Assignment 2

Uploaded by

62chintu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project: Autonomous Electric Vehicle (AEV)

Project Overview
Project Name: Autonomous Electric Vehicle (AEV)
Project Manager: Srikanth
Start Date: 5 SEP 2024
End Date: 31 DEC 2026
Budget: 300CR
Stakeholders:
● Project Sponsor: SR University
● Project Team: Srikanth, Niklesh, Vinod, Revanth
Project Objectives
Primary Objective:
● Design, develop, and commercialize an autonomous electric vehicle capable
of navigating complex environments without human intervention.
Secondary Objectives:
● Reduce traffic congestion and accidents.
● Improve energy efficiency and reduce carbon emissions.
● Advance autonomous vehicle technology for future applications.
Project Scope
In Scope:
● Vehicle design and engineering (powertrain, chassis, body, sensors)
● AI and machine learning algorithms for autonomous driving
● Software development for vehicle control and navigation
● Testing and validation in various driving conditions
● Manufacturing and production planning
Out of Scope:
● Infrastructure development (charging stations, autonomous vehicle
infrastructure)
● Long-term maintenance and support
Work Breakdown Structure
Initiation Phase:
● Project Charter Development
● Stakeholder Analysis
● Feasibility Study (including market analysis and technology assessment)
Planning Phase:
● Requirement Gathering
● Risk Management Plan
● Budget Planning
● Schedule Development (Gantt Chart)
● Design Concept Development
Execution Phase:
● Vehicle Design and Engineering
● AI and Machine Learning Development
● Software Development
● Prototyping and Testing
● Manufacturing and Production Planning
Monitoring and Control:
● Performance Tracking (KPIs: safety, efficiency, range)
● Quality Assurance
● Risk Monitoring
● Stakeholder Engagement
Closure Phase:
● Final Testing and Sign-off
● Project Documentation
● Lessons Learned
● Handover to Operations
Project Schedule
Milestones:
● Project Kickoff
● Completion of Vehicle Design
● Prototype Development
● Completion of Testing and Validation
● Final Delivery
Resource Management
Human Resources:
● Project Manager
● Automotive Engineers (mechanical, electrical, software)
● AI and Machine Learning Experts
● Software Developers
● Manufacturing Experts
Material Resources:
● Electric motors
● Batteries
● Sensors (LiDAR, radar, cameras)
● Electronic components
● Vehicle components
Software Tools and Licenses:
● Design software (CAD, CAE)
● AI and Machine Learning tools
● Simulation software
● Project management tools
Financial Resources:
● Budget Allocation for Each Phase
Risk Management
Risk Identification:
● Technical risks (e.g., sensor reliability, AI algorithm performance)
● Operational risks (e.g., supply chain disruptions, manufacturing challenges)
● Financial risks (e.g., cost overruns, market uncertainty)
Risk Analysis:
● Probability and Impact Matrix
● Risk Mitigation Strategies
Communication Plan
Internal Communication:
● Weekly Status Meetings
● Monthly Progress Reports
External Communication:
● Stakeholder Updates
● Public Relations
Quality Management
Quality Objectives:
● Ensure vehicle meets safety, performance, and regulatory standards.
● Optimize efficiency and range.
● Provide a comfortable and reliable driving experience.
Quality Assurance Activities:
● Regular inspections
● Performance testing
● User feedback
Procurement Management
Vendors and Contracts:
● List of approved vendors for components and materials
● Procurement Schedule
● Contract Management
Stakeholder Management
Stakeholder Analysis:
● Identify key stakeholders (government, customers, suppliers, etc.)
● Assess their interests and influence
Engagement Strategies:
● Regular communication
● Feedback mechanisms
Project Closure
Final Deliverables:
● Production-ready autonomous electric vehicle
● User manuals
● Final project report
Post-Implementation Review:
● Success metrics (sales, market penetration, environmental impact)
● Lessons learned
Additional Considerations
● Government regulations and policies
● Charging infrastructure requirements
● Consumer acceptance and market trends
● Ethical considerations for autonomous vehicles