0% found this document useful (0 votes)
17 views5 pages

MR Kayakmath

Uploaded by

S K Kayakamath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views5 pages

MR Kayakmath

Uploaded by

S K Kayakamath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Kitchen Décor

Kitchen Decor, Kattimani Complex, Date – 15/03/2024


Deshpande Nagar Hubli-580029

Contact Person : Nikhil


(9886202675)

Mail ID :
[email protected]

Ref No: 2159

Client Name:- Mr Abhinandan


P Shetty

Hubli

Modular Kitchen Estimate -


(2mm Acrylic Kitchen)

SL. Description Size SQFT Qty Rate Amount


No

A Modular Kitchen

1 Base Unit 29’6’’ X 2’6’’ 76.96 1 2,600 2,00,096

2mm Acrylic Kitchen

2 Wall Unit 9’6’’ X 2’ 19.3 1 2,600 50,180

2mm Acrylic Kitchen

3 Tall Unit 4’ X 7’ 28 1 2,600 72,800

2mm Acrylic Kitchen

Sub Total 3,23,076

B Hafele Hardware
1 M Height Drawer 1 6,400 6,400

2 B Height Drawer 1 7,650 7,650

3 D Height Drawer 9 7,650 68,850

4 Hinges 15 415 6,225

5 Plate Holder 1 1,500 1,500

6 Thali Holder 1 1,500 1,500

7 PVC Cutlery Tray 1 2,500 2,500

8 Olive Corner Unit 1 18,600 18,600


9 Skirting, Legs, Mini Fix, 18,400
Connector, Etc

10 Bottle Pull Out 1 7,350 7,350

11 Lift Up 4 13,450 53,800

Sub Total 1,92,775

C Matt Roll 1 6,000 6,000

D G Profile Handle 32 ,500

F Transportation 5,000

G Installation 40,000

Grand Total 5,99,351

H Master Bed Room

1 Acrylic Wardrobe 9’ X 8’ 72 3,200 2,30,400

2 Loft 2’ X 9’ 18 1,500 27,000

Grand Total 2,57,400


For Kitchen Decor

Nikhil Gondkar

Partner

Note -

 Sink & Faucet Not Included


 Counter Top Not Included
 Appliances Not Included

Terms and Condition:

1) 80% Advance on Confirmation, 15% after Carcass Work & 5% after completion.
2) Colour shade and Handle Subject to availability.
3) Any extra work will be done at extra Cost after approval by both.
4) Maximum Completion Period 50 Days From The date of 80% Payment subject to site.
5) All The Materials Provided Are As Per Your Selection.
6) Electrical, Plumbing, Core Cutting, Copper Piping, Civil Work, dummy ply will be under the scope of Customer.

You might also like