GENERAL CONDITIONS
All parts of the construction shall be finished with first class workmanship to the
fullest talent and meaning of the plans and these specifications, and to the entire
satisfaction of Architect/Engineer and the Owner.
The construction shall conform to all the requirements of the National Building
Code, as well as the local rules and regulations of the Municipality of
Binalonan,Pangasinan.
SITE WORKS
STAKING OUT BUILDING LINE
The building lines refer to all horizontal projections of the outer most portions of
all parts of the building on the ground. The building lines shall be staked out and all
lines and grades shown in the drawing established before any excavation is started.
Batterboards and reference marks shall be erected at such places where they will not
be disturbed during excavation.
EXCAVATION
All excavations shall be made to grade indicated in the plans. Where the building
site is covered with any kinds of fill the excavation for footing should be made
deeper until the stratum for safe bearing capacity of the soil is reached.
After concrete for foundation is hard enough to with stand pressure resulting
from fills, the material removed from excavation shall be used for backfill around
them.
Backfill and fills shall be placed in the layer not exceeding 150mm in thickness and
each layer shall be thoroughly compacted by wetting, tamping or rolling.
SOIL POISONING
Soil poisoning shall be done before concreting of footings and tie beams and
after backfilling and compaction of ground floor is completed. Any chemicals
effective for soil poisoning shall be used.
Unless otherwise specified herein, concrete works shall conform to the requirements
of the AC1 Building Code. Full cooperation shall be given their trades ti install
embedded items. Provisions shall be made for setting items not placed on forms.
Before concrete is placed, embedded items have been inspected and tested
MATERIALS
Cement for concrete shall conform to the requirements of the specifications for
Portland cement (ASTM C-150).
Water to be used the mixing concrete shall be clean and free from injurious
amounts of oils, acids, alkaline, organic materials or other substances that may be
deleterious to concrete and steel.
Fine aggregates shall consists of hard, tough, durable, uncoated particles. Concrete
aggregates shall consists of gravel, crushed gravel or rock, or combination of gravel
and rock, coursed aggregates shall consist of hard, tough, durable, clean and
uncoated particles. The size of course aggregates to be used shall be 3/4 inches for
all concrete works.
PROPORTIONING OF CONCRETE
All concrete works shall be done in accordance with the standards specifications
for concrete materials and the following proportions shall be used unless otherwise
indicated on plans;
Concrete shall have 28-day cylinder strength of 3,000 psi for all concrete works,
unless otherwise indicated on plans. Concrete mixing shall begin 30 minutes after
cement has been added to the aggregates. In the absence of concrete mixer, manual
mixing is allowed.
COL/FOOTING
SLAB ON FILL 0.10m thk. reinf. concrete slab 10mm Ø both bars SP at 0.30m O.C.,
10mm Ø top bars SP at 0.30m O.C. bent up bars, 10mm Ø O.C.
MASONRY WORKS
PARTITIONS
Hollow block sizes as specified on the plan shall be securely anchored to the
concrete columns, beams, slabs. All cells of the hollow blocks shall be filled with
cement mortar.
CARPENTRY WORKS
GENERAL CONDITION
Lumber shall be approved quality for the respective kinds required for
various parts of work. Lumber shall be rough dimensions shown on the plans or
specified hereafter. All exposed woodworks shall be smoothly dressed. Lumber shall
be free from imperfection that may impair their strength, durability and appearance.
TOILET & BATH use panel door with 2” x 6” door jamb, S4S KD
All other doors and openings indicated on the plans shall have mortise and
Tenon joints carefully fitted and of the same dimensions shown in the scheduled
drawing. All wooden frames in contact with concrete shall be anchored by means of
20d nails not more than apart around the contact surface.
WINDOWS
All windows shall be aluminium frame sliding and fixed respectively. Verify
detailed scheduled as shown on the plan.
CEILING
SURFACE FINISHES
FLOORING
The following floor finishing materials shall be used for respective floor;
PAINTING
Surface defects such as cracks, dents and holes must be filled with putty
and sandpapered before final coat of paint is applied.
ELECTRICAL WORKS
GENERAL CONDITION
All the Electrical works shall be done in accordance with all the rules and
regulations of the latest issue of The Philippine Electrical code, with rules and
regulations and ordinances of the local enforcing authorities of the city/munifipality
and the requirements of the power company.
WIRING
All materials to be used shall be new and of high quality suitable for the
location and purpose. Wiring materials shall be standard products of reputable
manufacturer.
FIXTURES
All fixtures and materials to be used for electrical installation shall be
“GE” or approved equivalent.
PLUMBING WORKS
Plumbing works and materials shall be in accordance with the National
plumbing Code of the Philippines. Soil and waste pipes shall be properly graded or
pitched downward to facilitate easy discharged of the solid and liquid wastes from
the plumbing fixtures of receptacles to their place of disposal.
All plumbing fixtures should be connected to a vertical pipe, with its top
end extending above the roof at least 0.60m.
All downspouts from the roof shall be 3” Ø PVC pipes sch. 40. The lower
ends shall terminate in concrete catch basins. Underground reinforced concrete
pipes 6” Ø shall connected to catch basins for draining the water to the street gutter
fronting the building.
E. Every exit shall be clearly visible. The route to the exit shall be conspicuously
marked in such a manner that every occupant of a building or structure will
readily know the direction of escape. Each route of escape, in its entirely, shall
be so arranged or marked that the way to a place of safety outside is
unmistakable. Any doorway not constituting an exit shall be marked to minimize
its possible consfusion as an exit. Likewise, passage constituting a way to reach
an exit shall be marked to minimize confusion.
Prepared By:
PRC NO:
VALIDITY:
PTR NO:
TIN NO: