Pipe Lowering Inspection Report
Pipe Lowering Inspection Report
1.7 Passage of holiday detector carried out with possitive result YES NO
2 Type of soil
Earth Gravel Rock Erth and boulde Mixed
2.1 Depth and width of designed trench m Design covering m
2.2 Depth of surveyed trench m covering surveyed m
3 Intervention works to be performed before pipeline laying
3.1 Cathodic protection cable connected to pipe YES NO
3.2 Laying bed YES NO
3.3 Bedding material Acceptable Not Acceptable
3.4 Backfill material Acceptable Not Acceptable
3.5 Berm material / height Acceptable Not Acceptable
3.6 Trench bottom condition Acceptable Not Acceptable
3.7 Laying continuity in the section YES NO
SIEMENS CLIENT
Signature
Name
SPE/010/013
Date
SPE/010/013