Sa 0330
Sa 0330
CORRECTIVE ACTIONS: To address this incident, this company did the following:
Crews discussed the need for better communications. They also installed a plastic tie in the shackle pin to make the removal of the shackle more difficult and less likely to happen. All shackles/clevises must have the pin wire tied in place at all times. A good practice would be to leave a shackle attached to the load cell so its available when needed. Equipment modifications that are not documented and communicated to all personnel can lead to very serious incidents. Anytime equipment is modified, it must be returned to its normal state as soon as possible. Obviously there must be a method used to alert all personnel to the fact that a change was made. The drillers cage height has been raised and the cage was extended to more completely protect the driller. All crews were reminded to an equipment modification process, which includes a document that must be signed by the appropriate supervisor in charge and passed on to other crews should a crew change take place.
The Corrective Actions stated in this alert are one companys attempts to address the incident, and do not necessarily reflect the position of IADC or the IADC HSE Committee.
This material is presented for information purposes only. Managers & Supervisors should evaluate this information to determine if it can be applied to their own situations and practices. Copyright 2003 International Association of Drilling Contractors. All Rights Reserved Issued July 2003