING
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED
LANESHOULDERS FLEXIBLE TO
FLEXIBLE PAVEMENT PAVEMENT IN OPEN COUNTRY
2-LANE CARRIAGEWAY WITH(FOR 70.0SHOULDERS
PAVED MSA)
INTERMEDIATE FLEXIBLE PAVEMENT
LANE FLEXIBLE IN OPENTO
PAVEMENT COUNTRY
2-LANE (FOR 70.0 MSA) WITH PAVED
CARRIAGEWAY
SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY (FOR 70.0WITH
MSA)PAVED
SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 70.0 MSA)

TCS-II-F: RECONSTRUCTION & WIDENING OF EXISTING INTERMEDIATE LANE FLEXIBLE


PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED SHOULDERS FLEXIBLE
PAVEMENT IN
TCS-II-G: RECONSTRUCTION OPEN COUNTRY
& WIDENING (WITH(FOR 30.0 RAISING)
PROFILE MSA) OF EXISTING
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED
LANESHOULDERS FLEXIBLE TO
FLEXIBLE PAVEMENT PAVEMENT IN OPEN COUNTRY
2-LANE CARRIAGEWAY WITH(FOR 30.0SHOULDERS
PAVED MSA)
FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR 30.0 MSA)
TCS-II-I: RECONSTRUCTION & ECCENTRIC WIDENING (RHS) OF EXISTING
INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE CARRIAGEWAY WITH PAVED
SHOULDERS
INTERMEDIATE FLEXIBLE
LANE PAVEMENT
FLEXIBLE PAVEMENT INTO
OPEN COUNTRY
2-LANE (FOR 30.0WITH
CARRIAGEWAY MSA)PAVED
SHOULDERS FLEXIBLE PAVEMENT IN OPEN COUNTRY (FOR
PAVEMENT TO 2-LANE WITH PAVED SHOULDERS RIGID PAVEMENT INCLUDING 30.0 MSA)
PAVEROF
TCS-IV: RETAINING BLOCK FLOORINGS
APPROACHES OFAND
UNDERRCCCONSTRUCTION
DRAIN IN BUILT-UPS
2-LANE ROB WITH
TCS-V-A: NEW CONSTRUCTION SLIP ROADS IN OPEN
OF 2-LANE COUNTRY WITH PAVED SHOULDERS
CARRIAGEWAY
FLEXIBLE
TCS-V-B: NEWPAVEMENT ON REALIGNMENTS
CONSTRUCTION IN OPEN COUNTRY
OF 2-LANE CARRIAGEWAY (FOR 70
WITH PAVED MSA)
SHOULDERS
FLEXIBLE FLEXIBLE
SHOULDERS PAVEMENT ON REALIGNMENTS
PAVEMENT IN OPEN COUNTRY
ON REALIGNMENTS (FOR 30.0(FOR
IN OPEN COUNTRY MSA)30.0
MSA)
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG GHAT
SHOULDERS FLEXIBLE PAVEMENT SECTIONS (FOR RCC
INCLUDING 70 MSA)
OPEN DRAIN ON HILL SIDE ALONG
GHAT SECTIONS
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN(FOR 70 MSA)
ON HILL SIDE ALONG GHAT
SECTIONS (FOR 70 MSA)

TCS-VI-D: RECONSTRUCTION & ECCENTRIC WIDENING (LHS, VALLEY SIDE) OF


EXISTING INTERMEDIATE LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG
TCS-VI-E: RECONSTRUCTION GHAT SECTIONS(IN
& WIDENING (FOR 70 MSA)OF EXISTING INTERMEDIATE
CUTTING)
LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS FLEXIBLE PAVEMENT
INCLUDING
FLEXIBLE RCC OPEN
PAVEMENT DRAINRCC
INCLUDING ALONG
OPENGHAT
DRAINSECTIONS
ON HILL(FOR
SIDE 70 MSA)GHAT
ALONG
SECTIONS (FOR 70 MSA)
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG GHAT
SHOULDERS FLEXIBLE PAVEMENT SECTIONS (FOR 30.0
INCLUDING RCC MSA)
OPEN DRAIN ON HILL SIDE ALONG
GHAT SECTIONS (FOR
FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN 30.0 MSA)
ON HILL SIDE ALONG GHAT
SECTIONS (FOR 30.0 MSA)
SHOULDERS FLEXIBLE PAVEMENT INCLUDING RCC OPEN DRAIN ON HILL SIDE ALONG
GHAT SECTIONS
FLEXIBLE PAVEMENT INCLUDING (FORDRAIN
RCC OPEN 30.0 MSA)
ON HILL SIDE ALONG GHAT
SECTIONS (FOR 30.0 MSA)
LANE FLEXIBLE PAVEMENT TO 2-LANE WITH PAVED SHOULDERS FLEXIBLE PAVEMENT
INCLUDING
FLEXIBLE RCC TO
PAVEMENT OPEN DRAIN
4-LANE ALONGCARRIAGEWAY
DIVIDED GHAT SECTIONS (FORRIGID
WITH 30.0 PAVEMENT
MSA)
INCLUDING PAVER BLOCK FLOORINGS AND RCC DRAIN IN BUILT-UPS
TCS-VIII: RECONSTRUCTION OF EXISTING 2-LANE FLEXIBLE PAVEMENT WITH RIGID
PAVEMENT IN CONGESTED BUILT-UPS
TCS-IX: RECONSTRUCTION AND WIDENING OF EXISTING INTERMEDIATE LANE
FLEXIBLE PAVEMENT TO 4-LANE DIVIDED CARRIAGEWAY WITH RIGID PAVEMENT
TCS-X:INCLUDING PAVER BLOCK
STRENGTHENING FLOORINGS
OF EXISTING AND
4-LANE RCC DRAIN
DIVIDED IN BUILT-UPS
CARRIAGEWAY FLEXIBLE
PAVEMENT WITH CONVENTIONAL WHITE TOPPINGS INCLUDING PAVER BLOCK
FLOORINGS AND RCC DRAIN IN BUILT-UPS
Summery of TCS Summery o

Bridge Length Net Length


Sl No Ref. TCS Length (Km) Sl No
(Km) (Km)

1 TCS-I 3.150 0.083 3.067 1

2 TCS-II-A 14.215 0.108 14.107 2

3 TCS-II-B 2.250 0.000 2.250 3


4 TCS-II-C 0.650 0.000 0.650 4
5 TCS-II-D 1.125 0.000 1.125 5
6 TCS-II-E 0.795 0.000 0.795 6

7 TCS-II-F 43.470 0.805 42.665 Total

8 TCS-II-G 7.900 0.033 7.867


9 TCS-II-H 5.750 0.040 5.710 Summery o

10 TCS-II-I 1.050 0.000 1.050 Sl No

11 TCS-II-J 0.650 0.000 0.650 1


12 TCS-III 5.350 0.000 5.350 2
13 TCS-IV 0.635 0.140 0.495 3
14 TCS-V-A 1.665 0.000 1.665 4
15 TCS-V-B 7.400 0.130 7.270 5
16 TCS-V-C 0.700 0.000 0.700 6
17 TCS-VI-A 1.230 0.000 1.230 7
18 TCS-VI-B 1.080 0.000 1.080 8
19 TCS-VI-C 1.715 0.000 1.715 9

20 TCS-VI-D 0.560 0.000 0.560 10

21 TCS-VI-E 0.430 0.000 0.430 11


22 TCS-VI-F 0.200 0.000 0.200 12
23 TCS-VI-G 1.270 0.000 1.270 Total
24 TCS-VI-H 0.230 0.000 0.230
25 TCS-VI-I 0.350 0.000 0.350
26 TCS-VI-J 0.150 0.000 0.150
27 TCS-VI-K 0.350 0.000 0.350
28 TCS-VI-L 0.550 0.000 0.550
29 TCS-VII 0.330 0.000 0.330
30 TCS-VIII 0.300 0.000 0.300
31 TCS-IX 4.850 0.000 4.850

32 TCS-X 1.150 0.000 1.150


Total 111.500 1.339 110.161
Summery of RCC Cover Drain Summery of Electrical Pole
Net
Length Length
Ref. TCS Side Length Sl No Ref. TCS
(Km) (Km)
(Km)

TCS-I 3.067 Both 6.134 1 TCS-I 3.15

TCS-III 5.35 Both 10.7 2 TCS-III 5.35

TCS-VII 0.33 Both 0.66 3 TCS-VII 0.33


TCS-VIII 0.300 Both 0.6 4 TCS-VIII 0.300
TCS-IX 4.850 Both 9.7 5 TCS-IX 4.850
TCS-X 1.150 Both 2.3 6 TCS-X 1.150

Total 15.047 30.094 Total 15.130

Summery of RCC Open Drain


Net
Length
Ref. TCS Side Length
(Km)
(Km)
TCS-VI-A 1.23 LHS 1.230
TCS-VI-B 1.080 LHS 1.080
TCS-VI-C 1.715 RHS 1.715
TCS-VI-D 0.560 RHS 0.560
TCS-VI-E 0.430 Both 0.86
TCS-VI-F 0.2 LHS 0.200
TCS-VI-G 1.270 RHS 1.270
TCS-VI-H 0.230 LHS 0.230
TCS-VI-I 0.350 LHS 0.350

TCS-VI-J 0.15 RHS 0.150

TCS-VI-K 0.35 LHS 0.35


TCS-VI-L 0.550 Both 1.1
8.115 9.095
Summery of Electrical Pole

Spacing Nos.

25 m c/c Staggered 126

25 m c/c Staggered 214

25 m c/c 13
25 m c/c Staggered 12
25 m c/c 194
25 m c/c 46

605.000
W-Beam Crash Barriers
Design Ch. Design Ch. Length Total Length
Sl No Side Remarks
(From) (To) (Km) (Km)

Structure
1 21.050 21.120 0.070 BOTH 0.140
Approach
Structure
2 21.150 21.180 0.030 BOTH 0.060
Approach
Outerside of
3 22.250 22.350 0.100 RHS 0.100
Curve
Outerside of
4 22.570 22.680 0.110 LHS 0.110
Curve
Outerside of
5 22.800 22.950 0.150 RHS 0.150
Curve
Outerside of
6 23.350 23.500 0.150 LHS 0.150
Curve
Outerside of
7 23.675 23.770 0.095 RHS 0.095
Curve
Outerside of
8 24.050 24.135 0.085 LHS 0.085
Curve
Outerside of
9 24.350 24.450 0.100 RHS 0.100
Curve
10 26.150 26.320 0.170 LHS 0.170 Valley Side
11 26.400 27.100 0.700 RHS 0.700 Valley Side
12 27.280 27.400 0.120 RHS 0.120 Valley Side
13 27.450 27.950 0.500 LHS 0.500 Valley Side
14 28.030 28.300 0.270 RHS 0.270 Valley Side
15 28.350 28.900 0.550 LHS 0.550 Valley Side
16 28.920 29.300 0.380 RHS 0.380 Valley Side

17 29.350 30.150 0.800 LHS 0.800 Valley Side

18 30.225 30.300 0.075 RHS 0.075 Valley Side


19 30.300 30.480 0.180 LHS 0.180 Valley Side
20 30.500 30.730 0.230 RHS 0.230 Valley Side
21 30.800 31.050 0.250 RHS 0.250 Valley Side
22 31.150 31.230 0.080 RHS 0.080 Valley Side
23 31.300 31.650 0.350 LHS 0.350 Valley Side
24 31.680 31.900 0.220 RHS 0.220 Valley Side
Structure
25 39.325 39.350 0.025 BOTH 0.050
Approach
Structure
26 39.400 39.425 0.025 BOTH 0.050
Approach
Outerside of
27 43.270 43.320 0.050 RHS 0.050
Curve
28 43.500 44.250 0.750 LHS 0.750 Valley Side
29 44.300 44.420 0.120 RHS 0.120 Valley Side

