Estimates 3B Group1
Estimates 3B Group1
Number of
No. Equipment Description Capacity No.
Equipment
1 Dump Truck 12 cu.yrd 1 31
2 Excavator 0.8 cu.m 1 32
3 Bar Cutter 1 33
4 Bar Bender 1 34
5 Mini Roller 1 35
6 One Bagger Mixer 1 36
7 Concrete Vibriator 1 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
SUB-TOTAL 7
QUIREMENTS
Number of
Equipment Description Capacity
Equipment
SUB-TOTAL 0
TOTAL 7
PROGRAM OF WORK
1,843,326.43
ITEM NO. DESCRIPTION QUANTITY UNIT
1. ESTIMATED COST
A. DIRECT COST
A1. MATERIAL COST 52% ₱ 967,629.45
A2. LABOR COST 23% ₱ 425,206.08
A3. EQUIPMENT EXPENSES 6% ₱ 105,941.08
B. INDIRECT COST
A1
SUBTOTAL FOR A1 ₱ -
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S MONTHLY RATE AMOUNT
EQUIPMENT
B1
SUB-TOTAL FOR B1 ₱ -
C1 TOTAL (A1 + B1) ₱ -
D1 OUTPUT PER HOUR 1
E1 DIRECT COST (C1/ D1) ₱ -
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST AMOUNT
MATERIALS
a. Blue Printed Papers,
l.s 1.00 ₱ 5,000.00 ₱ 5,000.00
Documents and Attachments
B1
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S MONTHLY RATE
EQUIPMENT
a. TOTAL STATION w/
1 16 ₱ 100.00
COMPLETE ACCESSORIES
B1 MINOR TOOLS 10% OF LABOR
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 5,599.
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
MISCELLANEOUS 5% MC
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 10,429.
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 834.
EXPENSES 8%
A1
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S PURCHASE RATE
EQUIPMENT
a. One Bagger Mixxer 1 ₱ 50,000.00
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 50,000.
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 50,000.
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 4,000.
EXPENSES 8%
AMOUNT
₱ 1,700.00
₱ 1,088.00
₱ 848.00
₱ 3,636.00
AMOUNT
₱ 1,600.00
₱ 363.60
₱ 1,963.60
₱ 5,599.60
1.00
5,599.60
AMOUNT
₱ 4,000.00
₱ 600.00
₱ 230.00
₱ 4,830.00
10,429.60
834.37
521.48
1,042.96
12,828.41
AMOUNT
₱ -
AMOUNT
₱ 50,000.00
₱ 50,000.00
₱ 50,000.00
1.00
50,000.00
AMOUNT
₱ -
50,000.00
4,000.00
2,500.00
5,000.00
61,500.00
DESCRIPTION CLEARING
UNIT OF MEASUREMET 1.00 l.s
OUTPUT PER HOUR 1
B1
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 8,731.80
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) EXPENSES ₱ 698.54
8%
I1 CONTRACTOR'S PROFIT ₱ 436.59
J1 VALUE ADDED TAX 10% ₱ 873.18
K1 TOTAL COST ₱ 10,740.11
DESCRIPTION EARTHFILL
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 5,032.83
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) EXPENSES ₱ 402.63
8%
I1 CONTRACTOR'S PROFIT ₱ 251.64
J1 VALUE ADDED TAX 10% ₱ 503.28
K1 TOTAL COST ₱ 6,190.38
DESCRIPTION LEVELING (COMPACTING)
UNIT OF MEASUREMET 1.00 l.s
OUTPUT PER HOUR 1
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S RENT RATE
EQUIPMENT
a. Roller 1 32 ₱ 147.50
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 11,080.00
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 11,080.00
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 886.40
EXPENSES 8%
I1 CONTRACTOR'S PROFIT ₱ 554.00
J1 VALUE ADDED TAX 10% ₱ 1,108.00
K1 TOTAL COST ₱ 13,628.40
0.08 0.05
DESCRIPTION COMPACTING
UNIT OF MEASUREMET 1.00 l.s
OUTPUT PER HOUR 1
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S RENT RATE
EQUIPMENT
a. Roller 1 24 ₱ 147.50
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 8,310.00