30 44.420 44.680 0.260 LHS 0.260 Valley Side

31 44.720 45.550 0.830 RHS 0.830 Valley Side


32 45.600 45.770 0.170 LHS 0.170 Valley Side
33 45.800 45.870 0.070 RHS 0.070 Valley Side
High
34 45.870 45.950 0.080 BOTH 0.160
Embankment

High
35 57.075 57.150 0.075 BOTH 0.150
Embankment
High
36 57.830 58.000 0.170 BOTH 0.340
Embankment
Structure
37 63.750 63.800 0.050 BOTH 0.100
Approach
Structure
38 63.890 63.925 0.035 BOTH 0.070
Approach
39 78.800 78.950 0.150 LHS 0.150 Pond
40 85.850 86.000 0.150 RHS 0.150 Embankment
41 86.100 86.270 0.170 LHS 0.170 Sharp Curve
42 86.270 86.400 0.130 RHS 0.130 Sharp Curve
Structure
43 109.170 109.200 0.030 BOTH 0.060
Approach
Structure
44 109.230 109.260 0.030 BOTH 0.060
Approach
Total Length 9.755

Guard Stone
Design Ch. Design Ch. Length Total Length C/C Spacing
Sl No Side Nos.
(From) (To) (Km) (Km) (m)

1 6.500 6.700 0.200 RHS 0.200 3.0 67

2 15.970 16.000 0.030 BOTH 0.060 3.0 20


3 16.020 16.050 0.030 BOTH 0.060 3.0 20
4 19.250 19.350 0.100 LHS 0.100 3.0 33

5 19.350 19.500 0.150 BOTH 0.300 3.0 100


6 19.900 19.970 0.070 BOTH 0.140 3.0 47
7 20.100 20.200 0.100 BOTH 0.200 3.0 67

8 20.450 20.850 0.400 BOTH 0.800 3.0 267

9 20.985 21.050 0.065 BOTH 0.130 3.0 43


10 21.180 21.250 0.070 BOTH 0.140 3.0 47
11 21.650 21.850 0.200 BOTH 0.400 3.0 133
12 22.100 22.200 0.100 BOTH 0.200 3.0 67
13 22.450 22.570 0.120 BOTH 0.240 3.0 80
14 22.700 22.800 0.100 BOTH 0.200 3.0 67
15 22.950 23.050 0.100 LHS 0.100 3.0 33
16 23.170 23.350 0.180 LHS 0.180 3.0 60
17 23.600 23.650 0.050 BOTH 0.100 3.0 33
18 23.900 24.050 0.150 BOTH 0.300 3.0 100
19 24.300 24.350 0.050 BOTH 0.100 3.0 33
20 24.650 24.750 0.100 RHS 0.100 3.0 33
21 24.950 25.100 0.150 LHS 0.150 3.0 50
22 25.750 25.850 0.100 LHS 0.100 3.0 33
23 26.050 26.150 0.100 LHS 0.100 3.0 33
24 35.850 35.950 0.100 LHS 0.100 3.0 33

25 36.300 36.350 0.050 BOTH 0.100 3.0 33

26 36.500 36.600 0.100 BOTH 0.200 3.0 67


27 40.300 40.400 0.100 RHS 0.100 3.0 33
28 40.600 40.750 0.150 BOTH 0.300 3.0 100
29 40.950 41.200 0.250 BOTH 0.500 3.0 167
30 42.200 42.300 0.100 RHS 0.100 3.0 33
31 42.500 42.650 0.150 LHS 0.150 3.0 50
32 45.950 46.050 0.100 BOTH 0.200 3.0 67
33 46.250 46.350 0.100 BOTH 0.200 3.0 67
34 46.550 46.665 0.115 RHS 0.115 3.0 38