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 8,310.00
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 664.80
EXPENSES 8%
I1 CONTRACTOR'S PROFIT ₱ 415.50
J1 VALUE ADDED TAX 10% ₱ 831.00
K1 TOTAL COST ₱ 10,221.30
AMOUNT
₱ 3,800.00
₱ 2,560.00
₱ 6,360.00
AMOUNT
₱ 4,720.00
₱ 4,720.00
₱ 11,080.00
1.00
11,080.00
AMOUNT
11,080.00
886.40
554.00
1,108.00
13,628.40
AMOUNT
₱ 2,850.00
₱ 1,920.00
₱ 4,770.00
AMOUNT
₱ 3,540.00
₱ 3,540.00
₱ 8,310.00
1.00
8,310.00
AMOUNT
8,310.00
664.80
415.50
831.00
10,221.30
DESCRIPTION STRUCTURE EXCAVATION (FOUNDATION & SLAB)
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
F1
SUB-TOTAL FOR F1 ₱ -
G1 DIRECT COST (E1 + F1) ₱ 13,461.15
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 1,076.89
EXPENSES 8%
I1 CONTRACTOR'S PROFIT ₱ 673.06
J1 VALUE ADDED TAX 10% ₱ 1,346.12
K1 TOTAL COST ₱ 16,557.21
B1
F1
SUB-TOTAL FOR F1 ₱ -
G1 DIRECT COST (E1 + F1) ₱ 1,688.50
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 135.08
EXPENSES 8%
I1 CONTRACTOR'S PROFIT ₱ 84.43
J1 VALUE ADDED TAX 10% ₱ 168.85
K1 TOTAL COST ₱ 2,076.86
DESCRIPTION GRAVEL FILL
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
F1
DESCRIPTION COLUMN
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
DESCRIPTION BEAM/GIRDERS
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
B1
Minor Tools 10% of Labor cost ₱ 1,958.00
DESCRIPTION STAIR
UNIT OF MEASUREMET 1 l.s
OUTPUT PER HOUR 1
B1
Minor Tools 10% of Labor cost ₱ 1,958.00
B1
B1
F1
F1
B1
B1
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S
EQUIPMENT
a. Dump Truck 8 cu.y 1 0.50
b. Concrete Vibrator 1 1.00
B1
c. One Bagger Mixer 1 12.00
Minor Tools 10% of Labor
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱
NAME AND SPECIFICATION UNIT QUANTITY
MATERIALS
a. REPUBLIC Cement bag 2.80
b. Sand cu.m 0.47
c. Gravel cu.m 0.10
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱
I1 CONTRACTOR'S PROFIT ₱
J1 VALUE ADDED TAX 10% ₱
K1 TOTAL COST ₱
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S
EQUIPMENT
Minor Tools 10% of Labor
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱
NAME AND SPECIFICATION UNIT QUANTITY
MATERIALS
a. Neltex Sanitary PVC Pipe S600 100mm m 5.00
b. Neltex PVC Sanitary Elbow 45° 100 mm m 5.00
c. Stainless Steel Dome type w/ cover Roof
pc 5.00
Drain
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) EXPENSES ₱
8%
I1 CONTRACTOR'S PROFIT ₱
J1 VALUE ADDED TAX 10% ₱
K1 TOTAL COST ₱
A1
a. Foreman 1 24.00
b. Plumber 1 24.00
A1 c. Unskilled Laborer 2 24.00
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S
EQUIPMENT
Minor Tools 10% of Labor
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱
NAME AND SPECIFICATION UNIT QUANTITY
MATERIALS
a. Kohler Adair Two Piece Water Closet with
pc 1.00
Bidet
b. Sefa Floor Strainer pc 2.00
c. Pozzi Wall Hung Lavatory Wall Hung
pc 2.00
Lavatory
d. Pozzi Wall Faucet pc 2.00
F1
e. Pozzi Rain Shower Head Set With Hand pc 1.00
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) EXPENSES ₱
8%
I1 CONTRACTOR'S PROFIT ₱
J1 VALUE ADDED TAX 10% ₱
K1 TOTAL COST ₱
DESCRIPTION
UNIT OF MEASUREMET
OUTPUT PER HOUR
₱ 68.00 ₱ 544.00
₱ 53.00 ₱ 848.00
A1
₱ 53.00 ₱ 848.00
₱ 68.00 ₱ 272.00
₱ 53.00 ₱ 636.00
₱ 68.00 ₱ 1,088.00
₱ 53.00 ₱ 848.00
₱ 422.00 ₱ 2,954.00
₱ 1,166.67 ₱ 19,833.33
DESCRIPTION
UNIT OF MEASUREMET
OUTPUT PER HOUR
c. Gravel
REINFORCEMENTS
a. G33 RSB 12mm dia.