35 47.100 47.350 0.250 LHS 0.250 3.0 83

36 47.550 47.650 0.100 LHS 0.100 3.0 33

37 47.900 53.600 5.700 LHS 5.700 3.0 1900

38 53.750 54.050 0.300 LHS 0.300 3.0 100

39 54.450 54.600 0.150 LHS 0.150 3.0 50

40 55.000 56.450 1.450 LHS 1.450 3.0 483

41 59.900 60.000 0.100 LHS 0.100 3.0 33

42 60.950 61.025 0.075 BOTH 0.150 3.0 50

43 62.000 62.250 0.250 LHS 0.250 3.0 83

44 63.600 63.750 0.150 BOTH 0.300 3.0 100

45 63.925 64.025 0.100 LHS 0.100 3.0 33

46 67.600 67.700 0.100 RHS 0.100 3.0 33

47 72.400 72.500 0.100 RHS 0.100 3.0 33

48 81.850 81.950 0.100 LHS 0.100 3.0 33

49 82.050 82.200 0.150 RHS 0.150 3.0 50

50 82.450 82.650 0.200 LHS 0.200 3.0 67


51 83.175 83.275 0.100 RHS 0.100 3.0 33

52 83.350 83.450 0.100 LHS 0.100 3.0 33

53 84.200 84.400 0.200 RHS 0.200 3.0 67

54 85.150 85.300 0.150 LHS 0.150 3.0 50

55 85.650 85.850 0.200 RHS 0.200 3.0 67

56 86.850 87.000 0.150 RHS 0.150 3.0 50

57 87.900 88.050 0.150 BOTH 0.300 3.0 100

58 89.250 89.400 0.150 LHS 0.150 3.0 50

59 89.450 89.600 0.150 BOTH 0.300 3.0 100

60 91.450 91.550 0.100 BOTH 0.200 3.0 67

61 93.350 93.450 0.100 RHS 0.100 3.0 33

62 99.300 99.500 0.200 BOTH 0.400 3.0 133

63 103.500 103.700 0.200 BOTH 0.400 3.0 133

64 104.200 104.300 0.100 BOTH 0.200 3.0 67

65 110.200 110.350 0.150 BOTH 0.300 3.0 100


Total Nos 6401

From To Month Rent Amount


Apr-20 Mar-21 12 13000 156000
Pay 11 Nov-2020 -50000
Pay 30 March-2020 -50000
Balance Last Year 56000
April-May 2020 Lockdown discount -26000
Net Balance Last Year 30000
Apr-21 Jun-21 3 13000 39000
April-May 2021 Lockdown discount -26000
Total Balance 43000
Due Rent pay early after reciving the payment from client.
Summary
Length Avg. Height Length
(Km) (m) (Km)
Toe Wall 0.8 1.000
Toe Wall 1.0 0.215

Toe Wall 1.2 1.035

Toe Wall 1.5 2.750


Retaining
2.0 0.740
Wall
Retaining
2.5 0.820
Wall
Retaining
3.0 1.100 0.375
Wall
Retaining
3.5 0.930
Wall
Retaining
4.0 0.920
Wall
Retaining
4.5 1.095 0.375
Wall
Retaining
5.5 0.225
Wall
Remarks

Outerside
of curve
Structure
Approach
,,
Outerside
of curve
Embankm
ent
,,
,,
Curve +
Embankm
ent
Embankm
ent
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
Outerside
of curve
Structure
Approach
Embankm
ent
,,
,,
,,
Outerside
of curve
,,
Embankm
ent
,,
,,
Curve +
Embankm
ent
Embankm
ent
LHS-
Canal
LHS-
Embankm
ent
LHS-
Canal
LHS-
Canal
Outerside
of curve
Embankm
ent
Outerside
of curve
Embankm
ent
Embankm
ent
Embankm
ent
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Outerside
of curve
Structure
Approach
Outerside
of curve
Structure
Approach
Structure
Approach
Outerside
of curve
Structure
Approach
Structure
Approach
+ Curve
Embankm
ent
Structure
Approach

You might also like