b. #16 Tie wires
PIPES AND FITTINGS
a. Neltex Sanitary PVC Pipe S600 100mm
b. Neltex PVC Sanitary Tee
c. Neltex PVC Sanitary Clean Out
F1 MASONRY WORKS
a. CHB 6"
b. REPUBLIC Cement
c. Sand
d. G40 RSB 12 mm dia.
e. #16 Tie Wires
MANHOLE COVER
a. REPUBLIC Cement
b. Sand
c. Gravel
d. G40 RSB 16 mm dia.
e. G40 RSB 10 mm dia.
f. #16 Tie Wires
DESCRIPTION
UNIT OF MEASUREMET
OUTPUT PER HOUR
A1
₱ 118.75 ₱ 2,850.00 a. Foreman
₱ 90.00 ₱ 2,160.00 b. Plumber
₱ 53.00 ₱ 2,544.00 A1 c. Unskilled Laborer
B1
1 48 ₱ 118.75 ₱ 5,700.00
1 48 ₱ 90.00 ₱ 4,320.00
2 48 ₱ 53.00 ₱ 5,088.00
₱ 15,108.00
NO. OF UNIT/S NO. OF HOUR/S MONTHLY RATE AMOUNT
₱ 1,510.80
₱ 1,510.80
₱ 16,618.80
1.00
₱ 16,618.80
UNIT QUANTITY UNIT COST AMOUNT
m 23 ₱ 875.00 ₱ 20,125.00
m 10 ₱ 375.00 ₱ 3,750.00
pc 3 ₱ 110.00 ₱ 330.00
pc 4 ₱ 195.00 ₱ 780.00
pc 4 ₱ 235.00 ₱ 940.00
pc 4 ₱148.00 ₱ 592.00
pc 2 ₱ 180.00 ₱ 360.00
pc 4 ₱ 65.00 ₱ 260.00
₱ 27,137.00
₱ 43,755.80
₱ 3,500.46
₱ 2,187.79
₱ 4,375.58
₱ 53,819.63
SEPTIC VAULT
1.00 l.s
1
1 40 ₱ 118.75 ₱ 4,750.00
2 40 ₱ 110.00 ₱ 8,800.00
3 40 ₱ 53.00 ₱ 6,360.00
₱ 19,910.00
NO. OF UNIT/S NO. OF HOUR/S RENT RATE AMOUNT
1 40 ₱ -
1 3 ₱ 219.75 ₱ 659.25
1 3 ₱ 351.50 ₱ 1,054.50
1 1 ₱ 175.25 ₱ 175.25
₱ 1,991.00
₱ 3,880.00
₱ 23,790.00
1.00
₱ 23,790.00
UNIT QUANTITY UNIT COST AMOUNT
m 3 ₱ 875.00 ₱ 2,625.00
pc 4 ₱ 225.00 ₱ 900.00
pc 4 ₱39.00 ₱ 156.00
₱ 15,828.40
₱ 39,618.40
₱ 3,169.47
₱ 1,980.92
₱ 3,961.84
₱ 48,730.63
₱ 5,036.00
NO. OF UNIT/S NO. OF HOUR/S MONTHLY RATE AMOUNT
₱ 503.60
₱ 503.60
₱ 5,539.60
1.00
₱ 5,539.60
UNIT QUANTITY UNIT COST AMOUNT
m 13 ₱ 665.00 ₱ 8,645.00
m 15 ₱ 383.00 ₱ 5,745.00
pc 6 ₱ 25.00 ₱ 150.00
pc 1 ₱ 27.00 ₱ 27.00
pc 6 ₱ 25.00 ₱ 150.00
pc 1 ₱ 585.00 ₱ 585.00
pc 1 ₱ 26.00 ₱ 26.00
₱ 766.40
₱ 16,094.40
₱ 21,634.00
₱ 1,730.72
₱ 1,081.70
₱ 2,163.40
₱ 26,609.82
0.08
0.05
R
B1
F1
B1
NO. OF NO. OF
DESIGNATION HOURLY RATE
PERSON/S HOUR/S
LABOR
a. Foreman 1 4 ₱ 118.75
b. Skilled Laborer 1 4 ₱ 68.00
A1 c. Unskilled Labore 1 4 ₱ 53.00
SUBTOTAL FOR A1
NO. OF
NAME AND CAPACITY NO. OF UNIT/S MONTHLY RATE
HOUR/S
EQUIPMENT
Minor Tools 10% of Labor
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 1
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
F1
Consumables 3% of Material Cost
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 8
NO. OF NO. OF
DESIGNATION HOURLY RATE
PERSON/S HOUR/S
LABOR
a. Foreman 1 4 ₱ 118.75
b. Skilled Laborer 1 4 ₱ 68.00
A1
c. Unskilled Labore 1 4 ₱ 53.00
SUBTOTAL FOR A1
NO. OF
NAME AND CAPACITY NO. OF UNIT/S MONTHLY RATE
HOUR/S
EQUIPMENT
Minor Tools 10% of Labor
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 1
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
F1
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 21
I1 CONTRACTOR'S PROFIT ₱ 1
J1 VALUE ADDED TAX 10% ₱ 2
K1 TOTAL COST ₱ 26
NO. OF NO. OF
DESIGNATION HOURLY RATE
PERSON/S HOUR/S
LABOR
a. Foreman 1 4 ₱ 118.75
b. Skilled Laborer 1 4 ₱ 68.00
A1 c. Unskilled Labore 1 4 ₱ 53.00
SUBTOTAL FOR A1
NO. OF
NAME AND CAPACITY NO. OF UNIT/S MONTHLY RATE
HOUR/S
EQUIPMENT
Minor Tools 10% of Labor
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 1
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
Costumized FD w/ Louver (2.1 m by
pc 1 ₱ 1,833.00
0.7 m)
Costumized FD w/ Louver (2.1 m by
F1 pc 1 ₱ 2,345.00
0.8 m)
I1 CONTRACTOR'S PROFIT ₱
NO. OF
AMOUNT DESIGNATION
PERSON/S
LABOR
₱ 475.00 a. Foreman 1
₱ 272.00 b. Skilled Laborer 1
₱ 212.00 A1 c. Unskilled Labore 1
B1
NO. OF
AMOUNT DESIGNATION
PERSON/S
LABOR
₱ 475.00 a. Foreman 1
₱ 272.00 b. Skilled Laborer 1
A1
₱ 212.00 c. Unskilled Labore 1
F1
NO. OF
AMOUNT DESIGNATION
PERSON/S
LABOR
₱ 475.00 a. Foreman 1
₱ 272.00 b. Skilled Laborer 1
₱ 212.00 A1 c. Unskilled Labore 1
B1
₱ 125.34
₱ 4,303.34 SUB-TOTAL FOR F1
5,358.24 G1 DIRECT COST (E1 + F1) ₱
4 ₱ 118.75 ₱ 475.00
4 ₱ 68.00 ₱ 272.00
4 ₱ 53.00 ₱ 212.00
₱ 959.00
NO. OF HOUR/S MONTHLY RATE AMOUNT
₱ 95.90
₱ 95.90
₱ 1,054.90
1.00
1,054.90
QUANTITY UNIT COST AMOUNT
1 ₱ 14,503.59 ₱ 14,503.59
₱ 435.11
₱ 14,938.70
15,993.60
1,279.49
799.68
1,599.36
19,672.12
4 ₱ 118.75 ₱ 475.00
4 ₱ 68.00 ₱ 272.00
4 ₱ 53.00 ₱ 212.00
₱ 959.00
NO. OF HOUR/S MONTHLY RATE AMOUNT
₱ 95.90
₱ 95.90
₱ 1,054.90
1.00
1,054.90
QUANTITY UNIT COST AMOUNT
2 ₱ 4,060.50 ₱ 8,121.00
₱ 243.63
₱ 8,364.63
9,419.53
669.17
470.98
941.95
11,501.63
H DOOR
4 ₱ 118.75 ₱ 475.00
4 ₱ 68.00 ₱ 272.00
4 ₱ 53.00 ₱ 212.00
₱ 959.00
NO. OF HOUR/S MONTHLY RATE AMOUNT
₱ 95.90
₱ 95.90
₱ 1,054.90
1.00
1,054.90
QUANTITY UNIT COST AMOUNT
1 ₱ 2,245.80 ₱ 2,245.80
₱ 67.37
₱ 2,313.17
3,368.07
269.45
168.40
336.81
4,142.73
0.08
0.05
DESCRIPTION AWNING WINDOWS
UNIT OF MEASUREMET l.s
OUTPUT PER HOUR 1
B1
Consumables 3% of Material
₱ 315.12
Cost
SUBTOTAL FOR A1
NAME AND CAPACITY NO. OF UNIT/S NO. OF HOUR/S MONTHLY RATE
EQUIPMENT
Minor Tools 10 % of Labor Cost
B1
SUB-TOTAL FOR B1
C1 TOTAL (A1 + B1)
D1 OUTPUT PER HOUR
E1 DIRECT UNIT COST (C1/ D1) ₱ 1,054.90
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
MATERIALS
Consumables 3% of
Material Cost
SUB-TOTAL FOR F1
G1 DIRECT COST (E1 + F1) ₱ 16,771.88
OVERHEAD, CONTINGENCIES &
H1 MISCELLANEOUS (OCM) ₱ 1,341.75
EXPENSES 8%
I1 CONTRACTOR'S PROFIT ₱ 838.59
J1 VALUE ADDED TAX 10% ₱ 1,677.19
K1 TOTAL COST ₱ 20,629.41
0.08 0.05
AMOUNT
₱ 475.00
₱ 272.00
₱ 212.00
₱ 959.00
AMOUNT
₱ 95.90
₱ 95.90
₱ 1,054.90
1
1,054.90
AMOUNT
₱ 9,873.60
₱ 5,385.60
₱ 457.78
₱ 15,716.98
16,771.88
1,341.75
838.59
1,677.19
20,629.41
DESCRIPTION TOILET & BATHROOM WALL FINISH
UNIT OF MEASUREMET l.s
OUTPUT PER HOUR 1
B1
B1
B1
a. 60 cm by 60 cm Homogenous
pc 33.44375 ₱ 1,360.00 ₱ 45,483.50
Ceramic Tile
B1
FOOTING FOOTINGS
QTY L W D VOLUME C S G
16 F4 4 1.6 1.6 0.3 3.072 27.648 1.536 3.072 DES
16 F3 5 1.4 1.4 0.3 2.94 26.46 1.47 2.94 F4
54.108 3.006 6.012 F3
SLAB ON FILL
QTY L W D VOLUME C S G
10 SOF1 2 4 4 0.1 3.2 19.2 1.6 3.2 SLAB ON FILL
10 SOF2 2 3 4 0.1 2.4 14.4 1.2 2.4
33.6 2.8 5.6 DES
COLUMN F4
QTY L W D VOLUME C S G F3
12&16 C1 3 0.2 0.4 6 1.44 12.96 0.72 1.44
12&16 C2 4 0.25 0.4 6 2.4 21.6 1.2 2.4
12&16 C3 2 0.25 0.4 6 1.2 10.8 0.6 1.2
45.36 2.52 5.04
SUSPENDED SLAB SUSPENDED SLAB
QTY L W D VOLUME C S G
10 SS1 1 4 4 0.115 1.84 16.56 0.92 1.84 DES
10 SS2 1 3 2.3 0.115 0.7935 7.1415 0.39675 0.7935 F4
23.7015 1.31675 2.6335 F3
GIRDERS
QTY L W D VOLUME C S G
G2 2 0.2 0.4 4 0.64 5.76 0.32 0.64
G3 2 0.2 0.35 4 0.56 5.04 0.28 0.56
G4 1 0.25 0.4 4 0.4 3.6 0.2 0.4
G5 2 0.2 0.35 3 0.42 3.78 0.21 0.42
G6 2 0.2 0.35 4 0.56 5.04 0.28 0.56
G7 2 0.2 0.35 4 0.56 5.04 0.28 0.56 RSB
B2 1 0.2 0.35 3 0.21 1.89 0.105 0.21
B3 1 0.2 0.35 4 0.28 2.52 0.14 0.28
2G7 2 0.2 0.35 3 0.42 3.78 0.21 0.42
36.45 2.025 4.05
FOOTINGS
QTY
KG M
245.76 155.52
235.20 148.84
480.96 304.36 VB ST
RSB DIA 0.016 0.012
SLAB ON FILL COLUMNS
QTY STIRRUPS
VERTICAL BARS
KG M DES INTERNAL EXTERNAL
256.00 414.72 NO L/pc TL NO CL TL NO CL
192.00 121.50 C1 10 20.4 204 61 0.612 111.996 61 1.272
448.00 536.22 C2 10 27.2 272 61 0.712 173.728 61 1.372
C3 12 13.6 163.2 61 0.712 86.864 61 1.372
639.2 372.6
SUSPENDED SLAB
QTY
KG M
147.20 93.15
63.48 40.17
210.68 133.32
FOOTING TIE BEAM
KG M
335.2 212.11875
96.96 157.0752
432.16 369.19395
9.84 36.9
Marine board good lumber
area 1.48645
length 2.4384
Marine board good lumber
1.92 7.6
1.68 6.8
3.6 14.4
1.6 16.4
1.4 12.4
EXTERNAL 3 28.8
TL
232.776
334.768 7.2 24.8
167.384 7.8 25
734.9 7.8 25
15 49.8
1.84 16.46
1.219 12.46
3.059 28.92
4.8 16.8
4.4 16.8
5.2 17
3.3 12.8
4.4 16.8
4.4 16.8
3.3 12.8
4.4 16.8
3.3 12.8
37.5 139.4
Column
Footing
C L W H # V pcs F L
C1 0.4 0.2 1.75 3 0.42 4 F4 1.6
C2 0.25 0.4 1.75 4 0.7 5 F3 1.4
C3 0.25 0.4 1.75 2 0.35
m m m pcs m3
1.32
236
2364
78.666667
m
total l of bar tie wires(pcs)
129 484
89 245
pcs 729
l 218.7
kg 5
218
BARS L BARS W
20 18
total bars 38
LENGTH OF BARS
L W
7.92 6.92
tie wires
PCS 360
L 108
KG 3
Item Material Price/ Cost unit
1 Good Lumber (2x4x8) ₱ 491.00 pc
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
Rica Hardware
Rica Hardware
Rica Hardware
Rica Hardware
Rica Hardware
Rica Hardware
Rica Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
RMC Hardware
Rica Hardware
Rica Hardware
Rica Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
Kingshine Hardware
RMC Hardware
Wilcon Depot
Wilcon Depot
BOYSEN
BOYSEN
BOYSEN
BOYSEN
Masonry and Concrete https://jomprice.ph/mater
Lafarge Portland Cement ₱ 261.21 bag LABOR
6" Hollow blocks (Exterior wall) ₱ 18.00 pc FOREMEN
4" (Interior Wall) ₱ 12.00 pc MASON
TILE SETTER
Woods PLUMBER
3⁄4” thick marine plywood (10x36 in.) ₱ 314.00 pc ELECTRICIAN
Lumber 2"x2"x8' ₱ 240.00 pc PAINTER
EXCAVATOR OPERATOR
Roofing ROLLER OPERATOR
Apo Puyat Steel G.I Sheets ₱ 400.00 sq.m STEEL MAN
UNSKILLED LABORER
Doors and Windows LIGHT SKILLED LABORER
SKILLED LABORER
Aluminum Framed Sliding Glass Door with LEADMAN
₱ 12,988.94 pc
awning
Fixed window ₱ 1,514.65 pc DRIVER
Aluminum Framed Sliding Glass Door ₱ 11,765.18 pc GEODETIC ENGINEER
Flush Door ₱ 4,060.50 pc
Flush Door with louver ₱ 5,850.00 pc
Sliding Flush Door ₱ 2,245.80 pc
SCHLAGE Lockset ₱ 2,151.00 pc
SCHLAGE Butts and Hinges ₱ 2,438.00 pack
Casement and Awning Windows ₱ 4,708.13 pc
Finishes
600 x 600 Homogenous Ceramic Tile ₱ 249.00 pc
300 x 300 Non-skid Ceramic Tile ₱ 41.99 pc
Concrete Finish ₱ 650.00 sq.m
150 x 900mm Plank Tile ₱ 944.00 8pc/box
Paint Finishes
Boysen Primer Coat White ₱ 1,169.00 gallon
Plumbing
Crown Pipes ( sanitary) 200mm dia. 3m
₱ 2,586.00 pc
length
Heavy Duty PPR Pipe 1"x4m dia. ₱ 408.00 pc
Electrical
a. Good Lumber ( 2x4x8) ₱ 612.00 Neltex Sanitary PVC Pipe S600 100mm
b. Marine Plywood ₱ 625.00 Neltex Sanitary PVC Pipe S600 75 mm
Apo Galfan Corrugated Sheet
10ft X 0.35mm ₱ 728.00 Neltex Sanitary PVC Pipe S600 50mm
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
Material Price/ Cost Quantity Materials Source
Good Lumber (2x4x8) ₱491.00 pc RMC Hardware
₱440.00 pc
1/2 board RMC Hardware
₱980.00 pc
3/4 board RMC Hardware
₱1,330.00 pc
40 mm dia RSC
100 mm dia Service Entrance Cap